ML101880372: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML101880372 | | number = ML101880372 | ||
| issue date = 07/07/2010 | | issue date = 07/07/2010 | ||
| title = | | title = Violation of Fitness for Duty Procedures - OI Case # 2-2010-009 | ||
| author name = | | author name = Mccoy G | ||
| author affiliation = NRC/RGN-II/DRP/RPB5 | | author affiliation = NRC/RGN-II/DRP/RPB5 | ||
| addressee name = Gatlin T | | addressee name = Gatlin T | ||
| addressee affiliation = South Carolina Electric & Gas Co | | addressee affiliation = South Carolina Electric & Gas Co | ||
| docket = 05000395 | | docket = 05000395 | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 July 7, 2010 Mr. Thomas D. Gatlin Vice President South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville, SC 29065 | ||
==SUBJECT:== | |||
SUMMER NUCLEAR STATION: VIOLATION OF FITNESS FOR DUTY PROCEDURES. OFFICE OF INVESTIGATIONS CASE NUMBER 2-2010-009 | |||
==Dear Mr. Gatlin:== | |||
Enclosed for your information is the synopsis of the Nuclear Regulatory Commission (NRC) | |||
Office of Investigations= (OI) completed report regarding potential violation of Fitness for Duty Procedures. | |||
OI determined there was insufficient evidence to substantiate the allegation that an SCE&G/Summer maintenance employee willfully violated the licensees FFD program. We plan no further action with regard to this matter. Should you have any questions concerning this letter, please contact us. | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Gerald J. McCoy, Chief Reactor Projects Branch 5 Division of Reactor Project | |||
==Enclosure:== | |||
Investigative Synopsis, OI Case No. 2-2010-009 | |||
July 7, 2010 Mr. Thomas D. Gatlin Vice President South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville, SC 29065 | |||
==SUBJECT:== | |||
SUMMER NUCLEAR STATION: VIOLATION OF FITNESS FOR DUTY PROCEDURES. OFFICE OF INVESTIGATIONS CASE NUMBER 2-2010-009 | |||
==Dear Mr. Gatlin:== | |||
Enclosed for your information is the synopsis of the Nuclear Regulatory Commission (NRC) Office of Investigations= | |||
(OI) completed report regarding potential violation of Fitness for Duty Procedures. | |||
OI determined there was insufficient evidence to substantiate the allegation that an SCE&G/Summer maintenance employee willfully violated the licensees FFD program. We plan no further action with regard to this matter. Should you have any questions concerning this letter, please contact us. | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Gerald J. McCoy, Chief Reactor Projects Branch 5 Division of Reactor Project | |||
==Enclosure:== | |||
Investigative Synopsis, OI Case No. 2-2010-009 cc w/encl: Oscar De Miranda Allegation Documents not Placed in ADAMS Publicly Available - NON-Sensitive OFFICE RII:DRP RII:DRP RII:EICS SIGNATURE DCA GJM1 CEvans for NAME DArnett GMcCoy ODe Miranda DATE 07/6/2010 07/7/2010 07/7/2010 ML101880372 | |||
SYNOPSIS This investigation was initiated on October 29, 2010, by the U.S. Nuclear Regulatory Commission (NRC), Office of Investigations (OI), Region II (RII), to determine whether a maintenance worker employed by South Carolina Electric & Gas, Inc (SCE&G), at the Virgil C. Summer Nuclear Station (Summer) willfully violated the licensee fitness-for-Duty (FFD) Program. This investigation also supplementally addressed an issue regarding an unnamed manager coaching or aiding employees in a work related exam. | |||
Based on the documentation and testimony developed during this investigation, OI:RII did not substantiate the allegation that an SCE&G/Summer maintenance employee willfully violated the licensee FFD program. | |||
NOT FOR PUBLIC DISCLOSURE WITHOUT APPROVAL OF FIELD OFFICE DIRECTOR, OFFICE OF INVESTIGATIONS, REGION II Official Use Only - OI Investigation Information Case No. 2-2010-009 Enclosure}} |
Latest revision as of 16:27, 13 November 2019
ML101880372 | |
Person / Time | |
---|---|
Site: | Summer |
Issue date: | 07/07/2010 |
From: | Gerald Mccoy NRC/RGN-II/DRP/RPB5 |
To: | Gatlin T South Carolina Electric & Gas Co |
References | |
2-2010-009 | |
Download: ML101880372 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 July 7, 2010 Mr. Thomas D. Gatlin Vice President South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville, SC 29065
SUBJECT:
SUMMER NUCLEAR STATION: VIOLATION OF FITNESS FOR DUTY PROCEDURES. OFFICE OF INVESTIGATIONS CASE NUMBER 2-2010-009
Dear Mr. Gatlin:
Enclosed for your information is the synopsis of the Nuclear Regulatory Commission (NRC)
Office of Investigations= (OI) completed report regarding potential violation of Fitness for Duty Procedures.
OI determined there was insufficient evidence to substantiate the allegation that an SCE&G/Summer maintenance employee willfully violated the licensees FFD program. We plan no further action with regard to this matter. Should you have any questions concerning this letter, please contact us.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Gerald J. McCoy, Chief Reactor Projects Branch 5 Division of Reactor Project
Enclosure:
Investigative Synopsis, OI Case No. 2-2010-009
July 7, 2010 Mr. Thomas D. Gatlin Vice President South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville, SC 29065
SUBJECT:
SUMMER NUCLEAR STATION: VIOLATION OF FITNESS FOR DUTY PROCEDURES. OFFICE OF INVESTIGATIONS CASE NUMBER 2-2010-009
Dear Mr. Gatlin:
Enclosed for your information is the synopsis of the Nuclear Regulatory Commission (NRC) Office of Investigations=
(OI) completed report regarding potential violation of Fitness for Duty Procedures.
OI determined there was insufficient evidence to substantiate the allegation that an SCE&G/Summer maintenance employee willfully violated the licensees FFD program. We plan no further action with regard to this matter. Should you have any questions concerning this letter, please contact us.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Gerald J. McCoy, Chief Reactor Projects Branch 5 Division of Reactor Project
Enclosure:
Investigative Synopsis, OI Case No. 2-2010-009 cc w/encl: Oscar De Miranda Allegation Documents not Placed in ADAMS Publicly Available - NON-Sensitive OFFICE RII:DRP RII:DRP RII:EICS SIGNATURE DCA GJM1 CEvans for NAME DArnett GMcCoy ODe Miranda DATE 07/6/2010 07/7/2010 07/7/2010 ML101880372
SYNOPSIS This investigation was initiated on October 29, 2010, by the U.S. Nuclear Regulatory Commission (NRC), Office of Investigations (OI), Region II (RII), to determine whether a maintenance worker employed by South Carolina Electric & Gas, Inc (SCE&G), at the Virgil C. Summer Nuclear Station (Summer) willfully violated the licensee fitness-for-Duty (FFD) Program. This investigation also supplementally addressed an issue regarding an unnamed manager coaching or aiding employees in a work related exam.
Based on the documentation and testimony developed during this investigation, OI:RII did not substantiate the allegation that an SCE&G/Summer maintenance employee willfully violated the licensee FFD program.
NOT FOR PUBLIC DISCLOSURE WITHOUT APPROVAL OF FIELD OFFICE DIRECTOR, OFFICE OF INVESTIGATIONS, REGION II Official Use Only - OI Investigation Information Case No. 2-2010-009 Enclosure