| issue date = 09/16/1994
| issue date = 09/16/1994
| title = LER 94-013-01:on 940622,containment Isolation Provisions for Monitoring Sys Were Inoperable.Caused by Error in Electrical Circuitry Design.Sample Return Lines Modified. W/940916 Ltr
| title = LER 94-013-01:on 940622,containment Isolation Provisions for Monitoring Sys Were Inoperable.Caused by Error in Electrical Circuitry Design.Sample Return Lines Modified. W/940916 Ltr
| author name = FOLEY C J, PARRISH J V
| author name = Foley C, Parrish J
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:1~1 P R.I C)R.IWY'ACCELERATED RIDS PROCESSIX(REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9409230285 DOC.DATE: 94/09/16 NOTARIZED:
{{#Wiki_filter:1     ~
NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION FOLEY,C.J.
1 P R.I C)                   RIDS PROCESSIX(
Washington Public Power Supply System PARRISH,J.V.
R.IWY'ACCELERATED REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000397
ACCESSION NBR:9409230285                     DOC.DATE: 94/09/16 NOTARIZED: NO                           DOCKET FACIL:50-397       WPPSS     Nuclear Project, Unit 2, Washington Public                         Powe 05000397 AUTH. NAME               AUTHOR     AFFILIATION FOLEY,C.J.               Washington Public Power Supply System PARRISH,J.V.             Washington Public Power Supply System RECIP.NAME               RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
LER 91-013-01:on 940622,containment isolation provisions for monitoring sos were inoperable.
LER       91-013-01:on 940622,containment isolation provisions for monitoring sos were inoperable. Caused by design of electrical circuitry was error. Sample return lines was modified to eliminate deficiency.
Caused by design of electrical circuitry was error.Sample return lines was modified to eliminate deficiency.
DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR                                         ENCL   SIZE:
DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR ENCL SIZE: TITLE: 50.73/50.9 Licensee Event Report (LER), Incident pt, etc.NOTES: RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS AEOD/SPD/RRAB NRR/DE/EELB NRR/DORS/OEAB NRR/DRCH/HICB NRR/DRSS/PRPB NRR/DSSA/SRXB RES/DSIR/EIB EXTERNAL: EGGG BRYCE,J.H NOAC MURPHY,G.A NRC PDR COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1 1 CLIFFORD,J 1 QD JROAB/DSP I~FILK CENTER~0-I NRR/DE~MEB-1 NRR/DRCH/HHFB 1 NRR/DRCH/HOLB 2 NRR/DSSA/SPLB 1 NRR/PMAS/IRCB-E 1 RGN4 FILE Ol 2 2 L ST LOBBY WARD 1 1 NOAC POOREFW 1 1'UDOCS FULL TXT COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 NOTE TO ALL"RI DS" RECIPIENTS:
TITLE: 50.73/50.9 Licensee Event Report (LER),                                     Incident pt, etc.
PLEASE HELP US TO REDUCE iVASTE!CONTACTTHE DOCL'iIENT CONTROL DESK.ROOM PI-37 (EXT.504-2083)TO ELIXIINATE YOUR NAME FROiI DISTRIBUTION LISTS I'OR DOCI.'MEN'I'S YOU DON" I'EED!FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 27 ENCL 27 4a vi WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 September 16, 1994 G02-94-214 Docket No.50-397 Document Control Desk U.S.Nuclear Regulatory Commission Washington, D.C.20555  
NOTES:
RECIPIENT                COPIES                            RECIPIENT       COPIES ID CODE/NAME               LTTR ENCL                        ID CODE/NAME    LTTR ENCL PD4-2 PD                       1    1                      CLIFFORD,J          1    1 INTERNAL: ACRS AEOD/SPD/RRAB 1
I  ~                    QDJROAB/DSP FILK CENTER  ~0-2 1
2 1
NRR/DE/EELB NRR/DORS/OEAB I                      NRR/DE~MEB        1    1 1                      NRR/DRCH/HHFB      1   1 NRR/DRCH/HICB                        1                     NRR/DRCH/HOLB      1    1 NRR/DRSS/PRPB                        2                     NRR/DSSA/SPLB       1    1 NRR/DSSA/SRXB                        1                      NRR/PMAS/IRCB-E     1    1 RES/DSIR/EIB                          1                     RGN4   FILE   Ol   1    1 EXTERNAL: EGGG BRYCE,J.H                        2     2                     L ST LOBBY WARD     1    1 NOAC MURPHY,G.A                1     1                     NOAC POOREFW       1    1 NRC PDR                        1     1       'UDOCS               FULL TXT   1   1 NOTE TO ALL"RI DS" RECIPIENTS:
PLEASE HELP US TO REDUCE iVASTE! CONTACTTHE DOCL'iIENTCONTROL DESK. ROOM PI-37 (EXT. 504-2083 ) TO ELIXIINATEYOUR NAME FROiI DISTRIBUTION LISTS I'OR DOCI.'MEN'I'S YOU DON"I'EED!
FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR                                       27   ENCL   27
 
4a vi WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 September 16, 1994 G02-94-214 Docket No. 50-397 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555


==Subject:==
==Subject:==
NUCLEAR PLANT WNP-2, OPERATING LICENSE NPF-21 LICENSEE EVENT REPORT NO.94-013-01 Transmitted herewith is Licensee Event Report No.94-013-01 for the WNP-2 Plant.LER94-013-00 reported a design deficiency in the containment isolation logic for the Containment Monitoring System (CMS).As part of the associated corrective actions, engineering was assigned to review other containment isolation logics to verify acceptable design.This review was scheduled for completion by September 2, 1994;however, the scope of this review has necessitated extending this date to October 28, 1994.Presently, over 60%of the review is complete.Should you have any questions or desire additional information, please call me or D.A.Swank at (509)377-4563.Sincerely, V.Parrish (Mail Drop 1023)Assistant Managing Director, Operations JVP/CJF/my Enclosure CC: LJ Callan, NRC-RIV KE Perkins, Jr., NRC RIV, Walnut Creek Field Office NS Reynolds, Winston&Strawn NRC Sr.Resident Inspector (Mail Drop 927N, 2 Copies)INPO Records Center-Atlanta, GA DL Williams, BPA (Mail Drop 399)9405'230285 9409i6 PDR ADOCK 05000397 g PDR AGILITY NAHE (1)LICENSEE EVE EPORT (LER)Washin ton Nuclear Plant-Unit 2 ITLE (4)DOCKET NUMBER (2)PAGE (3)P I 5 I P I P I P I3 I 9 I 7 I PF 4 DESIGN ERROR IN ELECTRICAL CIRCUITRY FOR CONTAINMENT ISOLATION EVENT DATE (5)LER NUHBER 6 REPORT DATE (7)OTHER FACILITIES INVOLVED (8)HOHTH DAY YEAR YEAR 9 SEQUENTIAL
NUCLEAR           PLANT       WNP-2,       OPERATING           LICENSE   NPF-21 LICENSEE EVENT REPORT NO. 94-013-01 Transmitted   herewith is Licensee Event Report No. 94-013-01 for the WNP-2 Plant.
<g NUMBER EVI SION UMBER MONTH=DAY YEAR FACILITY NAMES DOCKET NUMBERS(S) pl5lplplpl I I OI6 2I2 9I4 gl4 OIII3 Oil OI9 I I 6 gl4 pl5lplplpl I I PERATING ODE (9)HIS REPORT IS SUBHITTEO PURSUANT TO THE REQUIREHEHTS OF 10 CFR 5: (Check one or more of the following)
LER94-013-00 reported a design deficiency in the containment isolation logic for the Containment Monitoring System (CMS).               As part of the associated corrective actions, engineering was assigned to review other containment isolation logics to verify acceptable design. This review was scheduled for completion by September 2, 1994; however, the scope of this review has necessitated extending this date to October 28, 1994. Presently, over 60%
(11)5 POWER LEVEL (10)20.402(b)0 405(a)(1)(i) 0.405(a)(1)(ii) 0.405(a)(1)(iii) 20.405(a)(1)(iv) 0.405(a)(1)(v) 20.405(C)50.36(c)(1) 50.36(c)(2) 50.73(a)(2)(i) 50.73(a)(2)(ii) 50.73(a)(2)(iii) 50.73(a)(2)(iv) 50.73(a)(2)(v) 50.73(a)(2)(vii) 50.73(a)(2)(viii)(A) 50.73(a)(2)(viii)(B) 50.73(a)(2)(x) 77.71(b)73.73(c)THER (Specify in Abstract below and in Text.NRC Form 366A)LICENSEE CONTACT FOR THIS LER (12)C.J.Foley, Licensing Engineer TELEPHONE NUMBER REA CODE 5 I P I 9 I 7 I 7 I-I 4 I 3 I 2 I 5 COHPLETE OHE LINE FOR EACH COHPONEHT FAILURE DESCRIBED IH THIS REPORt (13)CAUSE SYSTEH COMPONENT MAHUFACTURER EPORTABLE&,':.j$CAUSE 0 HPRDS i+5:j3~SYSTEM COHPOHEHT MANUFACTURER REPORTABLE TO NPRDS NA HA I I I I I I I I I I I I I I I I I I I I I I IIII SUPPLEMENTAL REPORT EXPECTED (14)I YES (If yes, complete EXPECTED SUBHISSIOH DATE)I NO TRACT ed)EXPECTED SUBHISSIDH HOHTH DAY YEAR ATE (15)On June, 22, 1994, it was determined that containment isolation provisions for both Containment Monitoring Systems were inoperable because the design of the electrical circuitry was such that failure of a single electrical relay could prevent closure of the solenoid-operated containment isolation valves associated with those particular systems.The plant was in an annual refueling and maintenance outage.The root cause is design error during initial plant construction.
of the review is complete.
A plant modification was executed to revise the electrical circuitry to eliminate the design fiaw causing the deficiency.
Should you have any questions or desire additional information, please call me or D.A. Swank at (509) 377-4563.
LICENSEE EVENT REPORT)TEXT CONTINUATION FACILITY NANE (1)Washington Nuclear Plant-Unit 2 OOCKET NUNBER (2)0 5 0 0 0 3 9 7 LER NUMBER (8)Year Number ev.No.4 013 01 PAGE (3)2 OF 4 ITLE (4)DESIGN ERROR IN ELECTRICAL CIRCUITRY FOR CONTAINMENT ISOLATION Even Descri tion On June 22, 1994, the plant was in operational mode 5 (refueling) at 0%power.An electrical engineer, evaluating a report provided by INPO about a condition discovered at another nuclear plant, determined that a single failure of an electrical relay[RLYJ used in containment isolation logic circuits[JM]could prevent closure of solenoid-operated containment isolation valves PSV]for the WNP-2 Containment Monitoring System[IJ](CMS), The NRC was immediately notified per 10CFR50.72(b)(1)(ii)(B) because this condition was a violation of the single-failure criterion.
Sincerely, V. Parrish (Mail Drop 1023)
Immedi e rr i e Acti The Containment Monitoring System was declared inoperable on June 22, 1994.~h Two Containment Monitoring Systems serve as reactor coolant pressure boundary[AD]leak'detection systems in conformance with Regulatory Guide 1.45.The closed loop systems, installed in cabinets located in the secondary containment area, draw samples of primary containment
Assistant Managing Director, Operations JVP/CJF/my Enclosure CC:     LJ Callan, NRC-RIV KE Perkins, Jr., NRC RIV, Walnut Creek Field Office NS Reynolds, Winston & Strawn NRC Sr. Resident Inspector (Mail Drop 927N, 2 Copies)
[NH]atmosphere through radiation monitors[MON], and return the samples to the primary containment.
INPO Records Center - Atlanta, GA DL Williams, BPA (Mail Drop 399) 9405'230285 9409i6 PDR     ADOCK 05000397 g                       PDR
Containment isolation valves are provided for each system pursuant to GDC 56 as follows: 1)two solenoid-operated valves located outside of primary containment are installed in series in the sample supply line, and 2)a single solenoid-operated valve located outside of containment plus a check valve located inside containment provides isolation for the sample return line.The solenoid operated valves are spring-loaded to close upon interruption of power to the solenoid[SOL].The electrical circuitry that controls the position of these valves involves a one-out-of-two"taken twice" logic requiring receipt of either a'high'rywell pressure or'low'eactor water level signal in two separate circuits to interrupt power to the solenoids to allow the valves to close.Division 1 power is used to operate the logic associated with the isolation valves for one of the monitoring systems, and Division 2 power is used for the other.Each set of three valves is controlled by two electrical relays that must change position to allow the valves to close;the two relays for each set are within a single division.With this arrangement, failure of one of the two relays in the logic could prevent closure of its associated three isolation valves, which does not satisfy the single failure criterion as applied to containment isolation.
 
Roo ause The root cause is design error during initial plant construction.
LICENSEE EVE                   EPORT (LER)
The original design, released in 1979, included appropriate divisional separation, and consequently was not subject to this deficiency.
AGILITY NAHE (1)                                                                                       DOCKET NUMBER     (2)                     PAGE (3)
However, a design change in 1982 eliminated the divisional separation, thereby causing the deficiency as it existed when found.No records have been located documenting the rationale for the 1982 change.
Washin ton Nuclear                Plant - Unit      2                                              P I 5 I P     I P I P   I3   I 9 I 7   I PF   4 ITLE  (4)
LICENSEE EVENT REPOR R)TEXT CONTINUATION FACILITY NAME (1)Washington Nuclear Plant-Unit 2 OOCKET NUMBER (2)0 5 0 0 0 3 9 7 LER NUMBER (8)ear umber ev.No.AGE (3)4 13 01 ITLE (4)DESIGN ERROR IN ELECTRICAL CIRCUITRY FOR CONTAINMENT ISOLATION 3 OF 4 F rther rr tiv A i n The configuration of the control and indication circuitry for the solenoid-operated valves in the sample return lines was modified to eliminate the deficiency.
DESIGN ERROR IN ELECTRICAL CIRCUITRY FOR CONTAINMENT ISOLATION EVENT DATE     (5)                 LER NUHBER 6               REPORT DATE       (7)                   OTHER   FACILITIES INVOLVED (8)
The modification exchanged the control and indication circuits for one of the solenoid valves in each of the sample supply lines with that of the other electrical division, so that one of the two valves in series is actuated by the Division 1 logic and the other by the Division 2 logic.With this arrangement, failure of a single relay in either division s logic cannot prevent containment isolation.
HOHTH       DAY     YEAR   YEAR   9   SEQUENTIAL     EVI SION   MONTH     = DAY   YEAR FACILITY NAMES                                     DOCKET NUMBERS(S)
A representative sample of containment isolation valves was reviewed to determine if a single failure in control logic could prevent valve closure.No other cases were identified.
                                    <g  NUMBER          UMBER pl5lplplpl   I I OI6 2I2 9I4                 gl4         OIII3         Oil         OI9         I I 6 gl4                                                     pl5lplplpl I I PERATING                 HIS REPORT IS SUBHITTEO PURSUANT TO THE REQUIREHEHTS             OF 10 CFR 5: (Check one     or   more   of the following) (11)
A complete review of all containment isolation logics will be completed by October 28, 1994, to verify acceptable design.fet I nifican The equipment and tubing[TBG]comprising the Containment Monitoring Systems is a leak-tight closed loop boundary isolating the primary containment atmosphere from secondary containment.
ODE  (9)            5 POWER   LEVEL               20.402(b)                         20.405(C)                      50.73(a)(2)(iv)                      77.71(b)
These systems are not qualified as extensions of primary containment, but are equipped with pressure switches[PS]to isolate the sample supply and return lines from the system if the system pressure should rise to 2 psig.Leakage from the supply and return tubing or from the monitoring systems would enter the secondary containment which is designed to mitigate radioactive releases.Consequently, two barriers exist to limit the release of radioactivity in the event of a LOCA and concurrent failure of the containment isolation valves to close (the closed loop systems and secondary containment).
(10)                           0   405(a)(1)(i)                 50.36(c)(1)                     50.73(a)(2)(v)                       73.73(c) 0.405(a)(1)(ii)                 50.36(c)(2)                     50.73(a)(2)(vii)                       THER  (Specify in Abstract 0.405(a)(1)(iii)                 50.73(a)(2)(i)                 50.73(a)(2)(viii)(A)                below and in Text. NRC 20.405(a)(1)(iv)                 50.73(a)(2)(ii)                 50.73(a)(2)(viii)(B)                Form 366A) 0.405(a)(1)(v)                   50.73(a)(2)(iii)               50.73(a)(2)(x)
An existing analysis was available to assess the radiological consequences of a postulated accident involving the following assumed simultaneous failures: a LOCA involving core damage, failure of the containment isolation valves in the sample return line to close, and a breach of the closed loop system outboard of the open containment isolation valves.Based on the assumptions, the analysis showed that the 10CFR100 reference values for thyroid exposure at the exclusion boundary and GDC 19 thyroid limits for the control room would be exceeded.The assumptions included one open path from primary containment, while the deficiency described in this LER could involve two open paths which also result in exceeding 10CFR100 reference values and GDC 19 limits.Using figures from WNP-2 probabilistic risk studies, the probability of a LOCA with accompanying release of radioactivity to the containment atmosphere is 1.78 x 10'/year and the probability for a single relay to fail to open is 6 x 10'/year.The aggregate probability for radioactive release from primary containment is (1.78 x 10')x (6 x 10')x 2=2 x 10/year;the factor of 2 is used because two relays must change position to effect containment isolation.
LICENSEE CONTACT FOR THIS LER         (12)
LICENSEE EVENT REPORT)TEXT CONTINUATION LER HUHBER (8)DOCKET HUHBER (2)0 5 0 0 0 3 9 7 ACILITY HAHE (1)ear Humber ev.Ho.Washington Nuclear Plant-Unit 2 4 013 1 TITLE (4)DESIGN ERROR IN ELECTRICAL CIRCUITRY FOR CONTAINMENT ISOLATION PAGE (3)4 F 4 While the Containment Monitoring System is not qualified as an extension of containment, it does consist of closed loops that function as a pressure boundary during normal plant operations.
TELEPHONE NUMBER C.J. Foley, Licensing Engineer                                                                         REA CODE 5 I P I 9         I 7 I 7 I - I 4 I 3 I 2 I 5 COHPLETE OHE LINE FOR EACH COHPONEHT FAILURE DESCRIBED IH THIS REPORt (13)
The probability of failure of the pressure boundary of those systems is low, but not quantifiably so, because the monitoring systems have not previously been considered in probabilistic risk studies at WNP-2.However, those boundaries do provide further reduction of the aggregate failure probability of 2 x 107/year.Based on the above, it is concluded that the design error involving the electrical circuitry used to control containment isolation valves for the Containment Monitoring Systems was of low safety significance.
CAUSE       SYSTEH     COMPONENT         MAHUFACTURER   EPORTABLE &,':. j$     CAUSE     SYSTEM      COHPOHEHT          MANUFACTURER REPORTABLE 0 HPRDS     i+5:j3~                                                                   TO NPRDS IIII NA                   I   I     I       I   I   I                                                   I   I     I           I   I   I   I HA                    I   I     I       I   I   I                                                   I   I     I SUPPLEMENTAL REPORT EXPECTED   (14)                                       EXPECTED SUBHISSIDH          HOHTH  DAY    YEAR ATE (15)
imilar Even LER 94-009"Incorrect Isolation Valve Component Selection," reported installation of excess flow check valves as inboard isolation valves in the sample return lines for the Containment Monitoring Systems.This type of check valve was determined to be unable to satisfy requirements for the particular installation since such valves could open without operator action when primary containment pressure had declined below approximately 3.5 psid after a LOCA, The corrective action was to replace the excess flow check valves with ordinary check valves.However, that corrective action could not have been expected to address the deficiency of this LER because it involved a passive mechanical device problem, while the present event involves an electrical design error.}}
I YES   (If yes,   complete   EXPECTED SUBHISSIOH DATE)       I NO TRACT ed)
On June, 22, 1994, it was determined that containment isolation provisions for both Containment Monitoring Systems were inoperable because the design of the electrical circuitry was such that failure of a single electrical relay could prevent closure of the solenoid-operated containment isolation valves associated with those particular systems. The plant was in an annual refueling and maintenance outage.
The root cause is design error during initial plant construction. A plant modification was executed to revise the electrical circuitry to eliminate the design fiaw causing the deficiency.
 
LICENSEE EVENT REPORT                 )
TEXT CONTINUATION FACILITY NANE (1)                                 OOCKET NUNBER   (2)               LER NUMBER (8)         PAGE (3)
Year     Number       ev. No.
Washington Nuclear Plant - Unit          2 0  5  0    0  0 3 9 7 4     013       01         2 OF 4 ITLE (4)
DESIGN ERROR IN ELECTRICAL CIRCUITRY FOR CONTAINMENT ISOLATION Even Descri tion On June 22, 1994, the plant was in operational mode 5 (refueling) at 0% power. An electrical engineer, evaluating a report provided by INPO about a condition discovered at another nuclear plant, determined that a single failure of an electrical relay [RLYJ used in containment isolation logic circuits [JM] could prevent closure of solenoid-operated containment isolation valves PSV] for the WNP-2 Containment Monitoring System [IJ] (CMS), The NRC was immediately notified per 10CFR50.72(b)(1)(ii)(B) because this condition was a violation of the single-failure criterion.
Immedi e       rr   i e Acti The Containment Monitoring System was declared inoperable on June 22, 1994.
    ~h Two Containment Monitoring Systems serve as reactor coolant pressure boundary [AD] leak 'detection systems in conformance with Regulatory Guide 1.45. The closed loop systems, installed in cabinets located in the secondary containment area, draw samples of primary containment [NH] atmosphere through radiation monitors [MON], and return the samples to the primary containment. Containment isolation valves are provided for each system pursuant to GDC 56 as follows: 1) two solenoid-operated valves located outside of primary containment are installed in series in the sample supply line, and 2) a single solenoid-operated valve located outside of containment plus a check valve located inside containment provides isolation for the sample return line.
The solenoid operated valves are spring-loaded to close upon interruption of power to the solenoid [SOL].
The electrical circuitry that controls the position of these valves involves a one-out-of-two "taken twice" logic requiring receipt of either a 'high'rywell pressure or 'low'eactor water level signal in two separate circuits to interrupt power to the solenoids to allow the valves to close. Division 1 power is used to operate the logic associated with the isolation valves for one of the monitoring systems, and Division 2 power is used for the other. Each set of three valves is controlled by two electrical relays that must change position to allow the valves to close; the two relays for each set are within a single division. With this arrangement, failure of one of the two relays in the logic could prevent closure of its associated three isolation valves, which does not satisfy the single failure criterion as applied to containment isolation.
Roo     ause The root cause is design error during initial plant construction. The original design, released in 1979, included appropriate divisional separation, and consequently was not subject to this deficiency. However, a design change in 1982 eliminated the divisional separation, thereby causing the deficiency as it existed when found. No records have been located documenting the rationale for the 1982 change.
 
LICENSEE EVENT REPOR                 R)
TEXT CONTINUATION FACILITY NAME (1)                                 OOCKET NUMBER  (2)                 LER NUMBER (8)        AGE (3) ear     umber       ev. No.
Washington Nuclear Plant - Unit          2 0  5  0  0  0 3   9  7 4       13       01       3  OF  4 ITLE (4)
DESIGN ERROR IN ELECTRICAL CIRCUITRY FOR CONTAINMENT ISOLATION F rther     rr tiv A i     n The configuration of the control and indication circuitry for the solenoid-operated valves in the sample return lines was modified to eliminate the deficiency. The modification exchanged the control and indication circuits for one of the solenoid valves in each of the sample supply lines with that of the other electrical division, so that one of the two valves in series is actuated by the Division 1 logic and the other by the Division 2 logic. With this arrangement, failure of a single relay in either division s logic cannot prevent containment isolation.
A representative sample of containment isolation valves was reviewed to determine if a single failure in control logic could prevent valve closure. No other cases were identified. A complete review of all containment isolation logics will be completed by October 28, 1994, to verify acceptable design.
fet   I nifican The equipment and tubing [TBG] comprising the Containment Monitoring Systems is a leak-tight closed loop boundary isolating the primary containment atmosphere from secondary containment. These systems are not qualified as extensions of primary containment, but are equipped with pressure switches [PS] to isolate the sample supply and return lines from the system if the system pressure should rise to 2 psig.
Leakage from the supply and return tubing or from the monitoring systems would enter the secondary containment which is designed to mitigate radioactive releases. Consequently, two barriers exist to limit the release of radioactivity in the event of a LOCA and concurrent failure of the containment isolation valves to close (the closed loop systems and secondary containment).
An existing analysis was available to assess the radiological consequences of a postulated accident involving the following assumed simultaneous failures: a LOCA involving core damage, failure of the containment isolation valves in the sample return line to close, and a breach of the closed loop system outboard of the open containment isolation valves. Based on the assumptions, the analysis showed that the 10CFR100 reference values for thyroid exposure at the exclusion boundary and GDC 19 thyroid limits for the control room would be exceeded. The assumptions included one open path from primary containment, while the deficiency described in this LER could involve two open paths which also result in exceeding 10CFR100 reference values and GDC 19 limits.
Using figures from WNP-2 probabilistic risk studies, the probability of a LOCA with accompanying release of radioactivity to the containment atmosphere is 1.78 x 10'/year and the probability for a single relay to fail to open is 6 x 10'/year. The aggregate probability for radioactive release from primary containment is (1.78 x 10') x (6 x 10') x 2 = 2 x 10 /year; the factor of 2 is used because two relays must change position to effect containment isolation.
 
LICENSEE EVENT REPORT                   )
TEXT CONTINUATION ACILITY HAHE (1)                                 DOCKET HUHBER   (2)                 LER HUHBER (8)        PAGE (3) ear     Humber       ev. Ho.
Washington Nuclear Plant - Unit           2 0  5  0    0  0 3 9  7 4       013           1       4  F  4 TITLE (4)
DESIGN ERROR IN ELECTRICAL CIRCUITRY FOR CONTAINMENT ISOLATION While the Containment Monitoring System is not qualified as an extension of containment, it does consist of closed loops that function as a pressure boundary during normal plant operations. The probability of failure of the pressure boundary of those systems is low, but not quantifiably so, because the monitoring systems have not previously been considered in probabilistic risk studies at WNP-2. However, those boundaries do provide further reduction of the aggregate failure probability of 2 x 107/year.
Based on the above,     it is concluded that the design error involving the electrical circuitry used to control containment isolation valves for the Containment Monitoring Systems was of low safety significance.
imilar Even LER 94-009 "Incorrect Isolation Valve Component Selection," reported installation of excess flow check valves as inboard isolation valves in the sample return lines for the Containment Monitoring Systems. This type of check valve was determined to be unable to satisfy requirements for the particular installation since such valves could open without operator action when primary containment pressure had declined below approximately 3.5 psid after a LOCA, The corrective action was to replace the excess flow check valves with ordinary check valves. However, that corrective action could not have been expected to address the deficiency of this LER because it involved a passive mechanical device problem, while the present event involves an electrical design error.}}

Latest revision as of 13:31, 29 October 2019

LER 94-013-01:on 940622,containment Isolation Provisions for Monitoring Sys Were Inoperable.Caused by Error in Electrical Circuitry Design.Sample Return Lines Modified. W/940916 Ltr
ML17291A390
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/16/1994
From: Foley C, Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-94-214, LER-94-013, LER-94-13, NUDOCS 9409230285
Download: ML17291A390 (7)


Text

1 ~

1 P R.I C) RIDS PROCESSIX(

R.IWY'ACCELERATED REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9409230285 DOC.DATE: 94/09/16 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION FOLEY,C.J. Washington Public Power Supply System PARRISH,J.V. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

LER 91-013-01:on 940622,containment isolation provisions for monitoring sos were inoperable. Caused by design of electrical circuitry was error. Sample return lines was modified to eliminate deficiency.

DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR ENCL SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER), Incident pt, etc.

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 CLIFFORD,J 1 1 INTERNAL: ACRS AEOD/SPD/RRAB 1

I ~ QDJROAB/DSP FILK CENTER ~0-2 1

2 1

NRR/DE/EELB NRR/DORS/OEAB I NRR/DE~MEB 1 1 1 NRR/DRCH/HHFB 1 1 NRR/DRCH/HICB 1 NRR/DRCH/HOLB 1 1 NRR/DRSS/PRPB 2 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 NRR/PMAS/IRCB-E 1 1 RES/DSIR/EIB 1 RGN4 FILE Ol 1 1 EXTERNAL: EGGG BRYCE,J.H 2 2 L ST LOBBY WARD 1 1 NOAC MURPHY,G.A 1 1 NOAC POOREFW 1 1 NRC PDR 1 1 'UDOCS FULL TXT 1 1 NOTE TO ALL"RI DS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACTTHE DOCL'iIENTCONTROL DESK. ROOM PI-37 (EXT. 504-2083 ) TO ELIXIINATEYOUR NAME FROiI DISTRIBUTION LISTS I'OR DOCI.'MEN'I'S YOU DON"I'EED!

FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 27 ENCL 27

4a vi WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 September 16, 1994 G02-94-214 Docket No. 50-397 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

NUCLEAR PLANT WNP-2, OPERATING LICENSE NPF-21 LICENSEE EVENT REPORT NO. 94-013-01 Transmitted herewith is Licensee Event Report No. 94-013-01 for the WNP-2 Plant.

LER94-013-00 reported a design deficiency in the containment isolation logic for the Containment Monitoring System (CMS). As part of the associated corrective actions, engineering was assigned to review other containment isolation logics to verify acceptable design. This review was scheduled for completion by September 2, 1994; however, the scope of this review has necessitated extending this date to October 28, 1994. Presently, over 60%

of the review is complete.

Should you have any questions or desire additional information, please call me or D.A. Swank at (509) 377-4563.

Sincerely, V. Parrish (Mail Drop 1023)

Assistant Managing Director, Operations JVP/CJF/my Enclosure CC: LJ Callan, NRC-RIV KE Perkins, Jr., NRC RIV, Walnut Creek Field Office NS Reynolds, Winston & Strawn NRC Sr. Resident Inspector (Mail Drop 927N, 2 Copies)

INPO Records Center - Atlanta, GA DL Williams, BPA (Mail Drop 399) 9405'230285 9409i6 PDR ADOCK 05000397 g PDR

LICENSEE EVE EPORT (LER)

AGILITY NAHE (1) DOCKET NUMBER (2) PAGE (3)

Washin ton Nuclear Plant - Unit 2 P I 5 I P I P I P I3 I 9 I 7 I PF 4 ITLE (4)

DESIGN ERROR IN ELECTRICAL CIRCUITRY FOR CONTAINMENT ISOLATION EVENT DATE (5) LER NUHBER 6 REPORT DATE (7) OTHER FACILITIES INVOLVED (8)

HOHTH DAY YEAR YEAR 9 SEQUENTIAL EVI SION MONTH = DAY YEAR FACILITY NAMES DOCKET NUMBERS(S)

<g NUMBER UMBER pl5lplplpl I I OI6 2I2 9I4 gl4 OIII3 Oil OI9 I I 6 gl4 pl5lplplpl I I PERATING HIS REPORT IS SUBHITTEO PURSUANT TO THE REQUIREHEHTS OF 10 CFR 5: (Check one or more of the following) (11)

ODE (9) 5 POWER LEVEL 20.402(b) 20.405(C) 50.73(a)(2)(iv) 77.71(b)

(10) 0 405(a)(1)(i) 50.36(c)(1) 50.73(a)(2)(v) 73.73(c) 0.405(a)(1)(ii) 50.36(c)(2) 50.73(a)(2)(vii) THER (Specify in Abstract 0.405(a)(1)(iii) 50.73(a)(2)(i) 50.73(a)(2)(viii)(A) below and in Text. NRC 20.405(a)(1)(iv) 50.73(a)(2)(ii) 50.73(a)(2)(viii)(B) Form 366A) 0.405(a)(1)(v) 50.73(a)(2)(iii) 50.73(a)(2)(x)

LICENSEE CONTACT FOR THIS LER (12)

TELEPHONE NUMBER C.J. Foley, Licensing Engineer REA CODE 5 I P I 9 I 7 I 7 I - I 4 I 3 I 2 I 5 COHPLETE OHE LINE FOR EACH COHPONEHT FAILURE DESCRIBED IH THIS REPORt (13)

CAUSE SYSTEH COMPONENT MAHUFACTURER EPORTABLE &,':. j$ CAUSE SYSTEM COHPOHEHT MANUFACTURER REPORTABLE 0 HPRDS i+5:j3~ TO NPRDS IIII NA I I I I I I I I I I I I I HA I I I I I I I I I SUPPLEMENTAL REPORT EXPECTED (14) EXPECTED SUBHISSIDH HOHTH DAY YEAR ATE (15)

I YES (If yes, complete EXPECTED SUBHISSIOH DATE) I NO TRACT ed)

On June, 22, 1994, it was determined that containment isolation provisions for both Containment Monitoring Systems were inoperable because the design of the electrical circuitry was such that failure of a single electrical relay could prevent closure of the solenoid-operated containment isolation valves associated with those particular systems. The plant was in an annual refueling and maintenance outage.

The root cause is design error during initial plant construction. A plant modification was executed to revise the electrical circuitry to eliminate the design fiaw causing the deficiency.

LICENSEE EVENT REPORT )

TEXT CONTINUATION FACILITY NANE (1) OOCKET NUNBER (2) LER NUMBER (8) PAGE (3)

Year Number ev. No.

Washington Nuclear Plant - Unit 2 0 5 0 0 0 3 9 7 4 013 01 2 OF 4 ITLE (4)

DESIGN ERROR IN ELECTRICAL CIRCUITRY FOR CONTAINMENT ISOLATION Even Descri tion On June 22, 1994, the plant was in operational mode 5 (refueling) at 0% power. An electrical engineer, evaluating a report provided by INPO about a condition discovered at another nuclear plant, determined that a single failure of an electrical relay [RLYJ used in containment isolation logic circuits [JM] could prevent closure of solenoid-operated containment isolation valves PSV] for the WNP-2 Containment Monitoring System [IJ] (CMS), The NRC was immediately notified per 10CFR50.72(b)(1)(ii)(B) because this condition was a violation of the single-failure criterion.

Immedi e rr i e Acti The Containment Monitoring System was declared inoperable on June 22, 1994.

~h Two Containment Monitoring Systems serve as reactor coolant pressure boundary [AD] leak 'detection systems in conformance with Regulatory Guide 1.45. The closed loop systems, installed in cabinets located in the secondary containment area, draw samples of primary containment [NH] atmosphere through radiation monitors [MON], and return the samples to the primary containment. Containment isolation valves are provided for each system pursuant to GDC 56 as follows: 1) two solenoid-operated valves located outside of primary containment are installed in series in the sample supply line, and 2) a single solenoid-operated valve located outside of containment plus a check valve located inside containment provides isolation for the sample return line.

The solenoid operated valves are spring-loaded to close upon interruption of power to the solenoid [SOL].

The electrical circuitry that controls the position of these valves involves a one-out-of-two "taken twice" logic requiring receipt of either a 'high'rywell pressure or 'low'eactor water level signal in two separate circuits to interrupt power to the solenoids to allow the valves to close. Division 1 power is used to operate the logic associated with the isolation valves for one of the monitoring systems, and Division 2 power is used for the other. Each set of three valves is controlled by two electrical relays that must change position to allow the valves to close; the two relays for each set are within a single division. With this arrangement, failure of one of the two relays in the logic could prevent closure of its associated three isolation valves, which does not satisfy the single failure criterion as applied to containment isolation.

Roo ause The root cause is design error during initial plant construction. The original design, released in 1979, included appropriate divisional separation, and consequently was not subject to this deficiency. However, a design change in 1982 eliminated the divisional separation, thereby causing the deficiency as it existed when found. No records have been located documenting the rationale for the 1982 change.

LICENSEE EVENT REPOR R)

TEXT CONTINUATION FACILITY NAME (1) OOCKET NUMBER (2) LER NUMBER (8) AGE (3) ear umber ev. No.

Washington Nuclear Plant - Unit 2 0 5 0 0 0 3 9 7 4 13 01 3 OF 4 ITLE (4)

DESIGN ERROR IN ELECTRICAL CIRCUITRY FOR CONTAINMENT ISOLATION F rther rr tiv A i n The configuration of the control and indication circuitry for the solenoid-operated valves in the sample return lines was modified to eliminate the deficiency. The modification exchanged the control and indication circuits for one of the solenoid valves in each of the sample supply lines with that of the other electrical division, so that one of the two valves in series is actuated by the Division 1 logic and the other by the Division 2 logic. With this arrangement, failure of a single relay in either division s logic cannot prevent containment isolation.

A representative sample of containment isolation valves was reviewed to determine if a single failure in control logic could prevent valve closure. No other cases were identified. A complete review of all containment isolation logics will be completed by October 28, 1994, to verify acceptable design.

fet I nifican The equipment and tubing [TBG] comprising the Containment Monitoring Systems is a leak-tight closed loop boundary isolating the primary containment atmosphere from secondary containment. These systems are not qualified as extensions of primary containment, but are equipped with pressure switches [PS] to isolate the sample supply and return lines from the system if the system pressure should rise to 2 psig.

Leakage from the supply and return tubing or from the monitoring systems would enter the secondary containment which is designed to mitigate radioactive releases. Consequently, two barriers exist to limit the release of radioactivity in the event of a LOCA and concurrent failure of the containment isolation valves to close (the closed loop systems and secondary containment).

An existing analysis was available to assess the radiological consequences of a postulated accident involving the following assumed simultaneous failures: a LOCA involving core damage, failure of the containment isolation valves in the sample return line to close, and a breach of the closed loop system outboard of the open containment isolation valves. Based on the assumptions, the analysis showed that the 10CFR100 reference values for thyroid exposure at the exclusion boundary and GDC 19 thyroid limits for the control room would be exceeded. The assumptions included one open path from primary containment, while the deficiency described in this LER could involve two open paths which also result in exceeding 10CFR100 reference values and GDC 19 limits.

Using figures from WNP-2 probabilistic risk studies, the probability of a LOCA with accompanying release of radioactivity to the containment atmosphere is 1.78 x 10'/year and the probability for a single relay to fail to open is 6 x 10'/year. The aggregate probability for radioactive release from primary containment is (1.78 x 10') x (6 x 10') x 2 = 2 x 10 /year; the factor of 2 is used because two relays must change position to effect containment isolation.

LICENSEE EVENT REPORT )

TEXT CONTINUATION ACILITY HAHE (1) DOCKET HUHBER (2) LER HUHBER (8) PAGE (3) ear Humber ev. Ho.

Washington Nuclear Plant - Unit 2 0 5 0 0 0 3 9 7 4 013 1 4 F 4 TITLE (4)

DESIGN ERROR IN ELECTRICAL CIRCUITRY FOR CONTAINMENT ISOLATION While the Containment Monitoring System is not qualified as an extension of containment, it does consist of closed loops that function as a pressure boundary during normal plant operations. The probability of failure of the pressure boundary of those systems is low, but not quantifiably so, because the monitoring systems have not previously been considered in probabilistic risk studies at WNP-2. However, those boundaries do provide further reduction of the aggregate failure probability of 2 x 107/year.

Based on the above, it is concluded that the design error involving the electrical circuitry used to control containment isolation valves for the Containment Monitoring Systems was of low safety significance.

imilar Even LER 94-009 "Incorrect Isolation Valve Component Selection," reported installation of excess flow check valves as inboard isolation valves in the sample return lines for the Containment Monitoring Systems. This type of check valve was determined to be unable to satisfy requirements for the particular installation since such valves could open without operator action when primary containment pressure had declined below approximately 3.5 psid after a LOCA, The corrective action was to replace the excess flow check valves with ordinary check valves. However, that corrective action could not have been expected to address the deficiency of this LER because it involved a passive mechanical device problem, while the present event involves an electrical design error.