BYRON STATION - SECURITY BASELINE INSPECTION REPORT 05000454/2021403 AND 05000455/2021403
 
==Dear Mr. Rhoades:==
On November 15, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Byron Station and discussed the results of this inspection with Mr. Curt Catecamp, security manager, and other members of your staff. The results of this inspection are documented in the enclosed report.
 
No findings or violations of more than minor significance were identified during this inspection.
 
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
 
Sincerely, Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000454 and 05000455 License Nos. NPF-37 and NPF-66
 
===Enclosure:===
As stated
 
==Inspection Report==
Docket Numbers:
05000454 and 05000455
License Numbers:
NPF-37 and NPF-66
Report Numbers:
05000454/2021403 and 05000455/2021403
Enterprise Identifier:
I-2021-403-0026
Licensee:
Exelon Generation Company, LLC
Facility:
Byron Station
Location:
Byron, IL
Inspection Dates:
November 01, 2021 to November 15, 2021
Inspectors:
A. Anderson, Physical Security Inspector
J. Kutlesa, Physical Security Inspector
Approved By:
Steven K. Orth, Chief
Plant Support Branch
Division of Reactor Safety
 
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Byron Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
 
===List of Findings and Violations===
No findings or violations of more than minor significance were identified.
 
===Additional Tracking Items===
None.
 
=INSPECTION SCOPES=
 
Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
 
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), inspectors were directed to begin telework. In addition, regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.
 
==SAFEGUARDS==
==71130.04 - Equipment Performance, Testing, and Maintenance==
The inspectors evaluated the security equipment testing and maintenance program.
 
The completion of these elements, combined with the completion of elements documented in report 05000454/2020402 and 05000455/2020402, dated September 18, 2020, constitute one complete sample.
 
===Equipment Performance, Testing, and Maintenance (1 Sample)===
: (1) Tier I: 02.02 b, c, d, e, f, g, h; 02.03 b, c; 02.04 c, f, g; 02.05 b, c, d; 02.06 b; 02.07 b; 02.08 e
 
Tier II: 02.11 a, d; 02.12 a
 
Tier III: None
 
==71130.07 - Security Training==
The inspectors evaluated the security training program through completion of the following
 
===procedure elements: Security Training===
{{IP sample|IP=IP 71130.07|count=1}}
: (1) Tier I: All
 
Tier II: 02.05 a, c, d; 02.06 b; 02.07 a; 02.09 a
 
Tier III: 02.10; 02.11 a; 02.12 a, b; 02.13 a, b
 
==71130.09 - Security Plan Changes==
Review Security Plan Changes (IP Section 02.01) (1 Partial)
The inspectors evaluated the security plan changes through completion of the following procedure elements:
(1)
(Partial)
The opportunity to apply this procedure was not available in accordance with Inspection Manual Chapter 0306. This sample was not available because the licensee did not conduct the activity covered by this inspection procedure.
 
Specifically, the licensee has not initiated a physical security plan change in accordance with Title 10 of the Code of Federal Regulations, Part 50.54(p)(2)since the last performance of this inspection procedure.
 
==INSPECTION RESULTS==
No findings were identified.
 
==EXIT MEETINGS AND DEBRIEFS==
The inspectors verified no proprietary information was retained or documented in this report.
 
On November 15, 2021, the inspectors presented the security baseline inspection results to Mr. Curt Catecamp, security manager, and other members of the licensee staff.
 
=DOCUMENTS REVIEWED=
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71130.04
Procedures
SY-AA-150-103
Firearms Maintenance, Testing and Accountability
Instructor Certification Letters
04/05/2021
National Rifle Association Course Approval Documents for
Daylight Rifle Qualification Course, Night Fire Rifle
Qualification Course, and Thermal Rifle Qualification Course
01/20/2020;
04/20/2018;
04/20/2018
Oleoresin Capsicum Aerosol Training
01/01/2017
Byron Station, Security 3 Year Training Plan
2/16/2020
AR 4394288
Security Program Audit - NOSA-BYR-21-01
01/01/19 -
2/03/2021
LSN - 2101-PP
Patrol Officer: Duties and Responsibilities
N-AN-SY-FFD
Breath ALC
Fitness For Duty Breath Alcohol Collections
04/10/2017
Miscellaneous
SY-AA-150-101-
F-48
LSN - 1108-PP, Use of Force Continuum
HR-AA-07-110
Medical Examination
N-AN-SY-RTD-
IQT
Return to Duty Physical Fitness Test
SY-AA-101-142-
F-09
Firearms Fitness Regulations Questionnaires
SY-AA-150-1008
Firearms Training Simulator (FATS)
SY-AA-150-101
Exelon Nuclear Security Training
SY-AA-150-101-
F-04
Response Team Leader - Individual Qualification Record
SY-AA-150-101-
F-13
Individual Qualification Records
SY-AA-150-101-
F-13
Individual Security Training File Cover Sheet
SY-AA-150-101-
F-26
Personal Corrective Aids and New Hire Required Equipment
Checks
71130.07
Procedures
SY-AA-150-101-
F-47
Security Instructors Continuing Training 8 Hour Instructor Skills
Training with 12 Month Period and 8 Hours Technical Skills
Training
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
SY-AA-150-102
Security Drills and Exercises
SY-AA-150-104
Exelon Nuclear Security On-Job-Training (OJT) Program
SY-AA-150-105
Physical Fitness Test Development, Approval and Conduct
TQ-AA-224-F-080
Observations: 246160,246167, 246207, 246667, 246708,
246730, 246732, 246735
71130.09
Miscellaneous
Byron Station Security Plan, Training and Qualification Plan,
Safeguards Contingency Plan and Independent Spent Fuel
Storage Installation Security Program
17
}}
}}

Latest revision as of 19:59, 27 November 2024

Security Baseline Inspection Report 05000454/2021403 and 05000455/2021403
ML21321A333
Person / Time
Site: Byron  Constellation icon.png
Issue date: 11/22/2021
From: Steven Orth
Plant Support Branch II
To: Rhoades D
Exelon Generation Co, Exelon Nuclear
Anderson K
References
EPID I-2021-403-0026 IR 2021403
Download: ML21321A333 (8)


Text

SUBJECT:

BYRON STATION - SECURITY BASELINE INSPECTION REPORT 05000454/2021403 AND 05000455/2021403

Dear Mr. Rhoades:

On November 15, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Byron Station and discussed the results of this inspection with Mr. Curt Catecamp, security manager, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000454 and 05000455 License Nos. NPF-37 and NPF-66

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000454 and 05000455

License Numbers:

NPF-37 and NPF-66

Report Numbers:

05000454/2021403 and 05000455/2021403

Enterprise Identifier:

I-2021-403-0026

Licensee:

Exelon Generation Company, LLC

Facility:

Byron Station

Location:

Byron, IL

Inspection Dates:

November 01, 2021 to November 15, 2021

Inspectors:

A. Anderson, Physical Security Inspector

J. Kutlesa, Physical Security Inspector

Approved By:

Steven K. Orth, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Byron Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), inspectors were directed to begin telework. In addition, regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.

SAFEGUARDS

71130.04 - Equipment Performance, Testing, and Maintenance

The inspectors evaluated the security equipment testing and maintenance program.

The completion of these elements, combined with the completion of elements documented in report 05000454/2020402 and 05000455/2020402, dated September 18, 2020, constitute one complete sample.

Equipment Performance, Testing, and Maintenance (1 Sample)

(1) Tier I: 02.02 b, c, d, e, f, g, h; 02.03 b, c; 02.04 c, f, g; 02.05 b, c, d; 02.06 b; 02.07 b; 02.08 e

Tier II: 02.11 a, d; 02.12 a

Tier III: None

71130.07 - Security Training

The inspectors evaluated the security training program through completion of the following

procedure elements: Security Training

(1) Tier I: All

Tier II: 02.05 a, c, d; 02.06 b; 02.07 a; 02.09 a

Tier III: 02.10; 02.11 a; 02.12 a, b; 02.13 a, b

71130.09 - Security Plan Changes

Review Security Plan Changes (IP Section 02.01) (1 Partial)

The inspectors evaluated the security plan changes through completion of the following procedure elements:

(1)

(Partial)

The opportunity to apply this procedure was not available in accordance with Inspection Manual Chapter 0306. This sample was not available because the licensee did not conduct the activity covered by this inspection procedure.

Specifically, the licensee has not initiated a physical security plan change in accordance with Title 10 of the Code of Federal Regulations, Part 50.54(p)(2)since the last performance of this inspection procedure.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On November 15, 2021, the inspectors presented the security baseline inspection results to Mr. Curt Catecamp, security manager, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.04

Procedures

SY-AA-150-103

Firearms Maintenance, Testing and Accountability

Instructor Certification Letters

04/05/2021

National Rifle Association Course Approval Documents for

Daylight Rifle Qualification Course, Night Fire Rifle

Qualification Course, and Thermal Rifle Qualification Course

01/20/2020;

04/20/2018;

04/20/2018

Oleoresin Capsicum Aerosol Training

01/01/2017

Byron Station, Security 3 Year Training Plan

2/16/2020

AR 4394288

Security Program Audit - NOSA-BYR-21-01

01/01/19 -

2/03/2021

LSN - 2101-PP

Patrol Officer: Duties and Responsibilities

N-AN-SY-FFD

Breath ALC

Fitness For Duty Breath Alcohol Collections

04/10/2017

Miscellaneous

SY-AA-150-101-

F-48

LSN - 1108-PP, Use of Force Continuum

HR-AA-07-110

Medical Examination

N-AN-SY-RTD-

IQT

Return to Duty Physical Fitness Test

SY-AA-101-142-

F-09

Firearms Fitness Regulations Questionnaires

SY-AA-150-1008

Firearms Training Simulator (FATS)

SY-AA-150-101

Exelon Nuclear Security Training

SY-AA-150-101-

F-04

Response Team Leader - Individual Qualification Record

SY-AA-150-101-

F-13

Individual Qualification Records

SY-AA-150-101-

F-13

Individual Security Training File Cover Sheet

SY-AA-150-101-

F-26

Personal Corrective Aids and New Hire Required Equipment

Checks

71130.07

Procedures

SY-AA-150-101-

F-47

Security Instructors Continuing Training 8 Hour Instructor Skills

Training with 12 Month Period and 8 Hours Technical Skills

Training

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

SY-AA-150-102

Security Drills and Exercises

SY-AA-150-104

Exelon Nuclear Security On-Job-Training (OJT) Program

SY-AA-150-105

Physical Fitness Test Development, Approval and Conduct

TQ-AA-224-F-080

Observations: 246160,246167, 246207, 246667, 246708,

246730, 246732, 246735

71130.09

Miscellaneous

Byron Station Security Plan, Training and Qualification Plan,

Safeguards Contingency Plan and Independent Spent Fuel

Storage Installation Security Program

17