ML21145A259: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML21145A259
| number = ML21145A259
| issue date = 05/25/2021
| issue date = 05/25/2021
| title = Advanced Reactors GEIS Docs - Inl - Inl Haleu Capabilities
| title = Advanced Reactors GEIS Docs - INL - INL HALEU Capabilities
| author name =  
| author name =  
| author affiliation = NRC
| author affiliation = NRC
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:From:        Giacinto, Joseph Sent:        Tuesday, May 25, 2021 2:05 PM To:          AdvancedReactors-GEISDocsPEm Resource
 
==Subject:==
INL - INL HALEU Capabilities Attachments: Todd 2020 INL_Capabilities.pdf
 
INL HALEU Capabilities Terry Todd, Laboratory Fellow NEI/GAIN/EPRI HALEU Video Workshop April 28, 2020
 
Outline
* EBR-II metal uranium product
    - Recast- metal product
    - Small-scale polishing- oxide product
* Aluminum or Zirconium clad HEU fuels
    - Headend treatment (ZIRCEX)
    - Processing (pilot-scale and engineering-scale) 2
 
EBR-II Driver fuel processing Electrorefined uranium dendrite product Cast uranium product 3 ingot 3
 
Pyroprocessing - EBR II Driver Fuel Spent Driver              Electrorefined Uranium Ingot
 
HALEU EBR-II Metal Feedstock Progress
* HALEU as metal from EBR-II is the nearest term feedstock available to support fast-spectrum advanced reactor concepts
* Processing of EBR-II driver fuel will continue until all driver fuel is processed
* Production of EBR-II HALEU reguli will continue until all EBR-II driver fuel has been treated
        -  Operations ramp up to 7 day/wk, 12 hr/day
        -  0.365 MT produced in 2019
        -  2nd furnace available 2020 - 1 MT/year
        -  5 MT forecast to be available by 2024 Recovered U metal    Large metallic ingot      New graphite crucible                              Low dose rate, small size Novel Multi-function furnace  HALEU metal regulus 5
 
HALEU EBR-II Oxide Feedstock Demonstration
* Polished EBR-II uranium product suitable for thermal spectrum reactors
* Demonstrated U Polishing in small-scale equipment (using equipment on-hand)
    -  Dissolution of EBR II uranium metal regulus
    -  Uranium purification from residual fission products by solvent extraction
    -  Precipitation of uranium using peroxide process
    -  Uranium oxide produced by calcination Uranyl Peroxide                  Uranium Oxide Low dose rate, small size Uranium Trioxide HALEU metal regulus U metal dissolution  U purification 6
 
U metal regulus Uranyl Peroxide - UO2(O2).4H2O UO2 pellets EBR-II oxide product characteristics
* All metal species except uranium were below analytical detection limits
* Uranium isotopic analysis (same as metal)
    - U-235: 19.77%
    - U-238: 79.5 %
    - U-234: 0.18%
    - U-236: 0.55 %
* Dose rates (theoretical dose for unirradiated 20% U-235 HALEU) 8
 
Dry headend for zirconium or aluminum clad fuels 9
 
ZIRCEX Headend Progress
* Pilot plant operational on October 3, 2019
* Zirconium decladding testing initiated (10 completed runs to date)
* 2020 test schedule to include Zr and Al
* Receipt of unirradiated HEU fuel elements was completed in November 2019 Instantaneous and overall reaction rate with HCl gas and zirconium Zirconium sample after dry ZIRCEX decladding process Simulated Zircaloy-2 clad fuel
 
Process scale-up
* Design of pilot-scale processing glove box line for clean or lightly irradiated materials - in progress
    - Dissolution/solvent extraction/
conversion/waste vitrification
* EBR-II product (19.7% HALEU)
* ZIRCEX pilot plant product (unirradiated HEU)
* Other fuel/orphan materials
* Engineering-scale demonstration conceptual design in progress
* Projected 1-2 MT/yr of HALEU based on EBR-II and ATR recycled fuels 11
 
Projected INL HALEU Production Rates HALEU Production 2
1.8 1.6 1.4 1.2 HALEU (MT) 1 0.8 0.6 0.4 0.2 0
2020  2021  2022  2023  2024  2025  2026  2027    2028  2029  2030  2031  2032  2033  2034  2035 Year EBR II Production    HZD Production 12
 
2021 - Planned Activities
* EBR-II
    - Continue processing EBR-II driver fuel
    - Continue to recast previously processed EBR-II uranium product into reguli
    - A total of 1 MT of HALEU reguli will be produced per year
* ZIRCEX
    - Complete testing of Zr and Al simulated fuels
    - Initiate testing of unirradiated HEU fuel
    - Complete design of pilot-scale glovebox line for polishing EBR-II product and ZIRCEX HEU product
    - Complete conceptual design of Hybrid-ZIRCEX Engineering-Scale Demonstration
    - Initiate NEPA (Environmental Assessment) for Hybrid-ZIRCEX Engineering-Scale Demonstration
    - Complete construction of in-can vitrification pilot plant 13}}

Latest revision as of 19:40, 17 April 2023

Advanced Reactors GEIS Docs - INL - INL HALEU Capabilities
ML21145A259
Person / Time
Issue date: 05/25/2021
From:
NRC
To:
NRC/NMSS/DREFS
References
Download: ML21145A259 (14)


Text

From: Giacinto, Joseph Sent: Tuesday, May 25, 2021 2:05 PM To: AdvancedReactors-GEISDocsPEm Resource

Subject:

INL - INL HALEU Capabilities Attachments: Todd 2020 INL_Capabilities.pdf

INL HALEU Capabilities Terry Todd, Laboratory Fellow NEI/GAIN/EPRI HALEU Video Workshop April 28, 2020

Outline

- Recast- metal product

- Small-scale polishing- oxide product

- Headend treatment (ZIRCEX)

- Processing (pilot-scale and engineering-scale) 2

EBR-II Driver fuel processing Electrorefined uranium dendrite product Cast uranium product 3 ingot 3

Pyroprocessing - EBR II Driver Fuel Spent Driver Electrorefined Uranium Ingot

HALEU EBR-II Metal Feedstock Progress

  • HALEU as metal from EBR-II is the nearest term feedstock available to support fast-spectrum advanced reactor concepts
  • Processing of EBR-II driver fuel will continue until all driver fuel is processed
  • Production of EBR-II HALEU reguli will continue until all EBR-II driver fuel has been treated

- Operations ramp up to 7 day/wk, 12 hr/day

- 0.365 MT produced in 2019

- 2nd furnace available 2020 - 1 MT/year

- 5 MT forecast to be available by 2024 Recovered U metal Large metallic ingot New graphite crucible Low dose rate, small size Novel Multi-function furnace HALEU metal regulus 5

HALEU EBR-II Oxide Feedstock Demonstration

  • Polished EBR-II uranium product suitable for thermal spectrum reactors
  • Demonstrated U Polishing in small-scale equipment (using equipment on-hand)

- Dissolution of EBR II uranium metal regulus

- Uranium purification from residual fission products by solvent extraction

- Precipitation of uranium using peroxide process

- Uranium oxide produced by calcination Uranyl Peroxide Uranium Oxide Low dose rate, small size Uranium Trioxide HALEU metal regulus U metal dissolution U purification 6

U metal regulus Uranyl Peroxide - UO2(O2).4H2O UO2 pellets EBR-II oxide product characteristics

  • All metal species except uranium were below analytical detection limits
  • Uranium isotopic analysis (same as metal)

- U-235: 19.77%

- U-238: 79.5 %

- U-234: 0.18%

- U-236: 0.55 %

  • Dose rates (theoretical dose for unirradiated 20% U-235 HALEU) 8

Dry headend for zirconium or aluminum clad fuels 9

ZIRCEX Headend Progress

  • Pilot plant operational on October 3, 2019
  • Zirconium decladding testing initiated (10 completed runs to date)
  • 2020 test schedule to include Zr and Al
  • Receipt of unirradiated HEU fuel elements was completed in November 2019 Instantaneous and overall reaction rate with HCl gas and zirconium Zirconium sample after dry ZIRCEX decladding process Simulated Zircaloy-2 clad fuel

Process scale-up

  • Design of pilot-scale processing glove box line for clean or lightly irradiated materials - in progress

- Dissolution/solvent extraction/

conversion/waste vitrification

  • EBR-II product (19.7% HALEU)
  • ZIRCEX pilot plant product (unirradiated HEU)
  • Other fuel/orphan materials
  • Engineering-scale demonstration conceptual design in progress
  • Projected 1-2 MT/yr of HALEU based on EBR-II and ATR recycled fuels 11

Projected INL HALEU Production Rates HALEU Production 2

1.8 1.6 1.4 1.2 HALEU (MT) 1 0.8 0.6 0.4 0.2 0

2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Year EBR II Production HZD Production 12

2021 - Planned Activities

  • EBR-II

- Continue processing EBR-II driver fuel

- Continue to recast previously processed EBR-II uranium product into reguli

- A total of 1 MT of HALEU reguli will be produced per year

  • ZIRCEX

- Complete testing of Zr and Al simulated fuels

- Initiate testing of unirradiated HEU fuel

- Complete design of pilot-scale glovebox line for polishing EBR-II product and ZIRCEX HEU product

- Complete conceptual design of Hybrid-ZIRCEX Engineering-Scale Demonstration

- Initiate NEPA (Environmental Assessment) for Hybrid-ZIRCEX Engineering-Scale Demonstration

- Complete construction of in-can vitrification pilot plant 13