Category:TSTF: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page with "for TSTF")
 
No edit summary
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
for TSTF
for [[Technical Specifications Task Force]] (TSTF)
 
{{#default_form:TSTF}}
 
{|class="wikitable"
|{{#arraymap:B&W-L-LP, B&W-R-LP, CE, GE-2, GE-3, GE-4, GE-5, GE-6, W-AP1000, Westinghouse PWR 2-Loop, Westinghouse PWR 3-Loop, Westinghouse PWR 4-Loop|,|xx|[[xx]]{{!}}{{!}}{{#ask:[[Category:TSTF]][[Applies to reactor type::xx]]
|?title
|?Number of sites implemented=I
|?Number of sites open=O
|?Number of sites withdrawn=W
|sort=Number of sites implemented
|order=descending
|limit=0
|searchlabel=[For xx]
}}|\n{{!}}-\n{{!}}}}
|}
 
{{#ask:[[Category:TSTF]]
|?title
|?Number of sites implemented=I
|?Number of sites open=O
|?Number of sites withdrawn=W
|sort=Number of sites implemented
|order=descending
}}

Latest revision as of 16:33, 2 October 2024

for Technical Specifications Task Force (TSTF)

This category uses the form TSTF.

B&W-L-LP [For B&W-L-LP]
B&W-R-LP [For B&W-R-LP]
CE [For CE]
GE-2 [For GE-2]
GE-3 [For GE-3]
GE-4 [For GE-4]
GE-5 [For GE-5]
GE-6 [For GE-6]
W-AP1000 [For W-AP1000]
Westinghouse PWR 2-Loop [For Westinghouse PWR 2-Loop]
Westinghouse PWR 3-Loop [For Westinghouse PWR 3-Loop]
Westinghouse PWR 4-Loop [For Westinghouse PWR 4-Loop]
 TitleIOW
TSTF-448Control Room Habitability109464
TSTF-425Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B106357
TSTF-449Steam Generator Tube Integrity58271
TSTF-493Clarify Application of Setpoint Methodology for LSSS Functions56215
TSTF-505Provide RISK-INFORMED Extended Completion Times - RITSTF Initiative 4B49354
TSTF-051Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations42152
TSTF-510Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection3953
TSTF-542Reactor Pressure Vessel Water Inventory Control36100
TSTF-523Generic Letter 2008-01, Managing Gas Accumulation35130
TSTF-577Performance Based Frequencies for Steam Generator Tube Inspections3141
TSTF-372Addition of LCO 3.0.8, Inoperability of Snubbers3050
TSTF-545TS Inservice Testing (IST) Program Removal26110
TSTF-359Increase Flexibility in Mode Restraints26130
TSTF-447Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors24140
TSTF-529, Clarify Use and Application RulesClarify Use and Application Rules2220
TSTF-490Deletion of E BAR Definition and Revision to RCS Specific Activity Tech Spec2292
TSTF-360DC Electrical Rewrite2176
TSTF-501Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control2172
TSTF-419Revise PTLR Definition and References in ISTS 5.6.6, RCS PTLR2011
TSTF-439Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO2062
TSTF-484Use of TS 3.10.1 for SCRAM Time Testing Activities1932
TSTF-535Revise Shutdown Margin Definition to Address Advanced Fuel Designs1840
TSTF-427Allowance for Non Technical Specification Barrier Degradation on Supported System Operability17101
TSTF-563Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program1750
TSTF-564Safety Limit MCPR to COLR1740
TSTF-511Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 261790
TSTF-522Revise Ventilation System Surveillance Requirements to Operate for 10 Hours PER Month1760
TSTF-582RPV WIC Enhancements1620
TSTF-479Changes to Reflect Revision of 10 CFR 50.55A1690
TSTF-52Implement 10 CFR 50, Appendix J, Option B1531
TSTF-418RPS and ESFAS Test Times and Completion Times - WCAP-143331450
TSTF-363Revise Topical Report References in ITS 5.6.5, Colr1420
TSTF-500DC Electrical Rewrite - Update to TSTF-3601352
TSTF-547Clarification of Rod Position Requirements1300
TSTF-514Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation1300
TSTF-513Revise Operability Requirements and Actions for RCS Leakage Instrumentation1330
TSTF-374Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil1232
TSTF-421Revision to RCP Flywheel Inspection Program - WCAP-156661220
TSTF-312Administratively Control Containment Penetrations1241
TSTF-567Add Containment Sump TS to Address GSI-191 Issues1242
TSTF-258Changes to Section 5.0, Administrative Controls11140
TSTF-541Add Exceptions to Surveillance Requirements When the Safety Function is Being Performed1120
TSTF-423Technical Specifications End States, NEDC-32988-A1150
TSTF-411Surveillance Test Interval Extensions for Components of the Reactor Protection System - WCAP-15376-P1140
TSTF-369Removal of Monthly Operating Report and Occupational Radiation Exposure Report11230
TSTF-497Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less1160
TSTF-569Revise Response Time Testing Definition1030
TSTF-554Revise Reactor Coolant Leakage Requirements1000
TSTF-491Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications1040
TSTF-306Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration1010
... further results

Pages in category "TSTF"

The following 200 pages are in this category, out of 562 total.

(previous page) (next page)

T

(previous page) (next page)