ML17059B666: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17059B666
| number = ML17059B666
| issue date = 07/08/1997
| issue date = 07/08/1997
| title = Rev 0 to S20.6-YD-TANK01, EDG Fuel Oil Tank Replacement.
| title = Rev 0 to S20.6-YD-TANK01, EDG Fuel Oil Tank Replacement
| author name = AGOSTA C R, ALVI M
| author name = Agosta C, Alvi M
| author affiliation = NIAGARA MOHAWK POWER CORP.
| author affiliation = NIAGARA MOHAWK POWER CORP.
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:N%NIAGARA Li MOHAWK NUCLEAR ENGINEERING DISPOSITION COVER SHEET ATTAI.'HMENT L Page 1 (Next~a.Total~Last~A NINE MILE POINT NUCLEAR STATION TiUe EDG FUEL OIL TANK REPLACEMENT Unit (1, 2 or 0=Both): Caiouhtion No.S20.6-YD-TANK01 Originator CARMEN R.AGOSTA A Discipline:
{{#Wiki_filter:N % NIAGARA LiMOHAWK NUCLEARENGINEERING DISPOSITION COVER SHEET ATTAI.'HMENT L Page 1 (Next~a.
STRUCTURAL Rev Disp 00 00B Date 7/8/97 (Sub)System(s)82 Design Change No.NA Index No.S20.6 Approver Date Superceded Document(s):
Total~
Last ~A NINE MILEPOINT NUCLEARSTATION TiUe EDG FUEL OILTANKREPLACEMENT Unit (1, 2 or 0=Both):
Caiouhtion No.
S20.6-YD-TANK01 Originator CARMEN R. AGOSTA A Discipline: STRUCTURAL Rev Disp 00 00B Date 7/8/97 (Sub) System(s) 82 Design Change No.
NA Index No.
S20.6 Approver Date Superceded Document(s):
NONE NMPC Acceptance/Date:
NONE NMPC Acceptance/Date:
/I/A DescripUon of Change TANK-82<3 WAS EVALUATED USING THE GENERIC IMPLEMENTATION PROCEDURE (GIP)SCREENING EVALUATION WORK SHEETS (SEWS).THE EVALUATION REFERENCED THIS CALCULATION.
/I/A DescripUon of Change TANK-82<3WAS EVALUATEDUSING THE GENERIC IMPLEMENTATIONPROCEDURE (GIP) SCREENING EVALUATION WORK SHEETS (SEWS). THE EVALUATIONREFERENCED THIS CALCULATION.
ResoluUon ADD THE 82-43 SEWS TO THIS CALCULATION.
ResoluUon ADDTHE 82-43 SEWS TO THIS CALCULATION.
Cross Reference change(s):
Cross Reference change(s):
NONE Confirmation Required (Yes/No): Yes Final Issue Status File Location Operations Acceptance See Page(s): (APP/FIO/VOI): APP (Gale/Hold):Gale Req'd.(Yes/No): Yes Evaluation Number(s)/Revision: NR Copy of Applicability Review Attached (Yes/N/R)?N/R Key Words: NMP-1, STRUCTURAL, SQUG, SEWS, SEISMIC VERIFICATION Component ID(s)/EPN(s)/Line Number(s):
NONE Confirmation Required (Yes / No ): Yes Final Issue Status File Location Operations Acceptance See Page(s):
TANK42M TANK42M 9708070i42 9707$i PDR ADOC(t('5000220 P, s PDR J FORMAT If NET)ES48+0340  
( APP / FIO / VOI): APP (Gale / Hold):Gale Req'd. ( Yes / No ): Yes Evaluation Number(s) / Revision: NR Copy of ApplicabilityReview Attached (Yes / N/R)? N/R Key Words: NMP-1, STRUCTURAL, SQUG, SEWS, SEISMIC VERIFICATION Component ID(s) / EPN(s) / Line Number(s):
TANK42M TANK42M 9708070i42 9707$i PDR ADOC(t('5000220 P,
s PDR J
FORMATIfNET)ES48+0340


N T NIAGARA 4 MOHAWK NUCLEAR ENGINEERING CALCULATION CONTINUATION SHEET Page Z.(Next~Nine Mile Point Nuclear Station OriIIlnator te f7 ef.Unit: 1 Checker/Date
NT NIAGARA 4 MOHAWK NUCLEAR ENGINEERING CALCULATIONCONTINUATIONSHEET Page Z.
@4os Caiculation No.S20.6-YD-TANK01 Disposition:
(Next~
00B Reviston 00 PURPOSE: Document the Screening Evaluation Work Sheets (SEWS)for the DG FUEL OIL STORAGE TANK 4103, EQUIPMENT NUMBER 82-43.This SEWS has been prepared as part of the commitment to use the SQUG (GIP)methodology to document the seismic adequacy of SSEL components.
Nine Mile Point Nuclear Station OriIIlnator te f7 ef.
~CONCLUSION:
Unit:
Calculation S20.6-YD-TANK01 analyzed this tank for the design basis load combination of DL+seismic+variable tank fill.Therefore, the DG Fuel Oil Tank is seismically adequate.ATTACHMENTS A.SEWS for Equipment ID Number 82-43.FORMAT 4 NEP-DES-08, Rev.01 (F02)  
1 Checker/Date @4 os Caiculation No.
S20.6-YD-TANK01 Disposition:
00B Reviston 00 PURPOSE:
Document the Screening Evaluation Work Sheets (SEWS) forthe DG FUEL OIL STORAGE TANK4103, EQUIPMENT NUMBER 82-43.
This SEWS has been prepared as part ofthe commitment to use the SQUG (GIP) methodology to document the seismic adequacy of SSEL components.
~
CONCLUSION: Calculation S20.6-YD-TANK01 analyzed this tank for the design basis load combination of DL+ seismic+ variable tank fill.Therefore, the DG Fuel Oil Tank is seismically adequate.
ATTACHMENTS A. SEWS for Equipment ID Number 82-43.
FORMAT4 NEP-DES-08, Rev. 01 (F02)


ATTACHMENT ZEZZHS SC ENING EVALUATION NORK SHE (SEMS)Revision 2, Corrected, 6/28/91 Status Y N U Sheet 1 of 2 Equip.ID No.~~Equipment Description Location: Bldg.~<~floor El.2 4/Room, Row/Col c')Nanufacturer, Nodel, Etc.(optional)
ATTACHMENTZEZZHS SC ENING EVALUATION NORK SHE (SEMS)
S CA AC TY VS DEHAND~Buckling capacity of shell of large.flat-bottom, vertical tank is,equal to or greater than demand:~g~n IS/go@.i P.o~~ac.4 gUAyaH Equip.Class 21-Tanks and Heat Exchan ers OA C'c 5/c AC Fc ANCHO B AND B Capacity of anchor bolts and their embedments is equal to or greater than demand:/Poco Oou us~w+Ps 4 0 rc.gizA R4'crt A'~~~~~4<<OE'SIINC>l~Ca<.C,.S 2u.d-YO-78'~>i g N U N/A.CONNEC ION BETMEEN ANCHO 80 TS AND E Capacity of connections between the anchor bolts and the tank shell is equal to or greater than the demand: Y N U/A F IBI OF AC Attached piping has adequate flexibility to accaaaodate motion of large, flat-bottom, vertical tank: Y N U(S TANK FOUNDA 0 Ring-type foundation is not used to support large, flat-bottom, vertical tank: Y N U~/IS E UIPNENT SEISNICALLY ADE OAT T 6.21-1  
Revision 2, Corrected, 6/28/91 Status Y
N U
Sheet 1 of 2 Equip.
ID No.
~
~
Equipment Description Location: Bldg. ~<~ floor El. 2 4 /
: Room, Row/Col c'
)
Nanufacturer, Nodel, Etc. (optional)
S CA AC TY VS DEHAND
~ Buckling capacity of shell of large. flat-bottom, vertical tank is,equal to or greater than demand:
~g ~n IS
/go@. iP.o~~ac.
4 gUAyaH Equip. Class 21 - Tanks and Heat Exchan ers OA C'c 5/c AC Fc ANCHO B
AND B
Capacity of anchor bolts and their embedments is equal to or greater than demand:
/Poco Oou us~w+Ps 4 0 rc.gizA R4'crt A'~~~~~ 4<<
OE'SIINC> l~
Ca<.C,.
S 2u.d - YO -78'~>i g
N U
N/A.
CONNEC ION BETMEEN ANCHO 80 TS AND E
Capacity of connections between the anchor bolts and the tank shell is equal to or greater than the demand:
Y N
U
/A F
IBI OF AC Attached piping has adequate flexibilityto accaaaodate motion of large, flat-bottom, vertical tank:
Y N U(S TANK FOUNDA 0
Ring-type foundation is not used to support large, flat-bottom, vertical tank:
Y N U~/
IS E UIPNENT SEISNICALLY ADE OAT T 6.21-1


ATTACHMENT CAlC NO REVISION PAGE NO Revision 2, Corrected, 6/28/g1 SCREEHIN6 EVANATIOH WORK SHEET (SEMS)Sheet 2 pf 2~~~Equip.ID No.8 Z-43 Equipment Description COW EHTS Equip.Class 21-Tanks and Heat Exchan ers fVrIrI Pc cwLGuL~7.row S~4'4-Y~-TarIr'w o/A'ev.o Aced//a+~76'G p~4/oar~a: 7pnlr: a p~sic~ao To:<g>~p-Cp<aaal~.P.V-p,db)F p'/+/r'~//J~~gr~~~~7-~~g~~g~g7'roars 222/O/'t OMBrtr%7rMM]
ATTACHMENT CAlC NO REVISION PAGE NO Revision 2, Corrected, 6/28/g1 SCREEHIN6 EVANATIOH WORK SHEET (SEMS)
7"brf rtrIAL g 5CIsmrc.L,p&oS C p~<>>o)~pQ SL,C L,O4 gZ gag 8C.C.Ou~C.Cdc>ac a COW os Evaluated by: Data:/08/pJ to 6.21-2}}
Sheet 2 pf 2
~
~
~
Equip.
ID No.
8 Z -43 Equipment Description COWEHTS Equip. Class 21 - Tanks and Heat Exchan ers fVrIrIPc cwLGuL~7.row S ~4'4 Y~ - TarIr'w o/
A'ev.o Aced/ /a+~
76'G p~4/ oar~a:
7pnlr: a p~sic~ao To: <g
> ~p-Cp<aaal~.
P.V
- p,db)F p'/+/r'~/
/J
~~gr~~~~
7-~ ~g~~
g~g7'roars 222
/ O/'t OMBrtr%7rMM]
7"brf rtrIAL g 5CIsmrc. L,p&oS C p~<>>o)
~pQ SL,C L,O4gZ gag 8C.C.Ou
~C.Cdc >ac a COWos Evaluated by:
Data:
/08/pJ to 6.21-2}}

Latest revision as of 11:45, 9 January 2025

Rev 0 to S20.6-YD-TANK01, EDG Fuel Oil Tank Replacement
ML17059B666
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 07/08/1997
From: Agosta C, Alvi M
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17059B657 List:
References
S20.6-YD-TANK01, S20.6-YD-TANK01-R00, S20.6-YD-TANK1, S20.6-YD-TANK1-R, NUDOCS 9708070142
Download: ML17059B666 (8)


Text

N % NIAGARA LiMOHAWK NUCLEARENGINEERING DISPOSITION COVER SHEET ATTAI.'HMENT L Page 1 (Next~a.

Total~

Last ~A NINE MILEPOINT NUCLEARSTATION TiUe EDG FUEL OILTANKREPLACEMENT Unit (1, 2 or 0=Both):

Caiouhtion No.

S20.6-YD-TANK01 Originator CARMEN R. AGOSTA A Discipline: STRUCTURAL Rev Disp 00 00B Date 7/8/97 (Sub) System(s) 82 Design Change No.

NA Index No.

S20.6 Approver Date Superceded Document(s):

NONE NMPC Acceptance/Date:

/I/A DescripUon of Change TANK-82<3WAS EVALUATEDUSING THE GENERIC IMPLEMENTATIONPROCEDURE (GIP) SCREENING EVALUATION WORK SHEETS (SEWS). THE EVALUATIONREFERENCED THIS CALCULATION.

ResoluUon ADDTHE 82-43 SEWS TO THIS CALCULATION.

Cross Reference change(s):

NONE Confirmation Required (Yes / No ): Yes Final Issue Status File Location Operations Acceptance See Page(s):

( APP / FIO / VOI): APP (Gale / Hold):Gale Req'd. ( Yes / No ): Yes Evaluation Number(s) / Revision: NR Copy of ApplicabilityReview Attached (Yes / N/R)? N/R Key Words: NMP-1, STRUCTURAL, SQUG, SEWS, SEISMIC VERIFICATION Component ID(s) / EPN(s) / Line Number(s):

TANK42M TANK42M 9708070i42 9707$i PDR ADOC(t('5000220 P,

s PDR J

FORMATIfNET)ES48+0340

NT NIAGARA 4 MOHAWK NUCLEAR ENGINEERING CALCULATIONCONTINUATIONSHEET Page Z.

(Next~

Nine Mile Point Nuclear Station OriIIlnator te f7 ef.

Unit:

1 Checker/Date @4 os Caiculation No.

S20.6-YD-TANK01 Disposition:

00B Reviston 00 PURPOSE:

Document the Screening Evaluation Work Sheets (SEWS) forthe DG FUEL OIL STORAGE TANK4103, EQUIPMENT NUMBER 82-43.

This SEWS has been prepared as part ofthe commitment to use the SQUG (GIP) methodology to document the seismic adequacy of SSEL components.

~

CONCLUSION: Calculation S20.6-YD-TANK01 analyzed this tank for the design basis load combination of DL+ seismic+ variable tank fill.Therefore, the DG Fuel Oil Tank is seismically adequate.

ATTACHMENTS A. SEWS for Equipment ID Number 82-43.

FORMAT4 NEP-DES-08, Rev. 01 (F02)

ATTACHMENTZEZZHS SC ENING EVALUATION NORK SHE (SEMS)

Revision 2, Corrected, 6/28/91 Status Y

N U

Sheet 1 of 2 Equip.

ID No.

~

~

Equipment Description Location: Bldg. ~<~ floor El. 2 4 /

Room, Row/Col c'

)

Nanufacturer, Nodel, Etc. (optional)

S CA AC TY VS DEHAND

~ Buckling capacity of shell of large. flat-bottom, vertical tank is,equal to or greater than demand:

~g ~n IS

/go@. iP.o~~ac.

4 gUAyaH Equip. Class 21 - Tanks and Heat Exchan ers OA C'c 5/c AC Fc ANCHO B

AND B

Capacity of anchor bolts and their embedments is equal to or greater than demand:

/Poco Oou us~w+Ps 4 0 rc.gizA R4'crt A'~~~~~ 4<<

OE'SIINC> l~

Ca<.C,.

S 2u.d - YO -78'~>i g

N U

N/A.

CONNEC ION BETMEEN ANCHO 80 TS AND E

Capacity of connections between the anchor bolts and the tank shell is equal to or greater than the demand:

Y N

U

/A F

IBI OF AC Attached piping has adequate flexibilityto accaaaodate motion of large, flat-bottom, vertical tank:

Y N U(S TANK FOUNDA 0

Ring-type foundation is not used to support large, flat-bottom, vertical tank:

Y N U~/

IS E UIPNENT SEISNICALLY ADE OAT T 6.21-1

ATTACHMENT CAlC NO REVISION PAGE NO Revision 2, Corrected, 6/28/g1 SCREEHIN6 EVANATIOH WORK SHEET (SEMS)

Sheet 2 pf 2

~

~

~

Equip.

ID No.

8 Z -43 Equipment Description COWEHTS Equip. Class 21 - Tanks and Heat Exchan ers fVrIrIPc cwLGuL~7.row S ~4'4 Y~ - TarIr'w o/

A'ev.o Aced/ /a+~

76'G p~4/ oar~a:

7pnlr: a p~sic~ao To: <g

> ~p-Cp<aaal~.

P.V

- p,db)F p'/+/r'~/

/J

~~gr~~~~

7-~ ~g~~

g~g7'roars 222

/ O/'t OMBrtr%7rMM]

7"brf rtrIAL g 5CIsmrc. L,p&oS C p~<>>o)

~pQ SL,C L,O4gZ gag 8C.C.Ou

~C.Cdc >ac a COWos Evaluated by:

Data:

/08/pJ to 6.21-2