|
|
(4 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML13219A843 | | | number = ML13219A843 |
| | issue date = 07/30/2013 | | | issue date = 07/30/2013 |
| | title = Rensselaer Polytechnic Institute - Change in Level 1 Personnel at Rpi Reactor Critical Facility | | | title = Change in Level 1 Personnel at RPI Reactor Critical Facility |
| | author name = Sreepada S R | | | author name = Sreepada S |
| | author affiliation = Rensselaer Polytechnic Institute | | | author affiliation = Rensselaer Polytechnic Institute |
| | addressee name = | | | addressee name = |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:Rensselaer DEPARTMENT OF MECHANICAL, AEROSPACE, AND NUCLEAR ENGINEERING RCF-13-02 July 30, 2013U.S. Nuclear Regulatory Commission ATTN: Document Control DeskWashington, DC 20555Re: Change in Level 1 personnel at RPI Reactor critical Facility: | | {{#Wiki_filter:Rensselaer DEPARTMENT OF MECHANICAL, AEROSPACE, AND NUCLEAR ENGINEERING RCF-13-02 July 30, 2013 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Re: Change in Level 1 personnel at RPI Reactor critical Facility: License CX -22 |
| License CX -22 | |
|
| |
|
| ==Dear Sir,== | | ==Dear Sir,== |
| This letter notifies you, in accordance with our Technical Specifications of license CX -22,Change in Level 1 personnel (Dean of School of Engineering). | | |
| Effective July 1 st, the School ofEngineering is reporting directly to the office of Provost (Dr. Prabhat Hajela) pending theappointment of an administrative dean who will assume duties on August 16, 2013.ailIIArIIly, Prof. Sastry R. Sreepada IDirector, Walthousen Reactor Critical FacilityRensselaer Polytechnic Institute, 110 8th Street, Troy NY 12180cc:Dr. Prabhat Hajela,ProvostDr. Suvranu De, Chairman, MANEDr. Yaron Danon, Chairman NSRBDr. Peter Caracappa, RPI Radiation Safety OfficerDr. George Xu, Head, Nuclear Engineering ProgramMr. Glenn Winters, Reactor Operations Supervisor Rensselaer Polytechnic Institute 110 8th Street I Troy, NY 12180-3590 1 Jonsson Engineering CenterPhone (518) 276-6351 I Fax (518) 276-6025 I email: mane@rpi.edu}} | | This letter notifies you, in accordance with our Technical Specifications of license CX -22, Change in Level 1 personnel (Dean of School of Engineering). Effective July 1st, the School of Engineering is reporting directly to the office of Provost (Dr. Prabhat Hajela) pending the appointment of an administrative dean who will assume duties on August 16, 2013. |
| | ail IIArIIly, Prof. Sastry R. Sreepada I Director, Walthousen Reactor Critical Facility Rensselaer Polytechnic Institute, 110 8 th Street, Troy NY 12180 cc: |
| | Dr. Prabhat Hajela, Provost Dr. Suvranu De, Chairman, MANE Dr. Yaron Danon, Chairman NSRB Dr. Peter Caracappa, RPI Radiation Safety Officer Dr. George Xu, Head, Nuclear Engineering Program Mr. Glenn Winters, Reactor Operations Supervisor Rensselaer Polytechnic Institute 110 8th Street I Troy, NY 12180-3590 1Jonsson Engineering Center Phone (518) 276-6351 I Fax (518) 276-6025 I email: mane@rpi.edu}} |
|
---|
Category:Letter
MONTHYEARML24058A3562024-03-0707 March 2024 Examination Report No. 50-225/OL-24-01, Rensselaer Polytechnic Institute Critical Experiments Facility ML24058A3552024-03-0707 March 2024 Examination Results Letter No. 50-225/OL-24-01, Rensselaer Polytechnic Institute Critical Experiments Facility ML24002B0802024-01-0303 January 2024 – Change of Facility Project Manager IR 05000225/20232012023-12-12012 December 2023 Nuclear Regulatory Commission Routine Inspection Report No. 05000225/2023201 - Cover Letter and Enclosure ML23164A0522023-06-13013 June 2023 Examination Report Letter No. 50-225/OL-23-01, Rensselaer Polytechnic University ML23031A2032023-03-0808 March 2023 Examination Confirmation Letter No. 50-225/OL-23-01, Rensselaer Polytechnic Institute IR 05000225/20222012023-02-0808 February 2023 U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000225/2022201 - Cover Letter and Enclosure IR 05000225/20222022023-02-0707 February 2023 U.S. Nuclear Regulatory Commission Security Inspection Report No. 05000225/2022202 - Non-OUO-SRI Cover Letter ML22073A0782022-04-14014 April 2022 Examination Confirmation Letter No. 50-225/OL-22-01, Rensselaer Polytechnic Institute ML22005A3062022-01-0505 January 2022 Response Letter to NRC 2021 Inspection Report (Submission) ML21246A2742021-09-28028 September 2021 Issuance of Amendment No. 12 to Renewed Facility Operating License No. CX-22 ML21050A3862021-02-23023 February 2021 Rensselaer Polytech Institute - Request for RAI License Amendment Request for Modifications to the Restricted and Exclusion Area for the Renewed Facility Operating License (No≫ CX-22 ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards IR 05000225/20202012020-10-20020 October 2020 U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000225/2020201 ML20135H1592020-05-19019 May 2020 Additional Information Needed for the Application for a License Amendment Re Modification to the Restricted and Exclusion Areas for the Renewed Facility License No. CX-22 ML20099F9002020-04-10010 April 2020 Acceptance of the Application for a License Amendment New Definition of Facility'S Restricted and Exclusion Areas ML20076B8532020-03-30030 March 2020 Review of Revised Emergency Plan for the Renewed Facility License CX-22 ML19340C0762019-12-10010 December 2019 Supplemental Information Needed for Acceptance of the Application for a License Amendment Re Modification to the Restricted and Exclusion Areas for the Renewed Facility License No. CX-22 IR 05000225/20192012019-09-19019 September 2019 Nuclear Regulatory Commission Routine Inspection Report No. 05000225/2019201 - August 2019 IR 05000225/20192022019-09-19019 September 2019 Nuclear Regulatory Commission Security Inspection Report No. 05000225/2019202 (Cover Letter) ML19037A2972019-02-0707 February 2019 Examination Report No. 50-225/OL-19-02, Rensselaer Polytechnic Institute ML19008A2472019-01-0909 January 2019 Examination Confirmation Letter No. 50-225/OL-19-02, Rensselaer Polytechnic Institute ML18365A3602019-01-0808 January 2019 Change of Facility Back-Up Project Manager ML18319A1072018-11-14014 November 2018 Examination Report No. 50-225/OL-19-01 IR 05000225/20182012018-10-12012 October 2018 U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000225/2018201 ML18291A9232018-10-0202 October 2018 Submittal of Revised Emergency Plan ML18243A3172018-08-30030 August 2018 Examination Confirmation Letter No. 50-225/OL-19-01, Rensselaer Polytechnic Institute ML17348B2102017-12-26026 December 2017 Examination Report No. 50-225/OL-18-01, Rensselaer Polytechnic Institute IR 05000225/20172012017-12-0505 December 2017 Reactor Facility Routine Safety Inspection Report 05000225/2017201 ML17257A0692017-09-14014 September 2017 Examination Confirmation Letter No. 50-225/OL-18-01, Renssealer Polytechnic Institute ML17072A3712017-03-17017 March 2017 Examination Report No. 50-225/OL-17-01, Renssealer Polytechnic Institute ML16348A2972017-01-0505 January 2017 Rensselaer Polytechnic Institute - U.S. Nuclear Regulatory Commission Operations Inspection Report No. 50-225/2016-201 IR 05000225/20162022017-01-0404 January 2017 U.S. Nuclear Regulatory Commission Operations Inspection Report No. 50-225/2016-202. (Cover Letter Only) ML16257A0152016-09-14014 September 2016 Examination Confirmation Letter, No. 50/225-OL-17-01, Rensselaer Polytechnic Institute ML16252A4392016-09-0808 September 2016 Confirmation of Initial License Examination ML16179A2032016-06-0101 June 2016 Letter to Confirm Appointment as Chair of Rensselaer'S Nuclear Safety Review Board, Effective June 1, 2016 ML16050A2722016-02-24024 February 2016 Examination Report, No. 50-225/OL-16-01, Rensselaer Polytechnic Institute ML14290A4862015-06-0303 June 2015 Y020140127 - Withdrawal of Order EA-05-007, Order Imposing Additional Security Measures IR 05000225/20142022015-02-0404 February 2015 IR 05000225/2014202, on 12/08-11/2014, Rensselaer Polytechnic Institute ML15020A5882015-02-0303 February 2015 Examination Report 50-225/OL-15-01, January 13, 2015, Rensselaer Polytechnic Institute ML15020A5972015-01-30030 January 2015 Examination Reults Letter No 50-225/OL-15-01 ML15041A1952015-01-23023 January 2015 Letter from Virginia C. Gregg Supporting Self-guarantee Financial Test to Demonstrate Financial Assurance, as Specified in 10 CFR Part 30 ML14336A1742014-12-0404 December 2014 Examination Notification Letter Initial Examination No. 50-225/OL-15-01 Rensselaer Polytechnic Institute ML14192A0152014-07-0101 July 2014 Change in Level 1 Personnel at RPI Reactor Critical Facility: License CX-22 ML14136A4772014-05-27027 May 2014 Change of Facility Backup Project Manager ML13346A0182013-12-0303 December 2013 Change Update in Level 2 Pesonnel at RPI Reactor Critical Facility ML13226A0702013-08-12012 August 2013 Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit ML13233A3142013-08-0505 August 2013 Change in Level 1 Personnel at RPI Reactor Critical Facility: License Cx -22 ML13219A8432013-07-30030 July 2013 Change in Level 1 Personnel at RPI Reactor Critical Facility ML12324A0312012-11-19019 November 2012 Examination Results Letter 50-225/OL-13-01, Rensselaer Polytechnic Institute 2024-03-07
[Table view] |
Text
Rensselaer DEPARTMENT OF MECHANICAL, AEROSPACE, AND NUCLEAR ENGINEERING RCF-13-02 July 30, 2013 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Re: Change in Level 1 personnel at RPI Reactor critical Facility: License CX -22
Dear Sir,
This letter notifies you, in accordance with our Technical Specifications of license CX -22, Change in Level 1 personnel (Dean of School of Engineering). Effective July 1st, the School of Engineering is reporting directly to the office of Provost (Dr. Prabhat Hajela) pending the appointment of an administrative dean who will assume duties on August 16, 2013.
ail IIArIIly, Prof. Sastry R. Sreepada I Director, Walthousen Reactor Critical Facility Rensselaer Polytechnic Institute, 110 8 th Street, Troy NY 12180 cc:
Dr. Prabhat Hajela, Provost Dr. Suvranu De, Chairman, MANE Dr. Yaron Danon, Chairman NSRB Dr. Peter Caracappa, RPI Radiation Safety Officer Dr. George Xu, Head, Nuclear Engineering Program Mr. Glenn Winters, Reactor Operations Supervisor Rensselaer Polytechnic Institute 110 8th Street I Troy, NY 12180-3590 1Jonsson Engineering Center Phone (518) 276-6351 I Fax (518) 276-6025 I email: mane@rpi.edu