ML20293A183: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 23: | Line 23: | ||
==Subject:== | ==Subject:== | ||
Acceptance Review - Hope Creek - Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements (EPID: L-2020-LLA-0220) | Acceptance Review - Hope Creek - Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements (EPID: L-2020-LLA-0220) | ||
Mr. Duke, By letter dated September 29, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20274A097), Public Service Enterprise Group Nuclear, LCC (PSEG, the licensee) submitted a license amendment request for Hope Creek Generating Station (Hope Creek) to adopt TSTF 582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements. The Technical Specifications (TS) related to RPV WIC are revised to incorporate operating experience and to correct errors and omissions in TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control. | Mr. Duke, By {{letter dated|date=September 29, 2020|text=letter dated September 29, 2020}} (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20274A097), Public Service Enterprise Group Nuclear, LCC (PSEG, the licensee) submitted a license amendment request for Hope Creek Generating Station (Hope Creek) to adopt TSTF 582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements. The Technical Specifications (TS) related to RPV WIC are revised to incorporate operating experience and to correct errors and omissions in TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control. | ||
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence. | The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence. | ||
The NRC staff has estimated that this licensing request will take approximately 125 hours to complete. The NRC staff expect to complete this review in approximately 6 months, which is March 2021. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager. | The NRC staff has estimated that this licensing request will take approximately 125 hours to complete. The NRC staff expect to complete this review in approximately 6 months, which is March 2021. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager. |
Latest revision as of 01:58, 8 March 2021
ML20293A183 | |
Person / Time | |
---|---|
Site: | Hope Creek |
Issue date: | 10/19/2020 |
From: | James Kim NRC/NRR/DORL/LPL1 |
To: | Duke P Public Service Enterprise Group |
References | |
L-2020-LLA-0220 | |
Download: ML20293A183 (2) | |
Text
From: Kim, James Sent: Monday, October 19, 2020 8:12 AM To: Duke, Paul R.
Cc: Thomas, Brian J.; Danna, James
Subject:
Acceptance Review - Hope Creek - Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements (EPID: L-2020-LLA-0220)
Mr. Duke, By [[letter::LR-N20-0060, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements|letter dated September 29, 2020]] (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20274A097), Public Service Enterprise Group Nuclear, LCC (PSEG, the licensee) submitted a license amendment request for Hope Creek Generating Station (Hope Creek) to adopt TSTF 582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements. The Technical Specifications (TS) related to RPV WIC are revised to incorporate operating experience and to correct errors and omissions in TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
The NRC staff has estimated that this licensing request will take approximately 125 hours0.00145 days <br />0.0347 hours <br />2.066799e-4 weeks <br />4.75625e-5 months <br /> to complete. The NRC staff expect to complete this review in approximately 6 months, which is March 2021. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.
If you have any question, please contact me, James Kim, at James.Kim@nrc.gov or 301-415-4125.
James Kim, Project Manager Branch 1, Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission
Hearing Identifier: NRR_DRMA Email Number: 838 Mail Envelope Properties (DM6PR09MB504853A839F1066D6265C710E41E0)
Subject:
Acceptance Review - Hope Creek - Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements (EPID: L-2020-LLA-0220)
Sent Date: 10/19/2020 8:12:09 AM Received Date: 10/19/2020 8:12:00 AM From: Kim, James Created By: James.Kim@nrc.gov Recipients:
"Thomas, Brian J." <Brian.Thomas@pseg.com>
Tracking Status: None "Danna, James" <James.Danna@nrc.gov>
Tracking Status: None "Duke, Paul R." <Paul.Duke@pseg.com>
Tracking Status: None Post Office: DM6PR09MB5048.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2611 10/19/2020 8:12:00 AM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: