| {{#Wiki_filter:From: Kivi, Jeffrey L <jeffrey.l.kivi@xcelenergy.com> | | {{#Wiki_filter:From: |
| Sent: Monday, February 27, 2023 1:15 PM To: Brent Ballard Cc: Miller, Michael A | | Kivi, Jeffrey L <jeffrey.l.kivi@xcelenergy.com> |
| | Sent: |
| | Monday, February 27, 2023 1:15 PM To: |
| | Brent Ballard Cc: |
| | Miller, Michael A |
|
| |
|
| ==Subject:== | | ==Subject:== |
| [External_Sender] Prairie Island request for pre-application meeting for proposed LAR to change TS 3.7.8, Condition B Required Actions | | [External_Sender] Prairie Island request for pre-application meeting for proposed LAR to change TS 3.7.8, Condition B Required Actions |
| : Brent, | | : Brent, NSPM would like to conduct a pre-application meeting for a proposed license amendment request to change TS 3.7.8 (Cooling Water System), Condition B (inoperable cooling water header), Required Actions. The nature of the proposed change will be similar to the one-time change for Amendments 237/225 and would change the logical connector between Required Action B.1 (to verify operability of the 121 motor-driven cooling water pump) and Required Action B.2 (to verify operability of the diesel-driven cooling water pump associated with the operable cooling water header) from an AND to an OR. |
| | |
| NSPM would like to conduct a pre-application meeting for a proposed license amendment request to change TS 3.7.8 (Cooling Water System), Condition B (inoperable cooling water header), Required Actions. The nature of the proposed change will be similar to the one-time change for Amendments 237/225 and would change the logical connector between Required Action B.1 (to verify operability of the 121 motor-driven cooling water pump) and Required Action B.2 (to verify operability of the diesel-driven cooling water pump associated with the operable cooling water header) from an AND to an OR. | |
| | |
| Meeting times that currently would work for us include: | | Meeting times that currently would work for us include: |
| * 4/11 beginning either 1030 or 1330 CDT
| | 4/11 beginning either 1030 or 1330 CDT 4/12 beginning 1130 CDT 4/14 beginning between 1000 and 1200 CDT However, we are receptive to other times. |
| * 4/12 beginning 1130 CDT
| | : Thanks, Jeff Kivi PE Xcel Energy Sr Licensing Engineer Working from home Mon, Tues, Wed, and Fri; in the office Thus Cell: 612.250.2921 Email: Jeffrey.L.Kivi@xcelenergy.com XCELENERGY.COM Please consider the environment before printing this email. |
| * 4/14 beginning between 1000 and 1200 CDT
| |
| | |
| However, we are receptive to other times. | |
| : Thanks, | |
| | |
| Jeff Kivi PE Xcel Energy Sr Licensing Engineer Working from home Mon, Tues, Wed, and Fri; in the office Thus Cell: 612.250.2921 Email: Jeffrey.L.Kivi@xcelenergy.com XCELENERGY.COM Please consider the environment before printing this email. | |
| | |
| Hearing Identifier: NRR_DRMA Email Number: 1979
| |
|
| |
|
| Mail Envelope Properties (DM6PR01MB484176B45CE437F44935E382B5AF9) | | Hearing Identifier: |
| | NRR_DRMA Email Number: |
| | 1979 Mail Envelope Properties (DM6PR01MB484176B45CE437F44935E382B5AF9) |
|
| |
|
| ==Subject:== | | ==Subject:== |
| [External_Sender] Prairie Island request for pre-application meeting for proposed LAR to change TS 3.7.8, Condition B Required Actions Sent Date: 2/27/2023 1:15:11 PM Received Date: 2/27/2023 1:15:23 PM From: Kivi, Jeffrey L | | [External_Sender] Prairie Island request for pre-application meeting for proposed LAR to change TS 3.7.8, Condition B Required Actions Sent Date: |
| | | 2/27/2023 1:15:11 PM Received Date: |
| Created By: jeffrey.l.kivi@xcelenergy.com | | 2/27/2023 1:15:23 PM From: |
| | | Kivi, Jeffrey L Created By: |
| Recipients: | | jeffrey.l.kivi@xcelenergy.com Recipients: |
| "Miller, Michael A" <michael.a.miller@xcelenergy.com> | | "Miller, Michael A" <michael.a.miller@xcelenergy.com> |
| Tracking Status: None "Brent Ballard" <Brent.Ballard@nrc.gov> | | Tracking Status: None "Brent Ballard" <Brent.Ballard@nrc.gov> |
| Tracking Status: None | | Tracking Status: None Post Office: |
| | | DM6PR01MB4841.prod.exchangelabs.com Files Size Date & Time MESSAGE 1240 2/27/2023 1:15:23 PM Options Priority: |
| Post Office: DM6PR01MB4841.prod.exchangelabs.com | | Normal Return Notification: |
| | | No Reply Requested: |
| Files Size Date & Time MESSAGE 1240 2/27/2023 1:15:23 PM | | No Sensitivity: |
| | | Normal Expiration Date:}} |
| Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:}} | |
|
---|
Category:E-Mail
MONTHYEARML24185A0912024-07-0101 July 2024 Acceptance of LAR to Revise TS Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumptions in the Accident Analyses ML24116A2532024-04-25025 April 2024 Final Request for Additional Information for LAR to Revise SR 3.8.1.2 Note 3 (EPID: L- 2023-LLA-0135) ML24045A1502024-02-15015 February 2024 Verbal Authorization for Alternative Relief Request-09 ML24045A0862024-02-12012 February 2024 Final RAI for Alternative RR-09 ML23348A3472023-12-12012 December 2023 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Minnesota Regarding a Prairie Island Nuclear Generating Plant, Units 1 & 2, Amendment ML23335A1152023-12-0101 December 2023 NRR E-mail Capture - Prairie Island Units 1 and 2 - Request for Additional Information LAR to Revise TS 3.7.8 Required Actions ML23312A0882023-11-0808 November 2023 Acceptance of Request to Revise Alternatives 1-RR-5-10 and 2-RR-5-10 ML23248A3462023-09-0505 September 2023 NRR E-mail Capture - Request for Additional Information for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant - Decommissioning Funding Status Reports ML23207A1962023-07-26026 July 2023 NRR E-mail Capture - Prairie Island Units 1 and 2 - Acceptance of Requested Licensing Action Request to Revise Technical Specification 3.7.8 Required Actions ML23075A2802023-03-16016 March 2023 NRR E-mail Capture - Prairie Island Units 1 and 2 - Acceptance of Relief Requests 1-RR-5-15 and 2-RR-5-15 to Use Subsequent ASME Code Edition and Addenda ML23065A0592023-02-27027 February 2023 NRR E-mail Capture - (External_Sender) Prairie Island Request for Pre-application Meeting for Proposed LAR to Change TS 3.7.8, Condition B Required Actions ML23018A2952023-01-18018 January 2023 Acceptance of Requested Licensing Action to Revise Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) (EPID L-2022-LLA-0184) (Email) ML22167A0452022-06-16016 June 2022 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Request to Adopt TSTF-277 ML22166A4112022-06-15015 June 2022 NRR E-mail Capture - Request for Additional Information Prairie Island Nuclear Generating Plant, Unit 2, Alternative RR-08, PIV Leakage ML22160A6022022-06-0909 June 2022 NRR E-mail Capture - Draft Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, 24-Month Operating Cycle Amendment ML22131A2652022-05-11011 May 2022 NRR E-mail Capture - Request for Additional Information Xcel Energy Amendment Request to Create a Common Eplan and EOF for Monticello and Prairie Island ML22045A4972022-02-14014 February 2022 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Unit 2 - Acceptance of Alternative Request Alternative Related PIV Leakage Monitoring ML21347A0082021-12-10010 December 2021 NRR E-mail Capture - Monticello and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested License Amendment Standard Emergency Plan and Consolidated Emergency Operations Facility ML21321A0452021-11-10010 November 2021 Request for Additional Information: Prairie Island 24-Month Cycle Amendment Request ML21302A1252021-10-29029 October 2021 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action RTS Power Range Amendment ML21305A0102021-10-29029 October 2021 NRR E-mail Capture - Request for Additional Information Prairie Island Cooling Water Amendment ML21252A0152021-09-0202 September 2021 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Change in the Maximum Surveillance Intervals from 24 Months to 30 Months ML21252A0122021-08-30030 August 2021 NRR E-mail Capture - Request for Additional Information Amendment Request to Adopt TSTF-471 and 517-T for Prairie Island ML21133A2502021-05-13013 May 2021 NRR E-mail Capture - Prairie Island - Acceptance Review of TSTF-471 and TSTF-571-T ML20343A1292020-12-0808 December 2020 NRR E-mail Capture - Request for Additional Information ML20253A2782020-09-0909 September 2020 E-Mail Submitting Proposed New License Condition ML20254A1162020-09-0909 September 2020 Draft License Transmittal E-Mail ML20223A0632020-08-10010 August 2020 Email SHPO Comment Letter: Proposed License Amendment for the Prairie Island Independent Spent Fuel Storage Installation ML20192A1442020-07-0707 July 2020 NRR E-mail Capture - Request for Additional Information Prairie Island License Amendment Request to Adopt TSTF-505 ML20163A4282020-06-10010 June 2020 Email from MPCA Comment Letter - Prairie Island ISFSI ML20154K7632020-06-0202 June 2020 NRR E-mail Capture - Revision 2 to the Plan for the Audit of the Prairie Island Nuclear Generating Plant TSTF-505 License Amendment Request (Epdi: L-2019-LLA-0283) ML20135G8212020-05-14014 May 2020 NRR E-mail Capture - Revision to the Plan for the Audit of the Prairie Island Nuclear Generating Plant TSTF-505 License Amendment Request (Epdi: L-2019-LLA-0283) ML20112F4582020-04-21021 April 2020 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Low Temperature Overpressure Protection ML20083F4202020-03-20020 March 2020 NRR E-mail Capture - Plan for the Audit of the Prairie Island Nuclear Generating Plant TSTF-505 License Amendment Request (Epdi: L-2019-LLA-0283) ML20077L4632020-03-17017 March 2020 NRR E-mail Capture - Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 -Acceptance of Requested Licensing Action Request to Adopt TSTF-529 ML20052C7582020-02-21021 February 2020 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Westinghouse NSAL-09-05 and NSAL-09-05 ML20035F1552020-02-0404 February 2020 NRR E-mail Capture - Request for Additional Information Monticello and Prairie Island Alternative Requests to Adopt Code Cases N-786-3 and N-789-3 (Epids: L-2019-LLR-0078 and L-2019-LLR-0079) ML20022A1762020-01-22022 January 2020 NRR E-mail Capture - Prairie Units 1 and 2 - Acceptance of Requested Licensing Action Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements ML20021A1832020-01-21021 January 2020 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2 ML19316A0172019-11-0101 November 2019 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Integrated Leak Rate Test Extension Request ML19253B9642019-09-10010 September 2019 NRR E-mail Capture - Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Relief Request Adoption of Code Case N-786-3 ML19233A0032019-08-14014 August 2019 NRR E-mail Capture - Request for Additional Information Prairie Island Relief Requests 1-RR-10 and 2-RR-10 ML19193A0142019-07-0909 July 2019 NRR E-mail Capture - Acceptance of Prairie Island Nuclear Generating Plant, Units 1 and 2 Relief Request Nos. 1-RR-5-10 and 2-RR-5-10 Related to Reactor Vessel Inspection Intervals) ML19057A1652019-02-26026 February 2019 NRR E-mail Capture - Request for Additional Information Prairie Island 50.69 Amendment Request ML19057A4212019-02-26026 February 2019 NRR E-mail Capture - Acceptance of Prairie Island Reactor Vessel Capsule Removal Schedule Request ML19008A3562019-01-0707 January 2019 NRR E-mail Capture - Prairie Island Nuclear Generating Plant - Audit Plan Related to the License Amendment Request to Implement 10 CFR 50.69 ML18351A0142018-12-14014 December 2018 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Classification of Certain Fuel Handling Equipment ML18347A3282018-12-12012 December 2018 E-Mail from M. Krick/Sses SSES ISFSI (Conversation Held on December 12, 2018) ML18313A0832018-11-0707 November 2018 NRR E-mail Capture - Request for Additional Information Prairie Island NFPA-805 License Condition Modification Amendment Request ML18235A2982018-08-23023 August 2018 NRR E-mail Capture - Request for Additional Information Prairie Island TSTF-425 License Amendment Request 2024-07-01
[Table view] |
Text
From:
Kivi, Jeffrey L <jeffrey.l.kivi@xcelenergy.com>
Sent:
Monday, February 27, 2023 1:15 PM To:
Brent Ballard Cc:
Miller, Michael A
Subject:
[External_Sender] Prairie Island request for pre-application meeting for proposed LAR to change TS 3.7.8, Condition B Required Actions
- Brent, NSPM would like to conduct a pre-application meeting for a proposed license amendment request to change TS 3.7.8 (Cooling Water System), Condition B (inoperable cooling water header), Required Actions. The nature of the proposed change will be similar to the one-time change for Amendments 237/225 and would change the logical connector between Required Action B.1 (to verify operability of the 121 motor-driven cooling water pump) and Required Action B.2 (to verify operability of the diesel-driven cooling water pump associated with the operable cooling water header) from an AND to an OR.
Meeting times that currently would work for us include:
4/11 beginning either 1030 or 1330 CDT 4/12 beginning 1130 CDT 4/14 beginning between 1000 and 1200 CDT However, we are receptive to other times.
- Thanks, Jeff Kivi PE Xcel Energy Sr Licensing Engineer Working from home Mon, Tues, Wed, and Fri; in the office Thus Cell: 612.250.2921 Email: Jeffrey.L.Kivi@xcelenergy.com XCELENERGY.COM Please consider the environment before printing this email.
Hearing Identifier:
NRR_DRMA Email Number:
1979 Mail Envelope Properties (DM6PR01MB484176B45CE437F44935E382B5AF9)
Subject:
[External_Sender] Prairie Island request for pre-application meeting for proposed LAR to change TS 3.7.8, Condition B Required Actions Sent Date:
2/27/2023 1:15:11 PM Received Date:
2/27/2023 1:15:23 PM From:
Kivi, Jeffrey L Created By:
jeffrey.l.kivi@xcelenergy.com Recipients:
"Miller, Michael A" <michael.a.miller@xcelenergy.com>
Tracking Status: None "Brent Ballard" <Brent.Ballard@nrc.gov>
Tracking Status: None Post Office:
DM6PR01MB4841.prod.exchangelabs.com Files Size Date & Time MESSAGE 1240 2/27/2023 1:15:23 PM Options Priority:
Normal Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date: