Browse wiki

Jump to navigation Jump to search
The following information was provided by The following information was provided by the licensee via phone and email:</br>At 0959 CDT on 7/16/2025, with Unit 1 in mode 1 at 100 percent power, the reactor tripped coincident with operation of a bus 11 knife switch during performance of (surveillance procedure) SP 1857, 4KV bus 11/12 undervoltage and underfrequency relay test. The trip was not complicated with all systems responding normally post trip.</br>Operators responded and stabilized the plant. Decay heat is being removed by discharging steam using the steam dump system and the main feedwater system. Unit 2 is not affected.</br>Due to the reactor protection system actuation while critical, this event is being reported as a four-hour, non-emergency notification per 10 CFR 50.72 (b)(2)(iv)(B). The expected actuation of the auxiliary feed water system (an engineered safety feature) is being reported as an eight-hour report under 10 CFR 50.72 (b)(3)(iv)(A).</br>There was no impact to the health and safety of the public or plant personnel. The NRC Senior Resident Inspector has been notified.nior Resident Inspector has been notified.  +
14:59:00, 16 July 2025  +
13:57:00, 16 July 2025  +
14:59:00, 16 July 2025  +
The following information was provided by The following information was provided by the licensee via phone and email:</br>At 0959 CDT on 7/16/2025, with Unit 1 in mode 1 at 100 percent power, the reactor tripped coincident with operation of a bus 11 knife switch during performance of (surveillance procedure) SP 1857, 4KV bus 11/12 undervoltage and underfrequency relay test. The trip was not complicated with all systems responding normally post trip.</br>Operators responded and stabilized the plant. Decay heat is being removed by discharging steam using the steam dump system and the main feedwater system. Unit 2 is not affected.</br>Due to the reactor protection system actuation while critical, this event is being reported as a four-hour, non-emergency notification per 10 CFR 50.72 (b)(2)(iv)(B). The expected actuation of the auxiliary feed water system (an engineered safety feature) is being reported as an eight-hour report under 10 CFR 50.72 (b)(3)(iv)(A).</br>There was no impact to the health and safety of the public or plant personnel. The NRC Senior Resident Inspector has been notified.nior Resident Inspector has been notified.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 16 July 2025  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
11:20:04, 18 July 2025  +
13:57:00, 16 July 2025  +
Processing error"Processing error" is a predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> and represents errors that appeared in connection with improper value annotations or input processing.
-0.0429 d (-1.03 hours, -0.00613 weeks, -0.00141 months)  +
14:59:00, 16 July 2025  +
Automatic Reactor Trip  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
1  +