ML121150570: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(7 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML121150570
| number = ML121150570
| issue date = 04/25/2012
| issue date = 04/25/2012
| title = Three Mile Island Nuclear Station, Unit 1 - Withdrawal of Relief Request PR-05, Relief Request Associated with Fourth Inservice Testing Interval (TAC No. ME7532)
| title = Withdrawal of Relief Request PR-05, Relief Request Associated with Fourth Inservice Testing Interval
| author name = Bamford P J
| author name = Bamford P
| author affiliation = NRC/NRR/DORL/LPLI-2
| author affiliation = NRC/NRR/DORL/LPLI-2
| addressee name = Pacilio M J
| addressee name = Pacilio M
| addressee affiliation = Exelon Nuclear
| addressee affiliation = Exelon Nuclear
| docket = 05000289
| docket = 05000289
Line 14: Line 14:
| page count = 2
| page count = 2
| project = TAC:ME7532
| project = TAC:ME7532
| stage = Withdrawal
}}
}}


=Text=
=Text=
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 April 25, 2012 Mr. Michael President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 THREE MILE ISLAND NUCLEAR STATION, UNIT 1 -WITHDRAWAL OF RELIEF REQUEST PR-05, RELIEF REQUEST ASSOCIATED WITH FOURTH INSERVICE TESTING INTERVAL (TAC NO. ME7532)
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 25, 2012 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
 
==SUBJECT:==
THREE MILE ISLAND NUCLEAR STATION, UNIT 1 - WITHDRAWAL OF RELIEF REQUEST PR-05, RELIEF REQUEST ASSOCIATED WITH FOURTH INSERVICE TESTING INTERVAL (TAC NO. ME7532)


==Dear Mr. Pacilio:==
==Dear Mr. Pacilio:==
By letter dated October 28,2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 113010335), Exelon Generation Company, LLC (Exelon, the licensee), submitted a relief request proposing to perform an alternative testing method for the Reactor Building Emergency Cooling River Water Pumps at Three Mile Island Nuclear Station, Unit 1. By letter dated April 4, 2012 (ADAMS Accession No. ML 120870190), the U.S. Nuclear Regulatory Commission sent Exelon a request for additional information, in part, questioning the need for this relief request. Subsequently, by letter dated April 18, 2012 (ADAMS Accession No. ML 12110A123), Exelon concluded that the relief request was not needed, and withdreW the request. Based on the withdrawal of Relief Request PR-05, TAC No. ME7532 is being closed. Please contact me at 301-415-2833, if you have any questions.


Sincerely,Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289 cc: Distribution via Listserv April 25, 2012 Mr. Michael President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 THREE MILE ISLAND NUCLEAR STATION, UNIT 1 -WITHDRAWAL OF RELIEF REQUEST PR-05, RELIEF REQUEST ASSOCIATED WITH FOURTH INSERVICE TESTING INTERVAL (TAC NO. ME7532)
By letter dated October 28,2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML113010335), Exelon Generation Company, LLC (Exelon, the licensee), submitted a relief request proposing to perform an alternative testing method for the Reactor Building Emergency Cooling River Water Pumps at Three Mile Island Nuclear Station, Unit 1. By letter dated April 4, 2012 (ADAMS Accession No. ML120870190), the U.S. Nuclear Regulatory Commission sent Exelon a request for additional information, in part, questioning the need for this relief request. Subsequently, by letter dated April 18, 2012 (ADAMS Accession No. ML12110A123), Exelon concluded that the relief request was not needed, and withdreW the request. Based on the withdrawal of Relief Request PR-05, TAC No. ME7532 is being closed.
 
Please contact me at 301-415-2833, if you have any questions.
==Dear Mr. Pacilio:==
Sincerely,
By letter dated October 28,2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 113010335), Exelon Generation Company, LLC (Exelon, the licensee), submitted a relief request proposing to perform an alternative testing method for the Reactor Building Emergency Cooling River Water Pumps at Three Mile Island Nuclear Station, Unit 1. By letter dated April 4, 2012 (ADAMS Accession No. ML 120870190), the U.S. Nuclear Regulatory Commission sent Exelon a request for additional information, in part, questioning the need for this relief request. Subsequently, by letter dated April 18, 2012 (ADAMS Accession No. ML1211 OA123), Exelon concluded that the relief request was not needed, and withdrew the request. Based on the withdrawal of Relief Request PR-05, TAC No. ME7532 is being closed. Please contact me at 301-415-2833, if you have any questions.
                                              ~&M~
Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289 cc: Distribution via Listserv


Sincerely,/ra/ Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289 cc: Distribution via Listserv DISTRI BUTION: RidsNrrPMThreeMilelsland Resource PUBLIC LPLI-2 RtF RidsAcrsAcnw_MailCTR Resource RidsNrrLAABaxter Resource RidsOgcRp Resource RidsRgn1 MailCenter Resource RidsNrrDorlDpr Resource RidsNrrDorlLpl1-2 Resouce JBilierbeck, NRR RidsNrrDeEptb Resource ADAMS Accession Number" ML 121150570 *via email OFFICE LPLI-21PM LPLI-2/LA LPLI-2/BC NAME DATE PBamford 04/25/2012 ABaxter, SLittie for* 04/25/2012 MKhanna (JHughey for) 04/25/2012 OFFICIAL RECORD COPY}}
ML120870190), the U.S. Nuclear Regulatory Commission sent Exelon a request for additional information, in part, questioning the need for this relief request. Subsequently, by letter dated April 18, 2012 (ADAMS Accession No. ML1211 OA123), Exelon concluded that the relief request was not needed, and withdrew the request. Based on the withdrawal of Relief Request PR-05, TAC No. ME7532 is being closed.
Please contact me at 301-415-2833, if you have any questions.
Sincerely,
                                                /ra/
Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289 cc: Distribution via Listserv DISTRI BUTION:
RidsNrrPMThreeMilelsland Resource       PUBLIC                         LPLI-2 RtF RidsAcrsAcnw_MailCTR Resource           RidsNrrLAABaxter Resource     RidsOgcRp Resource RidsRgn1 MailCenter Resource             RidsNrrDorlDpr Resource       RidsNrrDorlLpl1-2 Resouce JBilierbeck, NRR                         RidsNrrDeEptb Resource ADAMS Accession Number" ML121150570 *via email OFFICE     LPLI-21PM         LPLI-2/LA         LPLI-2/BC NAME     PBamford      ABaxter, SLittie  MKhanna (JHughey for*              for)
DATE     04/25/2012       04/25/2012       04/25/2012}}

Latest revision as of 17:03, 6 February 2020

Withdrawal of Relief Request PR-05, Relief Request Associated with Fourth Inservice Testing Interval
ML121150570
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 04/25/2012
From: Peter Bamford
Plant Licensing Branch 1
To: Pacilio M
Exelon Nuclear
Bamford, Peter J., NRR/DORL 415-2833
References
TAC ME7532
Download: ML121150570 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 25, 2012 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

THREE MILE ISLAND NUCLEAR STATION, UNIT 1 - WITHDRAWAL OF RELIEF REQUEST PR-05, RELIEF REQUEST ASSOCIATED WITH FOURTH INSERVICE TESTING INTERVAL (TAC NO. ME7532)

Dear Mr. Pacilio:

By letter dated October 28,2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML113010335), Exelon Generation Company, LLC (Exelon, the licensee), submitted a relief request proposing to perform an alternative testing method for the Reactor Building Emergency Cooling River Water Pumps at Three Mile Island Nuclear Station, Unit 1. By letter dated April 4, 2012 (ADAMS Accession No. ML120870190), the U.S. Nuclear Regulatory Commission sent Exelon a request for additional information, in part, questioning the need for this relief request. Subsequently, by letter dated April 18, 2012 (ADAMS Accession No. ML12110A123), Exelon concluded that the relief request was not needed, and withdreW the request. Based on the withdrawal of Relief Request PR-05, TAC No. ME7532 is being closed.

Please contact me at 301-415-2833, if you have any questions.

Sincerely,

~&M~

Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289 cc: Distribution via Listserv

ML120870190), the U.S. Nuclear Regulatory Commission sent Exelon a request for additional information, in part, questioning the need for this relief request. Subsequently, by letter dated April 18, 2012 (ADAMS Accession No. ML1211 OA123), Exelon concluded that the relief request was not needed, and withdrew the request. Based on the withdrawal of Relief Request PR-05, TAC No. ME7532 is being closed.

Please contact me at 301-415-2833, if you have any questions.

Sincerely,

/ra/

Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289 cc: Distribution via Listserv DISTRI BUTION:

RidsNrrPMThreeMilelsland Resource PUBLIC LPLI-2 RtF RidsAcrsAcnw_MailCTR Resource RidsNrrLAABaxter Resource RidsOgcRp Resource RidsRgn1 MailCenter Resource RidsNrrDorlDpr Resource RidsNrrDorlLpl1-2 Resouce JBilierbeck, NRR RidsNrrDeEptb Resource ADAMS Accession Number" ML121150570 *via email OFFICE LPLI-21PM LPLI-2/LA LPLI-2/BC NAME PBamford ABaxter, SLittie MKhanna (JHughey for* for)

DATE 04/25/2012 04/25/2012 04/25/2012