ML17335A101: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(12 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17335A101
| number = ML17335A101
| issue date = 11/29/2017
| issue date = 11/29/2017
| title = 2017/11/29 NRR E-mail Capture - DC Cook Unit Nos. 1 and 2: Acceptance Review for License Amendment Request Related to National Fire Protection Association 805 Requirements Deviation (EPID: L-2017-LLA-0374)
| title = NRR E-mail Capture - DC Cook Unit Nos. 1 and 2: Acceptance Review for License Amendment Request Related to National Fire Protection Association 805 Requirements Deviation
| author name = Rankin J
| author name = Rankin J
| author affiliation = NRC/NRR/DORL/LPLIII
| author affiliation = NRC/NRR/DORL/LPLIII
| addressee name = Kish H L
| addressee name = Kish H
| addressee affiliation = Indiana Michigan Power Co
| addressee affiliation = Indiana Michigan Power Co
| docket = 05000315, 05000316
| docket = 05000315, 05000316
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:1NRR-DMPSPEm ResourceFrom:Rankin, JennivineSent:Wednesday, November 29, 2017 3:18 PMTo:Helen L KishSubject:DC Cook Unit Nos. 1 and 2:  Acceptance Review for License Amendment Request related to National Fire Protection Association 805 Requirements Deviation (EPID: L-2017-LLA-0374)Mrs. Kish, By letter dated November 7, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17317A472), Indiana Michigan Power Company (the licensee), submitted a license amendment request for Donald C. Cook Nuclear Plant (CNP), Unit Nos. 1 and 2. The proposed amendment would revise the CNP renewed facility operating license to allow a deviation from National Fire Protection Association Standard 805 requirements. Specifically, CNP is requesting approval to allow currently installed non-plenum listed cables routed above suspended ceilings and to allow currently installed thin wall electrical metallic tubing and embedded/buried polyvinyl chloride conduit. The purpose of this e-mail is to provide the results of the NRC staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
{{#Wiki_filter:NRR-DMPSPEm Resource From:                             Rankin, Jennivine Sent:                             Wednesday, November 29, 2017 3:18 PM To:                               Helen L Kish
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license must fully describe the changes requested, and following as far as applicable, the form prescribed for original application. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. 


The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence. Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 140 hours to complete. The NRC staff expects to complete this review in approximately 12 months, which is November 2018.
==Subject:==
DC Cook Unit Nos. 1 and 2: Acceptance Review for License Amendment Request related to National Fire Protection Association 805 Requirements Deviation (EPID:
L-2017-LLA-0374)
Mrs. Kish, By letter dated November 7, 2017 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML17317A472), Indiana Michigan Power Company (the licensee), submitted a license amendment request for Donald C. Cook Nuclear Plant (CNP), Unit Nos. 1 and 2. The proposed amendment would revise the CNP renewed facility operating license to allow a deviation from National Fire Protection Association Standard 805 requirements. Specifically, CNP is requesting approval to allow currently installed non-plenum listed cables routed above suspended ceilings and to allow currently installed thin wall electrical metallic tubing and embedded/buried polyvinyl chloride conduit.
The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license must fully describe the changes requested, and following as far as applicable, the form prescribed for original application. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately [[estimated NRC review hours::140 hours]] to complete. The NRC staff expects to complete this review in approximately 12 months, which is November 2018.
If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, I will communicate the reasons for the changes, along with the new estimates during our routine interactions.
These estimates are based on the staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review.
If you have any questions, please contact me at (301) 415-1530.
1
: Thanks, Jennie Jennie Rankin, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 2


If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, I will communicate the reasons for the changes, along with the new estimates during our routine interactions. 
Hearing Identifier:     NRR_DMPS Email Number:           13 Mail Envelope Properties     (Jennivine.Rankin@nrc.gov20171129151800)
 
These estimates are based on the staff's initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review. If you have any questions, please contact me at (301) 415-1530.
 
2Thanks, Jennie
 
Jennie Rankin, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Hearing Identifier: NRR_DMPS Email Number: 13   Mail Envelope Properties   (Jennivine.Rankin@nrc.gov20171129151800)  


==Subject:==
==Subject:==
DC Cook Unit Nos. 1 and 2: Acceptance Review for License Amendment Request related to National Fire Protection Association 805 Requirements Deviation (EPID: L-2017-LLA-0374)
DC Cook Unit Nos. 1 and 2: Acceptance Review for License Amendment Request related to National Fire Protection Association 805 Requirements Deviation (EPID:
Sent Date:   11/29/2017 3:18:08 PM Received Date: 11/29/2017 3:18:00 PM From:   Rankin, Jennivine Created By:   Jennivine.Rankin@nrc.gov Recipients:     "Helen L Kish" <hlkish@aep.com> Tracking Status: None Post Office:     Files     Size     Date & Time MESSAGE   3437     11/29/2017 3:18:00 PM Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:      
L-2017-LLA-0374)
}}
Sent Date:             11/29/2017 3:18:08 PM Received Date:         11/29/2017 3:18:00 PM From:                   Rankin, Jennivine Created By:             Jennivine.Rankin@nrc.gov Recipients:
"Helen L Kish" <hlkish@aep.com>
Tracking Status: None Post Office:
Files                           Size                     Date & Time MESSAGE                         3437                     11/29/2017 3:18:00 PM Options Priority:                       Standard Return Notification:             No Reply Requested:                 No Sensitivity:                     Normal Expiration Date:
Recipients Received:}}

Latest revision as of 13:39, 8 March 2020

NRR E-mail Capture - DC Cook Unit Nos. 1 and 2: Acceptance Review for License Amendment Request Related to National Fire Protection Association 805 Requirements Deviation
ML17335A101
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 11/29/2017
From: Jennivine Rankin
Plant Licensing Branch III
To: Kish H
Indiana Michigan Power Co
References
L-2017-LLA-0374
Download: ML17335A101 (3)


Text

NRR-DMPSPEm Resource From: Rankin, Jennivine Sent: Wednesday, November 29, 2017 3:18 PM To: Helen L Kish

Subject:

DC Cook Unit Nos. 1 and 2: Acceptance Review for License Amendment Request related to National Fire Protection Association 805 Requirements Deviation (EPID:

L-2017-LLA-0374)

Mrs. Kish, By letter dated November 7, 2017 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML17317A472), Indiana Michigan Power Company (the licensee), submitted a license amendment request for Donald C. Cook Nuclear Plant (CNP), Unit Nos. 1 and 2. The proposed amendment would revise the CNP renewed facility operating license to allow a deviation from National Fire Protection Association Standard 805 requirements. Specifically, CNP is requesting approval to allow currently installed non-plenum listed cables routed above suspended ceilings and to allow currently installed thin wall electrical metallic tubing and embedded/buried polyvinyl chloride conduit.

The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license must fully describe the changes requested, and following as far as applicable, the form prescribed for original application. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 140 hours5.833 days <br />0.833 weeks <br />0.192 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which is November 2018.

If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, I will communicate the reasons for the changes, along with the new estimates during our routine interactions.

These estimates are based on the staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review.

If you have any questions, please contact me at (301) 415-1530.

1

Thanks, Jennie Jennie Rankin, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 2

Hearing Identifier: NRR_DMPS Email Number: 13 Mail Envelope Properties (Jennivine.Rankin@nrc.gov20171129151800)

Subject:

DC Cook Unit Nos. 1 and 2: Acceptance Review for License Amendment Request related to National Fire Protection Association 805 Requirements Deviation (EPID:

L-2017-LLA-0374)

Sent Date: 11/29/2017 3:18:08 PM Received Date: 11/29/2017 3:18:00 PM From: Rankin, Jennivine Created By: Jennivine.Rankin@nrc.gov Recipients:

"Helen L Kish" <hlkish@aep.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 3437 11/29/2017 3:18:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: