ML18275A053

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Revise Battery Monitoring and Maintenance TS
ML18275A053
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/01/2018
From: Dietrich A
Plant Licensing Branch III
To: Levendosky H
Indiana Michigan Power Co
References
L-2018-LLA-0246
Download: ML18275A053 (3)


Text

NRR-DMPSPEm Resource From: Dietrich, Allison Sent: Monday, October 1, 2018 4:26 PM To: Helen L Levendosky Cc: Joe Tanko (jmtanko@aep.com)

Subject:

D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Revise Battery Monitoring and Maintenance TS (EPID L-2018-LLA-0246)

By letter dated September 5, 2018 (Agencywide Documents Access and Management System Accession No. ML18250A185), Indiana Michigan Power Company submitted a license amendment request for the Donald C.

Cook Nuclear Plant, Unit Nos. 1 and 2. The proposed amendment would modify technical specification (TS) 5.5.15, Battery Monitoring and Maintenance Program, to align with the latest Institute of Electrical and Electronics Engineers (IEEE) Standard.

The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and follow as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 255 hours10.625 days <br />1.518 weeks <br />0.349 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which is September, 2019. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me at 301-415-3826.

Sincerely, Allison W. Dietrich, Project Manager 1

Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-3826 2

Hearing Identifier: NRR_DMPS Email Number: 598 Mail Envelope Properties (Allison.Dietrich@nrc.gov20181001162500)

Subject:

D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Revise Battery Monitoring and Maintenance TS (EPID L-2018-LLA-0246)

Sent Date: 10/1/2018 4:25:44 PM Received Date: 10/1/2018 4:25:00 PM From: Dietrich, Allison Created By: Allison.Dietrich@nrc.gov Recipients:

"Joe Tanko (jmtanko@aep.com)" <jmtanko@aep.com>

Tracking Status: None "Helen L Levendosky" <hllevendosky@aep.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 3531 10/1/2018 4:25:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: