ML071720212: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Page I of 2] John White -Fwd: Re: Govt to Govt From: John White To: Tbrice@gw.dec.state.
{{#Wiki_filter:Page I of 2
ny. us Date: 03/16/2007 8:59 AM  
]John White - Fwd: Re: Govt to Govt From:               John White To:                 Tbrice@gw.dec.state. ny. us Date:               03/16/2007 8:59 AM


==Subject:==
==Subject:==
Fwd: Re: Govt to Govt John R. White Chief, Plant Support Branch 2 U.S. Nuclear Regulatory Commission, Region I 475 Allandale Road King of Prussia, PA 19406 Office: 610-337-5114 Fax: 610-337-6928 Cell: (b)(6)Email: jrwlC(dnrc.gov
Fwd: Re: Govt to Govt John R. White Chief, Plant Support Branch 2 U.S. Nuclear Regulatory Commission, Region I 475 Allandale Road King of Prussia, PA 19406 Office: 610-337-5114 Fax:     610-337-6928 Cell:             (b)(6)
>>> Marjorie McLaughlin 03/16/2007 8:38 AM >>>Tim: Good morning. We're happy to have you participate in any manner you like. I attached a copy of the meeting agenda. The meting will consist of 2 major portions:
Email: jrwlC(dnrc.gov
presentations and posterboard sessions.
>>> Marjorie McLaughlin 03/16/2007 8:38 AM >>>
The presentations will consist of the following topics: Plant performance, the license renewal process, and a few words from representatives of the EPA (Region II). Following each NRC presentation, we will allow for questions from the attendees.
Tim:
The Q/A time is built into the time allotted each presentation.
Good morning. We're happy to have you participate in any manner you like. I attached a copy of the meeting agenda. The meting will consist of 2 major portions: presentations and posterboard sessions. The presentations will consist of the following topics: Plant performance, the license renewal process, and a few words from representatives of the EPA (Region II). Following each NRC presentation, we will allow for questions from the attendees. The Q/A time is built into the time allotted each presentation. After all of that, we will move into the posterboard sessions. Each table has at least 1 poster that has some general information about the subject topic. NRC staff (and DHS at one table) will man the tables to answer 1-on-1 questions. Many will also have handouts.
After all of that, we will move into the posterboard sessions.
For the Groundwater table, we have 2 posters. I only have one electronically, and I attached that below (it is the slide titled "groundwater"). The other shows the hydrology of the site, I believe. At that table, we also will have a laptop set up, and have a few informational slides. I attached those as well (this is the PPT attachment titled "Groundwater Contam"). Other than that, we will have John White at the table to answer questions. He will be joined by Marsha Gamberoni, who will be the new Director of our Division of Reactor Safety at Region I.
Each table has at least 1 poster that has some general information about the subject topic. NRC staff (and DHS at one table) will man the tables to answer 1-on-1 questions.
They will be there to answer questions.
Many will also have handouts.For the Groundwater table, we have 2 posters. I only have one electronically, and I attached that below (it is the slide titled "groundwater").
I mentioned that the EPA is coming. Paul Giardina and Mike DeBois from the Region II office will be their representatives. They will not likely be a part of the Posterboard session. They will make remarks during the presentation part, and will be around to answer questions. Paul has to leave early, so he may not be there for most of the Posterboard part.
The other shows the hydrology of the site, I believe. At that table, we also will have a laptop set up, and have a few informational slides. I attached those as well (this is the PPT attachment titled "Groundwater Contam").
I hope that helps in your determination of what to bring. We will be arriving at the conference center by 07:00 to set up. You are welcome to come at that time to put some materials out on the table and join up with our staff. There also will be some time in between the presentations and posterboard sessions to set up, if you prefer.
Other than that, we will have John White at the table to answer questions.
Call me if you need anything further or have more questions.
He will be joined by Marsha Gamberoni, who will be the new Director of our Division of Reactor Safety at Region I.They will be there to answer questions.
VR,                                   ltormation In tb*.r8owu C     s deleted Marjorie                             in &cwrdsa..
I mentioned that the EPA is coming. Paul Giardina and Mike DeBois from the Region II office will be their representatives.
Marjorie McLaughlin                   Act,
They will not likely be a part of the Posterboard session. They will make remarks during the presentation part, and will be around to answer questions.
                                  -QT 040/20 f11~//rxtm~xrw~lAOn T-TTM                                                                     04/09/2007
Paul has to leave early, so he may not be there for most of the Posterboard part.I hope that helps in your determination of what to bring. We will be arriving at the conference center by 07:00 to set up. You are welcome to come at that time to put some materials out on the table and join up with our staff. There also will be some time in between the presentations and posterboard sessions to set up, if you prefer.Call me if you need anything further or have more questions.
 
VR, ltormation In tb*.r8owu C s deleted Marjorie in &cwrdsa..Marjorie McLaughlin Act, f11~//rxtm~xrw~lAOn -QT 040/20 T-TTM 04/09/2007 Page 2 of 2 Regional State Liaison Officer USNRC Region I 610-337-5240 (Office)(b)(6) (Cell)610-337-5354 (Fax)>>> 'Timothy Rice" < tbrice5gw.dec.state.ny.us  
Page 2 of 2 Regional State Liaison Officer USNRC Region I 610-337-5240 (Office)
> 03/15/2007 4:41 PM >>>Marjorie, You had asked if I would like to participate in the breakout for the groundwater contamination issue.After talking this over with DEC administration, I would be happy to participate in that session.Do you know what form it will take (Poster session, power point presentation, etc.) and what information will be presented, maps available, etc?Based upon what is being presented I may decide to bring some material with me.Thanks, Tim Rice NYSDEC Env Radiation Specialist II 625 Broadway, 9th floor Albany, NY12233-7255 Phone (518)402-8574 fax, hard copy (518)402-8646 f1c.W'\,~rn~fVJ AfAAI1-1TM 0/920 04/09/2007 0 INDIAN POINT GOVERNMENT TO GOVERNMENT MEETING March 20, 2007 AGENDA 07:30 -08:00 08:00 -08:10 08:10 -08:20 08:20 -09:00 09:00 -10:30 10:30 -10:45 Registration Welcome Meeting Structure Plant Performance License Renewal U.S. Environmental Protection Agency 10:45 -11:00 Break 11:00 -11:45 Breakout Sessions" Groundwater Contamination
(b)(6)       (Cell) 610-337-5354 (Fax)
* Inspection
>>> 'Timothy Rice" < tbrice5gw.dec.state.ny.us > 03/15/2007 4:41 PM >>>
/ Oversight Process" Spent Fuel Storage* Emergency Preparedness
: Marjorie, You had asked if I would like to participate in the breakout for the groundwater contamination issue.
* Security" License Renewal Samuel Collins, NRC Region I Regional Administrator Karl Farrar, NRC Region I Eugene Cobey, NRC Region I Rajender Auluck, NRC HQ Rani Franovich, NRC HQ Paul Giardina, EPA Region II John White, NRC Region I Eugene Cobey, NRC Region I William Ruland, NRC HQ Patricia Milligan, NRC HQ Craig Conklin, DHS Rebecca Thomson, FEMA Barry Westreich, NRC HQ Rajender Auluck, NRC HQ Rani Franovich, NRC HQ Samuel Collins 11:45- 12:00 12:00- 1:00 Closing Remarks Staff Available for Questions 17INITIACWELL GROUPINGS BY FUNCTICN4:
After talking this over with DEC administration, I would be happy to participate in that session.
N UNIT 2 INVESTIGATION -T Q WELLS U 2 G fII J.BTUBISEBLB IIUR11 400 U.3 INTAKE STRCTURE 350 300-4---250o +---200o -I-15o -I 100 100 4-50 1-0-3 A~erage Background NRC Public Limit EPA Standard NRC ALARA Objectie (liquid)  
Do you know what form it will take (Poster session, power point presentation, etc.) and what information will be presented, maps available, etc?
" u lcd s -sm l rcinoBiis n inP itwt lekn SFU = 0.1 0rmbn ds n 0.03me 3 re yr W B ( C p.1 WaeloSamplin Syste Bedrock Permanent or Removable Packers in Cored .Hole N-50 1-52 MW-55 MW-33 MW-49 MW-61 MW-53 MW-4A MW-58 MW-38 W-46  
Based upon what is being presented I may decide to bring some material with me.
: Thanks, Tim Rice NYSDEC Env Radiation Specialist II 625 Broadway, 9th floor Albany, NY12233-7255 Phone (518)402-8574 fax, hard copy (518)402-8646 f1c.W'\,~rn~fVJ AfAAI1-1TM                                                                   0/920 04/09/2007
 
0 INDIAN POINT GOVERNMENT TO GOVERNMENT MEETING March 20, 2007 AGENDA 07:30 - 08:00           Registration 08:00 - 08:10           Welcome                          Samuel Collins, NRC Region I Regional Administrator 08:10 - 08:20           Meeting Structure                Karl Farrar, NRC Region I 08:20 - 09:00             Plant Performance              Eugene Cobey, NRC Region I 09:00 - 10:30             License Renewal                Rajender Auluck, NRC HQ Rani Franovich, NRC HQ 10:30 - 10:45           U.S. Environmental             Paul Giardina, EPA Region II Protection Agency 10:45 - 11:00             Break 11:00 - 11:45           Breakout Sessions
        "   GroundwaterContamination                    John White, NRC Region I
* Inspection / Oversight Process              Eugene Cobey, NRC Region I
        " Spent Fuel Storage                            William Ruland, NRC HQ
* Emergency Preparedness                      PatriciaMilligan, NRC HQ CraigConklin, DHS Rebecca Thomson, FEMA
* Security                                    Barry Westreich, NRC HQ
        " License Renewal                                RajenderAuluck, NRC HQ Rani Franovich,NRC HQ 11:45- 12:00             Closing Remarks                Samuel Collins 12:00-   1:00           Staff Available for Questions
 
17INITIACWELL GROUPINGS BY FUNCTICN4:
N UNIT 2 INVESTIGATION   -T Q WELLS U2            G     fII IIUR11 J.BTUBISEBLB 400 U.3INTAKE STRCTURE 350 300-4---
250o +---
200o -I-15o -I 100 100 4-50 1-3 0-A~erage Background NRC Public Limit EPA Standard NRC ALARA Objectie (liquid)
 
" u   lcd   s - sm     l rcinoBiis             n   inP         itwt lekn     SFU   = 0.1               0rmbn ds         n 0.03me 3   re     yr W   (B       C           p.1
 
WaeloSamplin                   Syste Bedrock Permanent or Removable Packers in Cored .Hole
 
N-50 1-52 MW-55     MW-33 MW-49 MW-61 MW-53 MW-4A MW-58 MW-38 W-46
 
-CONCEPTIUAL SKETCII OFIPEC PHASE,' PAS 2, AN6&#xfd;PHASE 2AAMONIlTO'RING WELL LOCATIONS.
-CONCEPTIUAL SKETCII OFIPEC PHASE,' PAS 2, AN6&#xfd;PHASE 2AAMONIlTO'RING WELL LOCATIONS.
i-O MW39 MAW 410 RADIOACTIVE MW 45 r. --.MW 400 MW44 0 I *SUPERHEATER I ADMINISTRATION BLDG MW 57@mw 108 mw mw 59 %wJ: U-2 INTAKE"-STRUCTUR_4 MW 61 @MW62@4 -iINTAKEa)-SUT-RUCTUJRE, MW63 @y 3INAKE~suTRLITURE&#xfd; 4 HUDSON RIVER}}
O MW39 MAW410 MW 45           RADIOACTIVE r.--.
MW44 0 i-MW 400 I
* SUPERHEATER I ADMINISTRATION BLDG MW 57@
mw 108 mw mw 59 %wJ:
MW61 @  MW62@
4 MW63 @
U-2 INTAKE"-                     -iINTAKEa)
STRUCTUR_4                  -SUT-RUCTUJRE,                           y     3INAKE~
suTRLITURE&#xfd; 4
HUDSON RIVER}}

Latest revision as of 06:10, 23 November 2019

E-mail from J. White of USNRC to T. Rice of NYSDEC, Regarding Govt to Govt
ML071720212
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/16/2007
From: Jason White
NRC/RGN-I/DRS/PSB2
To: Rice T
State of NY, Dept of Environmental Conservation
References
FOIA/PA-2007-0166
Download: ML071720212 (8)


Text

Page I of 2

]John White - Fwd: Re: Govt to Govt From: John White To: Tbrice@gw.dec.state. ny. us Date: 03/16/2007 8:59 AM

Subject:

Fwd: Re: Govt to Govt John R. White Chief, Plant Support Branch 2 U.S. Nuclear Regulatory Commission, Region I 475 Allandale Road King of Prussia, PA 19406 Office: 610-337-5114 Fax: 610-337-6928 Cell: (b)(6)

Email: jrwlC(dnrc.gov

>>> Marjorie McLaughlin 03/16/2007 8:38 AM >>>

Tim:

Good morning. We're happy to have you participate in any manner you like. I attached a copy of the meeting agenda. The meting will consist of 2 major portions: presentations and posterboard sessions. The presentations will consist of the following topics: Plant performance, the license renewal process, and a few words from representatives of the EPA (Region II). Following each NRC presentation, we will allow for questions from the attendees. The Q/A time is built into the time allotted each presentation. After all of that, we will move into the posterboard sessions. Each table has at least 1 poster that has some general information about the subject topic. NRC staff (and DHS at one table) will man the tables to answer 1-on-1 questions. Many will also have handouts.

For the Groundwater table, we have 2 posters. I only have one electronically, and I attached that below (it is the slide titled "groundwater"). The other shows the hydrology of the site, I believe. At that table, we also will have a laptop set up, and have a few informational slides. I attached those as well (this is the PPT attachment titled "Groundwater Contam"). Other than that, we will have John White at the table to answer questions. He will be joined by Marsha Gamberoni, who will be the new Director of our Division of Reactor Safety at Region I.

They will be there to answer questions.

I mentioned that the EPA is coming. Paul Giardina and Mike DeBois from the Region II office will be their representatives. They will not likely be a part of the Posterboard session. They will make remarks during the presentation part, and will be around to answer questions. Paul has to leave early, so he may not be there for most of the Posterboard part.

I hope that helps in your determination of what to bring. We will be arriving at the conference center by 07:00 to set up. You are welcome to come at that time to put some materials out on the table and join up with our staff. There also will be some time in between the presentations and posterboard sessions to set up, if you prefer.

Call me if you need anything further or have more questions.

VR, ltormation In tb*.r8owu C s deleted Marjorie in &cwrdsa..

Marjorie McLaughlin Act,

-QT 040/20 f11~//rxtm~xrw~lAOn T-TTM 04/09/2007

Page 2 of 2 Regional State Liaison Officer USNRC Region I 610-337-5240 (Office)

(b)(6) (Cell) 610-337-5354 (Fax)

>>> 'Timothy Rice" < tbrice5gw.dec.state.ny.us > 03/15/2007 4:41 PM >>>

Marjorie, You had asked if I would like to participate in the breakout for the groundwater contamination issue.

After talking this over with DEC administration, I would be happy to participate in that session.

Do you know what form it will take (Poster session, power point presentation, etc.) and what information will be presented, maps available, etc?

Based upon what is being presented I may decide to bring some material with me.

Thanks, Tim Rice NYSDEC Env Radiation Specialist II 625 Broadway, 9th floor Albany, NY12233-7255 Phone (518)402-8574 fax, hard copy (518)402-8646 f1c.W'\,~rn~fVJ AfAAI1-1TM 0/920 04/09/2007

0 INDIAN POINT GOVERNMENT TO GOVERNMENT MEETING March 20, 2007 AGENDA 07:30 - 08:00 Registration 08:00 - 08:10 Welcome Samuel Collins, NRC Region I Regional Administrator 08:10 - 08:20 Meeting Structure Karl Farrar, NRC Region I 08:20 - 09:00 Plant Performance Eugene Cobey, NRC Region I 09:00 - 10:30 License Renewal Rajender Auluck, NRC HQ Rani Franovich, NRC HQ 10:30 - 10:45 U.S. Environmental Paul Giardina, EPA Region II Protection Agency 10:45 - 11:00 Break 11:00 - 11:45 Breakout Sessions

" GroundwaterContamination John White, NRC Region I

  • Inspection / Oversight Process Eugene Cobey, NRC Region I

" Spent Fuel Storage William Ruland, NRC HQ

  • Security Barry Westreich, NRC HQ

" License Renewal RajenderAuluck, NRC HQ Rani Franovich,NRC HQ 11:45- 12:00 Closing Remarks Samuel Collins 12:00- 1:00 Staff Available for Questions

17INITIACWELL GROUPINGS BY FUNCTICN4:

N UNIT 2 INVESTIGATION -T Q WELLS U2 G fII IIUR11 J.BTUBISEBLB 400 U.3INTAKE STRCTURE 350 300-4---

250o +---

200o -I-15o -I 100 100 4-50 1-3 0-A~erage Background NRC Public Limit EPA Standard NRC ALARA Objectie (liquid)

" u lcd s - sm l rcinoBiis n inP itwt lekn SFU = 0.1 0rmbn ds n 0.03me 3 re yr W (B C p.1

WaeloSamplin Syste Bedrock Permanent or Removable Packers in Cored .Hole

N-50 1-52 MW-55 MW-33 MW-49 MW-61 MW-53 MW-4A MW-58 MW-38 W-46

-CONCEPTIUAL SKETCII OFIPEC PHASE,' PAS 2, AN6ýPHASE 2AAMONIlTO'RING WELL LOCATIONS.

O MW39 MAW410 MW 45 RADIOACTIVE r.--.

MW44 0 i-MW 400 I

  • SUPERHEATER I ADMINISTRATION BLDG MW 57@

mw 108 mw mw 59 %wJ:

MW61 @ MW62@

4 MW63 @

U-2 INTAKE"- -iINTAKEa)

STRUCTUR_4 -SUT-RUCTUJRE, y 3INAKE~

suTRLITUREý 4

HUDSON RIVER