ML092440476: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML092440476 | | number = ML092440476 | ||
| issue date = 09/01/2009 | | issue date = 09/01/2009 | ||
| title = | | title = Report 22, Inspection/ Activity Plan 07/01/2009 - 12/31/2010 | ||
| author name = | | author name = | ||
| author affiliation = NRC/RGN-II | | author affiliation = NRC/RGN-II | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:Page 1 of 2 Farley 09/01/2009 08:08:05 Inspection / Activity Plan Report 22 07/01/2009 - 12/31/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site ISFSI - ISFSI OPERATIONAL INSPECTION 2 1, 2 07/01/2009 12/31/2009 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants PSB1-RP - RADIATION PROTECTION PUBLIC CORNERSTONE 3 1, 2 08/10/2009 08/14/2009 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 1, 2 08/10/2009 08/14/2009 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 1, 2 08/10/2009 08/14/2009 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 1, 2 08/10/2009 08/14/2009 IP 71151 Performance Indicator Verification PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 1, 2 09/14/2009 09/18/2009 IP 2515/175 Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 1, 2 09/14/2009 09/18/2009 IP 7111402 Alert and Notification System Testing 1, 2 09/14/2009 09/18/2009 IP 7111403 Emergency Response Organization Augmentation Testing 1, 2 09/14/2009 09/18/2009 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 09/14/2009 09/18/2009 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 09/14/2009 09/18/2009 IP 71151 Performance Indicator Verification PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1 11/02/2009 11/06/2009 IP 71152B Identification and Resolution of Problems 1 11/16/2009 11/20/2009 IP 71152B Identification and Resolution of Problems INSP - MODS/50/59 INSPECTION 3 1 01/25/2010 01/29/2010 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1 02/01/2010 02/05/2010 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications INIT - INITIAL EXAM PREP 5 1 02/08/2010 02/12/2010 V23323 FARLEY/MARCH 2010 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1 6 1 03/08/2010 03/12/2010 V23323 FARLEY/MARCH 2010 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 6 1 03/15/2010 03/19/2010 V23323 FARLEY/MARCH 2010 EXAM AT POWER FACILITIES EB3ISI - UNIT 2 ISI 1 2 04/05/2010 04/09/2010 IP 7111108P Inservice Inspection Activities - PWR EB3TI172 - EB3 RCS DM BUTT WELDS 1 1, 2 04/05/2010 04/19/2010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds OL RQ - REQUAL INSPECTION 3 1, 2 09/20/2010 09/24/2010 IP 7111111B Licensed Operator Requalification Program PSB1-RP - RP OCCUPATIONAL BASELINE WEEK1 2 1, 2 09/20/2010 09/24/2010 IP 7112101 Access Control to Radiologically Significant Areas 1, 2 09/20/2010 09/24/2010 IP 7112102-7112102R ALARA - Required This report does not include INPO and OUTAGE activities. | ||
-12/31/2010 Unit | This report shows only on-site and announced inspection procedures. Enclosure | ||
This report shows only on-site and announced inspection procedures. | |||
Page 2 of 2 Farley 09/01/2009 08:08:05 Inspection / Activity Plan Report 22 07/01/2009 - 12/31/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1-RP - RP OCCUPATIONAL BASELINE WEEK1 2 1, 2 09/20/2010 09/24/2010 IP 7112202 Radioactive Material Processing and Transportation 1, 2 09/20/2010 09/24/2010 IP 71151 Performance Indicator Verification EB3ISI - UNIT 1 INSERVICE INSPECTION 1 1 10/04/2010 10/08/2010 IP 7111108P Inservice Inspection Activities - PWR EB3TI172 - EB3 RX COOLANT SYS DM BUTT WELDS 1 1 10/04/2010 10/08/2010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds PSB1-RP - RP OCCUPATIONAL BASELINE WEEK 2 2 1, 2 10/11/2010 10/15/2010 IP 7112101 Access Control to Radiologically Significant Areas 1, 2 10/11/2010 10/15/2010 IP 7112102-7112102R ALARA - Required 1, 2 10/11/2010 10/15/2010 IP 7112202 Radioactive Material Processing and Transportation 1, 2 10/11/2010 10/15/2010 IP 71151 Performance Indicator Verification PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 1, 2 12/06/2010 12/10/2010 IP 7111401 Exercise Evaluation 1, 2 12/06/2010 12/10/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 12/06/2010 12/10/2010 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities. | |||
-12/31/2010 Unit | This report shows only on-site and announced inspection procedures. Enclosure}} | ||
This report shows only on-site and announced inspection procedures.}} |
Latest revision as of 03:39, 14 November 2019
ML092440476 | |
Person / Time | |
---|---|
Site: | Farley, 07200042 ![]() |
Issue date: | 09/01/2009 |
From: | NRC/RGN-II |
To: | Southern Nuclear Operating Co |
Shared Package | |
ML092440473 | List: |
References | |
Download: ML092440476 (2) | |
Text
Page 1 of 2 Farley 09/01/2009 08:08:05 Inspection / Activity Plan Report 22 07/01/2009 - 12/31/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site ISFSI - ISFSI OPERATIONAL INSPECTION 2 1, 2 07/01/2009 12/31/2009 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants PSB1-RP - RADIATION PROTECTION PUBLIC CORNERSTONE 3 1, 2 08/10/2009 08/14/2009 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 1, 2 08/10/2009 08/14/2009 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 1, 2 08/10/2009 08/14/2009 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 1, 2 08/10/2009 08/14/2009 IP 71151 Performance Indicator Verification PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 1, 2 09/14/2009 09/18/2009 IP 2515/175 Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 1, 2 09/14/2009 09/18/2009 IP 7111402 Alert and Notification System Testing 1, 2 09/14/2009 09/18/2009 IP 7111403 Emergency Response Organization Augmentation Testing 1, 2 09/14/2009 09/18/2009 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 09/14/2009 09/18/2009 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 09/14/2009 09/18/2009 IP 71151 Performance Indicator Verification PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1 11/02/2009 11/06/2009 IP 71152B Identification and Resolution of Problems 1 11/16/2009 11/20/2009 IP 71152B Identification and Resolution of Problems INSP - MODS/50/59 INSPECTION 3 1 01/25/2010 01/29/2010 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1 02/01/2010 02/05/2010 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications INIT - INITIAL EXAM PREP 5 1 02/08/2010 02/12/2010 V23323 FARLEY/MARCH 2010 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1 6 1 03/08/2010 03/12/2010 V23323 FARLEY/MARCH 2010 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 6 1 03/15/2010 03/19/2010 V23323 FARLEY/MARCH 2010 EXAM AT POWER FACILITIES EB3ISI - UNIT 2 ISI 1 2 04/05/2010 04/09/2010 IP 7111108P Inservice Inspection Activities - PWR EB3TI172 - EB3 RCS DM BUTT WELDS 1 1, 2 04/05/2010 04/19/2010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds OL RQ - REQUAL INSPECTION 3 1, 2 09/20/2010 09/24/2010 IP 7111111B Licensed Operator Requalification Program PSB1-RP - RP OCCUPATIONAL BASELINE WEEK1 2 1, 2 09/20/2010 09/24/2010 IP 7112101 Access Control to Radiologically Significant Areas 1, 2 09/20/2010 09/24/2010 IP 7112102-7112102R ALARA - Required This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures. Enclosure
Page 2 of 2 Farley 09/01/2009 08:08:05 Inspection / Activity Plan Report 22 07/01/2009 - 12/31/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1-RP - RP OCCUPATIONAL BASELINE WEEK1 2 1, 2 09/20/2010 09/24/2010 IP 7112202 Radioactive Material Processing and Transportation 1, 2 09/20/2010 09/24/2010 IP 71151 Performance Indicator Verification EB3ISI - UNIT 1 INSERVICE INSPECTION 1 1 10/04/2010 10/08/2010 IP 7111108P Inservice Inspection Activities - PWR EB3TI172 - EB3 RX COOLANT SYS DM BUTT WELDS 1 1 10/04/2010 10/08/2010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds PSB1-RP - RP OCCUPATIONAL BASELINE WEEK 2 2 1, 2 10/11/2010 10/15/2010 IP 7112101 Access Control to Radiologically Significant Areas 1, 2 10/11/2010 10/15/2010 IP 7112102-7112102R ALARA - Required 1, 2 10/11/2010 10/15/2010 IP 7112202 Radioactive Material Processing and Transportation 1, 2 10/11/2010 10/15/2010 IP 71151 Performance Indicator Verification PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 1, 2 12/06/2010 12/10/2010 IP 7111401 Exercise Evaluation 1, 2 12/06/2010 12/10/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 12/06/2010 12/10/2010 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures. Enclosure