ML081630139: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML081630139
| number = ML081630139
| issue date = 06/11/2008
| issue date = 06/11/2008
| title = 06/30/2008 Notice of Meeting with Arizona Public Service Company to Discuss the Current Status of the Palo Verde Nuclear Generating Station Site Integrated Improvement Plan
| title = Notice of Meeting with Arizona Public Service Company to Discuss the Current Status of the Palo Verde Nuclear Generating Station Site Integrated Improvement Plan
| author name =  
| author name =  
| author affiliation = NRC/RGN-IV
| author affiliation = NRC/RGN-IV
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125June 11, 2008  
{{#Wiki_filter:UNITED STATES NU C LE AR RE G ULATO RY C O M M I S S I O N R E GI ON I V 612 EAST LAMAR BLVD , SU ITE 400 AR LIN GTON , TEXAS 76011-4125 June 11, 2008


==SUBJECT:==
==SUBJECT:==
MEETING WITH ARIZONA PUBLIC SERVICE COMPANY  
MEETING WITH ARIZONA PUBLIC SERVICE COMPANY FACILITY:     Palo Verde Nuclear Generating Station DOCKET:       05000528, 05000529, 05000530 DATE & TIME: June 30, 2008 6:30 - 8:30 p.m. (MST)
 
LOCATION:     Tonopah Valley High School Auditorium 38201 W. Indian School Road Tonopah, AZ 85354 PURPOSE:     This is a meeting between the Nuclear Regulatory Commission and Arizona Public Service Company to discuss the current status of the Palo Verde Nuclear Generating Station Site Integrated Improvement Plan.
FACILITY: Palo Verde Nuclear Generating Station  
CATEGORY:     This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the Nuclear Regulatory Commission after the business portion, but before the meeting is adjourned.
 
The Nuclear Regulatory Commission provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript of other information from the meeting in another format (e.g. Braille or large print), please notify the Nuclear Regulatory Commissions meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
DOCKET: 05000528, 05000529, 05000530  
 
DATE & TIME: June 30, 2008 6:30 - 8:30 p.m. (MST)
LOCATION: Tonopah Valley High School Auditorium   38201 W. Indian School Road Tonopah, AZ 85354  
 
PURPOSE: This is a meeting between the Nuclear Regulatory Commission and Arizona Public Service Company to discuss the current status of the Palo Verde Nuclear Generating Station Site Integrated Improvement  
 
Plan.
CATEGORY: This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the Nuclear Regulatory Commission after the business portion, but before the meeting is adjourned.  
 
The Nuclear Regulatory Commission provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript of other information from the meeting in another format (e.g. Braille or large print), please notify the Nuclear Regulatory Commission's meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
PARTICIPANTS: Participants from the NRC include members of Region IV and the Office of Nuclear Reactor Regulation (NRR).
PARTICIPANTS: Participants from the NRC include members of Region IV and the Office of Nuclear Reactor Regulation (NRR).
NRC A. Vegel, Deputy Director, Division of Reactor Projects M. Hay, Chief, Reactor Projects Branch D M. Markley, Senior Project Manager, NRR G. Werner, Senior Project Engineer, Projects Branch D T. Buchanan, Project Engineer, Projects Branch D  
NRC A. Vegel, Deputy Director, Division of Reactor Projects M. Hay, Chief, Reactor Projects Branch D M. Markley, Senior Project Manager, NRR G. Werner, Senior Project Engineer, Projects Branch D T. Buchanan, Project Engineer, Projects Branch D
 
Arizona Public Service Company UTILITY R. Edington, Executive Vice President, Chief Nuclear Officer B. Bement, Vice President, Nuclear Operations D. Mims, Vice President, Regulatory Affairs and Plant Improvement J. Hesser, Vice President, Engineering T. Radtke, General Manager, Emergency Services and Support L. Cortopassi, Plant Manager, Nuclear Operations M. Lacal, Director, Executive Projects and Plant Support
 
S. Bauer, Director, Regulatory Affairs
 
T. Young, Director, Communications MEETING  Geoffrey Miller CONTACT:  Senior Project Engineer 817-860-8100 geoffrey.miller@nrc.gov
 
cc: Randall K. Edington, Executive Vice President, Nuclear/CNO
 
Mail Station 7602
 
Arizona Public Service Company P.O. Box 52034 Phoenix, AZ  85072-2034
 
Steve Olea
 
Arizona Corporation Commission 1200 W. Washington Street Phoenix, AZ  85007
 
Douglas K. Porter, Senior Counsel
 
Southern California Edison Company Law Department, Generation Resources P.O. Box 800 Rosemead, CA  91770
 
Chairman Maricopa County Board of Supervisors 301 W. Jefferson, 10th Floor Phoenix, AZ  85003
 
Aubrey V. Godwin, Director
 
Arizona Radiation Regulatory Agency
 
4814 South 40 Street Phoenix, AZ  85040
 
Arizona Public Service Company
 
Scott Bauer, Director Regulatory Affairs Palo Verde Nuclear Generating Station
 
Mail Station 7636 P.O. Box 52034 Phoenix, AZ  85072-2034
 
Mr. Dwight C. Mims Vice President, Regulatory Affairs and  Performance Improvement Palo Verde Nuclear Generating Station
 
Mail Station 7605 P.O. Box 52034 Phoenix, AZ  85072-2034
 
Jeffrey T. Weikert Assistant General Counsel El Paso Electric Company Mail Location 167
 
123 W. Mills El Paso, TX  79901
 
Eric J. Tharp Los Angeles Department of Water & Power Southern California Public Power Authority P.O. Box 51111, Room 1255-C
 
Los Angeles, CA 90051-0100
 
James Ray Public Service Company of New Mexico 2401 Aztec NE, MS Z110 Albuquerque, NM  87107-4224 Geoffrey M. Cook Southern California Edison Company 5000 Pacific Coast Hwy, Bldg. D21 San Clemente, CA  92672
 
Robert Henry Salt River Project 6504 East Thomas Road Scottsdale, AZ  85251
 
Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326
 
1701 North Congress Avenue Austin, TX  78701-3326 Arizona Public Service Company
 
Karen O' Regan Environmental Program Manager City of Phoenix Office of Environmental Programs 200 West Washington Street Phoenix, AZ  85003 
 
Matthew Benac Assistant Vice President Nuclear & Generation Services El Paso Electric Company
 
340 East Palm Lane, Suite 310 Phoenix, AZ  85004
 
Chief, Radiological Emergency Preparedness Section National Preparedness Directorate Technological Hazards Division Department of Homeland Security 1111 Broadway, Suite 1200
 
Oakland, CA  94607-4052 Arizona Public Service Company
 
Electronic distribution by RIV: NRC Attendees PMNS Resource, Mtg Announcement Coordinator
 
Elmo Collins, RA
 
Chuck Casto, DRA Dwight Chamberlain, D:DRP Roy Caniano, D:DRS Art Howell, D:DNMS Anton Vegel, DD:DRP Vincent Watkins, DD:DRS Troy Pruett, DD:DRS Ryan Lantz, C:DRS/OB Sue Bogle (OEWEB Resource)
Bruce Boger, ADRO OEMAIL, D/OE John Thorp Kevin Williams, NSIR/DRP/EP Chris Miller, NSIR/DRP/EP John Adams, RIV OEDO Coordinator Patricia Lougheed, RIV PEDO Coordinator
 
Paul Bonnett 
 
Mike Markley, Project Manager, NRR
 
Michael Hay, Branch Chief, PBD Greg Werner, Senior Project Engineer, PBD Geoff Miller, Senior Project Engineer, PBD Ryan Treadway, Senior Resident Inspector Michelle Catts, Resident Inspector Jim Melfi, Resident Inspector Joe Bashore, Resident Inspector Victor Dricks, Region IV PAO 
 
Bill Maier, Region IV RSLO Karla Fuller, Region IV RC/ACES  Michael Vasquez, Region IV Enforcement Specialist Lucy Owen, Region IV RA Secretary Judy Kilcrease, Region IV RA Secretary Anita Tannebaum, Region IV DRP Secretary Lynn Berger, Region IV DRS Secretary
 
Lenora Reyna, Region IV DRS Secretary


Tracy Karl, Region IV DRS Secretary MaryJane Spivey, Region IV DNMS Secretary Sue Trifiletti, Region IV DNMS Secretary
Arizona Public Service Company                                  UTILITY R. Edington, Executive Vice President, Chief Nuclear Officer B. Bement, Vice President, Nuclear Operations D. Mims, Vice President, Regulatory Affairs and Plant Improvement J. Hesser, Vice President, Engineering T. Radtke, General Manager, Emergency Services and Support L. Cortopassi, Plant Manager, Nuclear Operations M. Lacal, Director, Executive Projects and Plant Support S. Bauer, Director, Regulatory Affairs T. Young, Director, Communications MEETING              Geoffrey Miller CONTACT:              Senior Project Engineer 817-860-8100 geoffrey.miller@nrc.gov cc:
Randall K. Edington, Executive Vice President, Nuclear/CNO Mail Station 7602 Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072-2034 Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, AZ 85007 Douglas K. Porter, Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O. Box 800 Rosemead, CA 91770 Chairman Maricopa County Board of Supervisors 301 W. Jefferson, 10th Floor Phoenix, AZ 85003 Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street Phoenix, AZ 85040


Bub Mueller, IRMB Phil Longdo, Receptionist
Arizona Public Service Company            Scott Bauer, Director Regulatory Affairs Palo Verde Nuclear Generating Station Mail Station 7636 P.O. Box 52034 Phoenix, AZ 85072-2034 Mr. Dwight C. Mims Vice President, Regulatory Affairs and Performance Improvement Palo Verde Nuclear Generating Station Mail Station 7605 P.O. Box 52034 Phoenix, AZ 85072-2034 Jeffrey T. Weikert Assistant General Counsel El Paso Electric Company Mail Location 167 123 W. Mills El Paso, TX 79901 Eric J. Tharp Los Angeles Department of Water & Power Southern California Public Power Authority P.O. Box 51111, Room 1255-C Los Angeles, CA 90051-0100 James Ray Public Service Company of New Mexico 2401 Aztec NE, MS Z110 Albuquerque, NM 87107-4224 Geoffrey M. Cook Southern California Edison Company 5000 Pacific Coast Hwy, Bldg. D21 San Clemente, CA 92672 Robert Henry Salt River Project 6504 East Thomas Road Scottsdale, AZ 85251 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326


Ann Mattila, Security Advisor 
Arizona Public Service Company        Karen O' Regan Environmental Program Manager City of Phoenix Office of Environmental Programs 200 West Washington Street Phoenix, AZ 85003 Matthew Benac Assistant Vice President Nuclear & Generation Services El Paso Electric Company 340 East Palm Lane, Suite 310 Phoenix, AZ 85004 Chief, Radiological Emergency Preparedness Section National Preparedness Directorate Technological Hazards Division Department of Homeland Security 1111 Broadway, Suite 1200 Oakland, CA 94607-4052


SUNSI Review Completed:     GMB   ADAMS:   Yes G No   Initials:     GMB__
Arizona Public Service Company            Electronic distribution by RIV:
Publicly Available         Non-Publicly Available         Sensitive         Non-Sensitive R:\_REACTORS\_PV\2008\PV Meeting Notice 6-30-08.doc         ADAMS ML 081630139 RIV:SPE:DRP/D C:DRP/D PAO RSLO GMiller/amt MAHay VLDricks WAMaier /RA/ /RA/ /RA/ /RA/ 06/10/08 06/10/08 06/10/08 06/10/08 OFFICIAL RECORD COPY T=Telephone           E=E-mail       F=Fax}}
NRC Attendees PMNS Resource, Mtg Announcement Coordinator Elmo Collins, RA Chuck Casto, DRA Dwight Chamberlain, D:DRP Roy Caniano, D:DRS Art Howell, D:DNMS Anton Vegel, DD:DRP Vincent Watkins, DD:DRS Troy Pruett, DD:DRS Ryan Lantz, C:DRS/OB Sue Bogle (OEWEB Resource)
Bruce Boger, ADRO OEMAIL, D/OE John Thorp Kevin Williams, NSIR/DRP/EP Chris Miller, NSIR/DRP/EP John Adams, RIV OEDO Coordinator Patricia Lougheed, RIV PEDO Coordinator Paul Bonnett Mike Markley, Project Manager, NRR Michael Hay, Branch Chief, PBD Greg Werner, Senior Project Engineer, PBD Geoff Miller, Senior Project Engineer, PBD Ryan Treadway, Senior Resident Inspector Michelle Catts, Resident Inspector Jim Melfi, Resident Inspector Joe Bashore, Resident Inspector Victor Dricks, Region IV PAO Bill Maier, Region IV RSLO Karla Fuller, Region IV RC/ACES Michael Vasquez, Region IV Enforcement Specialist Lucy Owen, Region IV RA Secretary Judy Kilcrease, Region IV RA Secretary Anita Tannebaum, Region IV DRP Secretary Lynn Berger, Region IV DRS Secretary Lenora Reyna, Region IV DRS Secretary Tracy Karl, Region IV DRS Secretary MaryJane Spivey, Region IV DNMS Secretary Sue Trifiletti, Region IV DNMS Secretary Bub Mueller, IRMB Phil Longdo, Receptionist Ann Mattila, Security Advisor SUNSI Review Completed: GMB ADAMS: ; Yes                   G No Initials: GMB__
; Publicly Available       Non-Publicly Available     Sensitive     ; Non-Sensitive R:\_REACTORS\_PV\2008\PV Meeting Notice 6-30-08.doc                   ADAMS ML081630139 RIV:SPE:DRP/D           C:DRP/D                 PAO                   RSLO GMiller/amt             MAHay                   VLDricks               WAMaier
/RA/                     /RA/                     /RA/                   /RA/
06/10/08                 06/10/08                 06/10/08               06/10/08 OFFICIAL RECORD COPY                                   T=Telephone       E=E-mail     F=Fax}}

Latest revision as of 06:18, 7 December 2019

Notice of Meeting with Arizona Public Service Company to Discuss the Current Status of the Palo Verde Nuclear Generating Station Site Integrated Improvement Plan
ML081630139
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/11/2008
From:
NRC Region 4
To:
References
Download: ML081630139 (5)


Text

UNITED STATES NU C LE AR RE G ULATO RY C O M M I S S I O N R E GI ON I V 612 EAST LAMAR BLVD , SU ITE 400 AR LIN GTON , TEXAS 76011-4125 June 11, 2008

SUBJECT:

MEETING WITH ARIZONA PUBLIC SERVICE COMPANY FACILITY: Palo Verde Nuclear Generating Station DOCKET: 05000528, 05000529, 05000530 DATE & TIME: June 30, 2008 6:30 - 8:30 p.m. (MST)

LOCATION: Tonopah Valley High School Auditorium 38201 W. Indian School Road Tonopah, AZ 85354 PURPOSE: This is a meeting between the Nuclear Regulatory Commission and Arizona Public Service Company to discuss the current status of the Palo Verde Nuclear Generating Station Site Integrated Improvement Plan.

CATEGORY: This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the Nuclear Regulatory Commission after the business portion, but before the meeting is adjourned.

The Nuclear Regulatory Commission provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript of other information from the meeting in another format (e.g. Braille or large print), please notify the Nuclear Regulatory Commissions meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

PARTICIPANTS: Participants from the NRC include members of Region IV and the Office of Nuclear Reactor Regulation (NRR).

NRC A. Vegel, Deputy Director, Division of Reactor Projects M. Hay, Chief, Reactor Projects Branch D M. Markley, Senior Project Manager, NRR G. Werner, Senior Project Engineer, Projects Branch D T. Buchanan, Project Engineer, Projects Branch D

Arizona Public Service Company UTILITY R. Edington, Executive Vice President, Chief Nuclear Officer B. Bement, Vice President, Nuclear Operations D. Mims, Vice President, Regulatory Affairs and Plant Improvement J. Hesser, Vice President, Engineering T. Radtke, General Manager, Emergency Services and Support L. Cortopassi, Plant Manager, Nuclear Operations M. Lacal, Director, Executive Projects and Plant Support S. Bauer, Director, Regulatory Affairs T. Young, Director, Communications MEETING Geoffrey Miller CONTACT: Senior Project Engineer 817-860-8100 geoffrey.miller@nrc.gov cc:

Randall K. Edington, Executive Vice President, Nuclear/CNO Mail Station 7602 Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072-2034 Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, AZ 85007 Douglas K. Porter, Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O. Box 800 Rosemead, CA 91770 Chairman Maricopa County Board of Supervisors 301 W. Jefferson, 10th Floor Phoenix, AZ 85003 Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street Phoenix, AZ 85040

Arizona Public Service Company Scott Bauer, Director Regulatory Affairs Palo Verde Nuclear Generating Station Mail Station 7636 P.O. Box 52034 Phoenix, AZ 85072-2034 Mr. Dwight C. Mims Vice President, Regulatory Affairs and Performance Improvement Palo Verde Nuclear Generating Station Mail Station 7605 P.O. Box 52034 Phoenix, AZ 85072-2034 Jeffrey T. Weikert Assistant General Counsel El Paso Electric Company Mail Location 167 123 W. Mills El Paso, TX 79901 Eric J. Tharp Los Angeles Department of Water & Power Southern California Public Power Authority P.O. Box 51111, Room 1255-C Los Angeles, CA 90051-0100 James Ray Public Service Company of New Mexico 2401 Aztec NE, MS Z110 Albuquerque, NM 87107-4224 Geoffrey M. Cook Southern California Edison Company 5000 Pacific Coast Hwy, Bldg. D21 San Clemente, CA 92672 Robert Henry Salt River Project 6504 East Thomas Road Scottsdale, AZ 85251 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326

Arizona Public Service Company Karen O' Regan Environmental Program Manager City of Phoenix Office of Environmental Programs 200 West Washington Street Phoenix, AZ 85003 Matthew Benac Assistant Vice President Nuclear & Generation Services El Paso Electric Company 340 East Palm Lane, Suite 310 Phoenix, AZ 85004 Chief, Radiological Emergency Preparedness Section National Preparedness Directorate Technological Hazards Division Department of Homeland Security 1111 Broadway, Suite 1200 Oakland, CA 94607-4052

Arizona Public Service Company Electronic distribution by RIV:

NRC Attendees PMNS Resource, Mtg Announcement Coordinator Elmo Collins, RA Chuck Casto, DRA Dwight Chamberlain, D:DRP Roy Caniano, D:DRS Art Howell, D:DNMS Anton Vegel, DD:DRP Vincent Watkins, DD:DRS Troy Pruett, DD:DRS Ryan Lantz, C:DRS/OB Sue Bogle (OEWEB Resource)

Bruce Boger, ADRO OEMAIL, D/OE John Thorp Kevin Williams, NSIR/DRP/EP Chris Miller, NSIR/DRP/EP John Adams, RIV OEDO Coordinator Patricia Lougheed, RIV PEDO Coordinator Paul Bonnett Mike Markley, Project Manager, NRR Michael Hay, Branch Chief, PBD Greg Werner, Senior Project Engineer, PBD Geoff Miller, Senior Project Engineer, PBD Ryan Treadway, Senior Resident Inspector Michelle Catts, Resident Inspector Jim Melfi, Resident Inspector Joe Bashore, Resident Inspector Victor Dricks, Region IV PAO Bill Maier, Region IV RSLO Karla Fuller, Region IV RC/ACES Michael Vasquez, Region IV Enforcement Specialist Lucy Owen, Region IV RA Secretary Judy Kilcrease, Region IV RA Secretary Anita Tannebaum, Region IV DRP Secretary Lynn Berger, Region IV DRS Secretary Lenora Reyna, Region IV DRS Secretary Tracy Karl, Region IV DRS Secretary MaryJane Spivey, Region IV DNMS Secretary Sue Trifiletti, Region IV DNMS Secretary Bub Mueller, IRMB Phil Longdo, Receptionist Ann Mattila, Security Advisor SUNSI Review Completed: GMB ADAMS: ; Yes G No Initials: GMB__

Publicly Available Non-Publicly Available Sensitive  ; Non-Sensitive R
\_REACTORS\_PV\2008\PV Meeting Notice 6-30-08.doc ADAMS ML081630139 RIV:SPE:DRP/D C:DRP/D PAO RSLO GMiller/amt MAHay VLDricks WAMaier

/RA/ /RA/ /RA/ /RA/

06/10/08 06/10/08 06/10/08 06/10/08 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax