ML19253B983: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML19253B983
| number = ML19253B983
| issue date = 09/10/2019
| issue date = 09/10/2019
| title = Accepted for Review - FitzPatrick Application of Alternative Source Term for Calculating LOCA Dose Consequences (JAF-19-0077)
| title = NRR E-mail Capture - Accepted for Review - FitzPatrick Application of Alternative Source Term for Calculating LOCA Dose Consequences (JAF-19-0077)
| author name = Lee S
| author name = Lee S
| author affiliation = NRC/NRR/DORL/LPLI
| author affiliation = NRC/NRR/DORL/LPLI

Latest revision as of 00:34, 2 February 2020

NRR E-mail Capture - Accepted for Review - FitzPatrick Application of Alternative Source Term for Calculating LOCA Dose Consequences ([[::JAF-19-0077|JAF-19-0077]])
ML19253B983
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/10/2019
From: Samson Lee
Plant Licensing Branch 1
To: Tom Loomis
Exelon Generation Co
References
L-2019-LLA-0171
Download: ML19253B983 (2)


Text

NRR-DRMAPEm Resource From: Lee, Samson Sent: Tuesday, September 10, 2019 11:08 AM To: Loomis, Thomas R:(Exelon Nuclear)

Subject:

Accepted for Review - FitzPatrick Application of Alternative Source Term for Calculating LOCA Dose Consequences ([[::JAF-19-0077|JAF-19-0077]]) (EPID: L-2019-LLA-0171)

Mr. Loomis, By letter dated August 8, 2019 (ADAMS Accession No. ML19220A043), Exelon submitted the subject request for FitzPatrick. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed change in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

The NRC staff is expected to spend 2,500 hours20.833 days <br />2.976 weeks <br />0.685 months <br /> to complete the review within 12 months.

If you have any questions, please contact me.

Samson Lee FitzPatrick Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-3168 1

Hearing Identifier: NRR_DRMA Email Number: 191 Mail Envelope Properties (BL0PR0901MB3185CBA808FB026B67C415F79AB60)

Subject:

Accepted for Review - FitzPatrick Application of Alternative Source Term for Calculating LOCA Dose Consequences ([[::JAF-19-0077|JAF-19-0077]]) (EPID: L-2019-LLA-0171)

Sent Date: 9/10/2019 11:07:38 AM Received Date: 9/10/2019 11:07:00 AM From: Lee, Samson Created By: Samson.Lee@nrc.gov Recipients:

"Loomis, Thomas R:(Exelon Nuclear)" <thomas.loomis@exeloncorp.com>

Tracking Status: None Post Office: BL0PR0901MB3185.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 1747 9/10/2019 11:07:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: