ENS 57813: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 22: Line 22:
Due to the reactor protection system actuation while critical, this event is being reported as a four-hour, non-emergency notification per 10 CFR 50.72 (b)(2)(iv)(B). The expected actuation of the auxiliary feed water system (an engineered safety feature) is being reported as an eight-hour report under 10 CFR 50.72 (b)(3)(iv)(A).
Due to the reactor protection system actuation while critical, this event is being reported as a four-hour, non-emergency notification per 10 CFR 50.72 (b)(2)(iv)(B). The expected actuation of the auxiliary feed water system (an engineered safety feature) is being reported as an eight-hour report under 10 CFR 50.72 (b)(3)(iv)(A).
There was no impact to the health and safety of the public or plant personnel. The NRC Senior Resident Inspector has been notified.
There was no impact to the health and safety of the public or plant personnel. The NRC Senior Resident Inspector has been notified.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20250717en.html#en57813
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20250718en.html#en57813
}}{{unit info
}}{{unit info
| Unit = 1
| Unit = 1

Latest revision as of 06:20, 18 July 2025

ENS 57813 +/-
Where
Prairie Island Xcel Energy icon.png
Minnesota (NRC Region 3)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-1.03 h-0.0429 days <br />-0.00613 weeks <br />-0.00141 months <br />)
Opened: Jason Rhody
13:57 Jul 16, 2025
NRC Officer: Josue Ramirez
Last Updated: Jul 16, 2025
57813 - NRC Website
Loading map...