| 790605037 A?SG 053 | | 790605037 A?SG 053 |
|
| |
|
| .
| |
| .
| |
| A meeting was held with Construction and Production supervisory personnel regarding Auxiliary Building clean up, survey of potentially af fected personnel and en-vironmen tal monitoring. Notifications were made to the NRC, ANI and the State of Alabama. | | A meeting was held with Construction and Production supervisory personnel regarding Auxiliary Building clean up, survey of potentially af fected personnel and en-vironmen tal monitoring. Notifications were made to the NRC, ANI and the State of Alabama. |
| On 5/15/ 79, approximately 324 construc tion personnel that could have been in the a f fec ted area we re monito red. Results of the monitoring indicated 11 workers had fixed con tamina tion on their shoes varying f rom 400 DPM* to 10,000 DPM*. Also, two pairs of centaminated gloves with a reading of 6,000 DP:I* and 20,000 DPM* were dis cove re d. Ynoic body counts of the 11 workers revealed negative results. Based oa this survey, the cars in which the 11 had ridden were surveyed with no con-tamination found. On surveying the houses of the 11 personnel, 3 pairs o f pan ts and one shirt were found to have fixed contamination. Contamina tion on the pants was confined to Qe knee area with contamination levels varying from 2,000 DPM* | | On 5/15/ 79, approximately 324 construc tion personnel that could have been in the a f fec ted area we re monito red. Results of the monitoring indicated 11 workers had fixed con tamina tion on their shoes varying f rom 400 DPM* to 10,000 DPM*. Also, two pairs of centaminated gloves with a reading of 6,000 DP:I* and 20,000 DPM* were dis cove re d. Ynoic body counts of the 11 workers revealed negative results. Based oa this survey, the cars in which the 11 had ridden were surveyed with no con-tamination found. On surveying the houses of the 11 personnel, 3 pairs o f pan ts and one shirt were found to have fixed contamination. Contamina tion on the pants was confined to Qe knee area with contamination levels varying from 2,000 DPM* |
Line 49: |
Line 47: |
| : d. Unit 2 Drain Piping Plan (D-205 20 7, Rev. 5) - Same as e except sink drains uncapped. | | : d. Unit 2 Drain Piping Plan (D-205 20 7, Rev. 5) - Same as e except sink drains uncapped. |
| Inadequate design change control resulted in decontamination sinks being installed with their effluent routed to Unit 2 drain piping, tha t was shown capped on engineering drawings. | | Inadequate design change control resulted in decontamination sinks being installed with their effluent routed to Unit 2 drain piping, tha t was shown capped on engineering drawings. |
|
| |
| I . | | I . |
| *
| |
| .
| |
| e | | e |
| _ CORRECTIVE ACTION: | | _ CORRECTIVE ACTION: |
Nonroutine Environ Operating Rept Discussing 790330-0514 Drainage of 1,860 Gallons Contaminated Water Onto Unit 2 Floor Drain Sys.Caused by Inadequate Design Change Control. Drains Were PluggedML19289F241 |
Person / Time |
---|
Site: |
Farley |
---|
Issue date: |
05/25/1979 |
---|
From: |
ALABAMA POWER CO. |
---|
To: |
|
---|
Shared Package |
---|
ML19289F240 |
List: |
---|
References |
---|
TR-790525, NUDOCS 7906050287 |
Download: ML19289F241 (3) |
|
|
---|
Category:ENVIRONMENTAL MONITORING REPORTS(&RADIOLOGICAL)-PERIODIC
MONTHYEARL-99-016, 1998 Annual Environ Operating Rept (Nonradiological) for Jm Farley Nuclear Plant. with1998-12-31031 December 1998 1998 Annual Environ Operating Rept (Nonradiological) for Jm Farley Nuclear Plant. with ML20205S9571998-12-31031 December 1998 Annual Radioactive Effluent Release Rept for Farley Nuclear Plant for 1998 ML20206B5571998-12-31031 December 1998 Jm Farley Nuclear Plant Radiological Environ Operating Rept for 1998. with ML20207D7191998-12-31031 December 1998 Tabulation of Personnel Radiation Exposure for 1998 by Work & Job Function for Jm Farley Nuclear Plant. with L-99-174, Jm Farley Nuclear Plant Radiological Environ Operating Rept for 1998. with1998-12-31031 December 1998 Jm Farley Nuclear Plant Radiological Environ Operating Rept for 1998. with ML20237C9841997-12-31031 December 1997 Amended Page 94 of Jm Farley Nuclear Plant Annual Radioactive Effluent Rept for 1997 ML20217N8001997-12-31031 December 1997 Annual Radioactive Effluent Release Rept for CY97 for Jm Farley Nuclear Plant,Units 1 & 2 ML20217G1091997-12-31031 December 1997 Annual Environ Operating Rept for 1997 (Nonradiological) ML20217E1131997-12-31031 December 1997 Forwards 1997 Radiological Environmental Operating Rept ML20138B9071996-12-31031 December 1996 1996 Annual Environ Operating Rept (Nonradiological) ML20138A3501996-12-31031 December 1996 Annual Radioactive Effluent Release Rept for FY96 ML20135D2401996-12-31031 December 1996 Tabulation of Personnel Radiation Exposure at Jm Farley Nuclear Plant for 1996 by Work & Job Functions ML20140E9591996-12-31031 December 1996 Radiological Environ Operating Rept for 1996 ML20107L8581995-12-31031 December 1995 Annual Radioactive Effluent Release Rept for CY95 ML20107M1091995-12-31031 December 1995 Jm Farley Nuclear Plant,Radiological Environ Operating Rept for 1995 ML20100J5241995-12-31031 December 1995 Tabulation of Personnel Radiation Exposure at Jm Farley Nuclear Plant for 1995 by Work & Job Function ML20078J1901994-12-31031 December 1994 Tabulation of Personnel Radiation Exposure at Jm Farley Nuclear Plant for 1994 Work & Job Function ML20081G9311994-12-31031 December 1994 Annual Environ Operating Rept for 1994 (Nonradiological) ML20087H4531994-12-31031 December 1994 Annual Radioactive Effluent Release Rept CY94 ML20087H4981994-12-31031 December 1994 Annual Environ Operating Rept Part B:Radiological Jm Farley Nuclear Plant Units 1 & 2 for Period Ending 941231. W/ ML20029D3271993-12-31031 December 1993 Annual Environ Operating Rept Part B:Radiological Jm Farley Nuclear Plant Units 1 & 2 Period Ending 931231. ML20029C9901993-12-31031 December 1993 Semiannual Radioactive Effluent Release Rept Jul-Dec 1993. W/940427 Ltr ML20063L5971993-12-31031 December 1993 1993 Annual Rept of Radiation Dose Distribution ML20063K7681993-12-31031 December 1993 Tabulation of Personnel Radition Exposure at Jm Farley Nuclear Plant for 1993 by Work & Job Function ML20056F1281993-06-30030 June 1993 Semiannual Radioactive Effluent Release Rept Jan-June 1993 ML20012G4401992-12-31031 December 1992 Semiannual Radioactive Effluent Release Rept Jul-Dec 1992. W/930226 Ltr ML20128K4841992-12-31031 December 1992 1992 Annual Rept of Radiation Dose Distribution ML20029D3291992-12-31031 December 1992 Amended Pages to Annual Environ Operating Rept Part B: Radiological Jm Farley Nuclear Plant Units 1 & 2 for Period Ending 931231. ML20128K5731992-12-31031 December 1992 Tabulation of Personnel Radiation Exposure at Jm Farley Nuclear Plant for 1992 by Work & Job Function ML20114B4441992-06-30030 June 1992 Semiannual Radioactive Effluent Release Rept,Jan-June 1992 ML20092N0131991-12-31031 December 1991 Semiannual Radioactive Effluent Release Rept Jul-Dec 1991 ML20095K0601991-12-31031 December 1991 Annual Environ Operating Rept Part B:Radiological. W/ ML20101A5611991-12-31031 December 1991 Jm Farley Nuclear Plant 1991 Annual Environ Operating Rept (Nonradiological) ML20082K9651991-06-30030 June 1991 Semiannual Radioactive Effluent Release Rept - Jan Through Jun 1991 ML20029A9701990-12-31031 December 1990 1990 Annual Rept of Radiation Dose Distribution. W/910228 Ltr ML20029B1661990-12-31031 December 1990 Semiannual Radioactive Effluent Release Rept Jul-Dec 1990. W/910226 Ltr ML20073D9071990-12-31031 December 1990 Annual Environ Operating Rept Part B:Radiological ML20073E8151990-12-31031 December 1990 Annual Environ Operating Rept for 1990 (Nonradiological) ML20059B5661990-06-30030 June 1990 Semiannual Radioactive Effluent Release Rept Jan-June 1990 ML20042G5351990-03-31031 March 1990 Summary of NPDES Noncompliances for First Quarter 1990. W/900508 Ltr ML20011F7511989-12-31031 December 1989 Semiannual Radioactive Effluent Release Rept,Jul-Dec 1989. W/900223 Ltr ML20012A1651989-12-31031 December 1989 Amended, Semiannual Radioactive Effluent Release Rept for Jul-Dec 1989. ML20055C3811989-12-31031 December 1989 Annual Rept of Radiation Dose Distribution at Jm Farley Nuclear Plant for 1989 ML20042E9191989-12-31031 December 1989 Annual Environ Operating Rept Part B:Radiological. W/900430 Ltr ML20246P2241989-06-30030 June 1989 Semiannual Radioactive Effluent Release Rept Jan-June 1989 ML20245D9591988-12-31031 December 1988 Annual Environ Operating Rept for 1988 (Nonradiological) ML20245F5301988-12-31031 December 1988 Annual Environ Operating Rept,Part B: Radiological,1988 ML20235Q4271988-12-31031 December 1988 Tabulation of Personnel Radiation Exposure at Jm Farley Nuclear Plant for 1988 by Work & Job Function ML20235N5421988-12-31031 December 1988 Annual Rept of Radiation Dose Distribution at Jm Farley Nuclear Plant for 1988 ML20235R8171988-12-31031 December 1988 Jm Farley Semiannual Radioactive Effluent Release Rept for Jul-Dec 1988 1998-12-31
[Table view] Category:TEXT-ENVIRONMENTAL REPORTS
MONTHYEARML20205S9571998-12-31031 December 1998 Annual Radioactive Effluent Release Rept for Farley Nuclear Plant for 1998 ML20207D7191998-12-31031 December 1998 Tabulation of Personnel Radiation Exposure for 1998 by Work & Job Function for Jm Farley Nuclear Plant. with L-99-016, 1998 Annual Environ Operating Rept (Nonradiological) for Jm Farley Nuclear Plant. with1998-12-31031 December 1998 1998 Annual Environ Operating Rept (Nonradiological) for Jm Farley Nuclear Plant. with L-99-174, Jm Farley Nuclear Plant Radiological Environ Operating Rept for 1998. with1998-12-31031 December 1998 Jm Farley Nuclear Plant Radiological Environ Operating Rept for 1998. with ML20206B5571998-12-31031 December 1998 Jm Farley Nuclear Plant Radiological Environ Operating Rept for 1998. with ML20217N8001997-12-31031 December 1997 Annual Radioactive Effluent Release Rept for CY97 for Jm Farley Nuclear Plant,Units 1 & 2 ML20217E1131997-12-31031 December 1997 Forwards 1997 Radiological Environmental Operating Rept ML20217G1091997-12-31031 December 1997 Annual Environ Operating Rept for 1997 (Nonradiological) ML20237C9841997-12-31031 December 1997 Amended Page 94 of Jm Farley Nuclear Plant Annual Radioactive Effluent Rept for 1997 ML20138B9071996-12-31031 December 1996 1996 Annual Environ Operating Rept (Nonradiological) ML20135D2401996-12-31031 December 1996 Tabulation of Personnel Radiation Exposure at Jm Farley Nuclear Plant for 1996 by Work & Job Functions ML20140E9591996-12-31031 December 1996 Radiological Environ Operating Rept for 1996 ML20138A3501996-12-31031 December 1996 Annual Radioactive Effluent Release Rept for FY96 ML20107L8581995-12-31031 December 1995 Annual Radioactive Effluent Release Rept for CY95 ML20107M1091995-12-31031 December 1995 Jm Farley Nuclear Plant,Radiological Environ Operating Rept for 1995 ML20100J5241995-12-31031 December 1995 Tabulation of Personnel Radiation Exposure at Jm Farley Nuclear Plant for 1995 by Work & Job Function ML20101H1791995-10-24024 October 1995 NPDES Permit AL0024619,issued to Southern Nuclear Operating Co Farley Nuclear Plant ML20078J1901994-12-31031 December 1994 Tabulation of Personnel Radiation Exposure at Jm Farley Nuclear Plant for 1994 Work & Job Function ML20087H4981994-12-31031 December 1994 Annual Environ Operating Rept Part B:Radiological Jm Farley Nuclear Plant Units 1 & 2 for Period Ending 941231. W/ ML20087H4531994-12-31031 December 1994 Annual Radioactive Effluent Release Rept CY94 ML20081G9311994-12-31031 December 1994 Annual Environ Operating Rept for 1994 (Nonradiological) ML20065K1141994-03-14014 March 1994 NPDES Noncompliance Notification:On 940407,fecal Coliform Limitation Exceeded During Upset of Sewage Treatment Plant 2B (DSN011),as Result of Influent Flow Surge.Caused by Temporary Hydraulic Overload.Chlorine Feed Rate Maximized ML20063L5971993-12-31031 December 1993 1993 Annual Rept of Radiation Dose Distribution ML20063K7681993-12-31031 December 1993 Tabulation of Personnel Radition Exposure at Jm Farley Nuclear Plant for 1993 by Work & Job Function ML20029C9901993-12-31031 December 1993 Semiannual Radioactive Effluent Release Rept Jul-Dec 1993. W/940427 Ltr ML20029D3271993-12-31031 December 1993 Annual Environ Operating Rept Part B:Radiological Jm Farley Nuclear Plant Units 1 & 2 Period Ending 931231. ML20056F1281993-06-30030 June 1993 Semiannual Radioactive Effluent Release Rept Jan-June 1993 ML20029D3291992-12-31031 December 1992 Amended Pages to Annual Environ Operating Rept Part B: Radiological Jm Farley Nuclear Plant Units 1 & 2 for Period Ending 931231. ML20128K4841992-12-31031 December 1992 1992 Annual Rept of Radiation Dose Distribution ML20128K5731992-12-31031 December 1992 Tabulation of Personnel Radiation Exposure at Jm Farley Nuclear Plant for 1992 by Work & Job Function ML20012G4401992-12-31031 December 1992 Semiannual Radioactive Effluent Release Rept Jul-Dec 1992. W/930226 Ltr ML20114B4441992-06-30030 June 1992 Semiannual Radioactive Effluent Release Rept,Jan-June 1992 ML20101A5611991-12-31031 December 1991 Jm Farley Nuclear Plant 1991 Annual Environ Operating Rept (Nonradiological) ML20095K0601991-12-31031 December 1991 Annual Environ Operating Rept Part B:Radiological. W/ ML20092N0131991-12-31031 December 1991 Semiannual Radioactive Effluent Release Rept Jul-Dec 1991 ML20082K9651991-06-30030 June 1991 Semiannual Radioactive Effluent Release Rept - Jan Through Jun 1991 ML20029B1661990-12-31031 December 1990 Semiannual Radioactive Effluent Release Rept Jul-Dec 1990. W/910226 Ltr ML20073D9071990-12-31031 December 1990 Annual Environ Operating Rept Part B:Radiological ML20073E8151990-12-31031 December 1990 Annual Environ Operating Rept for 1990 (Nonradiological) ML20029A9701990-12-31031 December 1990 1990 Annual Rept of Radiation Dose Distribution. W/910228 Ltr ML20065D6671990-08-15015 August 1990 NPDES Permit AL0024619,issued to Alabama Power Co Farley Nuclear Plant ML20059B5661990-06-30030 June 1990 Semiannual Radioactive Effluent Release Rept Jan-June 1990 ML20042G5351990-03-31031 March 1990 Summary of NPDES Noncompliances for First Quarter 1990. W/900508 Ltr ML20011E8301990-02-0707 February 1990 NPDES Noncompliance Notification:Beginning on 891221,oil & Grease at River Water Bldg Sump Discharge Exceeded Permit Limit.No Specific Cause Could Be Determined.Sump Resampled on 900110 ML20012A1651989-12-31031 December 1989 Amended, Semiannual Radioactive Effluent Release Rept for Jul-Dec 1989. ML20055C3811989-12-31031 December 1989 Annual Rept of Radiation Dose Distribution at Jm Farley Nuclear Plant for 1989 ML20011F7511989-12-31031 December 1989 Semiannual Radioactive Effluent Release Rept,Jul-Dec 1989. W/900223 Ltr ML20042E9191989-12-31031 December 1989 Annual Environ Operating Rept Part B:Radiological. W/900430 Ltr ML19332D3491989-11-21021 November 1989 NPDES Noncompliance Rept for Third Quarter 1989 ML20246P2241989-06-30030 June 1989 Semiannual Radioactive Effluent Release Rept Jan-June 1989 1998-12-31
[Table view] |
Text
.
NON-ROUTINE ENVIRONMENTAL OPERATING REPORT May 25, 19 79 ANALYSIS OF EVENT:
At approximately 0800 on May 14,1979 an Alabama Power Co=pany Startup Supervisor notified the Chemistry & Health Physics Supervisor that it was possible tha t some of the decontamination room drains were routed to the Unit 2 floor drain sys tem.
By 1500 on 5/14/79 it was determined conclusively that 4 decontamination room s inks were connec ted to the Unit 2 floor drain system rather than the Unit 1 floor drain syste=. This determination was made by sampling of a Unit 2 Auxiliary Building, 7 7 ' Eleva tion, su=p.
The flow path for the ef flu 2nt from the 4 decontamination room sinks ran to a sump on the 77' eleva tion of the Unit 2 Auxiliary Building, to the Unit 2 tendon access gallery, then to an alkaline flush pond, and then to a ravine with possible run-of f to the Cha ttahoochee River. Radia tion surveys were conducted in the Auxiliary Building along the flow path with readings varying from 70,000 DPM*to less than 103 DPM". An analysis of the alkaline flush pond discharge revealed radioac tive isotopes "not present" as defined by 10CFR20, Appendix B, note 5.
An investigation indicated that approximately 1860 gallons of contaminated water had entered the above flow path since 3/ 30/79. Operations prac tice prior to 3/30/ 79 was to pump the drain waste to 55 gallon drums to prevent entry of decon chemicals to the Unit 1 floor drain system.
Radiation surveys revealed the following:
- a. Contamina tion was confined to discrete areas on the 7 7 ' , 8 7 ' a n d 100 '
Elevations, floor drain system and the tendon access gallery of the Unit 2 Auxiliary Building.
- b. The Unit 2 Auxiliary Building elevations above 100' were clear of con-tamina tio n . Areas above 100' that were surveyed provided the egress pa th frca the lower Auxiliary Building levels .
- c. Surveys of the clock alley and time card rack indicated no contamination.
- d. Surveys of construction personnel who 'were working in the immediate area at the time indica ted shoe contamina tion in 3 cases. The highest reading was 500 DPM*. This survey was conducted after the normal quitting tite for construc tion personnel. The shoes were dispositioned in accordance with FNP-0-RCP-29.
Decon tamina tion of the Unit 2 Auxiliary lower levels conmenced and tne pumps in the tendon access gallery were placed under administrative controls to preven t their inadvertent operation.
Based on the survey results of the upper levels of the Auxiliary Building and the clock alley, it was determined that loose surf ace contamination was not being tracked out of the building.
790605037 A?SG 053
A meeting was held with Construction and Production supervisory personnel regarding Auxiliary Building clean up, survey of potentially af fected personnel and en-vironmen tal monitoring. Notifications were made to the NRC, ANI and the State of Alabama.
On 5/15/ 79, approximately 324 construc tion personnel that could have been in the a f fec ted area we re monito red. Results of the monitoring indicated 11 workers had fixed con tamina tion on their shoes varying f rom 400 DPM* to 10,000 DPM*. Also, two pairs of centaminated gloves with a reading of 6,000 DP:I* and 20,000 DPM* were dis cove re d. Ynoic body counts of the 11 workers revealed negative results. Based oa this survey, the cars in which the 11 had ridden were surveyed with no con-tamination found. On surveying the houses of the 11 personnel, 3 pairs o f pan ts and one shirt were found to have fixed contamination. Contamina tion on the pants was confined to Qe knee area with contamination levels varying from 2,000 DPM*
to 20,000 DPM* . The contanination level on the shirt was 500 DPM*. All con-tamination on clo thing and shoes was fixed. Various other articles of clo thing were surveyed during the week of May 14th with no contamination found.
Appropriate environmental sampling was conducted the week of >by 14th. At this time, decon tamina tion of the Unit 2 Auxiliary Building and floor drain system is continuing.
The health and safety of the public were not affected.
DESIGNATION OF APPARENT CAUSE:
The decontamination room (Room 406), Auxiliary Building, Elevation 155 ', is located on the dividing line (Line 19) between Units 1 and 2 and is presently accessible from Unit 1 for security purposes only and locked and barricaded to Unit 2. This shared room is not separated by a barrier which clearly divides the room be tween Unit 1 and Unit 2. As a result it was incorrectly assumed that all of the drains went to the Unit 1 floor drain system.
On 9/4/ 73 Shop Ucrk Order 2309 was completed which installed sinks in the room, and this routed their effluent to sink drains leading to Unit 2.
Drawings rela ted to the decontamination room are as follows:
- a. Unit 1 P & 1D (D-175004, shee t 1, Rev. 13) - 3 capped sink drains, 1 uncapped '; ash pan drain and 1 uncapped floor drain.
- b. Unit 1 Drain Piping Plan (D-175207, Rev. 18) - same as a.
- c. Unic 2 P & 1D (D-205004, shee t 1, Rev. 7) - 3 capped sink drains and 1 uncapped floor drain.
- d. Unit 2 Drain Piping Plan (D-205 20 7, Rev. 5) - Same as e except sink drains uncapped.
Inadequate design change control resulted in decontamination sinks being installed with their effluent routed to Unit 2 drain piping, tha t was shown capped on engineering drawings.
I .
e
_ CORRECTIVE ACTION:
The following corrective actions have been accomplished:
- a. Ir=ediately af ter the incident, affected Unit 2 Auxiliary Building areas were roped off and posted with appropriate radiation warning signs.
- b. An investigation was perforced by an engineer to deternine if any other drains went from Unit 1 to Unit 2. A total of 6 drains, including 4 in the decontamination room, were located and plugged.
- c. Discharges from the tendon access gallery uere placed under administrative control.
- d. Incident has been discussed with appropriate supervisory personnel with responsibilities in implementing design change.
An investigation of the incident is continuing and a supplemental report will be issued.
NOTE:
- Radiation Levels at Contact with Surf ace, Taken with Eberline Count Ra te Me ter, Model E140/HP21J .