ML17122A332: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(18 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17122A332
| number = ML17122A332
| issue date = 05/04/2017
| issue date = 05/04/2017
| title = Hope Creek Generating Station - Acceptance of Requested Licensing Action Re: Revise and Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report
| title = Acceptance of Requested Licensing Action Revise and Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report
| author name = Parker C J
| author name = Parker C
| author affiliation = NRC/NRR/DORL/LPLI-2
| author affiliation = NRC/NRR/DORL/LPLI-2
| addressee name = Sena P P
| addressee name = Sena P
| addressee affiliation = PSEG Nuclear, LLC
| addressee affiliation = PSEG Nuclear, LLC
| docket = 05000354
| docket = 05000354
| license number = NPF-057
| license number = NPF-057
| contact person = Parker C J,  NRR/DORL/LPL1
| contact person = Parker C,  NRR/DORL/LPL1
| case reference number = CAC MF9502
| case reference number = CAC MF9502
| document type = Acceptance Review Letter
| document type = Acceptance Review Letter
| page count = 3
| page count = 3
| project = CAC:MF9502
| stage = Acceptance Review
}}
}}
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 4, 2017 Mr. Peter P. Sena, Ill President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P.O. Box 236 Hancocks Bridge, NJ 08038
==SUBJECT:==
HOPE CREEK GENERATING STATION-ACCEPTANCE OF REQUESTED LICENSING ACTION RE: REVISE AND RELOCATE THE PRESSURE-TEMPERATURE LIMIT CURVES TO A PRESSURE AND TEMPERATURE LIMITS REPORT (CAC NO. MF9502)
==Dear Mr. Sena:==
By letter dated March 27, 2017, 1 PSEG Nuclear LLC submitted a license amendment request for Hope Creek Generating Station. The proposed amendment would amend the Hope Creek Generating Station Technical Specifications to revise and relocate the pressure-temperature limit curves to a licensee-controlled pressure and temperature limits report. The request was submitted in accordance with guidance provided in U.S. Nuclear Regulatory Commission (NRC)
Generic Letter 96-03, "Relocation of the Pressure Temperature Limit Curves and Low Temperature Overpressure Protections System Limits," dated January 31, 1996.
By letter dated April 26, 2017, 2 the NRC staff informed PSEG Nuclear LLC that supplemental information was necessary to enable the staff to make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. PSEG Nuclear LLC provided the requested information by letter dated April 28, 2017. 3 The purpose of this letter is to provide the results of the NRC staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
1 Agencywide Documents Access and Management System (ADAMS) Accession No. ML17086A364 2 ADAMS Accession No. ML17114A340 3 ADAMS Accession No. ML17118A092
P. Sena, Ill                                  The NRC staff has reviewed your application and supplement and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately [[estimated NRC review hours::500 hours]] to complete. The NRC staff expects to complete this review by PSEG's requested date of February 28, 2018. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staff's initial review of the application and they could change, due to several factors, including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.
If you have any questions, please contact Carleen Parker at (301) 415-1603 or Carleen.Parker@nrc.gov or Justin Poole at (301) 415-2048 or Justin.Poole@nrc.gov.
s~
                                          ~
vx_
_.-~
c----~
n~
                                                                        --- f'l I Carleen J. Parker, Project Manager Plant Licensing Branch 1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-354 cc: Distribution via Listserv
P. Sena, Ill                           
==SUBJECT:==
HOPE CREEK GENERATING STATION-ACCEPTANCE OF REQUESTED LICENSING ACTION RE: REVISE AND RELOCATE THE PRESSURE-TEMPERATURE LIMIT CURVES TO A PRESSURE AND TEMPERATURE LIMITS REPORT (CAC NO. MF9502) DATED MAY 4, 2017 DISTRIBUTION:
Public LPL 1 Reading File RidsACRS_MailCTR Resource RidsNrrDssSnpb Resource RidsNrrDssStsb Resource RidsNrrDssSrxb Resource RidsNrrDreEvib Resource RidsNrrDorl Resource RidsNrrDorlLpl1 Resource RidsNrrLALRonewicz Resource RidsNrrPMHopeCreek Resource RidsRgn1 MailCenter Resource RGrover, NRR BParks, NRR SPeng, NRR AYoung, NRR CSydnor, NRR ADAMS Access1on No.: ML17122A332
* b1y e-ma1*1 OFFICE NRR/OORL/LPL 1/PM            NRR/OORL/LPL 1/LA    NRR/OSS/SNPB/BC*
NAME        CParker (JPoole for)    LRonewicz            RLukes DATE        05/04/2017              05/03/2017          04/28/2017 OFFICE      NRR/DORL/LPL 1BC        NRR/DORL/LPL 1/PM NAME        Joanna                  CParker (JPoole for)
DATE        05/04/2017              05/04/2017 OFFICIAL RECORD COPY}}

Latest revision as of 22:37, 8 March 2020

Acceptance of Requested Licensing Action Revise and Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report
ML17122A332
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 05/04/2017
From: Carleen Parker
Plant Licensing Branch 1
To: Sena P
Public Service Enterprise Group
Parker C, NRR/DORL/LPL1
References
CAC MF9502
Download: ML17122A332 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 4, 2017 Mr. Peter P. Sena, Ill President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P.O. Box 236 Hancocks Bridge, NJ 08038

SUBJECT:

HOPE CREEK GENERATING STATION-ACCEPTANCE OF REQUESTED LICENSING ACTION RE: REVISE AND RELOCATE THE PRESSURE-TEMPERATURE LIMIT CURVES TO A PRESSURE AND TEMPERATURE LIMITS REPORT (CAC NO. MF9502)

Dear Mr. Sena:

By letter dated March 27, 2017, 1 PSEG Nuclear LLC submitted a license amendment request for Hope Creek Generating Station. The proposed amendment would amend the Hope Creek Generating Station Technical Specifications to revise and relocate the pressure-temperature limit curves to a licensee-controlled pressure and temperature limits report. The request was submitted in accordance with guidance provided in U.S. Nuclear Regulatory Commission (NRC)

Generic Letter 96-03, "Relocation of the Pressure Temperature Limit Curves and Low Temperature Overpressure Protections System Limits," dated January 31, 1996.

By letter dated April 26, 2017, 2 the NRC staff informed PSEG Nuclear LLC that supplemental information was necessary to enable the staff to make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. PSEG Nuclear LLC provided the requested information by letter dated April 28, 2017. 3 The purpose of this letter is to provide the results of the NRC staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.

This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

1 Agencywide Documents Access and Management System (ADAMS) Accession No. ML17086A364 2 ADAMS Accession No. ML17114A340 3 ADAMS Accession No. ML17118A092

P. Sena, Ill The NRC staff has reviewed your application and supplement and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 500 hours20.833 days <br />2.976 weeks <br />0.685 months <br /> to complete. The NRC staff expects to complete this review by PSEG's requested date of February 28, 2018. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staff's initial review of the application and they could change, due to several factors, including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact Carleen Parker at (301) 415-1603 or Carleen.Parker@nrc.gov or Justin Poole at (301) 415-2048 or Justin.Poole@nrc.gov.

s~

~

vx_

_.-~

c----~

n~

--- f'l I Carleen J. Parker, Project Manager Plant Licensing Branch 1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-354 cc: Distribution via Listserv

P. Sena, Ill

SUBJECT:

HOPE CREEK GENERATING STATION-ACCEPTANCE OF REQUESTED LICENSING ACTION RE: REVISE AND RELOCATE THE PRESSURE-TEMPERATURE LIMIT CURVES TO A PRESSURE AND TEMPERATURE LIMITS REPORT (CAC NO. MF9502) DATED MAY 4, 2017 DISTRIBUTION:

Public LPL 1 Reading File RidsACRS_MailCTR Resource RidsNrrDssSnpb Resource RidsNrrDssStsb Resource RidsNrrDssSrxb Resource RidsNrrDreEvib Resource RidsNrrDorl Resource RidsNrrDorlLpl1 Resource RidsNrrLALRonewicz Resource RidsNrrPMHopeCreek Resource RidsRgn1 MailCenter Resource RGrover, NRR BParks, NRR SPeng, NRR AYoung, NRR CSydnor, NRR ADAMS Access1on No.: ML17122A332

  • b1y e-ma1*1 OFFICE NRR/OORL/LPL 1/PM NRR/OORL/LPL 1/LA NRR/OSS/SNPB/BC*

NAME CParker (JPoole for) LRonewicz RLukes DATE 05/04/2017 05/03/2017 04/28/2017 OFFICE NRR/DORL/LPL 1BC NRR/DORL/LPL 1/PM NAME Joanna CParker (JPoole for)

DATE 05/04/2017 05/04/2017 OFFICIAL RECORD COPY