ML15110A384: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(6 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML15110A384 | | number = ML15110A384 | ||
| issue date = 02/18/2015 | | issue date = 02/18/2015 | ||
| title = | | title = NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) | ||
| author name = Isham P | | author name = Isham P | ||
| author affiliation = Exelon Generation Co, LLC | | author affiliation = Exelon Generation Co, LLC | ||
| addressee name = Fish T | | addressee name = Fish T | ||
| addressee affiliation = NRC/RGN-I/DRS/OB | | addressee affiliation = NRC/RGN-I/DRS/OB | ||
| docket = 05000220 | | docket = 05000220 | ||
Line 14: | Line 14: | ||
| document type = License-Operator, Part 55 Examination Related Material | | document type = License-Operator, Part 55 Examination Related Material | ||
| page count = 1 | | page count = 1 | ||
| project = TAC:U01905 | |||
| stage = Draft Other | |||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:Memorandum To: --- Mr: Todd Fish .. _. | |||
* CC: | |||
From: Paul Isham Date: 02/18/2015 Re: Proposed revisions for Nine Mile Point Unit 1 March 2015 operating exam The following revisions have been made to the Nine Mile Point Unit 1March2015 operating exam based on submittal comments and NRC prep week: | |||
Scenario 2 | |||
* Made adjustment to field reports coming into the control room. | |||
Scenario 3 | |||
* Made adjustment to field reports corning into the control room. | |||
Simulator JPM 5 | |||
* Downgraded from alternate path. | |||
Simulator JPM 8 | |||
* Downgraded from alternate path. | |||
Simulator JPM 6 | |||
* Replaced with a new alternate path JPM. | |||
* Added an examiner note regarding steps that can be performed concurrently. | |||
Simulator JPM 7 | |||
* Minor adjustment to simulator initial conditions. | |||
Admin JPM RO/SRO C002 | |||
* Added additional clarifying information to the KEY | |||
* Made editorial change to applicant handout. | |||
Admin JPM SRO RC | |||
* Added an additional KEY for a form the applicant completes. | |||
Admin JPM SRO EP | |||
* Added additional KEY s for forms the applicant completes. | |||
Admin JPM RO EP | |||
* Added evaluator cue to terminate JPM after final critical step.}} |
Latest revision as of 13:48, 31 October 2019
ML15110A384 | |
Person / Time | |
---|---|
Site: | Nine Mile Point ![]() |
Issue date: | 02/18/2015 |
From: | Isham P Exelon Generation Co |
To: | Todd Fish Operations Branch I |
Shared Package | |
ML14238A301 | List: |
References | |
TAC U01905 | |
Download: ML15110A384 (1) | |
Text
Memorandum To: --- Mr: Todd Fish .. _.
- CC:
From: Paul Isham Date: 02/18/2015 Re: Proposed revisions for Nine Mile Point Unit 1 March 2015 operating exam The following revisions have been made to the Nine Mile Point Unit 1March2015 operating exam based on submittal comments and NRC prep week:
Scenario 2
- Made adjustment to field reports coming into the control room.
Scenario 3
- Made adjustment to field reports corning into the control room.
Simulator JPM 5
- Downgraded from alternate path.
Simulator JPM 8
- Downgraded from alternate path.
Simulator JPM 6
- Replaced with a new alternate path JPM.
- Added an examiner note regarding steps that can be performed concurrently.
Simulator JPM 7
- Minor adjustment to simulator initial conditions.
Admin JPM RO/SRO C002
- Added additional clarifying information to the KEY
- Made editorial change to applicant handout.
- Added an additional KEY for a form the applicant completes.
- Added additional KEY s for forms the applicant completes.
- Added evaluator cue to terminate JPM after final critical step.