ML15110A384: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15110A384
| number = ML15110A384
| issue date = 02/18/2015
| issue date = 02/18/2015
| title = Nine Mile Point Station, Unit 1 - NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2)
| title = NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2)
| author name = Isham P
| author name = Isham P
| author affiliation = Exelon Generation Co, LLC
| author affiliation = Exelon Generation Co, LLC
| addressee name = Fish T H
| addressee name = Fish T
| addressee affiliation = NRC/RGN-I/DRS/OB
| addressee affiliation = NRC/RGN-I/DRS/OB
| docket = 05000220
| docket = 05000220
Line 14: Line 14:
| document type = License-Operator, Part 55 Examination Related Material
| document type = License-Operator, Part 55 Examination Related Material
| page count = 1
| page count = 1
| project = TAC:U01905
| stage = Draft Other
}}
}}
=Text=
{{#Wiki_filter:Memorandum To:  --- Mr: Todd Fish .. _.
* CC:
From:    Paul Isham Date:    02/18/2015 Re:      Proposed revisions for Nine Mile Point Unit 1 March 2015 operating exam The following revisions have been made to the Nine Mile Point Unit 1March2015 operating exam based on submittal comments and NRC prep week:
Scenario 2
* Made adjustment to field reports coming into the control room.
Scenario 3
* Made adjustment to field reports corning into the control room.
Simulator JPM 5
* Downgraded from alternate path.
Simulator JPM 8
* Downgraded from alternate path.
Simulator JPM 6
* Replaced with a new alternate path JPM.
* Added an examiner note regarding steps that can be performed concurrently.
Simulator JPM 7
* Minor adjustment to simulator initial conditions.
Admin JPM RO/SRO C002
* Added additional clarifying information to the KEY
* Made editorial change to applicant handout.
Admin JPM SRO RC
* Added an additional KEY for a form the applicant completes.
Admin JPM SRO EP
* Added additional KEY s for forms the applicant completes.
Admin JPM RO EP
* Added evaluator cue to terminate JPM after final critical step.}}

Latest revision as of 13:48, 31 October 2019

NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2)
ML15110A384
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/18/2015
From: Isham P
Exelon Generation Co
To: Todd Fish
Operations Branch I
Shared Package
ML14238A301 List:
References
TAC U01905
Download: ML15110A384 (1)


Text

Memorandum To: --- Mr: Todd Fish .. _.

  • CC:

From: Paul Isham Date: 02/18/2015 Re: Proposed revisions for Nine Mile Point Unit 1 March 2015 operating exam The following revisions have been made to the Nine Mile Point Unit 1March2015 operating exam based on submittal comments and NRC prep week:

Scenario 2

  • Made adjustment to field reports coming into the control room.

Scenario 3

  • Made adjustment to field reports corning into the control room.

Simulator JPM 5

  • Downgraded from alternate path.

Simulator JPM 8

  • Downgraded from alternate path.

Simulator JPM 6

  • Replaced with a new alternate path JPM.
  • Added an examiner note regarding steps that can be performed concurrently.

Simulator JPM 7

  • Minor adjustment to simulator initial conditions.

Admin JPM RO/SRO C002

  • Added additional clarifying information to the KEY
  • Made editorial change to applicant handout.

Admin JPM SRO RC

  • Added an additional KEY for a form the applicant completes.

Admin JPM SRO EP

  • Added additional KEY s for forms the applicant completes.

Admin JPM RO EP

  • Added evaluator cue to terminate JPM after final critical step.