Line 27: |
Line 27: |
| ==Dear Ms. Gayheart:== | | ==Dear Ms. Gayheart:== |
|
| |
|
| By letter dated July 13, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession Package No. ML20206K831), Ms. Cheryl A. Gayheart of Southern Nuclear Operating Company submitted an affidavit dated June 24, 2020, executed by Joanna Phillips, on behalf of Cameron Technologies US, LLC (Cameron), requesting that the below two Engineering Reports to the above referenced letter, be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390: | | By {{letter dated|date=July 13, 2020|text=letter dated July 13, 2020}} (Agencywide Documents Access and Management System (ADAMS) Accession Package No. ML20206K831), Ms. Cheryl A. Gayheart of Southern Nuclear Operating Company submitted an affidavit dated June 24, 2020, executed by Joanna Phillips, on behalf of Cameron Technologies US, LLC (Cameron), requesting that the below two Engineering Reports to the above referenced letter, be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390: |
| Cameron Engineering Report: ER-1180 Rev. 1 and Rev. 1 Errata, Bounding Uncertainty Analysis for Thermal Power Determination at Farley Unit 1 Using the LEFM | | Cameron Engineering Report: ER-1180 Rev. 1 and Rev. 1 Errata, Bounding Uncertainty Analysis for Thermal Power Determination at Farley Unit 1 Using the LEFM |
| + System (CAW-20-05) | | + System (CAW-20-05) |
Letter Sequence Withholding Request Acceptance |
---|
|
|
MONTHYEARNL-19-0795, Cameron Non-Proprietary Engineering Reports; ER-1180NP, Rev. 1, ER-1181NP, Rev. 1; ER-1182NP, Rev. 1; and ER-1183NP, Rev. 1.2019-05-31031 May 2019 Cameron Non-Proprietary Engineering Reports; ER-1180NP, Rev. 1, ER-1181NP, Rev. 1; ER-1182NP, Rev. 1; and ER-1183NP, Rev. 1. Project stage: Request ML19308A7612019-05-31031 May 2019, 30 October 2019 Submittal of License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Request NL-19-1436, Submittal of Errata Pages to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (NL-19-0795)2019-11-25025 November 2019 Submittal of Errata Pages to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (NL-19-0795) Project stage: Request ML19350A0062019-12-16016 December 2019 NRR E-mail Capture - Joseph M. Farley, Units 1 and 2 - Acceptance of License Amendment Request for a Measurement Uncertainty Recapture Power Uprate Project stage: Acceptance Review ML19312B5662020-01-13013 January 2020 Request for Withholding Information from Public Disclosure for Joseph M. Farley Nuclear Plant, Units 1 and 2 - Measurement Uncertainty Recapture Power Uprate Project stage: Withholding Request Acceptance ML20084G5272020-03-23023 March 2020 NRR E-mail Capture - Joseph M. Farley Nuclear Plant, Units 1 and 2 - Request for Additional Information Measurement Uncertainty Recapture Power Uprate Project stage: RAI NL-20-0458, Response to Request for Additional Information Related to License Amendment Request for Measurement Uncertainty Recapture Power Uprate2020-04-22022 April 2020 Response to Request for Additional Information Related to License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI ML20121A1472020-04-29029 April 2020 NRR E-mail Capture - Joseph M. Farley Nuclear Plant, Units 1 and 2 - Measurement Uncertainty Recapture Power Uprate Follow-up RAI Emib No. 1 Project stage: RAI ML20132A2072020-05-0808 May 2020 9 to the Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant and Chapter 2 (Part 1 of 3); Redacted Version Project stage: Request NL-20-0538, Second Response to Request for Additional Information Related to License Amendment Request for Measurement Uncertainty Recapture Power Uprate2020-05-0808 May 2020 Second Response to Request for Additional Information Related to License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI ML20149K4392020-05-21021 May 2020 NRR E-mail Capture - Joseph M. Farley Nuclear Plant, Units 1 and 2 - Measurement Uncertainty Recapture Power Uprate RAI Sfnb RAI No. 2 Project stage: RAI NL-20-0275, Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues2020-05-29029 May 2020 Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues Project stage: Request NL-20-0636, Third Response to Request for Additional Information Related to License Amendment Request for Measurement Uncertainty Recapture Power Uprate2020-05-29029 May 2020 Third Response to Request for Additional Information Related to License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI ML20206K8312020-06-24024 June 2020, 13 July 2020 Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Request ML20206K8322020-07-13013 July 2020 Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Supplement ML20216A3182020-08-13013 August 2020 Request for Withholding Information from Public Disclosure for Joseph M. Farley Nuclear Plant, Units 1 and 2 - Measurement Uncertainty Recapture Power Uprate Project stage: Withholding Request Acceptance ML20121A2832020-10-0909 October 2020 Issuance of Amendments 230 and 227 Measurement Uncertainty Recapture Power Uprate Project stage: Approval 2020-04-22
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000348/20240032024-11-13013 November 2024 Integrated Inspection Report 05000348/2024003, 05000364/2024003 and 07200042/2024001 IR 05000348/20244032024-11-13013 November 2024 – Security Baseline Inspection Report 05000348/2024403 & 05000364/2024403 NL-24-0364, Notification of Deferral of Baffle Former Bolt Inspections from Farley 1R33 to 1R342024-10-31031 October 2024 Notification of Deferral of Baffle Former Bolt Inspections from Farley 1R33 to 1R34 NL-24-0392, Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-0022024-10-28028 October 2024 Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-002 NL-24-0396, Response to Request for Additional Information Related to Relief Request to Defer Charging Pump and Mini-Flow Isolation Valve Inservice Testing2024-10-25025 October 2024 Response to Request for Additional Information Related to Relief Request to Defer Charging Pump and Mini-Flow Isolation Valve Inservice Testing NL-24-0384, Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves2024-10-18018 October 2024 Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves NL-24-0320, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,.2024-09-27027 September 2024 License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,. NL-24-0349, Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided2024-09-20020 September 2024 Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided NL-24-0341, Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-09-10010 September 2024 Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency IR 05000348/20244012024-09-10010 September 2024 Security Baseline Inspection Report 05000348-2024401 and 05000364-2024401 ML24247A1102024-09-0505 September 2024 Corporate Notification Letter Aka 210-day Letter NUREG Rev 12 NL-24-0259, License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes2024-09-0404 September 2024 License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes NL-24-0340, Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R322024-09-0404 September 2024 Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R32 ML24242A1332024-08-29029 August 2024 Issuance of Amendment Nos. 250 and 247, Regarding License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, Actions (EPID L-2024-LLA-0098) - Non-Proprietary ML24240A0812024-08-27027 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Revised Completion Time ML24233A0022024-08-27027 August 2024 Request for Withholding Information from Public Disclosure for Joseph M. Farley Nuclear Plant, Units 1 and 2, License Amendment Request Supplement to Change Technical Specification 3.6.5, Containment Air Temperature Actions IR 05000348/20240052024-08-26026 August 2024 Updated Inspection Plan for Joseph M. Farley Nuclear Plant, Units 1 and 2 - Report 05000348/2024005 and 05000364/2024005 IR 05000348/20244022024-08-26026 August 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000348/2024402 and 05000364/2024402 ML24226B2112024-08-22022 August 2024 Regulatory Audit Summary in Support of License Amendment Requests to Revise Technical Specification 3.6.5, Containment Air Temperature, Actions NL-24-0321, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information2024-08-16016 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information IR 05000348/20240022024-08-12012 August 2024 – Integrated Inspection Report 05000348-2024002 and 05000364-2024002 and Exercise of Enforcement Discretion ML24215A3772024-08-0707 August 2024 2024 Farley Requal Inspection Corporate Notification Letter ML24201A2032024-08-0101 August 2024 Request for Withholding Information from Public Disclosure for Joseph M. Farley Nuclear Plant, Units 1 and 2, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions ML24200A1392024-07-25025 July 2024 Regulatory Audit in Support of Review of the License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature ML24199A2072024-07-24024 July 2024 TS 3-6-5 LAR - Individual Notice Transmittal Letter and NSHC - Rev 1 (1) - Letter NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 NL-24-0281, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions2024-07-18018 July 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML24184A0452024-07-0202 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A3762024-07-0101 July 2024 Nonacceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, Using Risk-Informed Process for Evaluations NL-24-0230, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-3602024-06-28028 June 2024 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-360 NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in 05000348/LER-2024-002-01, Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel2024-06-19019 June 2024 Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) 05000348/LER-2024-001, Pressurizer Safety Valve Lift Pressure Outside of Technical Specifications Limits Due to Setpoint Drift2024-06-17017 June 2024 Pressurizer Safety Valve Lift Pressure Outside of Technical Specifications Limits Due to Setpoint Drift NL-24-0238, RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information2024-06-14014 June 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information NL-24-0229, Notice of Intent to Pursue Subsequent License Renewal2024-06-0707 June 2024 Notice of Intent to Pursue Subsequent License Renewal ML24149A0492024-06-0404 June 2024 SNC Fleet - Regulatory Audit in Support of Review of the License Amendment Request to Revise TS 1.1, Use and Application Definitions, and Add New Technical Specification 5.5.21 and 5.5.17, Online Monitoring Program, ML24143A0412024-05-28028 May 2024 Supplemental Information Needed for Using the Risk-Informed Process for Evaluation for the LAR to Change Technical Specification 3.6.5, Containment Air Temperature, Actions NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0188, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 IR 05000348/20240012024-04-24024 April 2024 Integrated Inspection Report 05000348/2024001 and 05000364/2024001 NL-24-0137, RIPE License Amendment Request to Change Containment Air Temperature Actions2024-04-19019 April 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions IR 05000348/20240102024-04-16016 April 2024 NRC Inspection Report 05000348/2024010 and 05000364/2024010 05000364/LER-2024-002, For Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel2024-04-15015 April 2024 For Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel NL-24-0134, Renewed National Pollutant Discharge Elimination System (NPDES) Permit2024-04-12012 April 2024 Renewed National Pollutant Discharge Elimination System (NPDES) Permit 2024-09-05
[Table view] Category:Proprietary Information Review
MONTHYEARML24233A0022024-08-27027 August 2024 Request for Withholding Information from Public Disclosure for Joseph M. Farley Nuclear Plant, Units 1 and 2, License Amendment Request Supplement to Change Technical Specification 3.6.5, Containment Air Temperature Actions ML24201A2032024-08-0101 August 2024 Request for Withholding Information from Public Disclosure for Joseph M. Farley Nuclear Plant, Units 1 and 2, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions ML23345A1312024-01-0303 January 2024 Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) ML22311A5122022-11-29029 November 2022 Request for Withholding Information from Public Disclosure License Amendment Request to Revise TS 4.3, Fuel Storage, to Correct Tabulated Values from the Associated SFP Criticality Analysis ML20280A6852020-10-26026 October 2020 Request for Withholding Information from Public Disclosure for Joseph M. Farley, Units 1 and 2 ML20216A3182020-08-13013 August 2020 Request for Withholding Information from Public Disclosure for Joseph M. Farley Nuclear Plant, Units 1 and 2 - Measurement Uncertainty Recapture Power Uprate NL-20-0828, Attachment 5 - Caw 20-05, Application for Withholding Proprietary Information from Public Disclosure2020-06-24024 June 2020 Attachment 5 - Caw 20-05, Application for Withholding Proprietary Information from Public Disclosure ML20115E6182020-05-0404 May 2020 Request for Withholding Information from Public Disclosure ML18312A2412018-11-15015 November 2018 Request for Withholding Information from Public Disclosure - November 13, 2018, Closed Meeting Presentation Slides ML18116A0062018-05-0404 May 2018 Request for Withholding Information from Public Disclosure ML15051A3302015-02-27027 February 2015 Request for Withholding Information from Public Disclosure ML14175A5562014-07-0202 July 2014 Request for Withholding Information from Public Disclosure for Joseph M. Farley ML13199A1582013-08-0505 August 2013 Request for Withholding Information from Public Disclosure, Relief Request of Proposed Inservice Inspection Alternative FNP-ISI-ALT-13, Version 1.0 ML0835203162009-06-0909 June 2009 Request Westinghouse Electric Company Withholding Information from Public Disclosure ML0413804262004-05-17017 May 2004 Withholding from Public Disclosure, WCAP-12825, Addendum 1 ML0313404722003-05-14014 May 2003 Proprietary Information Reviews, Request for Withholding Information from Public Disclosure-Westinghouse Electric Company, TAC MB8007 & TAC MB8008 2024-08-27
[Table view] |
Text
August 13, 2020 Ms. Cheryl A. Gayheart Regulatory Affairs Director Southern Nuclear Operating Company, Inc.
3535 Colonnade Parkway Birmingham, AL 35243
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 -
RE: MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE (EPID L-2019-LLS-0002)
Dear Ms. Gayheart:
By letter dated July 13, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession Package No. ML20206K831), Ms. Cheryl A. Gayheart of Southern Nuclear Operating Company submitted an affidavit dated June 24, 2020, executed by Joanna Phillips, on behalf of Cameron Technologies US, LLC (Cameron), requesting that the below two Engineering Reports to the above referenced letter, be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390:
Cameron Engineering Report: ER-1180 Rev. 1 and Rev. 1 Errata, Bounding Uncertainty Analysis for Thermal Power Determination at Farley Unit 1 Using the LEFM
+ System (CAW-20-05)
Cameron Engineering Report: ER-1181 Rev. 1 and Rev. 1 Errata, Bounding Uncertainty Analysis for Thermal Power Determination at Farley Unit 2 Using the LEFM
+ System (CAW-20-05)
Nonproprietary versions of the above documents can be found at ADAMS Accession No. ML20206K832.
The affidavit states, in part, that the Engineering Reports (CAW-20-05) be considered exempt from mandatory public disclosure for the following reasons:
- 5. Pursuant to the provisions of paragraph (b)(4) of Section 2.390 of the Commissions regulations, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld.
(i) The information sought to be withheld from public disclosure is owned and has been held in confidence by Cameron.
(ii) The information is of a type customarily held in confidence by Cameron and not customarily disclosed to the public. Cameron has a rational basis
C. Gayheart for determining the types of information customarily held in confidence by it and, in that connection utilizes a system to determine when and whether to hold certain types of information in confidence. The application of that system and the substance of that system constitutes Cameron policy and provides the rational basis required. Furthermore, the information is submitted voluntarily and need not rely on the evaluation of any rational basis.
Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential advantage, as follows:
(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Camerons competitors without license from Cameron constitutes a competitive economic advantage over other companies.
(b) It consists of supporting data; including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.
(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, and assurance of quality, or licensing a similar product.
The information sought to be withheld is considered to be proprietary for the reasons set forth in paragraphs (a), (b) and (c), above.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the proprietary version of CAW-20-05 will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the U.S. Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
C. Gayheart If you have any questions regarding this matter, please contact me at (301) 415-1009 or Shawn.Williams@nrc.gov.
Sincerely, Shawn A. Digitally signed by Shawn A. Williams Williams Date: 2020.08.13 07:01:58 Shawn A. Williams, Senior Project -04'00' Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364 cc: Joanna Phillips, Nuclear Sales Manager Cameron Technologies US LLC 1000 McClaren Woods Drive Coraopolis, PA, 15108 Listserv
ML20216A318 OFFICE NRR/DORL/LPL2-1/PM NRR/DORL/LPL2-1/PM NRR/DORL/LPL2-1/LA NAME SDevlin-Gill SWilliams KGoldstein DATE 07/31/2020 08/07/2020 08/07/2020 OFFICE NRR/DORL/LPL2-1/BC DORL/LPL2 1/PM NAME MMarkley SWilliams DATE 08/12/2020 08/13/2020