{{#Wiki_filter:6/23/22, 6:59 AM                                     blob:https://www.fdms.gov/f7b0535d-bc59-408c-bf70-821a6738efa6 SUNI Review Complete Template=ADM-013          As of: 6/23/22 6:59 AM E-RIDS=ADM-03            Received: June 21, 2022 PUBLIC SUBMISSION                                                ADD: Michael Eudy, Kevin Hsueh, Sean Meighan, Status: Pending_Post Tracking No. l4o-dzh7-8x7o Mark Blumberg, Bridget    Comments Due: June 21, 2022 Curran, Mary Neely Comment (11)              Submission Type: Web Publication Date:
{{#Wiki_filter:6/23/22, 6:59 AM blob:https://www.fdms.gov/f7b0535d-bc59-408c-bf70-821a6738efa6 blob:https://www.fdms.gov/f7b0535d-bc59-408c-bf70-821a6738efa6 1/1 PUBLIC SUBMISSION As of: 6/23/22 6:59 AM Received: June 21, 2022 Status: Pending_Post Tracking No. l4o-dzh7-8x7o Comments Due: June 21, 2022 Submission Type: Web Docket: NRC-2021-0179 Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Plants Comment On: NRC-2021-0179-0001 Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors Document: NRC-2021-0179-DRAFT-0013 Comment on FR Doc # 2022-08519 Submitter Information Email:atb@nei.org
4/21/2022 Docket: NRC-2021-0179                                             Citation: 87 FR 23891 Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Plants Comment On: NRC-2021-0179-0001 Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors Document: NRC-2021-0179-DRAFT-0013 Comment on FR Doc # 2022-08519 Submitter Information Email: atb@nei.org Organization: Nuclear Energy Institute General Comment See attached file(s)
Attachments 06-21-22_NRC_Industry Comments on DG-1389 blob:https://www.fdms.gov/f7b0535d-bc59-408c-bf70-821a6738efa6                                                                1/1


FRANCES PIMENTEL Senior Project Manager, Risk and Technical Support 1201 F Street, NW, Suite 1100 Washington, DC 20004                                                                                                   NUCLEAR ENERGY INSTITUTE P: 202.739.8132 fap@nei.org June 21, 2022 Office of Administration Mail Stop: TWFN-7-A60M U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTN: Program Management, Announcements and Editing Staff Project Number: 689
Organization:Nuclear Energy Institute General Comment See attached file(s)
Attachments 06-21-22_NRC_Industry Comments on DG-1389 SUNI Review Complete Template=ADM-013 E-RIDS=ADM-03 ADD: Michael Eudy, Kevin Hsueh, Sean Meighan, Mark Blumberg, Bridget Curran, Mary Neely Comment (11)
Publication Date:
4/21/2022 Citation: 87 FR 23891
 
FRANCES PIMENTEL Senior Project Manager, Risk and Technical Support 1201 F Street, NW, Suite 1100 Washington, DC 20004 P: 202.739.8132 fap@nei.org June 21, 2022 Office of Administration Mail Stop: TWFN-7-A60M U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTN: Program Management, Announcements and Editing Staff Project Number: 689  


==Subject:==
==Subject:==
NEI Comments on draft Regulatory Guide (DG), DG-1389, Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors, Docket ID NRC-2021-0179.
NEI Comments on draft Regulatory Guide (DG), DG-1389, Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors, Docket ID NRC-2021-0179.
Subm itted via regulations.gov
Submitted via regulations.gov  


==Dear Program Management,==
==Dear Program Management,==
Announcements and Editing Staff, The Nuclear Energy Institute (NEI) 1, on behalf of our members, appreciates the opportunity to provide 0F comments on the subject draft regulatory guide (DG), DG-1389, Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors. This DG is proposed Revision 1 to Regulatory Guide (RG) 1.183 which describes a method that the NRC staff considers acceptable for complying with regulations for design basis accident dose consequence analysis using an Alternative Source Term. The purpose of this letter is to provide the attached comments which recommend several changes to improve clarity and consistency on the recommended approaches, methods, and analysis this guidance provides.
Announcements and Editing Staff, The Nuclear Energy Institute (NEI)0F1, on behalf of our members, appreciates the opportunity to provide comments on the subject draft regulatory guide (DG), DG-1389, Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors. This DG is proposed Revision 1 to Regulatory Guide (RG) 1.183 which describes a method that the NRC staff considers acceptable for complying with regulations for design basis accident dose consequence analysis using an Alternative Source Term. The purpose of this letter is to provide the attached comments which recommend several changes to improve clarity and consistency on the recommended approaches, methods, and analysis this guidance provides.
These comments were developed by a nuclear energy industry task force and reflect a substantial body of industry technical expertise, experience, and lessons learned gained from successful licensing actions utilizing alternative radiological source terms as part of their supporting design basis accident analyses.
These comments were developed by a nuclear energy industry task force and reflect a substantial body of industry technical expertise, experience, and lessons learned gained from successful licensing actions utilizing alternative radiological source terms as part of their supporting design basis accident analyses.
Of particular concern is that the DG does not include the results of the staffs PWR and BWR analyses to enable an assessment of the impact to analyzed doses resulting from the updated guidance, such as impact from the new release fractions and timing. Industry views the proposed changes in this DG just as significant as when the guidance transitioned from the TID Source Term to the Alternative Source Term. As proposed, the conservatisms and changes incorporated in this revision precludes its use by many plants that 1
Of particular concern is that the DG does not include the results of the staffs PWR and BWR analyses to enable an assessment of the impact to analyzed doses resulting from the updated guidance, such as impact from the new release fractions and timing. Industry views the proposed changes in this DG just as significant as when the guidance transitioned from the TID Source Term to the Alternative Source Term. As proposed, the conservatisms and changes incorporated in this revision precludes its use by many plants that 1 The Nuclear Energy Institute (NEI) is responsible for establishing unified policy on behalf of its members relating to matters affecting the nuclear energy industry, including the regulatory aspects of generic operational and technical issues. NEIs members include entities licensed to operate commercial nuclear power plants in the United States, nuclear plant designers, major architect and engineering firms, fuel cycle facilities, nuclear materials licensees, and other organizations involved in the nuclear energy industry.
The Nuclear Energy Institute (NEI) is responsible for establishing unified policy on behalf of its members relating to matters affecting the nuclear energy industry, including the regulatory aspects of generic operational and technical issues. NEIs members include entities licensed to operate commercial nuclear power plants in the United States, nuclear plant designers, major architect and engineering firms, fuel cycle facilities, nuclear materials licensees, and other organizations involved in the nuclear energy industry.
NUCLEAR ENERGY INSTITUTE NUCLEAR. CLEAN AIR ENERGY  
NUCLEAR. CLEAN AIR ENERGY


June 21, 2021 Page 2 are interested in implementing near-term ATF design concepts, fuel burnup extension to 68 GWd/MTU (peak rod average), and 235U enrichments up to 8.0 wt%.
June 21, 2021 Page 2 are interested in implementing near-term ATF design concepts, fuel burnup extension to 68 GWd/MTU (peak rod average), and 235U enrichments up to 8.0 wt%.
Line 37: Line 39:
Additionally, it is unclear from the SAND2011-0128 report whether suppression pool scrubbing was credited in determining the release fractions from a BWR SBO. Credit for suppression pool scrubbing can significantly decrease the airborne activity since the SBO-related releases would be released via spargers submerged in the suppression pool. Therefore, any sequences that involve releases through the pool spargers should take credit for suppression pool scrubbing.
Additionally, it is unclear from the SAND2011-0128 report whether suppression pool scrubbing was credited in determining the release fractions from a BWR SBO. Credit for suppression pool scrubbing can significantly decrease the airborne activity since the SBO-related releases would be released via spargers submerged in the suppression pool. Therefore, any sequences that involve releases through the pool spargers should take credit for suppression pool scrubbing.
Also, although new guidance was added for crediting holdup and retention of MSIV leakage within the main steamlines and condenser for BWRs, it contains more conservative assumptions than previous models that limits its effectiveness. For example, Section A-5 of the DG presents three acceptable methods for calculating aerosol deposition within the main steam lines, but also states, these methods are not valid if credit has been taken for aerosol removal from drywell sprays. No technical justification is provided for why aerosol removal from drywell sprays is not valid if used with credit for main steamline deposition. As a result, the effectiveness of the application of these models is significantly reduced. Considering the number of BWRs currently modeling both removal mechanisms, the DG should provide guidance for crediting both of these important mitigative features.
Also, although new guidance was added for crediting holdup and retention of MSIV leakage within the main steamlines and condenser for BWRs, it contains more conservative assumptions than previous models that limits its effectiveness. For example, Section A-5 of the DG presents three acceptable methods for calculating aerosol deposition within the main steam lines, but also states, these methods are not valid if credit has been taken for aerosol removal from drywell sprays. No technical justification is provided for why aerosol removal from drywell sprays is not valid if used with credit for main steamline deposition. As a result, the effectiveness of the application of these models is significantly reduced. Considering the number of BWRs currently modeling both removal mechanisms, the DG should provide guidance for crediting both of these important mitigative features.
Further, the DG states, Revision 0 of RG 1.183 will continue to be available for use by licensees and applicants as a method acceptable to the NRC staff for demonstrating compliance with the regulations. A combination of the methods contained in revision 0 or revision 1 of RG 1.183 would need additional justification. However, it is not clear in the proposed document if licensees can transition one (or a few) analyses to revision 1, or if full implementation for all design basis accidents is required. Clarification should be added to discuss that selective implementation is acceptable, provided that each accident analysis uses either revision 0 or revision 1 and to specify that a combination of the methods contained in revision 0 or revision 1 of RG 1.183, in a single analysis, would need additional justification.
Further, the DG states, Revision 0 of RG 1.183 will continue to be available for use by licensees and applicants as a method acceptable to the NRC staff for demonstrating compliance with the regulations. A combination of the methods contained in revision 0 or revision 1 of RG 1.183 would need additional justification. However, it is not clear in the proposed document if licensees can transition one (or a few) analyses to revision 1, or if full implementation for all design basis accidents is required. Clarification should be added to discuss that selective implementation is acceptable, provided that each accident analysis uses either revision 0 or revision 1 and to specify that a combination of the methods contained in revision 0 or revision 1 of RG 1.183, in a single analysis, would need additional justification.  


June 21, 2021 Page 3 Finally, we appreciate the staffs efforts to include guidance for accident tolerant fuel (ATF), high-burnup fuel, and increased enrichment source term analyses and in revising the transport and decontamination models for the fuel handling DBA when developing this draft guidance. We encourage your consideration of all stakeholder comments prior to finalizing this draft RG. Given the long-lasting impact of the final document, we recommend a public meeting be scheduled to discuss in more detail the comments included in the attachment and how the staff plans to address them. We trust that you will find these comments useful and informative as you finalize the draft, and we look forward to future engagement on this important matter.
June 21, 2021 Page 3 Finally, we appreciate the staffs efforts to include guidance for accident tolerant fuel (ATF), high-burnup fuel, and increased enrichment source term analyses and in revising the transport and decontamination models for the fuel handling DBA when developing this draft guidance. We encourage your consideration of all stakeholder comments prior to finalizing this draft RG. Given the long-lasting impact of the final document, we recommend a public meeting be scheduled to discuss in more detail the comments included in the attachment and how the staff plans to address them. We trust that you will find these comments useful and informative as you finalize the draft, and we look forward to future engagement on this important matter.
Please contact me at fap@nei.org or (202) 739-8132 with any questions or comments about the content of this letter or the attached comments.
Please contact me at fap@nei.org or (202) 739-8132 with any questions or comments about the content of this letter or the attached comments.
Sincerely, Frances A. Pimentel Attachment c:       Sean Meighan, NRR/DRA/ARCB, NRC Mike Franovich, NRR/DRA, NRC
Sincerely, Frances A. Pimentel Attachment c:
Sean Meighan, NRR/DRA/ARCB, NRC Mike Franovich, NRR/DRA, NRC  


Consolidated Comments on Draft Regulatory Guide DG-1389 (RG 1.183, Rev.1)
Page 1 Consolidated Comments on Draft Regulatory Guide DG-1389 (RG 1.183, Rev.1)
Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors No. Section                                           Comment/Basis                                                     Recommendation Section B   The NRC has identified that licensees may elect to use risk insights in support of proposed NRC should provide some additional (Background)   changes to the design basis that are not addressed in currently approved NRC staff          explanation on the acceptable uses of
Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors No.
[p. 5] and positions. The NRC should provide some more explanation on the parameters/limitations      risk insight in conjunction with the
Section Comment/Basis Recommendation
: 1. Section 1.4 of using risk insights.                                                                    radiological analyses performed with Risk                                                                                                 this RG.
: 1.
Implications
Section B (Background)
[p. 5] and Section 1.4 Risk Implications
[p. 14-15]
[p. 14-15]
The last paragraph of the section states: Revision 0 of RG 1.183 will continue to be      NRC should include a statement like the available for use by licensees and applicants as a method acceptable to the NRC staff for  following: For example, across a demonstrating compliance with the regulations. A combination of the methods contained      licensing basis, different revision in Revision 0 or Revision 1 of RG 1.183 would need additional justification.              methods may be adopted provided the individual analyses fully adopt a single Section B.
The NRC has identified that licensees may elect to use risk insights in support of proposed changes to the design basis that are not addressed in currently approved NRC staff positions. The NRC should provide some more explanation on the parameters/limitations of using risk insights.
The NRC should provide additional clarifications in this paragraph (or Section 1.2) to      revision (i.e., individual analysis inputs,
NRC should provide some additional explanation on the acceptable uses of risk insight in conjunction with the radiological analyses performed with this RG.
: 2.  (Background) inform the licensee as to acceptable instances for combination of Revision 0 and 1          assumptions, or modeling aspects may
: 2.
Section B.
(Background)
[p. 6]
[p. 6]
methods.                                                                                   not adopt different revision methods within the same analysis).
The last paragraph of the section states: Revision 0 of RG 1.183 will continue to be available for use by licensees and applicants as a method acceptable to the NRC staff for demonstrating compliance with the regulations. A combination of the methods contained in Revision 0 or Revision 1 of RG 1.183 would need additional justification.
The NRC should provide additional clarifications in this paragraph (or Section 1.2) to inform the licensee as to acceptable instances for combination of Revision 0 and 1 methods.
NRC should include a statement like the following: For example, across a licensing basis, different revision methods may be adopted provided the individual analyses fully adopt a single revision (i.e., individual analysis inputs, assumptions, or modeling aspects may not adopt different revision methods within the same analysis).
Additional details should also be included in Section 1.2 - Scope of Implementation.
Additional details should also be included in Section 1.2 - Scope of Implementation.
The last sentence states: Once the staff has approved the initial AST implementation and   The NRC should clarify the sentence as:
: 3.
Section 1.1.1  it has become part of the facility design basis                                           Once the staff has approved the initial
Section 1.1.1 (Safety Margins) [p.8]
: 3.      (Safety    This sentence should be clarified to identify the initial AST implementation associated     AST implementation in accordance with Margins) [p.8] with Revision 1 of RG 1.183.                                                               Revision 1 and it has become part of the facility design basis SECY-98-154, Reference 19, performed a re-baselining of sample radiological                 Supplement Section 1.3.2 by consequences analyses when transitioning from TID to AST source terms. Has the NRC         incorporating results from supporting Section 1.3.2  performed similar re-baselining studies for the major method changes being made in DG-     analyses performed by staff when (Reanalysis  1389 compared to RG 1.183, Revision 0? Notably, the NRC should investigate sample PWR       developing the proposed revisions 4.
The last sentence states: Once the staff has approved the initial AST implementation and it has become part of the facility design basis This sentence should be clarified to identify the initial AST implementation associated with Revision 1 of RG 1.183.
Guidance)  and BWR analyses for the LOCA release fraction and timings, non-LOCA release fractions     contained in DG-1389.
The NRC should clarify the sentence as:
[p.13]    (including TFGR components), updated FHA modeling, etc. If this has already been performed, the wording for this section should be supplemented to include reference to these studies.
Once the staff has approved the initial AST implementation in accordance with Revision 1 and it has become part of the facility design basis
Page 1
: 4.
Section 1.3.2 (Reanalysis Guidance)
[p.13]
SECY-98-154, Reference 19, performed a re-baselining of sample radiological consequences analyses when transitioning from TID to AST source terms. Has the NRC performed similar re-baselining studies for the major method changes being made in DG-1389 compared to RG 1.183, Revision 0? Notably, the NRC should investigate sample PWR and BWR analyses for the LOCA release fraction and timings, non-LOCA release fractions (including TFGR components), updated FHA modeling, etc. If this has already been performed, the wording for this section should be supplemented to include reference to these studies.
Supplement Section 1.3.2 by incorporating results from supporting analyses performed by staff when developing the proposed revisions contained in DG-1389.


No. Section                                           Comment/Basis                                                     Recommendation Section 3.1 RG 1.183, Revision 0 identified specific computer codes acceptable for use in core            The NRC should continue to include (Fission inventory calculations (ORIGEN2 and ORIGEN-ARP). These code examples were deleted            examples of core inventory codes which
Page 2 No.
: 5. Product   for DG-1389. The NRC should continue to include examples of core inventory codes which        are acceptable for use in core inventory Inventory) are acceptable for use.                                                                      calculations.
Section Comment/Basis Recommendation
: 5.
Section 3.1 (Fission Product Inventory)
[p.17]
[p.17]
Section 3.1  Based on the directive to "maximize fission product inventory" it is implied that bounding    The RG should be consistent in Fission  core parameters should be used, however downstream discussion (e.g., Section 3.2)             prescribing if a bounding or an
RG 1.183, Revision 0 identified specific computer codes acceptable for use in core inventory calculations (ORIGEN2 and ORIGEN-ARP). These code examples were deleted for DG-1389. The NRC should continue to include examples of core inventory codes which are acceptable for use.
: 6. Product    states that the inventory should be for an equilibrium core. The RG should be consistent      equilibrium core should be applied to Inventory -  in prescribing if a bounding or an equilibrium core should be applied to dose calculations. dose calculations.
The NRC should continue to include examples of core inventory codes which are acceptable for use in core inventory calculations.
: 6.
Section 3.1 Fission Product Inventory -
[p.18]
[p.18]
Section 3.1  Its not clear that this directive can be applied. Many BWR units do not have radial          Remove discussion of COLR/TS from this Fission  peaking factors in the COLR nor Technical Specifications.                                    section.
Based on the directive to "maximize fission product inventory" it is implied that bounding core parameters should be used, however downstream discussion (e.g., Section 3.2) states that the inventory should be for an equilibrium core. The RG should be consistent in prescribing if a bounding or an equilibrium core should be applied to dose calculations.
: 7. Product Inventory -
The RG should be consistent in prescribing if a bounding or an equilibrium core should be applied to dose calculations.
: 7.
Section 3.1 Fission Product Inventory -
[p.18]
[p.18]
Footnote 10 identifies that the data in this section does not apply to cores containing      Footnote 10 should also include these Section 3.2 mixed oxide fuel (MOX). The section also identifies that Accident Tolerant Fuel (ATF)        ATF concepts as not being applicable for (Release
Its not clear that this directive can be applied. Many BWR units do not have radial peaking factors in the COLR nor Technical Specifications.
: 8.               concepts, excluding near-term ATF concepts, are also not applicable to the data in this      the data in Section 3.2.
Remove discussion of COLR/TS from this section.
Fractions) section. Footnote 10 should also include these ATF concepts as not being applicable for
: 8.
Section 3.2 (Release Fractions)
[p.18]
[p.18]
the data in Section 3.2.
Footnote 10 identifies that the data in this section does not apply to cores containing mixed oxide fuel (MOX). The section also identifies that Accident Tolerant Fuel (ATF) concepts, excluding near-term ATF concepts, are also not applicable to the data in this section. Footnote 10 should also include these ATF concepts as not being applicable for the data in Section 3.2.
It states the steady-state fission product release fractions in Table 3 can only be used if  Please remove the requirement that BWR part-length rods are treated as full-length rods with respect to overall quantity of      BWR part-length rods are treated as full-Section 3.2, fission products. BWR fuel bundles can have up to 20 part-length rods. Assuming all the      length rods with respect to overall
Footnote 10 should also include these ATF concepts as not being applicable for the data in Section 3.2.
: 9. 4th paragraph part length rods have the same fission products of a full-length rod penalizes the source    quantity of fission products.
: 9.
Section 3.2, 4th paragraph
[p.18]
[p.18]
term by a large amount. The consequence of this requirement would be the source term has many pins more worth of inventory than it actually has.
It states the steady-state fission product release fractions in Table 3 can only be used if BWR part-length rods are treated as full-length rods with respect to overall quantity of fission products. BWR fuel bundles can have up to 20 part-length rods. Assuming all the part length rods have the same fission products of a full-length rod penalizes the source term by a large amount. The consequence of this requirement would be the source term has many pins more worth of inventory than it actually has.
Regulatory Position 3.2 includes the following statement:                                     The NRC should clarify the level of Section 3.2 If it can be demonstrated that local power level, rate of fission gas release, and          justification needed to confirm fission (Release
Please remove the requirement that BWR part-length rods are treated as full-length rods with respect to overall quantity of fission products.
: 10.              cumulative fission gas release remain less than the limiting co-resident UO2 fuel rod, then  gas release rates and cumulative fission Fractions)
: 10.
Table 3 and 4 steady-state fission product release fractions apply to fuel rod designs        gas release for fuel designs containing
Section 3.2 (Release Fractions)
[p.18]
[p.18]
containing integral burnable absorbers (e.g., Gadolinia).                                   integral burnable absorbers.
Regulatory Position 3.2 includes the following statement:
Section 3.2 A factor is presented to adjust the transient fission product release correlations for short- The NRC should present the factor for (Release  lived isotopes. This factor is not prominently presented with the correlations and may be     short-lived isotopes more prominently
If it can be demonstrated that local power level, rate of fission gas release, and cumulative fission gas release remain less than the limiting co-resident UO2 fuel rod, then Table 3 and 4 steady-state fission product release fractions apply to fuel rod designs containing integral burnable absorbers (e.g., Gadolinia).
: 11.              missed by applicants or licensees.                                                            with the correlations presented in the Fractions)
The NRC should clarify the level of justification needed to confirm fission gas release rates and cumulative fission gas release for fuel designs containing integral burnable absorbers.
[p.19]                                                                                                section.
: 11.
Page 2
Section 3.2 (Release Fractions)
[p.19]
A factor is presented to adjust the transient fission product release correlations for short-lived isotopes. This factor is not prominently presented with the correlations and may be missed by applicants or licensees.
The NRC should present the factor for short-lived isotopes more prominently with the correlations presented in the section.  


No. Section                                         Comment/Basis                                                   Recommendation Section 3.2 contains the following guidance:                                                 Recommend that the current draft regulatory guide be updated to For the remaining non-LOCA DBAs which predict fuel rod cladding failure, such as PWR         provide complete guidance for these reactor coolant pump locked rotor and fuel handling accident, additional fission product     remaining accidents.
Page 3 No.
Section 3.2 releases may occur as a result of fuel pellet fragmentation (e.g., fracturing of high burnup (Release  rim region) due to loss of pellet-to-cladding mechanical constraint or impact loads. TFGR 12.
Section Comment/Basis Recommendation
Fractions) has been experimentally observed under a variety of accident conditions and should be
: 12.
[p.19]  addressed in future applications.
Section 3.2 (Release Fractions)
[p.19]
Section 3.2 contains the following guidance:
For the remaining non-LOCA DBAs which predict fuel rod cladding failure, such as PWR reactor coolant pump locked rotor and fuel handling accident, additional fission product releases may occur as a result of fuel pellet fragmentation (e.g., fracturing of high burnup rim region) due to loss of pellet-to-cladding mechanical constraint or impact loads. TFGR has been experimentally observed under a variety of accident conditions and should be addressed in future applications.
However, the regulatory guide does not provide guidance regarding an acceptable treatment for any additional fission product releases for these accidents. Therefore, the current guidance within the draft regulatory guide is incomplete.
However, the regulatory guide does not provide guidance regarding an acceptable treatment for any additional fission product releases for these accidents. Therefore, the current guidance within the draft regulatory guide is incomplete.
The paragraph starting with For the remaining non-LOCA DBs which predict fuel rod           Include background documents for cladding failure is not clear on the background of the issue or the success pathways       further description of the issue and/or Section 3.2 afforded to the licensees to address the NRCs concerns on the topic in question. Ideally,   documents identifying acceptable (Release  background documents for further description of the issue and/or documents identifying       methods of evaluation so that licensees 13.
Recommend that the current draft regulatory guide be updated to provide complete guidance for these remaining accidents.
Fractions) acceptable methods of evaluation are cited. The NRC should include these documents in       can fully understand and properly
: 13.
[p.19]  order for the licensees to fully understand and properly address the issue in question. If  address the issue in question. If no no documents exist, the NRC should develop these positions.                                 documents exist, the NRC should develop these positions.
Section 3.2 (Release Fractions)
Page 3
[p.19]
The paragraph starting with For the remaining non-LOCA DBs which predict fuel rod cladding failure is not clear on the background of the issue or the success pathways afforded to the licensees to address the NRCs concerns on the topic in question. Ideally, background documents for further description of the issue and/or documents identifying acceptable methods of evaluation are cited. The NRC should include these documents in order for the licensees to fully understand and properly address the issue in question. If no documents exist, the NRC should develop these positions.
Include background documents for further description of the issue and/or documents identifying acceptable methods of evaluation so that licensees can fully understand and properly address the issue in question. If no documents exist, the NRC should develop these positions.  


No. Section                                           Comment/Basis                                                   Recommendation Tables 1 and 2 present core inventory fraction releases into containment for BWRs and     The NRC should clarify that the Te, Ba, PWRs. The release groups are updated from Revision 0 of RG 1.183. One significant         and Sr groups do contribute releases difference is that the tellurium group (both PWRs and BWRs) and barium, strontium         during the gap release phase for LOCA group (PWRs only) identify a release fraction during the gap release phase.               releases in Tables 1 and 2; however, these releases are more accurately From page 34 of the SAND-2011-0128 report: At the same time, the Gap Release Phase       classified as early in-vessel releases and was calculated to be long enough that some core degradation characteristic of the In-     these groups do not need to be vessel Phase of release as prescribed in the NUREG-1465 Source Term did take place. This   considered in gap releases for other is indicated by small amounts of tellurium release during the Gap Release Phase and in     events.
Page 4 No.
Section 3.2  the case of PWR accidents small amounts of alkaline earth release. Ordinarily tellurium (Release  and alkaline earths are not thought to be contributors to the gap release. They contribute 14.
Section Comment/Basis Recommendation
Fractions)  here because some portions of the core had entered into what would be categorized
: 14.
[p.20]  phenomenologically as in-vessel release before the criterion to terminate gap release had been reached."
Section 3.2 (Release Fractions)
[p.20]
Tables 1 and 2 present core inventory fraction releases into containment for BWRs and PWRs. The release groups are updated from Revision 0 of RG 1.183. One significant difference is that the tellurium group (both PWRs and BWRs) and barium, strontium group (PWRs only) identify a release fraction during the gap release phase.
From page 34 of the SAND-2011-0128 report: At the same time, the Gap Release Phase was calculated to be long enough that some core degradation characteristic of the In-vessel Phase of release as prescribed in the NUREG-1465 Source Term did take place. This is indicated by small amounts of tellurium release during the Gap Release Phase and in the case of PWR accidents small amounts of alkaline earth release. Ordinarily tellurium and alkaline earths are not thought to be contributors to the gap release. They contribute here because some portions of the core had entered into what would be categorized phenomenologically as in-vessel release before the criterion to terminate gap release had been reached."
This confirms that, while the timing of the Te, Ba, and Sr groups does release during the gap fraction phase, these releases are more accurately associated with the early in-vessel phase. The continued identification of these groups release as gap phase release creates confusion with subsequent gap fraction tables (Tables 3 and 4) which do not identify these nuclide groups as being released.
This confirms that, while the timing of the Te, Ba, and Sr groups does release during the gap fraction phase, these releases are more accurately associated with the early in-vessel phase. The continued identification of these groups release as gap phase release creates confusion with subsequent gap fraction tables (Tables 3 and 4) which do not identify these nuclide groups as being released.
[Note that it is not requested to add Te, Ba, and Sr to the gap releases.]
[Note that it is not requested to add Te, Ba, and Sr to the gap releases.]
Tables 1 and 2 report release fractions from a new Molybdenum group; however, the         It is expected that the final grouping is Section 3.2  elements in this new group are not listed in Table 6.                                      consistent with SAND-2011-0128 since Tables 1 & 2                                                                                            that is the basis for the release fractions 15.
The NRC should clarify that the Te, Ba, and Sr groups do contribute releases during the gap release phase for LOCA releases in Tables 1 and 2; however, these releases are more accurately classified as early in-vessel releases and these groups do not need to be considered in gap releases for other events.
(p20), and  Which release group is Zirconium (Zr) considered to reside? DG-1389 is consistent with     in Tables 1 & 2. Update the Table 6 for Table 6 (p22) Revision 0 and indicates it is part of the Lanthanides while Table 14 in the underlying   the new proposed Molybdenum group.
: 15.
Sandia report (SAND 2011-0128) reports Zirconium as part of the Cerium group.             Change Zr grouping to Cerium group.
Section 3.2 Tables 1 & 2 (p20), and Table 6 (p22)
Page 4
Tables 1 and 2 report release fractions from a new Molybdenum group; however, the elements in this new group are not listed in Table 6.
Which release group is Zirconium (Zr) considered to reside? DG-1389 is consistent with Revision 0 and indicates it is part of the Lanthanides while Table 14 in the underlying Sandia report (SAND 2011-0128) reports Zirconium as part of the Cerium group.
It is expected that the final grouping is consistent with SAND-2011-0128 since that is the basis for the release fractions in Tables 1 & 2. Update the Table 6 for the new proposed Molybdenum group.
Change Zr grouping to Cerium group.  


No. Section                                             Comment/Basis                                                   Recommendation Figure 1 presents the maximum allowable power operating envelope for steady-state          Include the following statement in a release fractions. The envelope is identified by rod average power (kW/ft) and rod          footnote for Figure 1 or incorporated average burnup (GWD/MTU). The figure further identifies a Peak LHGR (Linear Heat          into the discussion of Section 3:
Page 5 No.
Generation Rate) of 15.0 kW/ft for BWRs and 14.0 kW/ft for PWRs.
Section Comment/Basis Recommendation
From Ref. 24, the Peak LHGR is defined From the Ref. 24 Technical Basis for Non-LOCA Fission Product Release Fractions, the Peak as the product of the peak fuel rod LHGR is a combination of rod average power and the axial power profile maximum              average power and the peak fuel rod factors. For example, using a rod average power of 12.2 kW/ft from Figure 1 and an axial    axial power distribution. This Peak LHGR Section 3.2 power profile maximum factor of approximately 1.15 for PWRs from Figure 2 of Ref. 24,      may differ from the definition used in (Release
: 16.
: 16.                the resulting Peak LHGR would be approximately 14.0 kW/ft.                                licensees Technical Specification or Fractions)
Section 3.2 (Release Fractions)
Core Operating Limits Report. A Peak
[p.21]
[p.21]
The maximum linear heat rate is a typical term for licensees (generally defined in safety   LHGR derived consistent with the analyses and/or Technical Specifications) and is the product of the rod average power (or definition of Ref. 24 should be used for linear heat generation rate determined by the core rated thermal power and the linear       comparison of applicability to Figure 1.
Figure 1 presents the maximum allowable power operating envelope for steady-state release fractions. The envelope is identified by rod average power (kW/ft) and rod average burnup (GWD/MTU). The figure further identifies a Peak LHGR (Linear Heat Generation Rate) of 15.0 kW/ft for BWRs and 14.0 kW/ft for PWRs.
component of all power producing rods in the core) and the hot channel factor (FQ).
From the Ref. 24 Technical Basis for Non-LOCA Fission Product Release Fractions, the Peak LHGR is a combination of rod average power and the axial power profile maximum factors. For example, using a rod average power of 12.2 kW/ft from Figure 1 and an axial power profile maximum factor of approximately 1.15 for PWRs from Figure 2 of Ref. 24, the resulting Peak LHGR would be approximately 14.0 kW/ft.
The maximum linear heat rate is a typical term for licensees (generally defined in safety analyses and/or Technical Specifications) and is the product of the rod average power (or linear heat generation rate determined by the core rated thermal power and the linear component of all power producing rods in the core) and the hot channel factor (FQ).
These maximum linear heat rates can exceed the definition of Peak LHGR associated with Figure 1 of DG-1389. Without further explanation of the definition of Peak LHGR associated with the figure, misinterpretation and confusion of the Figure 1 envelope may result between the licensee and regulator.
These maximum linear heat rates can exceed the definition of Peak LHGR associated with Figure 1 of DG-1389. Without further explanation of the definition of Peak LHGR associated with the figure, misinterpretation and confusion of the Figure 1 envelope may result between the licensee and regulator.
The Figure 1 rod average power envelopes were derived in Ref. 24. Ref. 24 does not          The NRC should confirm that indicate if uncertainties were applied to the rod average powers or normalized axial       uncertainties do not need to be applied power distributions in Figure 2 of Ref. 24.                                                to the power inputs used in comparing to the bounding power profile and It is assumed that uncertainties are not applied; however, the NRC should confirm that      include this clarifying information in the Section 3.2 uncertainties do not need to be considered when comparing against the bounding power discussion in Section 3.2.
Include the following statement in a footnote for Figure 1 or incorporated into the discussion of Section 3:
(Release
From Ref. 24, the Peak LHGR is defined as the product of the peak fuel rod average power and the peak fuel rod axial power distribution. This Peak LHGR may differ from the definition used in licensees Technical Specification or Core Operating Limits Report. A Peak LHGR derived consistent with the definition of Ref. 24 should be used for comparison of applicability to Figure 1.
: 17.                profile.
: 17.
Fractions)
Section 3.2 (Release Fractions)
[p.21]
[p.21]
The Figure 1 rod average power envelopes were derived in Ref. 24. Ref. 24 does not indicate if uncertainties were applied to the rod average powers or normalized axial power distributions in Figure 2 of Ref. 24.
It is assumed that uncertainties are not applied; however, the NRC should confirm that uncertainties do not need to be considered when comparing against the bounding power profile.
Note that for typical applications for determining release inventories, uncertainties may be accounted for in peaking factors such as the radial peaking factor (applied uncertainty), which is applied separately to the core inventory from the gap fractions in the radiological analyses. As such, applying uncertainties in determining the gap fractions may result in double-accounting and should not be advised.
Note that for typical applications for determining release inventories, uncertainties may be accounted for in peaking factors such as the radial peaking factor (applied uncertainty), which is applied separately to the core inventory from the gap fractions in the radiological analyses. As such, applying uncertainties in determining the gap fractions may result in double-accounting and should not be advised.
Section 3.3   Table 5 in Section 3.3 lists the duration of the gap release phase is 0.22 hours for PWRs   The NRC should delete or correct the (Timing of    and 0.16 hours for BWRs. However, the last sentence of the following paragraph says:       sentence in question as it contradicts
The NRC should confirm that uncertainties do not need to be applied to the power inputs used in comparing to the bounding power profile and include this clarifying information in the discussion in Section 3.2.
: 18.                Regardless of delays in the onset, the duration of the gap release phase is 0.5 hours. gap phase durations in Table 5.
: 18.
Release Phases) [p. 22] The values in Table 5 are not consistent with this statement.
Section 3.3 (Timing of Release Phases) [p. 22]
Page 5
Table 5 in Section 3.3 lists the duration of the gap release phase is 0.22 hours for PWRs and 0.16 hours for BWRs. However, the last sentence of the following paragraph says:
Regardless of delays in the onset, the duration of the gap release phase is 0.5 hours.
The values in Table 5 are not consistent with this statement.
The NRC should delete or correct the sentence in question as it contradicts gap phase durations in Table 5.


No. Section                                           Comment/Basis                                                       Recommendation DG-1389 states: The activity released from the core during each release phase should be         Clarify that the statement in the modeled as increasing in a linear fashion over the duration of the phase.                      guidance excludes the effects of decay.
Page 6 No.
Section 3.3 19.
Section Comment/Basis Recommendation
[p. 22]  RADTRAD models core release as a constant fraction of the core inventory over the release duration. Including decay of the core inventory will make this release slightly non-linear, decreasing over time as the core inventory decreases due to decay.
: 19.
Section 3.4 Table 6 presents the radionuclide groups which should be considered in design basis             The NRC should present molybdenum as (Radionuclide analyses. The table presents molybdenum as included in the noble metals group. This is           a separate group in Table 6 in order to
Section 3.3
: 20.              inconsistent with Tables 1 and 2 which present molybdenum as a separate group with               maintain consistency with Tables 1 and Composition)
[p. 22]
[p. 22]  different release fractions than the noble metals group.                                        2.
DG-1389 states: The activity released from the core during each release phase should be modeled as increasing in a linear fashion over the duration of the phase.
DG-1389 includes a statement that the transit dose to personnel traveling to and from the        The NRC should remove these control room should be considered for licensees whose licensing basis includes transit          statements from the RG on the basis dose. This statement should be clarified or removed based on the following points:              that transit doses would be addressed
RADTRAD models core release as a constant fraction of the core inventory over the release duration. Including decay of the core inventory will make this release slightly non-linear, decreasing over time as the core inventory decreases due to decay.
* For licensees who do not currently include transit dose in their licensing basis, will    by ALARA principles through Emergency the NRC force the adoption of transit dose if this regulatory guide is adopted?        Planning. These measures may include
Clarify that the statement in the guidance excludes the effects of decay.
* For licensees who do currently include transit dose in their licensing basis, will the    alternate travel pathways to and from NRC allow for removal of the transit dose based on the positions summarized            the control room such that operators below:                                                                                 are not traversing the radioactive plume
: 20.
* GDC 19 identifies that Adequate radiation protection shall be provided          and personal protective equipment to permit access and occupancy of the control room. GDC 19 does not          (e.g., respirators).
Section 3.4 (Radionuclide Composition)
Section 4.2 identify that access includes the need for the control room to provide (Control Room protections outside of the control room envelope. Additionally,
[p. 22]
: 21.      Dose radiological consequences analyses are intended to provide an evaluation Consequences)
Table 6 presents the radionuclide groups which should be considered in design basis analyses. The table presents molybdenum as included in the noble metals group. This is inconsistent with Tables 1 and 2 which present molybdenum as a separate group with different release fractions than the noble metals group.
The NRC should present molybdenum as a separate group in Table 6 in order to maintain consistency with Tables 1 and
: 2.
: 21.
Section 4.2 (Control Room Dose Consequences)
[p. 24]
[p. 24]
of the design and performance of structures, systems, and components of the facility. This intent is to confirm the design, construction, and siting of the facility and applicable safety features are adequate to limit dose exposure; thus, operator actions outside of the CR envelope are not historically considered in the design basis analyses.
DG-1389 includes a statement that the transit dose to personnel traveling to and from the control room should be considered for licensees whose licensing basis includes transit dose. This statement should be clarified or removed based on the following points:
* During emergency situations, personnel dose is governed by ALARA principles such that Emergency Planning will limit the dose received by operators during transit to and from the control room. 10 CFR 50.47(a)(9), (10), and (11) provide sufficient requirements for the Emergency Response organizations to measure and limit doses to emergency response personnel including control room operators.
For licensees who do not currently include transit dose in their licensing basis, will the NRC force the adoption of transit dose if this regulatory guide is adopted?
Page 6
For licensees who do currently include transit dose in their licensing basis, will the NRC allow for removal of the transit dose based on the positions summarized below:
GDC 19 identifies that Adequate radiation protection shall be provided to permit access and occupancy of the control room. GDC 19 does not identify that access includes the need for the control room to provide protections outside of the control room envelope. Additionally, radiological consequences analyses are intended to provide an evaluation of the design and performance of structures, systems, and components of the facility. This intent is to confirm the design, construction, and siting of the facility and applicable safety features are adequate to limit dose exposure; thus, operator actions outside of the CR envelope are not historically considered in the design basis analyses.
During emergency situations, personnel dose is governed by ALARA principles such that Emergency Planning will limit the dose received by operators during transit to and from the control room. 10 CFR 50.47(a)(9), (10), and (11) provide sufficient requirements for the Emergency Response organizations to measure and limit doses to emergency response personnel including control room operators.
The NRC should remove these statements from the RG on the basis that transit doses would be addressed by ALARA principles through Emergency Planning. These measures may include alternate travel pathways to and from the control room such that operators are not traversing the radioactive plume and personal protective equipment (e.g., respirators).


No. Section                                         Comment/Basis                                                       Recommendation The occupancy factors in RG 1.183 R0 are based on RG 1.183 R0 Reference 22. Reference       Remove the following discussion as it is 22 is the paper by K. G. Murphy and K. W. Campe, "Nuclear Power Plant Control Room           unnecessary:
Page 7 No.
Ventilation System Design for Meeting General Design Criterion 19," published August 1974. In that paper, the occupancy factors are described as follows:                         The following guidance should be used in determining the TEDE dose for
Section Comment/Basis Recommendation
                  "...an allowance may be considered for the time the operator leaves the plant vicinity.     demonstrating compliance with 10 CFR This is described as the occupancy factor."                                                 50.67(b)(2)(iii). For the purpose of this RG, a transit dose is considered to be Table 1 in the paper by K. G. Murphy and K. W. Campe provides the occupancy factors         the dose that is accumulated as included in the determination of the X/Q values using the K. G. Murphy and K. W. Campe       personnel travel to and from the control methodology.                                                                                 room for the duration of an accident once onsite (e.g., dose from site Therefore, it is reasonable to conclude the occupancy factors (1, 0.6 and 0.4) assumed for   boundary to the control room).
: 22.
Section 4.2 the control room analysis already implicitly account for the time for the operator travel   Licensees whose licensing basis includes (Control Room from the parking lot to the control room. The occupancy factor discussion is in the X/Q     transit dose should include the transit
Section 4.2 (Control Room Dose Consequences
: 22.      Dose section (page 13) which is consistent with this argument. No additional discussion is       dose to demonstrate compliance with Consequences required with those occupancy factors.                                                       10 CFR 50.67(b)(2)(iii). The licensees
) [p. 24]
      ) [p. 24]
The occupancy factors in RG 1.183 R0 are based on RG 1.183 R0 Reference 22. Reference 22 is the paper by K. G. Murphy and K. W. Campe, "Nuclear Power Plant Control Room Ventilation System Design for Meeting General Design Criterion 19," published August 1974. In that paper, the occupancy factors are described as follows:  
results for the evaluation of transit dose Further the Murphy and Campe paper interprets the GDC in this way: Whole body               will be evaluated on a case-by-case gamma radiation from direct shine radiation sources external to the control room and         basis. New reactor licensees that are from the airborne activity within the control room should not exceed a total of 5 rem.     required to show compliance with GDC Direct shine here is from outside radioactivity directly to operators within the control    19 or similar control room radiological room. This would further exclude a transit dose for the operators.                          habitability principal design criteria may use this guidance.
"...an allowance may be considered for the time the operator leaves the plant vicinity.
This is described as the occupancy factor."
Table 1 in the paper by K. G. Murphy and K. W. Campe provides the occupancy factors included in the determination of the X/Q values using the K. G. Murphy and K. W. Campe methodology.
Therefore, it is reasonable to conclude the occupancy factors (1, 0.6 and 0.4) assumed for the control room analysis already implicitly account for the time for the operator travel from the parking lot to the control room. The occupancy factor discussion is in the X/Q section (page 13) which is consistent with this argument. No additional discussion is required with those occupancy factors.
Further the Murphy and Campe paper interprets the GDC in this way: Whole body gamma radiation from direct shine radiation sources external to the control room and from the airborne activity within the control room should not exceed a total of 5 rem.
Direct shine here is from outside radioactivity directly to operators within the control room. This would further exclude a transit dose for the operators.
As well, in NUREG-0800, Section 6.4, referring to individuals within the control room says:
As well, in NUREG-0800, Section 6.4, referring to individuals within the control room says:
In accordance with GDC 19, these doses to an individual should not be excluded for any postulated accident. The whole body gamma doses consists of the contributions from airborne radioactivity inside and outside the control room, as well as direct shine from all radiation sources. Industry has general evaluated the other sources in terms of containment shine and filter shine.
In accordance with GDC 19, these doses to an individual should not be excluded for any postulated accident. The whole body gamma doses consists of the contributions from airborne radioactivity inside and outside the control room, as well as direct shine from all radiation sources. Industry has general evaluated the other sources in terms of containment shine and filter shine.
Page 7
Remove the following discussion as it is unnecessary:
The following guidance should be used in determining the TEDE dose for demonstrating compliance with 10 CFR 50.67(b)(2)(iii). For the purpose of this RG, a transit dose is considered to be the dose that is accumulated as personnel travel to and from the control room for the duration of an accident once onsite (e.g., dose from site boundary to the control room).
Licensees whose licensing basis includes transit dose should include the transit dose to demonstrate compliance with 10 CFR 50.67(b)(2)(iii). The licensees results for the evaluation of transit dose will be evaluated on a case-by-case basis. New reactor licensees that are required to show compliance with GDC 19 or similar control room radiological habitability principal design criteria may use this guidance.


No. Section                                           Comment/Basis                                                     Recommendation Footnote 15 states that nuclides used for modeling dose from airborne radioactivity         The NRC should provide clarification for inside the control room may not be conservative for determining the dose from               Footnote 15 in terms of which nuclides radioactivity outside of the control room.                                                   are of concern for the different aspects Section 4.2.3 of the control room dose. Lack of (Transport
Page 8 No.
: 23.                This statement is vague and does not provide the licensee with details as to which           explanation infers that the NRC accepts Models) [p.
Section Comment/Basis Recommendation
nuclides the NRC is concerned about for the different control room dose aspects             the licensees currently analyzed source 25]
: 23.
(inhalation/immersion versus plume shine dose). Without further explanation, it is           terms and no updates are needed.
Section 4.2.3 (Transport Models) [p.
assumed that the NRC is in agreement that the sets of nuclides used by licensees acceptably addresses the footnote.
25]
This section provides the expression to correct the semi-infinite cloud dose to a finite     The NRC should note that the expression Section 4.2.7  cloud dose for external exposure. This expression is generally incorporated into            may be incorporated into radiological (Dose      radiological consequences codes (e.g., RADTRAD) and does not specifically need to be         consequences codes (e.g., RADTRAD) 24.
Footnote 15 states that nuclides used for modeling dose from airborne radioactivity inside the control room may not be conservative for determining the dose from radioactivity outside of the control room.
Conversion    considered as an additional factor applied to the control room dose results.                 and does not need to be specifically Factor) [p. 26]                                                                                              applied to the control room dose results.
This statement is vague and does not provide the licensee with details as to which nuclides the NRC is concerned about for the different control room dose aspects (inhalation/immersion versus plume shine dose). Without further explanation, it is assumed that the NRC is in agreement that the sets of nuclides used by licensees acceptably addresses the footnote.
Table 7 provides the analysis release duration for the various accidents presented in the    For consistency with the event-specific regulatory guide. The following items should be addressed by the NRC:                        guidance presented in Appendices E, F,
The NRC should provide clarification for Footnote 15 in terms of which nuclides are of concern for the different aspects of the control room dose. Lack of explanation infers that the NRC accepts the licensees currently analyzed source terms and no updates are needed.
* The PWR Steam Generator Tube Rupture, PWR Main Steamline Break, and PWR                and G, change wording from the analysis Locked Rotor identify that the analysis release duration is Until cold shutdown is release duration is Until cold shutdown Section 4.4           established. For consistency with the event-specific guidance presented in        is established to Until shutdown (Acceptance             Appendices E, F, and G, this wording should be changed to Until shutdown          cooling is in operation and releases from 25.
: 24.
Criteria) [p.          cooling is in operation and releases from the SG(s) have been terminated.          the SG(s) have been terminated.
Section 4.2.7 (Dose Conversion Factor) [p. 26]
This section provides the expression to correct the semi-infinite cloud dose to a finite cloud dose for external exposure. This expression is generally incorporated into radiological consequences codes (e.g., RADTRAD) and does not specifically need to be considered as an additional factor applied to the control room dose results.
The NRC should note that the expression may be incorporated into radiological consequences codes (e.g., RADTRAD) and does not need to be specifically applied to the control room dose results.
: 25.
Section 4.4 (Acceptance Criteria) [p.
28]
28]
* For Fuel Handling Accident, the analysis release duration should be updated for consistency with the updated FHA model presented in Appendix B. The updated         In the Fuel Handling Accident, update model presents releases in two phases which potentially span the entire standard   the analysis release duration with the 30 days of event duration.                                                          updated FHA model presented in Appendix B.
Table 7 provides the analysis release duration for the various accidents presented in the regulatory guide. The following items should be addressed by the NRC:
Page 8
The PWR Steam Generator Tube Rupture, PWR Main Steamline Break, and PWR Locked Rotor identify that the analysis release duration is Until cold shutdown is established. For consistency with the event-specific guidance presented in Appendices E, F, and G, this wording should be changed to Until shutdown cooling is in operation and releases from the SG(s) have been terminated.
For Fuel Handling Accident, the analysis release duration should be updated for consistency with the updated FHA model presented in Appendix B. The updated model presents releases in two phases which potentially span the entire standard 30 days of event duration.
For consistency with the event-specific guidance presented in Appendices E, F, and G, change wording from the analysis release duration is Until cold shutdown is established to Until shutdown cooling is in operation and releases from the SG(s) have been terminated.
In the Fuel Handling Accident, update the analysis release duration with the updated FHA model presented in Appendix B.  


Guidance for the modeling of the limiting X/Qs for the LPZ and control room is presented       The NRC should re-assess the need to and directs the licensee to model the period of most unfavorable atmospheric dispersion       include this guidance for atmospheric factors coincident with the time period of most adverse environmental release. This           dispersion factor modeling. The guidance has been included previously for the control room location in RG 1.194 (and           guidance, as presented, may result in a identified in the 2015 periodic review of RG 1.194 as an item for alignment). However, the     misappropriation of the limiting two-guidance has not been previously incorporated in or identified as needed for RG 1.183.         hour X/Q values for the time period of
Page 9
[Also, no identification of this guidance has been made for RG 1.145 for the LPZ location.]   greatest release as this may not align with the time period of greatest dose The current widely used practice for modeling X/Q values for the LPZ and control room is       contribution for the control room.
: 26.
to align the values in correct time period order, e.g., 0-2 hrs, 2-8 hrs, etc. (similar to the first portion of Figure 2 in DG-1389). However, it is recognized that this may not align with It is recommended that the NRC remove the period of most adverse environmental release in instances of delayed releases from         this position from DG-1389 and maintain damaged/melted fuel (in cases of an MHA) or prolonged buildup and transit from the             the current practice of applying LPZ and primary to secondary systems to the environment (in cases of a locked RCP rotor).             CR values from highest X/Q at event initiation (T=0) for all events, regardless The interpretation of the guidance presented in DG-1389 is that the period of most             of release magnitude. It is also Section 5.3 adverse release aligns with the period of highest dose. However, the NRC has not               recommended that this position be (Atmospheric provided sufficient guidance for consideration of situations in which the period of most       removed from RG 1.194.
Section 5.3 (Atmospheric Dispersion Modeling and Meteorology Assumptions)
Dispersion adverse environmental release does not align with the period of highest dose. This may
[p. 30-32]
: 26. Modeling and be the case for instances in the control room depending on specific modeling Meteorology  assumptions.
Guidance for the modeling of the limiting X/Qs for the LPZ and control room is presented and directs the licensee to model the period of most unfavorable atmospheric dispersion factors coincident with the time period of most adverse environmental release. This guidance has been included previously for the control room location in RG 1.194 (and identified in the 2015 periodic review of RG 1.194 as an item for alignment). However, the guidance has not been previously incorporated in or identified as needed for RG 1.183.
Assumptions)
[Also, no identification of this guidance has been made for RG 1.145 for the LPZ location.]
[p. 30-32] For instance, for a PWR MHA, a staged release is modeled in accordance with Table 2 of RG 1.183. This results in the limiting environmental release typically occurring after the initial 0-2 hour time period. The control room is typically isolated early in the event, accounting for some delay, such that only gap activity enters the control room envelope during unfiltered, normal ventilation mode. Therefore, during the period of greatest environmental release, the activity entering the control room would be subject to emergency mode flows (possibly lower than normal mode), filtration (~90-95% iodine and particulates), and lower X/Q values associated with emergency mode intakes (depending on the receptor positioning). As a result, applying the proposed guidance would decrease the control room dose consequences relative to the current practices.
The current widely used practice for modeling X/Q values for the LPZ and control room is to align the values in correct time period order, e.g., 0-2 hrs, 2-8 hrs, etc. (similar to the first portion of Figure 2 in DG-1389). However, it is recognized that this may not align with the period of most adverse environmental release in instances of delayed releases from damaged/melted fuel (in cases of an MHA) or prolonged buildup and transit from the primary to secondary systems to the environment (in cases of a locked RCP rotor).
The interpretation of the guidance presented in DG-1389 is that the period of most adverse release aligns with the period of highest dose. However, the NRC has not provided sufficient guidance for consideration of situations in which the period of most adverse environmental release does not align with the period of highest dose. This may be the case for instances in the control room depending on specific modeling assumptions.
For instance, for a PWR MHA, a staged release is modeled in accordance with Table 2 of RG 1.183. This results in the limiting environmental release typically occurring after the initial 0-2 hour time period. The control room is typically isolated early in the event, accounting for some delay, such that only gap activity enters the control room envelope during unfiltered, normal ventilation mode. Therefore, during the period of greatest environmental release, the activity entering the control room would be subject to emergency mode flows (possibly lower than normal mode), filtration (~90-95% iodine and particulates), and lower X/Q values associated with emergency mode intakes (depending on the receptor positioning). As a result, applying the proposed guidance would decrease the control room dose consequences relative to the current practices.
Additionally, no guidance has been provided for cases in which multiple release pathways are modeled with varying periods of limiting environmental releases and/or dose.
Additionally, no guidance has been provided for cases in which multiple release pathways are modeled with varying periods of limiting environmental releases and/or dose.
For simplicity, and to avoid potential non-conservative applications of the guidance, it is recommended that the NRC remove this position from DG-1389 and maintain the current practice of applying LPZ and CR values from highest X/Q at event initiation (T=0) for all Page 9
For simplicity, and to avoid potential non-conservative applications of the guidance, it is recommended that the NRC remove this position from DG-1389 and maintain the current practice of applying LPZ and CR values from highest X/Q at event initiation (T=0) for all The NRC should re-assess the need to include this guidance for atmospheric dispersion factor modeling. The guidance, as presented, may result in a misappropriation of the limiting two-hour X/Q values for the time period of greatest release as this may not align with the time period of greatest dose contribution for the control room.
It is recommended that the NRC remove this position from DG-1389 and maintain the current practice of applying LPZ and CR values from highest X/Q at event initiation (T=0) for all events, regardless of release magnitude. It is also recommended that this position be removed from RG 1.194.


No.     Section                                             Comment/Basis                                                 Recommendation events, regardless of release magnitude. It is also recommended that this position be removed from RG 1.194.
Page 10 No.
This section indicates that the aerosol deposition models in NUREG/CR-6189 are still        Confirm the continued applicability of Appendix A, applicable; however, based on Section 1 of NUREG/CR-6189, the models are based on the      the NUREG/CR-6189 aerosol removal Section A-2.2,
Section Comment/Basis Recommendation events, regardless of release magnitude. It is also recommended that this position be removed from RG 1.194.
: 27.                release fractions and timing in NUREG-1465. Considering the significant changes to the      rates.
: 27.
Page A-2 release fractions and timings in DG-1389, there may be significant impacts to the
Appendix A, Section A-2.2, Page A-2
[p.39]
[p.39]
deposition rates in this NUREG.
This section indicates that the aerosol deposition models in NUREG/CR-6189 are still applicable; however, based on Section 1 of NUREG/CR-6189, the models are based on the release fractions and timing in NUREG-1465. Considering the significant changes to the release fractions and timings in DG-1389, there may be significant impacts to the deposition rates in this NUREG.
Revise A-2.5 to allow credit for suppression pool scrubbing based on:                       Change A-2.5 to reference NUREG/CR-NUREG/CR-6153 - provides models for accident dose calculations using the AST         6153 and allow credit for reduction in for the purposes of crediting iodine decontamination provided by suppression       airborne radioactivity in the Appendix A,            pools                                                                             containment by suppression pool Section A-2.5,
Confirm the continued applicability of the NUREG/CR-6189 aerosol removal rates.
* Accounts for the changing aerosol distribution following passage through   scrubbing in BWRs.
: 28.
28.
Appendix A, Section A-2.5, Page A-3
Page A-3                      the pool
[p.40]
[p.40]          State-of-the-Art Reactor Consequence Analyses (SOARCA) project results (ML20304A339- NRC Brochure) include the suppression pool in their models and indicate that all modeled accident scenarios, progress more slowly and release smaller amounts of radioactive material than calculated in earlier studies.
Revise A-2.5 to allow credit for suppression pool scrubbing based on:
For gas-filled secondary containment bypass leakage paths, this section states deposition  Add deposition of aerosol radioactivity Appendix A, of aerosol radioactivity in gas-filled lines may be considered on a case-by-case basis. and plate-out of elemental halogens Section A-3.5,
NUREG/CR-6153 - provides models for accident dose calculations using the AST for the purposes of crediting iodine decontamination provided by suppression pools Accounts for the changing aerosol distribution following passage through the pool State-of-the-Art Reactor Consequence Analyses (SOARCA) project results (ML20304A339-NRC Brochure) include the suppression pool in their models and indicate that all modeled accident scenarios, progress more slowly and release smaller amounts of radioactive material than calculated in earlier studies.
: 29.                Plate-out of elemental iodine may also be a significant removal mechanism in gas-filled Page A-4 secondary bypass leakage pathways. In addition to aerosol deposition, the plate-out of
Change A-2.5 to reference NUREG/CR-6153 and allow credit for reduction in airborne radioactivity in the containment by suppression pool scrubbing in BWRs.
: 29.
Appendix A, Section A-3.5, Page A-4
[p.41]
[p.41]
elemental iodine should not be excluded.
For gas-filled secondary containment bypass leakage paths, this section states deposition of aerosol radioactivity in gas-filled lines may be considered on a case-by-case basis.
Multiple BWRs currently have credit for aerosol removal from drywell sprays as well as     Provide a model where it is acceptable Appendix A,  aerosol deposition within in the main steam lines (some also have Condenser removal) in     to credit aerosol removal from drywell A-5. Main    their current licensing basis. Section A-5 presents three acceptable methods for           sprays as well as aerosol deposition Steam    calculating aerosol deposition within the main steam lines, but this section states,       within in the main steam lines.
Plate-out of elemental iodine may also be a significant removal mechanism in gas-filled secondary bypass leakage pathways. In addition to aerosol deposition, the plate-out of elemental iodine should not be excluded.
Isolation Valve however, these methods are not valid if credit has been taken for aerosol removal
Add deposition of aerosol radioactivity and plate-out of elemental halogens
: 30. Leakage in  from drywell sprays.
: 30.
Boiling-Water Reactors,  Given the prevalence of credit for both sprays and steam line deposition, why is there not Page A-6    a model presented that the Staff finds acceptable for crediting both, or modifications to
Appendix A, A-5. Main Steam Isolation Valve Leakage in Boiling-Water
[p.43]    the presented models if the licensee wants to credit spray removal (e.g., different aerosol size distribution)?
: Reactors, Page A-6
Page 10
[p.43]
Multiple BWRs currently have credit for aerosol removal from drywell sprays as well as aerosol deposition within in the main steam lines (some also have Condenser removal) in their current licensing basis. Section A-5 presents three acceptable methods for calculating aerosol deposition within the main steam lines, but this section states, however, these methods are not valid if credit has been taken for aerosol removal from drywell sprays.
Given the prevalence of credit for both sprays and steam line deposition, why is there not a model presented that the Staff finds acceptable for crediting both, or modifications to the presented models if the licensee wants to credit spray removal (e.g., different aerosol size distribution)?
Provide a model where it is acceptable to credit aerosol removal from drywell sprays as well as aerosol deposition within in the main steam lines.


No.     Section                                           Comment/Basis                                                   Recommendation Appendix A,   What is the technical justification for drywell sprays aerosol removal not being valid if Revise words to state that the impact of A-5. Main   used alongside main steam isolation valve leakage? The removal mechanisms associated      sprays on aerosol removal should be Steam     with spray described in NUREG/CR-5966 are largely different than the removal              determined in the submittal, and do not Isolation Valve mechanisms associated with deposition described in SAND2008-6601 and AEB 98-03.          state that removal by both sprays and
Page 11 No.
: 31. Leakage in   Section 6.2 of SAND2008-6601 states that sprays should not be used in conjunction with    deposition should not be used.
Section Comment/Basis Recommendation
Boiling-Water main steam line deposition, but this discussion is based on the steam dome being the Reactors,   source of radioactivity rather than the accepted position of the drywell being the source Page A-6   of radioactivity.
: 31.
Appendix A, A-5. Main Steam Isolation Valve Leakage in Boiling-Water
: Reactors, Page A-6
[p.43]
[p.43]
Appendix A,  DG-1389 states that the reported 3 aerosol methods are not valid if credit has been taken Confirm acceptability of applying A-5. Main    for aerosol removal by drywell sprays. Are other aerosol removal mechanisms similarly    NUREG/CR-6189 aerosol deposition in Steam      affected? Can a licensee credit the natural removal mechanisms in NUREG/CR-6189          addition to reported MSL deposition Isolation Valve consistent with Section A-2.2 and apply the reported MSL models? Although the             models.
What is the technical justification for drywell sprays aerosol removal not being valid if used alongside main steam isolation valve leakage? The removal mechanisms associated with spray described in NUREG/CR-5966 are largely different than the removal mechanisms associated with deposition described in SAND2008-6601 and AEB 98-03.
: 32. Leakage in   deposition models in NUREG/CR-6189 may affect the aerosol size distribution, this impact Boiling-Water would be expected to be similar to the impact of the MSL models themselves such that Reactors,   the aerosol distribution entering the MSLs are not significantly different from that Page A-6   assumed in the models.
Section 6.2 of SAND2008-6601 states that sprays should not be used in conjunction with main steam line deposition, but this discussion is based on the steam dome being the source of radioactivity rather than the accepted position of the drywell being the source of radioactivity.
Revise words to state that the impact of sprays on aerosol removal should be determined in the submittal, and do not state that removal by both sprays and deposition should not be used.
: 32.
Appendix A, A-5. Main Steam Isolation Valve Leakage in Boiling-Water
: Reactors, Page A-6
[p.43]
[p.43]
DG-1389 reports the first MSL aerosol deposition model as: Direct adoption of the SAND    Revise first aerosol deposition model to 2008-6601 (Ref. A-11) recommendations without scaling R*-factors;                        without scaling RM and R* factors.
DG-1389 states that the reported 3 aerosol methods are not valid if credit has been taken for aerosol removal by drywell sprays. Are other aerosol removal mechanisms similarly affected? Can a licensee credit the natural removal mechanisms in NUREG/CR-6189 consistent with Section A-2.2 and apply the reported MSL models? Although the deposition models in NUREG/CR-6189 may affect the aerosol size distribution, this impact would be expected to be similar to the impact of the MSL models themselves such that the aerosol distribution entering the MSLs are not significantly different from that assumed in the models.
Appendix A, This approach needs additional explanation. As defined in Section 1.1 of SAND2008-6601, A-5. Main the R* factor is defined as the ratio of NUREG-1465 containment airborne concentrations Steam to MELCOR containment airborne concentrations. A separate factor, RM, models the ratio Isolation Valve of the steam dome concentration to the drywell concentration determined by the
Confirm acceptability of applying NUREG/CR-6189 aerosol deposition in addition to reported MSL deposition models.
: 33. Leakage in MELCOR full plant analyses. Backing the R* factor out of the process does not appear to Boiling-Water be possible since, per Section 5.2 of SAND2008-6601, the RM and R* factors are combined Reactors, and their product is applied to develop the results in Table 5-3.
: 33.
Page A-6
Appendix A, A-5. Main Steam Isolation Valve Leakage in Boiling-Water
: Reactors, Page A-6
[p.43]
[p.43]
DG-1389 reports the first MSL aerosol deposition model as: Direct adoption of the SAND 2008-6601 (Ref. A-11) recommendations without scaling R*-factors; This approach needs additional explanation. As defined in Section 1.1 of SAND2008-6601, the R* factor is defined as the ratio of NUREG-1465 containment airborne concentrations to MELCOR containment airborne concentrations. A separate factor, RM, models the ratio of the steam dome concentration to the drywell concentration determined by the MELCOR full plant analyses. Backing the R* factor out of the process does not appear to be possible since, per Section 5.2 of SAND2008-6601, the RM and R* factors are combined and their product is applied to develop the results in Table 5-3.
This section should adopt the MHA approach where the drywell and steam dome are well-mixed. As such, there should be no scaling factor applied to model the increased concentration in the steam dome.
This section should adopt the MHA approach where the drywell and steam dome are well-mixed. As such, there should be no scaling factor applied to model the increased concentration in the steam dome.
Page 11
Revise first aerosol deposition model to without scaling RM and R* factors.


No. Section                                           Comment/Basis                                                     Recommendation It is understood that there are several deposition and removal mechanisms (see Table         Change footnote 4 to state that 4.1-3 of the State-of-the-Art Report for examples) present inside of steam lines and it is   previously approved methods are not challenging to provide a comprehensive model due to lack of experimental data and           superseded by the RG 1.183 Revision 1 disassociation between the reality of core cooling being maintained during a design basis   methods if unaltered during submittals accident and fuel damage being assumed per DG-1389. The State-of-the-Art Report             associated with licensing actions Appendix A, attempts to capture all of these uncertainties but cannot and does not form a conclusion     unrelated to steam line removal.
Page 12 No.
: 34. A-5.6, Page A-based on all of the available literature.
Section Comment/Basis Recommendation
9 [p.46]
: 34.
Appendix A, A-5.6, Page A-9 [p.46]
It is understood that there are several deposition and removal mechanisms (see Table 4.1-3 of the State-of-the-Art Report for examples) present inside of steam lines and it is challenging to provide a comprehensive model due to lack of experimental data and disassociation between the reality of core cooling being maintained during a design basis accident and fuel damage being assumed per DG-1389. The State-of-the-Art Report attempts to capture all of these uncertainties but cannot and does not form a conclusion based on all of the available literature.
Based on previous approval of AST applications and the lack of concrete knowledge surrounding removal in steam lines, it is recommended to allow licensees to continue to use their existing main steam line removal models if pursuing licensing actions unrelated to the steam lines themselves.
Based on previous approval of AST applications and the lack of concrete knowledge surrounding removal in steam lines, it is recommended to allow licensees to continue to use their existing main steam line removal models if pursuing licensing actions unrelated to the steam lines themselves.
Aerosol deposition in vertical volumes is non-zero. SAND2008-6601 Section 3.3 states that   Remove in horizontal volumes or some deposition occurs in vertical surfaces. This is confirmed by Figure 2-16 and Figure     provide different guidance for horizontal Appendix A, 2-17 of the State-of-the-Art Report which show strong correlations between temperature       vs. vertical volumes when applying
Change footnote 4 to state that previously approved methods are not superseded by the RG 1.183 Revision 1 methods if unaltered during submittals associated with licensing actions unrelated to steam line removal.
: 35. A-5.6, Page A-driven deposition by thermophoresis and condensing vapor deposition by                       Method 1: Direct adoption of the SAND 9 [p.46]
: 35.
diffusiophoresis. These removal mechanisms are largely independent of gravitational         2008-6601 recommendations without settling in horizontal segments.                                                            scaling RM and R* factors.
Appendix A, A-5.6, Page A-9 [p.46]
Section A-5.6 implies that only plants other than Mark I, II, or III will be considered on a Revise statement to allow case by case Appendix A,  case-by-case basis. All models should be considered on a case-by-case basis considering     review for all technologies.
Aerosol deposition in vertical volumes is non-zero. SAND2008-6601 Section 3.3 states that some deposition occurs in vertical surfaces. This is confirmed by Figure 2-16 and Figure 2-17 of the State-of-the-Art Report which show strong correlations between temperature driven deposition by thermophoresis and condensing vapor deposition by diffusiophoresis. These removal mechanisms are largely independent of gravitational settling in horizontal segments.
: 36. A-5.6, Page A- the models described by positions A-5.6.1, A-5.6.2, and A-5.6.3 do not consider all 9 [p.46]    removal mechanisms present in the steam lines.
Remove in horizontal volumes or provide different guidance for horizontal vs. vertical volumes when applying Method 1: Direct adoption of the SAND 2008-6601 recommendations without scaling RM and R* factors.
Section A-5.6 indicates that the multi-group method will be evaluated on an individual     Confirm that the approaches in Sections case-by-case basis.                                                                         A-5.6.2 and A-5.6.3 are acceptable Appendix A,                                                                                                models for aerosol deposition in the
: 36.
: 37. A-5.6, Page A- This statement implies that the application of this method may not be fully approved,       MSLs.
Appendix A, A-5.6, Page A-9 [p.46]
9 [p.46]    thereby increasing the potential for regulatory uncertainty in future submittals. Why does the approach described in Section A-5.6.2, including an AMMD of 2.0 µm, 2,000 groups, and 10,000 trials, require additional regulatory review?
Section A-5.6 implies that only plants other than Mark I, II, or III will be considered on a case-by-case basis. All models should be considered on a case-by-case basis considering the models described by positions A-5.6.1, A-5.6.2, and A-5.6.3 do not consider all removal mechanisms present in the steam lines.
Page 12
Revise statement to allow case by case review for all technologies.
: 37.
Appendix A, A-5.6, Page A-9 [p.46]
Section A-5.6 indicates that the multi-group method will be evaluated on an individual case-by-case basis.
This statement implies that the application of this method may not be fully approved, thereby increasing the potential for regulatory uncertainty in future submittals. Why does the approach described in Section A-5.6.2, including an AMMD of 2.0 µm, 2,000 groups, and 10,000 trials, require additional regulatory review?
Confirm that the approaches in Sections A-5.6.2 and A-5.6.3 are acceptable models for aerosol deposition in the MSLs.


No. Section                                           Comment/Basis                                                       Recommendation The basis for not being able to credit the piping upstream of the inboard MSIV seems to       Revise table to be consistent with come from Section 6.3 of SAND2008-6601 which states that at times in the simulation         SAND2008-6601 and add in calculated the temperature of portions of the in-board MSL piping are predicted to be high enough       removal for in-board lines.
Page 13 No.
to vaporize fission products that had been previously deposited. The MELCOR simulation Appendix A,  in SAND2008-6601 is not representative of plant specific thermo-hydraulic conditions.
Section Comment/Basis Recommendation
: 38. A-5.6.1, Page  (e.g., Figure 2-19 of SAND2008-6601 shows a long term temperature of approximately A-9 [p.46]  800F in the steam dome while most BWR analyses would show long term temperatures of less than 300F in the core with ECCS operational). Credit should be able to be taken for deposition in the inboard lines if plant specific analysis shows low temperatures considering RIS 2006-04 states that deposition of particles in the inboard volume occurs.
: 38.
Appendix A, A-5.6.1, Page A-9 [p.46]
The basis for not being able to credit the piping upstream of the inboard MSIV seems to come from Section 6.3 of SAND2008-6601 which states that at times in the simulation the temperature of portions of the in-board MSL piping are predicted to be high enough to vaporize fission products that had been previously deposited. The MELCOR simulation in SAND2008-6601 is not representative of plant specific thermo-hydraulic conditions.
(e.g., Figure 2-19 of SAND2008-6601 shows a long term temperature of approximately 800F in the steam dome while most BWR analyses would show long term temperatures of less than 300F in the core with ECCS operational). Credit should be able to be taken for deposition in the inboard lines if plant specific analysis shows low temperatures considering RIS 2006-04 states that deposition of particles in the inboard volume occurs.
In addition, the time periods in DG-1389 are inconsistent with SAND2008-6601.
In addition, the time periods in DG-1389 are inconsistent with SAND2008-6601.
Calculations typically consider a single failure which is either assumed to be a break in a Clarify that there is no in-board pipe Appendix A,  steam line leading to not modeling holdup/deposition in a steam line upstream of the         break in the MHA scenario.
Revise table to be consistent with SAND2008-6601 and add in calculated removal for in-board lines.
A-5.6.2, Page  inboard MSIV or assumed to be a stuck open MSIV which leads to combining the inboard 39.
: 39.
A-9 to A-11  volume with the between MSIV volume in a single steam line. The discussion states that a
Appendix A, A-5.6.2, Page A-9 to A-11
[p.46-48]  pipe break is not assumed, so should all applicants consider the limiting single failure to be a stuck open MSIV (with respect to deposition in the steam lines)?
[p.46-48]
The State-of-the-Art report recommends a AMMD of 3 µm for containment and Section            Revise the text to apply a 3.0 µm AMMD A-5.6.2 describes the approved approach as applying an aerodynamic mass mean                  or explain the basis for the suggested Appendix A, diameter (AMMD) of 2.0 µm. This appears to be an average value of the RCS and                value of 2.0 µm.
Calculations typically consider a single failure which is either assumed to be a break in a steam line leading to not modeling holdup/deposition in a steam line upstream of the inboard MSIV or assumed to be a stuck open MSIV which leads to combining the inboard volume with the between MSIV volume in a single steam line. The discussion states that a pipe break is not assumed, so should all applicants consider the limiting single failure to be a stuck open MSIV (with respect to deposition in the steam lines)?
A-5.6.2, Page
Clarify that there is no in-board pipe break in the MHA scenario.
: 40.                containment AMMD values of 1.0 and 3.0 µm respectively. Considering the MHA A-9 to A-11 assumption of a well-mixed drywell, the containment AMMD of 3.0 µm would be the
: 40.
Appendix A, A-5.6.2, Page A-9 to A-11
[p.46-48]
[p.46-48]
applicable parameter on which to base the aerosol size distribution entering the main steam lines.
The State-of-the-Art report recommends a AMMD of 3 µm for containment and Section A-5.6.2 describes the approved approach as applying an aerodynamic mass mean diameter (AMMD) of 2.0 µm. This appears to be an average value of the RCS and containment AMMD values of 1.0 and 3.0 µm respectively. Considering the MHA assumption of a well-mixed drywell, the containment AMMD of 3.0 µm would be the applicable parameter on which to base the aerosol size distribution entering the main steam lines.
These methods are based on the AEB 98-03 methodology which does not account for               Clarify that other associated removal Appendix A, thermophoresis, impaction, diffusiophoresis, flow irregularities, and hygroscopicity. The     mechanisms may be calculated A-5.6.2 and A-removal calculated is largely correlated to particle size but because it does not include     separately and included in the TEARE.
Revise the text to apply a 3.0 µm AMMD or explain the basis for the suggested value of 2.0 µm.
: 41. 5.6.3 Page A-9 these other mechanisms it is overly conservative. For example, Section 2.6.3 of the State-to A-12 [p.46-of-the-Art Report states that thermophoretic deposition velocity is not an especially 49]
: 41.
strong function of particle size.
Appendix A, A-5.6.2 and A-5.6.3 Page A-9 to A-12 [p.46-49]
Page 13
These methods are based on the AEB 98-03 methodology which does not account for thermophoresis, impaction, diffusiophoresis, flow irregularities, and hygroscopicity. The removal calculated is largely correlated to particle size but because it does not include these other mechanisms it is overly conservative. For example, Section 2.6.3 of the State-of-the-Art Report states that thermophoretic deposition velocity is not an especially strong function of particle size.
Clarify that other associated removal mechanisms may be calculated separately and included in the TEARE.


No. Section                                           Comment/Basis                                                     Recommendation Section A-5.6.4 indicates that aerosol deposition in the condenser using a multi-group or   Clarify use of Table A-1 condenser numerical integration approach needs to be evaluated on an individual case basis.           deposition coefficients or clarify why the multi-group method is not applicable to Appendix A, Why would the multi-group or numerical integration approaches not be applicable in the       the condenser.
Page 14 No.
: 42. A-5.6.4, Page condenser? These models consider the impact of easier-to-remove particles being A-12 [p.49]
Section Comment/Basis Recommendation
removed in the upstream compartments, leading to less deposition in the condenser. Can the condenser deposition coefficients in Table A-1 be applied instead of a value developed with the multi-group or numerical integration approaches?
: 42.
Footnote 1 in Appendix B presents that if a postulated event (heavy load drop) occurs for   Replace the footnote wording with the an FHA, the activity release may be based on core average gap fractions presented for the   following to clarify the gap fractions and LOCA in Tables 1 and 2. The following issues should be addressed by the NRC:                timings to apply for the heavy load drop accident:
Appendix A, A-5.6.4, Page A-12 [p.49]
* Tables 1 and 2 identify gap fraction releases for the Te, Ba, and Sr groups. As identified in a previous comment, the SAND-2011-0128 report, in which Tables 1       These assumptions may also be used in and 2 are based, clarified that these releases listed in the gap phase were more     assessing the radiological consequences accurately classified as in-vessel releases that occurred during the gap release     of a heavy load drop over fuel accident.
Section A-5.6.4 indicates that aerosol deposition in the condenser using a multi-group or numerical integration approach needs to be evaluated on an individual case basis.
phase. As a heavy load drop event is a shutdown event and fuel damage should         If the event is postulated to damage all only result from a load impact, there would not be a driver for further fuel failure of the rods in the core, the release Appendix B associated with in-vessel releases (which results from fuel melt). Therefore, these activity may be based on the core-(Fuel Handling
Why would the multi-group or numerical integration approaches not be applicable in the condenser? These models consider the impact of easier-to-remove particles being removed in the upstream compartments, leading to less deposition in the condenser. Can the condenser deposition coefficients in Table A-1 be applied instead of a value developed with the multi-group or numerical integration approaches?
: 43.                        nuclide groups should be excluded from consideration in the fuel handling           average gap fractions of Tables 1 and 2 Accident) [p.
Clarify use of Table A-1 condenser deposition coefficients or clarify why the multi-group method is not applicable to the condenser.
accidents involving the entire core.                                                 in the main text of the guide, and the 52]
: 43.
* The Tables 1 and 2 release fractions are associated with the timings presented in   radial peaking factor may be omitted.
Appendix B (Fuel Handling Accident) [p.
Table 5. Table 5 presents gap phase durations of 0.22 hours (PWRs) and 0.16         Gap fractions may be limited to the hours (BWRs). The timings in Table 5 are based on simulations of various plant       noble gas, halogen, and alkali metal transients which do not include fuel handling accidents / heavy load drop events. groups, consistent with Tables 3 and 4.
52]
Therefore, it should be specified that the use of Tables 1 and 2 do not need to     Additionally, the release timings and explicitly follow the gap phase durations from Table 5 and can instead use the       durations associated with this appendix durations presented in this appendix (Appendix B).                                   may be used in lieu of release timings and durations associated with Regulatory Position 3.2 for Tables 1 and 2.
Footnote 1 in Appendix B presents that if a postulated event (heavy load drop) occurs for an FHA, the activity release may be based on core average gap fractions presented for the LOCA in Tables 1 and 2. The following issues should be addressed by the NRC:
Page 14
Tables 1 and 2 identify gap fraction releases for the Te, Ba, and Sr groups. As identified in a previous comment, the SAND-2011-0128 report, in which Tables 1 and 2 are based, clarified that these releases listed in the gap phase were more accurately classified as in-vessel releases that occurred during the gap release phase. As a heavy load drop event is a shutdown event and fuel damage should only result from a load impact, there would not be a driver for further fuel failure associated with in-vessel releases (which results from fuel melt). Therefore, these nuclide groups should be excluded from consideration in the fuel handling accidents involving the entire core.
The Tables 1 and 2 release fractions are associated with the timings presented in Table 5. Table 5 presents gap phase durations of 0.22 hours (PWRs) and 0.16 hours (BWRs). The timings in Table 5 are based on simulations of various plant transients which do not include fuel handling accidents / heavy load drop events.
Therefore, it should be specified that the use of Tables 1 and 2 do not need to explicitly follow the gap phase durations from Table 5 and can instead use the durations presented in this appendix (Appendix B).
Replace the footnote wording with the following to clarify the gap fractions and timings to apply for the heavy load drop accident:
These assumptions may also be used in assessing the radiological consequences of a heavy load drop over fuel accident.
If the event is postulated to damage all of the rods in the core, the release activity may be based on the core-average gap fractions of Tables 1 and 2 in the main text of the guide, and the radial peaking factor may be omitted.
Gap fractions may be limited to the noble gas, halogen, and alkali metal groups, consistent with Tables 3 and 4.
Additionally, the release timings and durations associated with this appendix may be used in lieu of release timings and durations associated with Regulatory Position 3.2 for Tables 1 and
: 2.  


No. Section                                           Comment/Basis                                                     Recommendation In the current licensing basis fuel handling accidents, the impacts of stable and long-lived Confirm the applicability of Tables 3 and iodine isotopes (e.g., I-127 and I-129) are not typically considered due to their negligible 4 for I-127 and I-129 as other dose consequences. For the revised fuel handling accident approach, these isotopes are      halogens.
Page 15 No.
Appendix B, B- important to develop the pool iodine concentration as they represent most of the iodine
Section Comment/Basis Recommendation
: 44. 1.3, Page B-1 inventory in the fuel rods.
: 44.
Appendix B, B-1.3, Page B-1
[p. 52]
[p. 52]
In the current licensing basis fuel handling accidents, the impacts of stable and long-lived iodine isotopes (e.g., I-127 and I-129) are not typically considered due to their negligible dose consequences. For the revised fuel handling accident approach, these isotopes are important to develop the pool iodine concentration as they represent most of the iodine inventory in the fuel rods.
The NRCs assessment in the staffs example in ML21190A040 appears to apply a much larger value of 23% for Iodine-129 which is significantly higher than the 4% from Table 4 for other halogens.
The NRCs assessment in the staffs example in ML21190A040 appears to apply a much larger value of 23% for Iodine-129 which is significantly higher than the 4% from Table 4 for other halogens.
DG-1389 only reports the iodine species distribution released into the pool water. Reg       Provide additional guidance on Guide 1.183 Rev. 0 reported that the iodine chemical species above the water is 57%         acceptable airborne iodine species elemental and 43% organic.                                                                  assumptions.
Confirm the applicability of Tables 3 and 4 for I-127 and I-129 as other halogens.
For Rev. 1 applications, what iodine species distribution should be applied for the early 2-
: 45.
: 45. Section B.1-3  hour airborne release considering the new fuel handling accident model? Based on the calculated overall pool DF from Equations 3-1, 3-2, and 3-3, is a species-dependent DF approach acceptable with organic iodine having a DF of 1?
Section B.1-3 DG-1389 only reports the iodine species distribution released into the pool water. Reg Guide 1.183 Rev. 0 reported that the iodine chemical species above the water is 57%
elemental and 43% organic.
For Rev. 1 applications, what iodine species distribution should be applied for the early 2-hour airborne release considering the new fuel handling accident model? Based on the calculated overall pool DF from Equations 3-1, 3-2, and 3-3, is a species-dependent DF approach acceptable with organic iodine having a DF of 1?
Is a purely elemental iodine species appropriate for the long-term release since this is comprised of re-evolved elemental iodine?
Is a purely elemental iodine species appropriate for the long-term release since this is comprised of re-evolved elemental iodine?
There can be fuel handling accident scenarios where the water depth may be greater than      Revise statement as follows:
Provide additional guidance on acceptable airborne iodine species assumptions.
23 feet such as drops over the core. However, Section B-2 states that the DF can be calculated from Equations in B-1, B-2, and B-3, if the water depth is between 19 and 23      For water depths greater than or equal Appendix B, B-feet. There is no guidance in the event the water depth is greater than 23 feet.            to 19 feet, an overall iodine DF based on
: 46.
: 46. 2, Page B-2 [p.
Appendix B, B-2, Page B-2 [p.
pin pressure is computed as follows:
52]
52]
There can be fuel handling accident scenarios where the water depth may be greater than 23 feet such as drops over the core. However, Section B-2 states that the DF can be calculated from Equations in B-1, B-2, and B-3, if the water depth is between 19 and 23 feet. There is no guidance in the event the water depth is greater than 23 feet.
Since the DG-1389 equations are not dependent on depth, it would be expected that they would yield a conservatively low DF than an actual value for cases that credit the additional scrubbing depth.
Since the DG-1389 equations are not dependent on depth, it would be expected that they would yield a conservatively low DF than an actual value for cases that credit the additional scrubbing depth.
Appendix B-3 The mass transfer coefficient (KL) is presented as a constant value (3.66x10-6 m/s). From       The NRC should clarify that the mass (Phase 2    Enclosure 4 of Reference B-1, this is a combined liquid-gas phase coefficient that does not transfer coefficient remains applicable Release - Re- consider recirculation in the pool and is based on the assumption of a high flow rate to       for all conditions (i.e., recirculation in 47.
Revise statement as follows:
evolution    clear the building air.                                                                      the pool and low flow rate to clear the Release) [p.                                                                                              building air) and no adjustments need to 54, B-3]                                                                                                be made for changing conditions.
For water depths greater than or equal to 19 feet, an overall iodine DF based on pin pressure is computed as follows:
Page 15
: 47.
Appendix B-3 (Phase 2 Release - Re-evolution Release) [p.
54, B-3]
The mass transfer coefficient (KL) is presented as a constant value (3.66x10-6 m/s). From of Reference B-1, this is a combined liquid-gas phase coefficient that does not consider recirculation in the pool and is based on the assumption of a high flow rate to clear the building air.
The NRC should clarify that the mass transfer coefficient remains applicable for all conditions (i.e., recirculation in the pool and low flow rate to clear the building air) and no adjustments need to be made for changing conditions.  


No. Section                                           Comment/Basis                                                     Recommendation Step 2 of the FHA model instructs the analyst to calculate the amount of iodine in the fuel  The NRC should specify that additional pin gap. The calculations consider I-131 for the amount of radioactive iodine (with          non-radioactive iodine isotopes subsequent clarification to include other radioactive iodine isotopes to the total) and      (especially I-127) should be considered consider I-129 for the amount of non-radioactive iodine (with no subsequent clarification    to maximize the amount of iodine Appendix B-3 to include other non-radioactive iodine isotopes). The radioactive and non-radioactive      considered in Step 2 of the FHA model (Phase 2 iodines are then combined for a total iodine which is used in the downstream                calculation.
Page 16 No.
Release - Re-
Section Comment/Basis Recommendation
: 48.                calculations. [Note that the individual components are not used in any downstream evolution calculations within the model and calculations involving only the radioactivity iodine can Release) [p.
: 48.
be removed from the model development.]
Appendix B-3 (Phase 2 Release - Re-evolution Release) [p.
54, B-3]
54, B-3]
Step 2 of the FHA model instructs the analyst to calculate the amount of iodine in the fuel pin gap. The calculations consider I-131 for the amount of radioactive iodine (with subsequent clarification to include other radioactive iodine isotopes to the total) and consider I-129 for the amount of non-radioactive iodine (with no subsequent clarification to include other non-radioactive iodine isotopes). The radioactive and non-radioactive iodines are then combined for a total iodine which is used in the downstream calculations. [Note that the individual components are not used in any downstream calculations within the model and calculations involving only the radioactivity iodine can be removed from the model development.]
It was observed in the calculations that a higher total iodine amount is conservative for calculating the release rate to be used in the analysis. As such, additional non-radioactive iodine isotopes (I-127) should conservatively be considered.
It was observed in the calculations that a higher total iodine amount is conservative for calculating the release rate to be used in the analysis. As such, additional non-radioactive iodine isotopes (I-127) should conservatively be considered.
Equation B-10 in Step 2 calculates the [I2]/[I-]2 concentration ratio using the following   The NRC should provide clarification as Appendix B-3  equation:                                                                                   to the discrepancy in constants between (Phase 2        R.i = [hJ/[I-]2 = ch2 1  6.0603E-14 + 1.4 osE-09        ch 1                            NUREG/CR-5950 and DG-1389 or update Release - Re-                                                                                              Equation B-10 to present the constants
The NRC should specify that additional non-radioactive iodine isotopes (especially I-127) should be considered to maximize the amount of iodine considered in Step 2 of the FHA model calculation.
: 49.                Constants 6.0603E-14 and 1.4708E-09 originate from Ref. B-2 (NUREG/CR-5950);
: 49.
evolution                                                                                                to the degree of precision from Release) [p. however, the constants are not presented in the reference to that degree of accuracy.
Appendix B-3 (Phase 2 Release - Re-evolution Release) [p.
NUREG/CR-5950.
55, B-4]
55, B-4]    The constants presented in NUREG/CR-5950 are 6.05E-14 and 1.47E-09 [NUREG/CR-5950 page 13 and Appendix C, page C.3]. It is unclear where the discrepancy is occurring.
Equation B-10 in Step 2 calculates the [I2]/[I-]2 concentration ratio using the following equation:
Position B-5.1 provides a release duration time for the first phase releases (2 hours). The  The NRC should clarify the starting time Appendix B-5  position does not provide any specifics for onset and duration timing for the second        and duration of the re-evolution phase.
Constants 6.0603E-14 and 1.4708E-09 originate from Ref. B-2 (NUREG/CR-5950);
(Fuel Handling phase releases (re-evolution releases). From the Ref. B-1 model background, this release Accidents   phase should begin immediately after the first phase (2 hours) and be modeled until the 50.
however, the constants are not presented in the reference to that degree of accuracy.
within the   typical end of the radiological considerations (30 days). It is assumed that there is no Fuel Building) overlap of release phases.
The constants presented in NUREG/CR-5950 are 6.05E-14 and 1.47E-09 [NUREG/CR-5950 page 13 and Appendix C, page C.3]. It is unclear where the discrepancy is occurring.
The NRC should provide clarification as to the discrepancy in constants between NUREG/CR-5950 and DG-1389 or update Equation B-10 to present the constants to the degree of precision from NUREG/CR-5950.
: 50.
Appendix B-5 (Fuel Handling Accidents within the Fuel Building)
[p. 56, B-5]
[p. 56, B-5]
Position B-5.1 provides a release duration time for the first phase releases (2 hours). The position does not provide any specifics for onset and duration timing for the second phase releases (re-evolution releases). From the Ref. B-1 model background, this release phase should begin immediately after the first phase (2 hours) and be modeled until the typical end of the radiological considerations (30 days). It is assumed that there is no overlap of release phases.
Note that this comment is also applicable to Position B-6.3.
Note that this comment is also applicable to Position B-6.3.
Appendix B-5   Footnote 4 breaks across pages B-5 and B-6. This footnote should be contained on a single See comment for the items to address.
The NRC should clarify the starting time and duration of the re-evolution phase.
(Fuel Handling  page.
: 51.
Accidents
Appendix B-5 (Fuel Handling Accidents within Containment)
: 51.      within    Note that this footnote is referenced in Positions B-6.1 and B-6.2 which are currently on Containment)    separate pages, so Footnote 4 may have to be repeated on separate pages.
[p. 56-57, B 6]
[p. 56-57, B            6]      Likewise, Footnote 3 for Position B-6.4 is not located on the same page as the position.
Footnote 4 breaks across pages B-5 and B-6. This footnote should be contained on a single page.
Page 16
Note that this footnote is referenced in Positions B-6.1 and B-6.2 which are currently on separate pages, so Footnote 4 may have to be repeated on separate pages.
Likewise, Footnote 3 for Position B-6.4 is not located on the same page as the position.
See comment for the items to address.
R.i = [hJ/[I-]2 = ch2 1 6.0603E-14 + 1.4 osE-09 ch 1


No. Section                                           Comment/Basis                                                       Recommendation Appendix E Revision 0 of RG 1.183 presented the PWR Main Steamline Break event in Appendix E.             The NRC should consider maintaining (Steam    There is no indication as to the motive behind the switch in appendices for DG-1389. This     consistency in the event order
Page 17 No.
: 52. Generator  may cause confusion to licensees which need to compare/contrast the RG revisions or           presented in the regulatory guide Tube Rupture) those that elect to implement and maintain different RG revision methods for these             appendices.
Section Comment/Basis Recommendation
[p. 63]  events.
: 52.
Appendix E  The page numbering for Appendix E is not correct as the first page of the appendix is          The NRC should correct the page (Steam    identified as page E-3.                                                                       number in Appendix E and also review
Appendix E (Steam Generator Tube Rupture)
: 53. Generator                                                                                                 the entirety of the regulatory guide to Tube Rupture)                                                                                               correct any further editorial errors.
[p. 63]
Revision 0 of RG 1.183 presented the PWR Main Steamline Break event in Appendix E.
There is no indication as to the motive behind the switch in appendices for DG-1389. This may cause confusion to licensees which need to compare/contrast the RG revisions or those that elect to implement and maintain different RG revision methods for these events.
The NRC should consider maintaining consistency in the event order presented in the regulatory guide appendices.
: 53.
Appendix E (Steam Generator Tube Rupture)
[p. 63]
[p. 63]
Position E-6.1 states that the primary-to-secondary leak rate in the steam generators          The NRC should add a statement that should be assumed to be the leak rate for the limiting condition for operation specified in    licensees may credit a reduction in the the TSs. This leak rate is associated with significant pressure differentials across the steam TS leakage rates for later periods of the Appendix E-6 generator tubes which typically occur early in the transient. In later periods of the          transient when pressure differentials (Transport -
The page numbering for Appendix E is not correct as the first page of the appendix is identified as page E-3.
transient, and especially during longer-term steaming for cooldown, the pressure              across the steam generator tubes are Steam
The NRC should correct the page number in Appendix E and also review the entirety of the regulatory guide to correct any further editorial errors.
: 54.              differential is significantly decreased. Licensees should be able to credit this significant  significantly reduced based on adequate Generator reduction in leakage if it is shown to be credible.                                            technical justifications.
: 54.
Tube Rupture)
Appendix E-6 (Transport -
Steam Generator Tube Rupture)
[p. 64]
[p. 64]
Position E-6.1 states that the primary-to-secondary leak rate in the steam generators should be assumed to be the leak rate for the limiting condition for operation specified in the TSs. This leak rate is associated with significant pressure differentials across the steam generator tubes which typically occur early in the transient. In later periods of the transient, and especially during longer-term steaming for cooldown, the pressure differential is significantly decreased. Licensees should be able to credit this significant reduction in leakage if it is shown to be credible.
This comment is also applicable for other steam release events which model primary-to-secondary leakage. [MSLB in Appendix F, Locked Rotor in Appendix G, and Rod Ejection in Appendix H]
This comment is also applicable for other steam release events which model primary-to-secondary leakage. [MSLB in Appendix F, Locked Rotor in Appendix G, and Rod Ejection in Appendix H]
Page 17
The NRC should add a statement that licensees may credit a reduction in the TS leakage rates for later periods of the transient when pressure differentials across the steam generator tubes are significantly reduced based on adequate technical justifications.


No. Section                                           Comment/Basis                                                       Recommendation Position E-6.6 identifies that the potential impact of tube uncovery on the transport           The NRC should update the wording of model parameters needs to be considered.                                                       this position to acknowledge for U-tube steam generators that the issue of The issue of tube uncovery was addressed by the Westinghouse Owners Group (WOG) in             short-term tube uncovery has previously WCAP-13247, "Report on the Methodology for the Resolution of the Steam Generator               been resolved and does not need to be Tube Uncovery Issue," March 1992. The WOG program concluded that the effect of tube             considered in future applications.
Page 18 No.
Appendix E-6  uncovery would be essentially negligible and the issue could be closed without any (Transport -  further investigation or generic restrictions. This position was accepted by the NRC in a Steam      {{letter dated|date=March 10, 1993|text=letter dated March 10, 1993}}, from Robert C. Jones, Chief of the Reactor System Branch, to 55.
Section Comment/Basis Recommendation
Generator    Lawrence A. Walsh, Chairman of the WOG. The letter states " ... the Westinghouse Tube Rupture)  analyses demonstrate that the effects of partial steam generator tube uncovery on the
: 55.
[p. 66]    iodine release for SGTR and non-SGTR events is negligible. Therefore, we agree with your position on this matter and consider this issue to be resolved." Consistent with this position, tube uncovery should not need to be addressed further for U-tube style steam generators.
Appendix E-6 (Transport -
Steam Generator Tube Rupture)
[p. 66]
Position E-6.6 identifies that the potential impact of tube uncovery on the transport model parameters needs to be considered.
The issue of tube uncovery was addressed by the Westinghouse Owners Group (WOG) in WCAP-13247, "Report on the Methodology for the Resolution of the Steam Generator Tube Uncovery Issue," March 1992. The WOG program concluded that the effect of tube uncovery would be essentially negligible and the issue could be closed without any further investigation or generic restrictions. This position was accepted by the NRC in a {{letter dated|date=March 10, 1993|text=letter dated March 10, 1993}}, from Robert C. Jones, Chief of the Reactor System Branch, to Lawrence A. Walsh, Chairman of the WOG. The letter states "... the Westinghouse analyses demonstrate that the effects of partial steam generator tube uncovery on the iodine release for SGTR and non-SGTR events is negligible. Therefore, we agree with your position on this matter and consider this issue to be resolved." Consistent with this position, tube uncovery should not need to be addressed further for U-tube style steam generators.
This comment also applies to Positions F-6.6.3 for MSLB, G-5.5 for Locked Rotor, and H-7.4 for Rod Ejection.
This comment also applies to Positions F-6.6.3 for MSLB, G-5.5 for Locked Rotor, and H-7.4 for Rod Ejection.
Appendix I is not referenced within DG-1389 and the purpose and importance of this             NRC should delete this appendix or Appendix I [p. appendix is not understood. Given the unspecified use and importance of this appendix, it      provide reference in document as to
The NRC should update the wording of this position to acknowledge for U-tube steam generators that the issue of short-term tube uncovery has previously been resolved and does not need to be considered in future applications.
: 56.               is recommended the NRC remove the appendix and flowchart.                                      why this is needed.
: 56.
Appendix I [p.
76]
76]
The first paragraph of this appendix cross-references Section C of the main body of this       The NRC should correct this cross-Appendix J [p. guide for the release fractions in Tables 3 and 4. This is an editorial error as Tables 3 and 4 reference and review DG-1389 for any
Appendix I is not referenced within DG-1389 and the purpose and importance of this appendix is not understood. Given the unspecified use and importance of this appendix, it is recommended the NRC remove the appendix and flowchart.
: 57.               are located in Section 3.2.                                                                    other potential cross-referencing errors.
NRC should delete this appendix or provide reference in document as to why this is needed.
: 57.
Appendix J [p.
77]
77]
Section C position 3.2.
The first paragraph of this appendix cross-references Section C of the main body of this guide for the release fractions in Tables 3 and 4. This is an editorial error as Tables 3 and 4 are located in Section 3.2.
Page 18}}
The NRC should correct this cross-reference and review DG-1389 for any other potential cross-referencing errors.
Section C position 3.2.}}

Latest revision as of 17:40, 27 November 2024

Comment (11) of Frances A. Pimentel on Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Plants
ML22174A072
Person / Time
Site: Nuclear Energy Institute
Issue date: 06/21/2022
From: Pimentel F
Nuclear Energy Institute
To:
Office of Administration
References
87FR23891 00011, DG-1389, NRC-2021-0179
Download: ML22174A072 (22)


Text

6/23/22, 6:59 AM blob:https://www.fdms.gov/f7b0535d-bc59-408c-bf70-821a6738efa6 blob:https://www.fdms.gov/f7b0535d-bc59-408c-bf70-821a6738efa6 1/1 PUBLIC SUBMISSION As of: 6/23/22 6:59 AM Received: June 21, 2022 Status: Pending_Post Tracking No. l4o-dzh7-8x7o Comments Due: June 21, 2022 Submission Type: Web Docket: NRC-2021-0179 Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Plants Comment On: NRC-2021-0179-0001 Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors Document: NRC-2021-0179-DRAFT-0013 Comment on FR Doc # 2022-08519 Submitter Information Email:atb@nei.org

Organization:Nuclear Energy Institute General Comment See attached file(s)

Attachments 06-21-22_NRC_Industry Comments on DG-1389 SUNI Review Complete Template=ADM-013 E-RIDS=ADM-03 ADD: Michael Eudy, Kevin Hsueh, Sean Meighan, Mark Blumberg, Bridget Curran, Mary Neely Comment (11)

Publication Date:

4/21/2022 Citation: 87 FR 23891

FRANCES PIMENTEL Senior Project Manager, Risk and Technical Support 1201 F Street, NW, Suite 1100 Washington, DC 20004 P: 202.739.8132 fap@nei.org June 21, 2022 Office of Administration Mail Stop: TWFN-7-A60M U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTN: Program Management, Announcements and Editing Staff Project Number: 689

Subject:

NEI Comments on draft Regulatory Guide (DG), DG-1389, Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors, Docket ID NRC-2021-0179.

Submitted via regulations.gov

Dear Program Management,

Announcements and Editing Staff, The Nuclear Energy Institute (NEI)0F1, on behalf of our members, appreciates the opportunity to provide comments on the subject draft regulatory guide (DG), DG-1389, Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors. This DG is proposed Revision 1 to Regulatory Guide (RG) 1.183 which describes a method that the NRC staff considers acceptable for complying with regulations for design basis accident dose consequence analysis using an Alternative Source Term. The purpose of this letter is to provide the attached comments which recommend several changes to improve clarity and consistency on the recommended approaches, methods, and analysis this guidance provides.

These comments were developed by a nuclear energy industry task force and reflect a substantial body of industry technical expertise, experience, and lessons learned gained from successful licensing actions utilizing alternative radiological source terms as part of their supporting design basis accident analyses.

Of particular concern is that the DG does not include the results of the staffs PWR and BWR analyses to enable an assessment of the impact to analyzed doses resulting from the updated guidance, such as impact from the new release fractions and timing. Industry views the proposed changes in this DG just as significant as when the guidance transitioned from the TID Source Term to the Alternative Source Term. As proposed, the conservatisms and changes incorporated in this revision precludes its use by many plants that 1 The Nuclear Energy Institute (NEI) is responsible for establishing unified policy on behalf of its members relating to matters affecting the nuclear energy industry, including the regulatory aspects of generic operational and technical issues. NEIs members include entities licensed to operate commercial nuclear power plants in the United States, nuclear plant designers, major architect and engineering firms, fuel cycle facilities, nuclear materials licensees, and other organizations involved in the nuclear energy industry.

NUCLEAR ENERGY INSTITUTE NUCLEAR. CLEAN AIR ENERGY

June 21, 2021 Page 2 are interested in implementing near-term ATF design concepts, fuel burnup extension to 68 GWd/MTU (peak rod average), and 235U enrichments up to 8.0 wt%.

A comparison of the changes in MHA release fractions between BWRs (Table 1) and PWRs (Table 2) identified a significant increase in the BWR halogen release fractions with no indication in either SAND2011-0128 or DG-1389 as to the cause. This increase may adversely affect the ability of BWRs to comply with RG 1.183 Rev. 1. A comparison to the PWR analyses suggests that the accident sequences may be responsible for this impact. SAND2011-0128 updates NUREG-1465 with higher core exposures utilizing the latest NRCs MELCOR methodology. The accident sequences that were analyzed to develop the PWR release fractions are listed in Table 5 of the Sandia report and include a variety of accident types. However, for the BWR release fractions, Table 3 of the Sandia report indicates that nearly all the evaluations were based on station blackout (SBO) sequences. However, the risk from SBO events has been substantially reduced by the industrys implementation of FLEX. Consistent with the PWR analysis in SAND2011-0128, the BWR release fractions should be re-evaluated to ensure that they are based on an appropriate set of accident sequences that more accurately reflect BWR risk profiles.

Additionally, it is unclear from the SAND2011-0128 report whether suppression pool scrubbing was credited in determining the release fractions from a BWR SBO. Credit for suppression pool scrubbing can significantly decrease the airborne activity since the SBO-related releases would be released via spargers submerged in the suppression pool. Therefore, any sequences that involve releases through the pool spargers should take credit for suppression pool scrubbing.

Also, although new guidance was added for crediting holdup and retention of MSIV leakage within the main steamlines and condenser for BWRs, it contains more conservative assumptions than previous models that limits its effectiveness. For example, Section A-5 of the DG presents three acceptable methods for calculating aerosol deposition within the main steam lines, but also states, these methods are not valid if credit has been taken for aerosol removal from drywell sprays. No technical justification is provided for why aerosol removal from drywell sprays is not valid if used with credit for main steamline deposition. As a result, the effectiveness of the application of these models is significantly reduced. Considering the number of BWRs currently modeling both removal mechanisms, the DG should provide guidance for crediting both of these important mitigative features.

Further, the DG states, Revision 0 of RG 1.183 will continue to be available for use by licensees and applicants as a method acceptable to the NRC staff for demonstrating compliance with the regulations. A combination of the methods contained in revision 0 or revision 1 of RG 1.183 would need additional justification. However, it is not clear in the proposed document if licensees can transition one (or a few) analyses to revision 1, or if full implementation for all design basis accidents is required. Clarification should be added to discuss that selective implementation is acceptable, provided that each accident analysis uses either revision 0 or revision 1 and to specify that a combination of the methods contained in revision 0 or revision 1 of RG 1.183, in a single analysis, would need additional justification.

June 21, 2021 Page 3 Finally, we appreciate the staffs efforts to include guidance for accident tolerant fuel (ATF), high-burnup fuel, and increased enrichment source term analyses and in revising the transport and decontamination models for the fuel handling DBA when developing this draft guidance. We encourage your consideration of all stakeholder comments prior to finalizing this draft RG. Given the long-lasting impact of the final document, we recommend a public meeting be scheduled to discuss in more detail the comments included in the attachment and how the staff plans to address them. We trust that you will find these comments useful and informative as you finalize the draft, and we look forward to future engagement on this important matter.

Please contact me at fap@nei.org or (202) 739-8132 with any questions or comments about the content of this letter or the attached comments.

Sincerely, Frances A. Pimentel Attachment c:

Sean Meighan, NRR/DRA/ARCB, NRC Mike Franovich, NRR/DRA, NRC

Page 1 Consolidated Comments on Draft Regulatory Guide DG-1389 (RG 1.183, Rev.1)

Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors No.

Section Comment/Basis Recommendation

1.

Section B (Background)

[p. 5] and Section 1.4 Risk Implications

[p. 14-15]

The NRC has identified that licensees may elect to use risk insights in support of proposed changes to the design basis that are not addressed in currently approved NRC staff positions. The NRC should provide some more explanation on the parameters/limitations of using risk insights.

NRC should provide some additional explanation on the acceptable uses of risk insight in conjunction with the radiological analyses performed with this RG.

2.

Section B.

(Background)

[p. 6]

The last paragraph of the section states: Revision 0 of RG 1.183 will continue to be available for use by licensees and applicants as a method acceptable to the NRC staff for demonstrating compliance with the regulations. A combination of the methods contained in Revision 0 or Revision 1 of RG 1.183 would need additional justification.

The NRC should provide additional clarifications in this paragraph (or Section 1.2) to inform the licensee as to acceptable instances for combination of Revision 0 and 1 methods.

NRC should include a statement like the following: For example, across a licensing basis, different revision methods may be adopted provided the individual analyses fully adopt a single revision (i.e., individual analysis inputs, assumptions, or modeling aspects may not adopt different revision methods within the same analysis).

Additional details should also be included in Section 1.2 - Scope of Implementation.

3.

Section 1.1.1 (Safety Margins) [p.8]

The last sentence states: Once the staff has approved the initial AST implementation and it has become part of the facility design basis This sentence should be clarified to identify the initial AST implementation associated with Revision 1 of RG 1.183.

The NRC should clarify the sentence as:

Once the staff has approved the initial AST implementation in accordance with Revision 1 and it has become part of the facility design basis

4.

Section 1.3.2 (Reanalysis Guidance)

[p.13]

SECY-98-154, Reference 19, performed a re-baselining of sample radiological consequences analyses when transitioning from TID to AST source terms. Has the NRC performed similar re-baselining studies for the major method changes being made in DG-1389 compared to RG 1.183, Revision 0? Notably, the NRC should investigate sample PWR and BWR analyses for the LOCA release fraction and timings, non-LOCA release fractions (including TFGR components), updated FHA modeling, etc. If this has already been performed, the wording for this section should be supplemented to include reference to these studies.

Supplement Section 1.3.2 by incorporating results from supporting analyses performed by staff when developing the proposed revisions contained in DG-1389.

Page 2 No.

Section Comment/Basis Recommendation

5.

Section 3.1 (Fission Product Inventory)

[p.17]

RG 1.183, Revision 0 identified specific computer codes acceptable for use in core inventory calculations (ORIGEN2 and ORIGEN-ARP). These code examples were deleted for DG-1389. The NRC should continue to include examples of core inventory codes which are acceptable for use.

The NRC should continue to include examples of core inventory codes which are acceptable for use in core inventory calculations.

6.

Section 3.1 Fission Product Inventory -

[p.18]

Based on the directive to "maximize fission product inventory" it is implied that bounding core parameters should be used, however downstream discussion (e.g., Section 3.2) states that the inventory should be for an equilibrium core. The RG should be consistent in prescribing if a bounding or an equilibrium core should be applied to dose calculations.

The RG should be consistent in prescribing if a bounding or an equilibrium core should be applied to dose calculations.

7.

Section 3.1 Fission Product Inventory -

[p.18]

Its not clear that this directive can be applied. Many BWR units do not have radial peaking factors in the COLR nor Technical Specifications.

Remove discussion of COLR/TS from this section.

8.

Section 3.2 (Release Fractions)

[p.18]

Footnote 10 identifies that the data in this section does not apply to cores containing mixed oxide fuel (MOX). The section also identifies that Accident Tolerant Fuel (ATF) concepts, excluding near-term ATF concepts, are also not applicable to the data in this section. Footnote 10 should also include these ATF concepts as not being applicable for the data in Section 3.2.

Footnote 10 should also include these ATF concepts as not being applicable for the data in Section 3.2.

9.

Section 3.2, 4th paragraph

[p.18]

It states the steady-state fission product release fractions in Table 3 can only be used if BWR part-length rods are treated as full-length rods with respect to overall quantity of fission products. BWR fuel bundles can have up to 20 part-length rods. Assuming all the part length rods have the same fission products of a full-length rod penalizes the source term by a large amount. The consequence of this requirement would be the source term has many pins more worth of inventory than it actually has.

Please remove the requirement that BWR part-length rods are treated as full-length rods with respect to overall quantity of fission products.

10.

Section 3.2 (Release Fractions)

[p.18]

Regulatory Position 3.2 includes the following statement:

If it can be demonstrated that local power level, rate of fission gas release, and cumulative fission gas release remain less than the limiting co-resident UO2 fuel rod, then Table 3 and 4 steady-state fission product release fractions apply to fuel rod designs containing integral burnable absorbers (e.g., Gadolinia).

The NRC should clarify the level of justification needed to confirm fission gas release rates and cumulative fission gas release for fuel designs containing integral burnable absorbers.

11.

Section 3.2 (Release Fractions)

[p.19]

A factor is presented to adjust the transient fission product release correlations for short-lived isotopes. This factor is not prominently presented with the correlations and may be missed by applicants or licensees.

The NRC should present the factor for short-lived isotopes more prominently with the correlations presented in the section.

Page 3 No.

Section Comment/Basis Recommendation

12.

Section 3.2 (Release Fractions)

[p.19]

Section 3.2 contains the following guidance:

For the remaining non-LOCA DBAs which predict fuel rod cladding failure, such as PWR reactor coolant pump locked rotor and fuel handling accident, additional fission product releases may occur as a result of fuel pellet fragmentation (e.g., fracturing of high burnup rim region) due to loss of pellet-to-cladding mechanical constraint or impact loads. TFGR has been experimentally observed under a variety of accident conditions and should be addressed in future applications.

However, the regulatory guide does not provide guidance regarding an acceptable treatment for any additional fission product releases for these accidents. Therefore, the current guidance within the draft regulatory guide is incomplete.

Recommend that the current draft regulatory guide be updated to provide complete guidance for these remaining accidents.

13.

Section 3.2 (Release Fractions)

[p.19]

The paragraph starting with For the remaining non-LOCA DBs which predict fuel rod cladding failure is not clear on the background of the issue or the success pathways afforded to the licensees to address the NRCs concerns on the topic in question. Ideally, background documents for further description of the issue and/or documents identifying acceptable methods of evaluation are cited. The NRC should include these documents in order for the licensees to fully understand and properly address the issue in question. If no documents exist, the NRC should develop these positions.

Include background documents for further description of the issue and/or documents identifying acceptable methods of evaluation so that licensees can fully understand and properly address the issue in question. If no documents exist, the NRC should develop these positions.

Page 4 No.

Section Comment/Basis Recommendation

14.

Section 3.2 (Release Fractions)

[p.20]

Tables 1 and 2 present core inventory fraction releases into containment for BWRs and PWRs. The release groups are updated from Revision 0 of RG 1.183. One significant difference is that the tellurium group (both PWRs and BWRs) and barium, strontium group (PWRs only) identify a release fraction during the gap release phase.

From page 34 of the SAND-2011-0128 report: At the same time, the Gap Release Phase was calculated to be long enough that some core degradation characteristic of the In-vessel Phase of release as prescribed in the NUREG-1465 Source Term did take place. This is indicated by small amounts of tellurium release during the Gap Release Phase and in the case of PWR accidents small amounts of alkaline earth release. Ordinarily tellurium and alkaline earths are not thought to be contributors to the gap release. They contribute here because some portions of the core had entered into what would be categorized phenomenologically as in-vessel release before the criterion to terminate gap release had been reached."

This confirms that, while the timing of the Te, Ba, and Sr groups does release during the gap fraction phase, these releases are more accurately associated with the early in-vessel phase. The continued identification of these groups release as gap phase release creates confusion with subsequent gap fraction tables (Tables 3 and 4) which do not identify these nuclide groups as being released.

[Note that it is not requested to add Te, Ba, and Sr to the gap releases.]

The NRC should clarify that the Te, Ba, and Sr groups do contribute releases during the gap release phase for LOCA releases in Tables 1 and 2; however, these releases are more accurately classified as early in-vessel releases and these groups do not need to be considered in gap releases for other events.

15.

Section 3.2 Tables 1 & 2 (p20), and Table 6 (p22)

Tables 1 and 2 report release fractions from a new Molybdenum group; however, the elements in this new group are not listed in Table 6.

Which release group is Zirconium (Zr) considered to reside? DG-1389 is consistent with Revision 0 and indicates it is part of the Lanthanides while Table 14 in the underlying Sandia report (SAND 2011-0128) reports Zirconium as part of the Cerium group.

It is expected that the final grouping is consistent with SAND-2011-0128 since that is the basis for the release fractions in Tables 1 & 2. Update the Table 6 for the new proposed Molybdenum group.

Change Zr grouping to Cerium group.

Page 5 No.

Section Comment/Basis Recommendation

16.

Section 3.2 (Release Fractions)

[p.21]

Figure 1 presents the maximum allowable power operating envelope for steady-state release fractions. The envelope is identified by rod average power (kW/ft) and rod average burnup (GWD/MTU). The figure further identifies a Peak LHGR (Linear Heat Generation Rate) of 15.0 kW/ft for BWRs and 14.0 kW/ft for PWRs.

From the Ref. 24 Technical Basis for Non-LOCA Fission Product Release Fractions, the Peak LHGR is a combination of rod average power and the axial power profile maximum factors. For example, using a rod average power of 12.2 kW/ft from Figure 1 and an axial power profile maximum factor of approximately 1.15 for PWRs from Figure 2 of Ref. 24, the resulting Peak LHGR would be approximately 14.0 kW/ft.

The maximum linear heat rate is a typical term for licensees (generally defined in safety analyses and/or Technical Specifications) and is the product of the rod average power (or linear heat generation rate determined by the core rated thermal power and the linear component of all power producing rods in the core) and the hot channel factor (FQ).

These maximum linear heat rates can exceed the definition of Peak LHGR associated with Figure 1 of DG-1389. Without further explanation of the definition of Peak LHGR associated with the figure, misinterpretation and confusion of the Figure 1 envelope may result between the licensee and regulator.

Include the following statement in a footnote for Figure 1 or incorporated into the discussion of Section 3:

From Ref. 24, the Peak LHGR is defined as the product of the peak fuel rod average power and the peak fuel rod axial power distribution. This Peak LHGR may differ from the definition used in licensees Technical Specification or Core Operating Limits Report. A Peak LHGR derived consistent with the definition of Ref. 24 should be used for comparison of applicability to Figure 1.

17.

Section 3.2 (Release Fractions)

[p.21]

The Figure 1 rod average power envelopes were derived in Ref. 24. Ref. 24 does not indicate if uncertainties were applied to the rod average powers or normalized axial power distributions in Figure 2 of Ref. 24.

It is assumed that uncertainties are not applied; however, the NRC should confirm that uncertainties do not need to be considered when comparing against the bounding power profile.

Note that for typical applications for determining release inventories, uncertainties may be accounted for in peaking factors such as the radial peaking factor (applied uncertainty), which is applied separately to the core inventory from the gap fractions in the radiological analyses. As such, applying uncertainties in determining the gap fractions may result in double-accounting and should not be advised.

The NRC should confirm that uncertainties do not need to be applied to the power inputs used in comparing to the bounding power profile and include this clarifying information in the discussion in Section 3.2.

18.

Section 3.3 (Timing of Release Phases) [p. 22]

Table 5 in Section 3.3 lists the duration of the gap release phase is 0.22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> for PWRs and 0.16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> for BWRs. However, the last sentence of the following paragraph says:

Regardless of delays in the onset, the duration of the gap release phase is 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.

The values in Table 5 are not consistent with this statement.

The NRC should delete or correct the sentence in question as it contradicts gap phase durations in Table 5.

Page 6 No.

Section Comment/Basis Recommendation

19.

Section 3.3

[p. 22]

DG-1389 states: The activity released from the core during each release phase should be modeled as increasing in a linear fashion over the duration of the phase.

RADTRAD models core release as a constant fraction of the core inventory over the release duration. Including decay of the core inventory will make this release slightly non-linear, decreasing over time as the core inventory decreases due to decay.

Clarify that the statement in the guidance excludes the effects of decay.

20.

Section 3.4 (Radionuclide Composition)

[p. 22]

Table 6 presents the radionuclide groups which should be considered in design basis analyses. The table presents molybdenum as included in the noble metals group. This is inconsistent with Tables 1 and 2 which present molybdenum as a separate group with different release fractions than the noble metals group.

The NRC should present molybdenum as a separate group in Table 6 in order to maintain consistency with Tables 1 and

2.
21.

Section 4.2 (Control Room Dose Consequences)

[p. 24]

DG-1389 includes a statement that the transit dose to personnel traveling to and from the control room should be considered for licensees whose licensing basis includes transit dose. This statement should be clarified or removed based on the following points:

For licensees who do not currently include transit dose in their licensing basis, will the NRC force the adoption of transit dose if this regulatory guide is adopted?

For licensees who do currently include transit dose in their licensing basis, will the NRC allow for removal of the transit dose based on the positions summarized below:

GDC 19 identifies that Adequate radiation protection shall be provided to permit access and occupancy of the control room. GDC 19 does not identify that access includes the need for the control room to provide protections outside of the control room envelope. Additionally, radiological consequences analyses are intended to provide an evaluation of the design and performance of structures, systems, and components of the facility. This intent is to confirm the design, construction, and siting of the facility and applicable safety features are adequate to limit dose exposure; thus, operator actions outside of the CR envelope are not historically considered in the design basis analyses.

During emergency situations, personnel dose is governed by ALARA principles such that Emergency Planning will limit the dose received by operators during transit to and from the control room. 10 CFR 50.47(a)(9), (10), and (11) provide sufficient requirements for the Emergency Response organizations to measure and limit doses to emergency response personnel including control room operators.

The NRC should remove these statements from the RG on the basis that transit doses would be addressed by ALARA principles through Emergency Planning. These measures may include alternate travel pathways to and from the control room such that operators are not traversing the radioactive plume and personal protective equipment (e.g., respirators).

Page 7 No.

Section Comment/Basis Recommendation

22.

Section 4.2 (Control Room Dose Consequences

) [p. 24]

The occupancy factors in RG 1.183 R0 are based on RG 1.183 R0 Reference 22. Reference 22 is the paper by K. G. Murphy and K. W. Campe, "Nuclear Power Plant Control Room Ventilation System Design for Meeting General Design Criterion 19," published August 1974. In that paper, the occupancy factors are described as follows:

"...an allowance may be considered for the time the operator leaves the plant vicinity.

This is described as the occupancy factor."

Table 1 in the paper by K. G. Murphy and K. W. Campe provides the occupancy factors included in the determination of the X/Q values using the K. G. Murphy and K. W. Campe methodology.

Therefore, it is reasonable to conclude the occupancy factors (1, 0.6 and 0.4) assumed for the control room analysis already implicitly account for the time for the operator travel from the parking lot to the control room. The occupancy factor discussion is in the X/Q section (page 13) which is consistent with this argument. No additional discussion is required with those occupancy factors.

Further the Murphy and Campe paper interprets the GDC in this way: Whole body gamma radiation from direct shine radiation sources external to the control room and from the airborne activity within the control room should not exceed a total of 5 rem.

Direct shine here is from outside radioactivity directly to operators within the control room. This would further exclude a transit dose for the operators.

As well, in NUREG-0800, Section 6.4, referring to individuals within the control room says:

In accordance with GDC 19, these doses to an individual should not be excluded for any postulated accident. The whole body gamma doses consists of the contributions from airborne radioactivity inside and outside the control room, as well as direct shine from all radiation sources. Industry has general evaluated the other sources in terms of containment shine and filter shine.

Remove the following discussion as it is unnecessary:

The following guidance should be used in determining the TEDE dose for demonstrating compliance with 10 CFR 50.67(b)(2)(iii). For the purpose of this RG, a transit dose is considered to be the dose that is accumulated as personnel travel to and from the control room for the duration of an accident once onsite (e.g., dose from site boundary to the control room).

Licensees whose licensing basis includes transit dose should include the transit dose to demonstrate compliance with 10 CFR 50.67(b)(2)(iii). The licensees results for the evaluation of transit dose will be evaluated on a case-by-case basis. New reactor licensees that are required to show compliance with GDC 19 or similar control room radiological habitability principal design criteria may use this guidance.

Page 8 No.

Section Comment/Basis Recommendation

23.

Section 4.2.3 (Transport Models) [p.

25]

Footnote 15 states that nuclides used for modeling dose from airborne radioactivity inside the control room may not be conservative for determining the dose from radioactivity outside of the control room.

This statement is vague and does not provide the licensee with details as to which nuclides the NRC is concerned about for the different control room dose aspects (inhalation/immersion versus plume shine dose). Without further explanation, it is assumed that the NRC is in agreement that the sets of nuclides used by licensees acceptably addresses the footnote.

The NRC should provide clarification for Footnote 15 in terms of which nuclides are of concern for the different aspects of the control room dose. Lack of explanation infers that the NRC accepts the licensees currently analyzed source terms and no updates are needed.

24.

Section 4.2.7 (Dose Conversion Factor) [p. 26]

This section provides the expression to correct the semi-infinite cloud dose to a finite cloud dose for external exposure. This expression is generally incorporated into radiological consequences codes (e.g., RADTRAD) and does not specifically need to be considered as an additional factor applied to the control room dose results.

The NRC should note that the expression may be incorporated into radiological consequences codes (e.g., RADTRAD) and does not need to be specifically applied to the control room dose results.

25.

Section 4.4 (Acceptance Criteria) [p.

28]

Table 7 provides the analysis release duration for the various accidents presented in the regulatory guide. The following items should be addressed by the NRC:

The PWR Steam Generator Tube Rupture, PWR Main Steamline Break, and PWR Locked Rotor identify that the analysis release duration is Until cold shutdown is established. For consistency with the event-specific guidance presented in Appendices E, F, and G, this wording should be changed to Until shutdown cooling is in operation and releases from the SG(s) have been terminated.

For Fuel Handling Accident, the analysis release duration should be updated for consistency with the updated FHA model presented in Appendix B. The updated model presents releases in two phases which potentially span the entire standard 30 days of event duration.

For consistency with the event-specific guidance presented in Appendices E, F, and G, change wording from the analysis release duration is Until cold shutdown is established to Until shutdown cooling is in operation and releases from the SG(s) have been terminated.

In the Fuel Handling Accident, update the analysis release duration with the updated FHA model presented in Appendix B.

Page 9

26.

Section 5.3 (Atmospheric Dispersion Modeling and Meteorology Assumptions)

[p. 30-32]

Guidance for the modeling of the limiting X/Qs for the LPZ and control room is presented and directs the licensee to model the period of most unfavorable atmospheric dispersion factors coincident with the time period of most adverse environmental release. This guidance has been included previously for the control room location in RG 1.194 (and identified in the 2015 periodic review of RG 1.194 as an item for alignment). However, the guidance has not been previously incorporated in or identified as needed for RG 1.183.

[Also, no identification of this guidance has been made for RG 1.145 for the LPZ location.]

The current widely used practice for modeling X/Q values for the LPZ and control room is to align the values in correct time period order, e.g., 0-2 hrs, 2-8 hrs, etc. (similar to the first portion of Figure 2 in DG-1389). However, it is recognized that this may not align with the period of most adverse environmental release in instances of delayed releases from damaged/melted fuel (in cases of an MHA) or prolonged buildup and transit from the primary to secondary systems to the environment (in cases of a locked RCP rotor).

The interpretation of the guidance presented in DG-1389 is that the period of most adverse release aligns with the period of highest dose. However, the NRC has not provided sufficient guidance for consideration of situations in which the period of most adverse environmental release does not align with the period of highest dose. This may be the case for instances in the control room depending on specific modeling assumptions.

For instance, for a PWR MHA, a staged release is modeled in accordance with Table 2 of RG 1.183. This results in the limiting environmental release typically occurring after the initial 0-2 hour time period. The control room is typically isolated early in the event, accounting for some delay, such that only gap activity enters the control room envelope during unfiltered, normal ventilation mode. Therefore, during the period of greatest environmental release, the activity entering the control room would be subject to emergency mode flows (possibly lower than normal mode), filtration (~90-95% iodine and particulates), and lower X/Q values associated with emergency mode intakes (depending on the receptor positioning). As a result, applying the proposed guidance would decrease the control room dose consequences relative to the current practices.

Additionally, no guidance has been provided for cases in which multiple release pathways are modeled with varying periods of limiting environmental releases and/or dose.

For simplicity, and to avoid potential non-conservative applications of the guidance, it is recommended that the NRC remove this position from DG-1389 and maintain the current practice of applying LPZ and CR values from highest X/Q at event initiation (T=0) for all The NRC should re-assess the need to include this guidance for atmospheric dispersion factor modeling. The guidance, as presented, may result in a misappropriation of the limiting two-hour X/Q values for the time period of greatest release as this may not align with the time period of greatest dose contribution for the control room.

It is recommended that the NRC remove this position from DG-1389 and maintain the current practice of applying LPZ and CR values from highest X/Q at event initiation (T=0) for all events, regardless of release magnitude. It is also recommended that this position be removed from RG 1.194.

Page 10 No.

Section Comment/Basis Recommendation events, regardless of release magnitude. It is also recommended that this position be removed from RG 1.194.

27.

Appendix A, Section A-2.2, Page A-2

[p.39]

This section indicates that the aerosol deposition models in NUREG/CR-6189 are still applicable; however, based on Section 1 of NUREG/CR-6189, the models are based on the release fractions and timing in NUREG-1465. Considering the significant changes to the release fractions and timings in DG-1389, there may be significant impacts to the deposition rates in this NUREG.

Confirm the continued applicability of the NUREG/CR-6189 aerosol removal rates.

28.

Appendix A, Section A-2.5, Page A-3

[p.40]

Revise A-2.5 to allow credit for suppression pool scrubbing based on:

NUREG/CR-6153 - provides models for accident dose calculations using the AST for the purposes of crediting iodine decontamination provided by suppression pools Accounts for the changing aerosol distribution following passage through the pool State-of-the-Art Reactor Consequence Analyses (SOARCA) project results (ML20304A339-NRC Brochure) include the suppression pool in their models and indicate that all modeled accident scenarios, progress more slowly and release smaller amounts of radioactive material than calculated in earlier studies.

Change A-2.5 to reference NUREG/CR-6153 and allow credit for reduction in airborne radioactivity in the containment by suppression pool scrubbing in BWRs.

29.

Appendix A, Section A-3.5, Page A-4

[p.41]

For gas-filled secondary containment bypass leakage paths, this section states deposition of aerosol radioactivity in gas-filled lines may be considered on a case-by-case basis.

Plate-out of elemental iodine may also be a significant removal mechanism in gas-filled secondary bypass leakage pathways. In addition to aerosol deposition, the plate-out of elemental iodine should not be excluded.

Add deposition of aerosol radioactivity and plate-out of elemental halogens

30.

Appendix A, A-5. Main Steam Isolation Valve Leakage in Boiling-Water

Reactors, Page A-6

[p.43]

Multiple BWRs currently have credit for aerosol removal from drywell sprays as well as aerosol deposition within in the main steam lines (some also have Condenser removal) in their current licensing basis. Section A-5 presents three acceptable methods for calculating aerosol deposition within the main steam lines, but this section states, however, these methods are not valid if credit has been taken for aerosol removal from drywell sprays.

Given the prevalence of credit for both sprays and steam line deposition, why is there not a model presented that the Staff finds acceptable for crediting both, or modifications to the presented models if the licensee wants to credit spray removal (e.g., different aerosol size distribution)?

Provide a model where it is acceptable to credit aerosol removal from drywell sprays as well as aerosol deposition within in the main steam lines.

Page 11 No.

Section Comment/Basis Recommendation

31.

Appendix A, A-5. Main Steam Isolation Valve Leakage in Boiling-Water

Reactors, Page A-6

[p.43]

What is the technical justification for drywell sprays aerosol removal not being valid if used alongside main steam isolation valve leakage? The removal mechanisms associated with spray described in NUREG/CR-5966 are largely different than the removal mechanisms associated with deposition described in SAND2008-6601 and AEB 98-03.

Section 6.2 of SAND2008-6601 states that sprays should not be used in conjunction with main steam line deposition, but this discussion is based on the steam dome being the source of radioactivity rather than the accepted position of the drywell being the source of radioactivity.

Revise words to state that the impact of sprays on aerosol removal should be determined in the submittal, and do not state that removal by both sprays and deposition should not be used.

32.

Appendix A, A-5. Main Steam Isolation Valve Leakage in Boiling-Water

Reactors, Page A-6

[p.43]

DG-1389 states that the reported 3 aerosol methods are not valid if credit has been taken for aerosol removal by drywell sprays. Are other aerosol removal mechanisms similarly affected? Can a licensee credit the natural removal mechanisms in NUREG/CR-6189 consistent with Section A-2.2 and apply the reported MSL models? Although the deposition models in NUREG/CR-6189 may affect the aerosol size distribution, this impact would be expected to be similar to the impact of the MSL models themselves such that the aerosol distribution entering the MSLs are not significantly different from that assumed in the models.

Confirm acceptability of applying NUREG/CR-6189 aerosol deposition in addition to reported MSL deposition models.

33.

Appendix A, A-5. Main Steam Isolation Valve Leakage in Boiling-Water

Reactors, Page A-6

[p.43]

DG-1389 reports the first MSL aerosol deposition model as: Direct adoption of the SAND 2008-6601 (Ref. A-11) recommendations without scaling R*-factors; This approach needs additional explanation. As defined in Section 1.1 of SAND2008-6601, the R* factor is defined as the ratio of NUREG-1465 containment airborne concentrations to MELCOR containment airborne concentrations. A separate factor, RM, models the ratio of the steam dome concentration to the drywell concentration determined by the MELCOR full plant analyses. Backing the R* factor out of the process does not appear to be possible since, per Section 5.2 of SAND2008-6601, the RM and R* factors are combined and their product is applied to develop the results in Table 5-3.

This section should adopt the MHA approach where the drywell and steam dome are well-mixed. As such, there should be no scaling factor applied to model the increased concentration in the steam dome.

Revise first aerosol deposition model to without scaling RM and R* factors.

Page 12 No.

Section Comment/Basis Recommendation

34.

Appendix A, A-5.6, Page A-9 [p.46]

It is understood that there are several deposition and removal mechanisms (see Table 4.1-3 of the State-of-the-Art Report for examples) present inside of steam lines and it is challenging to provide a comprehensive model due to lack of experimental data and disassociation between the reality of core cooling being maintained during a design basis accident and fuel damage being assumed per DG-1389. The State-of-the-Art Report attempts to capture all of these uncertainties but cannot and does not form a conclusion based on all of the available literature.

Based on previous approval of AST applications and the lack of concrete knowledge surrounding removal in steam lines, it is recommended to allow licensees to continue to use their existing main steam line removal models if pursuing licensing actions unrelated to the steam lines themselves.

Change footnote 4 to state that previously approved methods are not superseded by the RG 1.183 Revision 1 methods if unaltered during submittals associated with licensing actions unrelated to steam line removal.

35.

Appendix A, A-5.6, Page A-9 [p.46]

Aerosol deposition in vertical volumes is non-zero. SAND2008-6601 Section 3.3 states that some deposition occurs in vertical surfaces. This is confirmed by Figure 2-16 and Figure 2-17 of the State-of-the-Art Report which show strong correlations between temperature driven deposition by thermophoresis and condensing vapor deposition by diffusiophoresis. These removal mechanisms are largely independent of gravitational settling in horizontal segments.

Remove in horizontal volumes or provide different guidance for horizontal vs. vertical volumes when applying Method 1: Direct adoption of the SAND 2008-6601 recommendations without scaling RM and R* factors.

36.

Appendix A, A-5.6, Page A-9 [p.46]

Section A-5.6 implies that only plants other than Mark I, II, or III will be considered on a case-by-case basis. All models should be considered on a case-by-case basis considering the models described by positions A-5.6.1, A-5.6.2, and A-5.6.3 do not consider all removal mechanisms present in the steam lines.

Revise statement to allow case by case review for all technologies.

37.

Appendix A, A-5.6, Page A-9 [p.46]

Section A-5.6 indicates that the multi-group method will be evaluated on an individual case-by-case basis.

This statement implies that the application of this method may not be fully approved, thereby increasing the potential for regulatory uncertainty in future submittals. Why does the approach described in Section A-5.6.2, including an AMMD of 2.0 µm, 2,000 groups, and 10,000 trials, require additional regulatory review?

Confirm that the approaches in Sections A-5.6.2 and A-5.6.3 are acceptable models for aerosol deposition in the MSLs.

Page 13 No.

Section Comment/Basis Recommendation

38.

Appendix A, A-5.6.1, Page A-9 [p.46]

The basis for not being able to credit the piping upstream of the inboard MSIV seems to come from Section 6.3 of SAND2008-6601 which states that at times in the simulation the temperature of portions of the in-board MSL piping are predicted to be high enough to vaporize fission products that had been previously deposited. The MELCOR simulation in SAND2008-6601 is not representative of plant specific thermo-hydraulic conditions.

(e.g., Figure 2-19 of SAND2008-6601 shows a long term temperature of approximately 800F in the steam dome while most BWR analyses would show long term temperatures of less than 300F in the core with ECCS operational). Credit should be able to be taken for deposition in the inboard lines if plant specific analysis shows low temperatures considering RIS 2006-04 states that deposition of particles in the inboard volume occurs.

In addition, the time periods in DG-1389 are inconsistent with SAND2008-6601.

Revise table to be consistent with SAND2008-6601 and add in calculated removal for in-board lines.

39.

Appendix A, A-5.6.2, Page A-9 to A-11

[p.46-48]

Calculations typically consider a single failure which is either assumed to be a break in a steam line leading to not modeling holdup/deposition in a steam line upstream of the inboard MSIV or assumed to be a stuck open MSIV which leads to combining the inboard volume with the between MSIV volume in a single steam line. The discussion states that a pipe break is not assumed, so should all applicants consider the limiting single failure to be a stuck open MSIV (with respect to deposition in the steam lines)?

Clarify that there is no in-board pipe break in the MHA scenario.

40.

Appendix A, A-5.6.2, Page A-9 to A-11

[p.46-48]

The State-of-the-Art report recommends a AMMD of 3 µm for containment and Section A-5.6.2 describes the approved approach as applying an aerodynamic mass mean diameter (AMMD) of 2.0 µm. This appears to be an average value of the RCS and containment AMMD values of 1.0 and 3.0 µm respectively. Considering the MHA assumption of a well-mixed drywell, the containment AMMD of 3.0 µm would be the applicable parameter on which to base the aerosol size distribution entering the main steam lines.

Revise the text to apply a 3.0 µm AMMD or explain the basis for the suggested value of 2.0 µm.

41.

Appendix A, A-5.6.2 and A-5.6.3 Page A-9 to A-12 [p.46-49]

These methods are based on the AEB 98-03 methodology which does not account for thermophoresis, impaction, diffusiophoresis, flow irregularities, and hygroscopicity. The removal calculated is largely correlated to particle size but because it does not include these other mechanisms it is overly conservative. For example, Section 2.6.3 of the State-of-the-Art Report states that thermophoretic deposition velocity is not an especially strong function of particle size.

Clarify that other associated removal mechanisms may be calculated separately and included in the TEARE.

Page 14 No.

Section Comment/Basis Recommendation

42.

Appendix A, A-5.6.4, Page A-12 [p.49]

Section A-5.6.4 indicates that aerosol deposition in the condenser using a multi-group or numerical integration approach needs to be evaluated on an individual case basis.

Why would the multi-group or numerical integration approaches not be applicable in the condenser? These models consider the impact of easier-to-remove particles being removed in the upstream compartments, leading to less deposition in the condenser. Can the condenser deposition coefficients in Table A-1 be applied instead of a value developed with the multi-group or numerical integration approaches?

Clarify use of Table A-1 condenser deposition coefficients or clarify why the multi-group method is not applicable to the condenser.

43.

Appendix B (Fuel Handling Accident) [p.

52]

Footnote 1 in Appendix B presents that if a postulated event (heavy load drop) occurs for an FHA, the activity release may be based on core average gap fractions presented for the LOCA in Tables 1 and 2. The following issues should be addressed by the NRC:

Tables 1 and 2 identify gap fraction releases for the Te, Ba, and Sr groups. As identified in a previous comment, the SAND-2011-0128 report, in which Tables 1 and 2 are based, clarified that these releases listed in the gap phase were more accurately classified as in-vessel releases that occurred during the gap release phase. As a heavy load drop event is a shutdown event and fuel damage should only result from a load impact, there would not be a driver for further fuel failure associated with in-vessel releases (which results from fuel melt). Therefore, these nuclide groups should be excluded from consideration in the fuel handling accidents involving the entire core.

The Tables 1 and 2 release fractions are associated with the timings presented in Table 5. Table 5 presents gap phase durations of 0.22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> (PWRs) and 0.16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> (BWRs). The timings in Table 5 are based on simulations of various plant transients which do not include fuel handling accidents / heavy load drop events.

Therefore, it should be specified that the use of Tables 1 and 2 do not need to explicitly follow the gap phase durations from Table 5 and can instead use the durations presented in this appendix (Appendix B).

Replace the footnote wording with the following to clarify the gap fractions and timings to apply for the heavy load drop accident:

These assumptions may also be used in assessing the radiological consequences of a heavy load drop over fuel accident.

If the event is postulated to damage all of the rods in the core, the release activity may be based on the core-average gap fractions of Tables 1 and 2 in the main text of the guide, and the radial peaking factor may be omitted.

Gap fractions may be limited to the noble gas, halogen, and alkali metal groups, consistent with Tables 3 and 4.

Additionally, the release timings and durations associated with this appendix may be used in lieu of release timings and durations associated with Regulatory Position 3.2 for Tables 1 and

2.

Page 15 No.

Section Comment/Basis Recommendation

44.

Appendix B, B-1.3, Page B-1

[p. 52]

In the current licensing basis fuel handling accidents, the impacts of stable and long-lived iodine isotopes (e.g., I-127 and I-129) are not typically considered due to their negligible dose consequences. For the revised fuel handling accident approach, these isotopes are important to develop the pool iodine concentration as they represent most of the iodine inventory in the fuel rods.

The NRCs assessment in the staffs example in ML21190A040 appears to apply a much larger value of 23% for Iodine-129 which is significantly higher than the 4% from Table 4 for other halogens.

Confirm the applicability of Tables 3 and 4 for I-127 and I-129 as other halogens.

45.

Section B.1-3 DG-1389 only reports the iodine species distribution released into the pool water. Reg Guide 1.183 Rev. 0 reported that the iodine chemical species above the water is 57%

elemental and 43% organic.

For Rev. 1 applications, what iodine species distribution should be applied for the early 2-hour airborne release considering the new fuel handling accident model? Based on the calculated overall pool DF from Equations 3-1, 3-2, and 3-3, is a species-dependent DF approach acceptable with organic iodine having a DF of 1?

Is a purely elemental iodine species appropriate for the long-term release since this is comprised of re-evolved elemental iodine?

Provide additional guidance on acceptable airborne iodine species assumptions.

46.

Appendix B, B-2, Page B-2 [p.

52]

There can be fuel handling accident scenarios where the water depth may be greater than 23 feet such as drops over the core. However, Section B-2 states that the DF can be calculated from Equations in B-1, B-2, and B-3, if the water depth is between 19 and 23 feet. There is no guidance in the event the water depth is greater than 23 feet.

Since the DG-1389 equations are not dependent on depth, it would be expected that they would yield a conservatively low DF than an actual value for cases that credit the additional scrubbing depth.

Revise statement as follows:

For water depths greater than or equal to 19 feet, an overall iodine DF based on pin pressure is computed as follows:

47.

Appendix B-3 (Phase 2 Release - Re-evolution Release) [p.

54, B-3]

The mass transfer coefficient (KL) is presented as a constant value (3.66x10-6 m/s). From of Reference B-1, this is a combined liquid-gas phase coefficient that does not consider recirculation in the pool and is based on the assumption of a high flow rate to clear the building air.

The NRC should clarify that the mass transfer coefficient remains applicable for all conditions (i.e., recirculation in the pool and low flow rate to clear the building air) and no adjustments need to be made for changing conditions.

Page 16 No.

Section Comment/Basis Recommendation

48.

Appendix B-3 (Phase 2 Release - Re-evolution Release) [p.

54, B-3]

Step 2 of the FHA model instructs the analyst to calculate the amount of iodine in the fuel pin gap. The calculations consider I-131 for the amount of radioactive iodine (with subsequent clarification to include other radioactive iodine isotopes to the total) and consider I-129 for the amount of non-radioactive iodine (with no subsequent clarification to include other non-radioactive iodine isotopes). The radioactive and non-radioactive iodines are then combined for a total iodine which is used in the downstream calculations. [Note that the individual components are not used in any downstream calculations within the model and calculations involving only the radioactivity iodine can be removed from the model development.]

It was observed in the calculations that a higher total iodine amount is conservative for calculating the release rate to be used in the analysis. As such, additional non-radioactive iodine isotopes (I-127) should conservatively be considered.

The NRC should specify that additional non-radioactive iodine isotopes (especially I-127) should be considered to maximize the amount of iodine considered in Step 2 of the FHA model calculation.

49.

Appendix B-3 (Phase 2 Release - Re-evolution Release) [p.

55, B-4]

Equation B-10 in Step 2 calculates the [I2]/[I-]2 concentration ratio using the following equation:

Constants 6.0603E-14 and 1.4708E-09 originate from Ref. B-2 (NUREG/CR-5950);

however, the constants are not presented in the reference to that degree of accuracy.

The constants presented in NUREG/CR-5950 are 6.05E-14 and 1.47E-09 [NUREG/CR-5950 page 13 and Appendix C, page C.3]. It is unclear where the discrepancy is occurring.

The NRC should provide clarification as to the discrepancy in constants between NUREG/CR-5950 and DG-1389 or update Equation B-10 to present the constants to the degree of precision from NUREG/CR-5950.

50.

Appendix B-5 (Fuel Handling Accidents within the Fuel Building)

[p. 56, B-5]

Position B-5.1 provides a release duration time for the first phase releases (2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />). The position does not provide any specifics for onset and duration timing for the second phase releases (re-evolution releases). From the Ref. B-1 model background, this release phase should begin immediately after the first phase (2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />) and be modeled until the typical end of the radiological considerations (30 days). It is assumed that there is no overlap of release phases.

Note that this comment is also applicable to Position B-6.3.

The NRC should clarify the starting time and duration of the re-evolution phase.

51.

Appendix B-5 (Fuel Handling Accidents within Containment)

[p. 56-57, B 6]

Footnote 4 breaks across pages B-5 and B-6. This footnote should be contained on a single page.

Note that this footnote is referenced in Positions B-6.1 and B-6.2 which are currently on separate pages, so Footnote 4 may have to be repeated on separate pages.

Likewise, Footnote 3 for Position B-6.4 is not located on the same page as the position.

See comment for the items to address.

R.i = [hJ/[I-]2 = ch2 1 6.0603E-14 + 1.4 osE-09 ch 1

Page 17 No.

Section Comment/Basis Recommendation

52.

Appendix E (Steam Generator Tube Rupture)

[p. 63]

Revision 0 of RG 1.183 presented the PWR Main Steamline Break event in Appendix E.

There is no indication as to the motive behind the switch in appendices for DG-1389. This may cause confusion to licensees which need to compare/contrast the RG revisions or those that elect to implement and maintain different RG revision methods for these events.

The NRC should consider maintaining consistency in the event order presented in the regulatory guide appendices.

53.

Appendix E (Steam Generator Tube Rupture)

[p. 63]

The page numbering for Appendix E is not correct as the first page of the appendix is identified as page E-3.

The NRC should correct the page number in Appendix E and also review the entirety of the regulatory guide to correct any further editorial errors.

54.

Appendix E-6 (Transport -

Steam Generator Tube Rupture)

[p. 64]

Position E-6.1 states that the primary-to-secondary leak rate in the steam generators should be assumed to be the leak rate for the limiting condition for operation specified in the TSs. This leak rate is associated with significant pressure differentials across the steam generator tubes which typically occur early in the transient. In later periods of the transient, and especially during longer-term steaming for cooldown, the pressure differential is significantly decreased. Licensees should be able to credit this significant reduction in leakage if it is shown to be credible.

This comment is also applicable for other steam release events which model primary-to-secondary leakage. [MSLB in Appendix F, Locked Rotor in Appendix G, and Rod Ejection in Appendix H]

The NRC should add a statement that licensees may credit a reduction in the TS leakage rates for later periods of the transient when pressure differentials across the steam generator tubes are significantly reduced based on adequate technical justifications.

Page 18 No.

Section Comment/Basis Recommendation

55.

Appendix E-6 (Transport -

Steam Generator Tube Rupture)

[p. 66]

Position E-6.6 identifies that the potential impact of tube uncovery on the transport model parameters needs to be considered.

The issue of tube uncovery was addressed by the Westinghouse Owners Group (WOG) in WCAP-13247, "Report on the Methodology for the Resolution of the Steam Generator Tube Uncovery Issue," March 1992. The WOG program concluded that the effect of tube uncovery would be essentially negligible and the issue could be closed without any further investigation or generic restrictions. This position was accepted by the NRC in a letter dated March 10, 1993, from Robert C. Jones, Chief of the Reactor System Branch, to Lawrence A. Walsh, Chairman of the WOG. The letter states "... the Westinghouse analyses demonstrate that the effects of partial steam generator tube uncovery on the iodine release for SGTR and non-SGTR events is negligible. Therefore, we agree with your position on this matter and consider this issue to be resolved." Consistent with this position, tube uncovery should not need to be addressed further for U-tube style steam generators.

This comment also applies to Positions F-6.6.3 for MSLB, G-5.5 for Locked Rotor, and H-7.4 for Rod Ejection.

The NRC should update the wording of this position to acknowledge for U-tube steam generators that the issue of short-term tube uncovery has previously been resolved and does not need to be considered in future applications.

56.

Appendix I [p.

76]

Appendix I is not referenced within DG-1389 and the purpose and importance of this appendix is not understood. Given the unspecified use and importance of this appendix, it is recommended the NRC remove the appendix and flowchart.

NRC should delete this appendix or provide reference in document as to why this is needed.

57.

Appendix J [p.

77]

The first paragraph of this appendix cross-references Section C of the main body of this guide for the release fractions in Tables 3 and 4. This is an editorial error as Tables 3 and 4 are located in Section 3.2.

The NRC should correct this cross-reference and review DG-1389 for any other potential cross-referencing errors.

Section C position 3.2.