Line 16: | Line 16: | ||
| event date = 02/14/2016 20:58 EST | | event date = 02/14/2016 20:58 EST | ||
| last update date = 02/14/2016 | | last update date = 02/14/2016 | ||
| title = Automatic Reactor Trip | | title = Automatic Reactor Trip on Main Generator Protection Trip | ||
| event text = This 4-hour and 8-hour notification is being made to report that Salem Unit 2 had an unplanned automatic reactor trip. The trip occurred because the Unit 2 main generator tripped on generator protection with reactor power greater than P-9 (49%). The cause of the generator protection trip that resulted in the reactor trip is unknown at this time. A troubleshooting team is being assembled to determine the exact cause for the generator protection actuation. | | event text = This 4-hour and 8-hour notification is being made to report that Salem Unit 2 had an unplanned automatic reactor trip. The trip occurred because the Unit 2 main generator tripped on generator protection with reactor power greater than P-9 (49%). The cause of the generator protection trip that resulted in the reactor trip is unknown at this time. A troubleshooting team is being assembled to determine the exact cause for the generator protection actuation. | ||
All control rods inserted on the reactor trip. All ECCS and ESF systems functioned as expected. The motor driven and steam driven auxiliary feed pumps started as expected on steam generator low level. | All control rods inserted on the reactor trip. All ECCS and ESF systems functioned as expected. The motor driven and steam driven auxiliary feed pumps started as expected on steam generator low level. |
Latest revision as of 20:45, 1 March 2018
Where | |
---|---|
Salem New Jersey (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
LER: | 05000311/LER-2016-003 |
Time - Person (Reporting Time:+-2.75 h-0.115 days <br />-0.0164 weeks <br />-0.00377 months <br />) | |
Opened: | Jason Morgan 23:13 Feb 14, 2016 |
NRC Officer: | Steve Sandin |
Last Updated: | Feb 14, 2016 |