      - - = = '                                                                            Ertlergy Operatiotis, Inc.
c-=ENTERGY                                                                          ~ .      -
                                                                                                        ,a W. T. Cotus April 22, 1992 U.S. Nuclear Regulatory Commit,sion Mail Station P1-137 Washington, D.C. 20555 Attention:        Document Control Desk
 
==Subject:==
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Extension of T.ustrumentation Surveillance Intervals and Allowed Outage Tires Proposed Amendmen* to the Oporating License (PCOL-91/12)
 
==References:==
: 1. GNRO-91/00083 Extension of Instrumentation Surveillance Intervals and Allowed Outage Times, Proposed Amendmnnt to the Operat.ing License (PCOL-91/12), dated June 26, 1991
: 2. NEDC-31677P-A, Technical Specification improvement Analysis for BWR 1 solation Actuation Instrumentation, July 1990
: 3. NEDC ',0936P-A, BWR Owner's Group Technical Specification improvement.Hethodology (With Demonstration for BWR ECCS Actuation Int,trumentat. ion) Part 2, December 1988
: 4. NEDC-30851P-A, Supplement 2. Technical Specification Improvement Analysis for DWR lsolation Instrumentation Common to RPS and ECCS Instrumentation, March 1989 GNRO-92/00045 Gentlemen:
Entergy Operations, Inc. by this letter is submitting a modification to the proposed amendment to the Grand Gulf Nuclear Station (GGNS) Operating License transmitted to the NRC via Reference 1. This letter modifies the l;                wording of the requested change to Limiting Condition for Operation 3.3.2 l                  ACTION    b.-
The wording of the ACTION b proposed in Reference 1 is justified by the analysis of References 1, 2, 3, and 4.              However, subsequent discussions with the NRC revealed that raview and approval of the change would be expedited by modifying the proposed wording to correspond with the example ACTION requirement provided in Reference 2.
f    ' fi #                  9204280016      920422 G9204 $I/'SNLICFLR - 1                  DR    ADOCK 0500  6                                          [/
If l
 
April 22, 1992 GNRO-92/00045 Page 2 of 3 This letter modifles the requested wording of ACT10N b.1 to correspond with                  )
the exampic ACTION requirement provided in Referetce 2. The following is the medified requested wording:
: 1. If placing the inoperable channel (s) in the tripped condition would                    !
cause an inolation, thn inoperabic channel (s) shall be restored to                      ;
OPERAB12. status within 6 bours or the ACTION requirnd by Table 3.1.2-1                  ;
for the af fcct ed t rip -funci f on shall be t aken.
The proposed wording is more teatrictive than justified by the analysis of References 1, 2, 3, and 4 and corresponds with the example ACTION requirement provided in Reference 2. This change is bounded by the original justification providod and does not affect the No Significant llazards Consideration presented in Referenen i for the proposed Techn.ical Specification changes.
This modificat. ion to the wording requested in Reference 1 has been reviewed and accepted by the Plant Safety Review Committee.
Yours truly, e.o P ds4A WTC/BSF/mte attachment:    Mod i f lot'. Insert A to Page 3/4 3-9 cc:            Mr. D. C. Illntz (w/a)
Mr. J. b. Mathis (w/a)
Mr. R. B. McGehen (w/a)
Mr. N. S. Reynolds (w/a)
Mr.11. L. Thomas (w/o)
: t.                                            Mr. Stewart. D. Elmeter (w/a)
Regional Administrator U.S. Nuc1 car Regulatory Commission Region II 101 Marietta St.. . N.W. , Suit e 2900 Atlanta,-Georgia 30323 ar. P. W. O'Connor, Project. Manager (w/2)
Office of Nuclear Reactor Regult.tfon U.S. Nuclear Regulatory Commission Mail Stop- 131:3 Washington, D.C. -20555 Dr. Alton B. Cobb (w/a)
State llcalth Officer State Board of ihmith P.O. Box 1700 Jackson. Mississ ppi 39205 G9204081/SNL1CFLR - 2
__ _ _ _ _ _                              . _ _ _ . _ _ _ _ _ . - . . _ . . . _ . . - _ _ . _ _ _ - _}}

Latest revision as of 13:59, 12 May 2020

Suppl to 910626 Application for Amend to License NPF-29, Modifying Wording of Requested Change to LCO 3.3.2,Action B Re Extension of Instrumentation Surveillance Intervals & Allowed Outage Times
ML20095E734
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 04/22/1992
From: Cottle W
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20095E738 List:
References
GNRO-92-00045, GNRO-92-45, NUDOCS 9204280016
Download: ML20095E734 (2)


Text

. . ~ -

- - = = ' Ertlergy Operatiotis, Inc.

c-=ENTERGY ~ . -

,a W. T. Cotus April 22, 1992 U.S. Nuclear Regulatory Commit,sion Mail Station P1-137 Washington, D.C. 20555 Attention: Document Control Desk

Subject:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Extension of T.ustrumentation Surveillance Intervals and Allowed Outage Tires Proposed Amendmen* to the Oporating License (PCOL-91/12)

References:

1. GNRO-91/00083 Extension of Instrumentation Surveillance Intervals and Allowed Outage Times, Proposed Amendmnnt to the Operat.ing License (PCOL-91/12), dated June 26, 1991
2. NEDC-31677P-A, Technical Specification improvement Analysis for BWR 1 solation Actuation Instrumentation, July 1990
3. NEDC ',0936P-A, BWR Owner's Group Technical Specification improvement.Hethodology (With Demonstration for BWR ECCS Actuation Int,trumentat. ion) Part 2, December 1988
4. NEDC-30851P-A, Supplement 2. Technical Specification Improvement Analysis for DWR lsolation Instrumentation Common to RPS and ECCS Instrumentation, March 1989 GNRO-92/00045 Gentlemen:

Entergy Operations, Inc. by this letter is submitting a modification to the proposed amendment to the Grand Gulf Nuclear Station (GGNS) Operating License transmitted to the NRC via Reference 1. This letter modifies the l; wording of the requested change to Limiting Condition for Operation 3.3.2 l ACTION b.-

The wording of the ACTION b proposed in Reference 1 is justified by the analysis of References 1, 2, 3, and 4. However, subsequent discussions with the NRC revealed that raview and approval of the change would be expedited by modifying the proposed wording to correspond with the example ACTION requirement provided in Reference 2.

f ' fi # 9204280016 920422 G9204 $I/'SNLICFLR - 1 DR ADOCK 0500 6 [/

If l

April 22, 1992 GNRO-92/00045 Page 2 of 3 This letter modifles the requested wording of ACT10N b.1 to correspond with )

the exampic ACTION requirement provided in Referetce 2. The following is the medified requested wording:

1. If placing the inoperable channel (s) in the tripped condition would  !

cause an inolation, thn inoperabic channel (s) shall be restored to  ;

OPERAB12. status within 6 bours or the ACTION requirnd by Table 3.1.2-1  ;

for the af fcct ed t rip -funci f on shall be t aken.

The proposed wording is more teatrictive than justified by the analysis of References 1, 2, 3, and 4 and corresponds with the example ACTION requirement provided in Reference 2. This change is bounded by the original justification providod and does not affect the No Significant llazards Consideration presented in Referenen i for the proposed Techn.ical Specification changes.

This modificat. ion to the wording requested in Reference 1 has been reviewed and accepted by the Plant Safety Review Committee.

Yours truly, e.o P ds4A WTC/BSF/mte attachment: Mod i f lot'. Insert A to Page 3/4 3-9 cc: Mr. D. C. Illntz (w/a)

Mr. J. b. Mathis (w/a)

Mr. R. B. McGehen (w/a)

Mr. N. S. Reynolds (w/a)

Mr.11. L. Thomas (w/o)

t. Mr. Stewart. D. Elmeter (w/a)

Regional Administrator U.S. Nuc1 car Regulatory Commission Region II 101 Marietta St.. . N.W. , Suit e 2900 Atlanta,-Georgia 30323 ar. P. W. O'Connor, Project. Manager (w/2)

Office of Nuclear Reactor Regult.tfon U.S. Nuclear Regulatory Commission Mail Stop- 131:3 Washington, D.C. -20555 Dr. Alton B. Cobb (w/a)

State llcalth Officer State Board of ihmith P.O. Box 1700 Jackson. Mississ ppi 39205 G9204081/SNL1CFLR - 2

__ _ _ _ _ _ . _ _ _ . _ _ _ _ _ . - . . _ . . . _ . . - _ _ . _ _ _ - _