ML100960044: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Research Reactor Center University of Missouri-Columbia March 31, 2010 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-37 Washington, DC 20555-0001 Research Park Columbia, MO 65211 PHONE (573) 882-4211 FAX (573) 882-6360
{{#Wiki_filter:Research Park Research Reactor Center                                                 Columbia, MO 65211 University of Missouri-Columbia PHONE  (573) 882-4211 FAX (573) 882-6360 March 31, 2010 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-37 Washington, DC 20555-0001


==REFERENCE:==
==REFERENCE:==
Docket Number 50-186 University of Missouri - Columbia Research Reactor Amended Facility License R-103


==SUBJECT:==
==SUBJECT:==
Docket Number 50-186 University of Missouri -Columbia Research Reactor Amended Facility License R-103 Federal Funding for the Conversion of the University of Missouri -Columbia Research Reactor from Highly-Enriched Uranium Fuel to Low-Enriched Uranium Fuel Enclosed is a copy of the U.S. Department of Energy (DOE) letter stating Federal funding under the DOE's University Research Reactor Infrastructure Program for the conversion of the University of Missouri -Columbia Research Reactor (MURR) from highly-enriched uranium (HEU) fuel to low-enriched uranium (LEU) fuel will not be available during fiscal year 2010.ENDORSEMENT:
Federal Funding for the Conversion of the University of Missouri -
Sincerely, Reviewed and Approved Les P. Foyto Reactor Manager Ralph A. Butler, P.E.Director Enclosure xc: Mr. Alexander Adams, Jr., U.S. NRC Mr. Craig Bassett, U.S. NRC Aj V_ lt AN EQUAL OPPORTUNITY/ADA INSTITUTION Department of Energy Idaho Operations Office 1955 Fremont Avenue ES ~Idaho Falls, ID 83401 March 18, 2010 Mr. Ralph Butler University of Missouri -Columbia Research Reactor Facility Columbia, MO 65211  
Columbia Research Reactor from Highly-Enriched Uranium Fuel to Low-Enriched Uranium Fuel Enclosed is a copy of the U.S. Department of Energy (DOE) letter stating Federal funding under the DOE's University Research Reactor Infrastructure Program for the conversion of the University of Missouri - Columbia Research Reactor (MURR) from highly-enriched uranium (HEU) fuel to low-enriched uranium (LEU) fuel will not be available during fiscal year 2010.
ENDORSEMENT:
Sincerely,                                           Reviewed and Approved Les P. Foyto                                         Ralph A. Butler, P.E.
Reactor Manager                                      Director Enclosure xc:     Mr. Alexander Adams, Jr., U.S. NRC Mr. Craig Bassett, U.S. NRC AN EQUAL OPPORTUNITY/ADA INSTITUTION                                                         Aj V_ lt
 
Department of Energy Idaho Operations Office 1955 Fremont Avenue ES ~Idaho                                 Falls, ID 83401 March 18, 2010 Mr. Ralph Butler University of Missouri - Columbia Research Reactor Facility Columbia, MO 65211


==SUBJECT:==
==SUBJECT:==
Line 27: Line 33:


==Dear Mr. Butler:==
==Dear Mr. Butler:==
The University of Missouri's Research Reactor (MURR) applied for a unique purpose exemption as defined in 10 CFR Part 50.2, which is still under review by the Nuclear Regulatory Commission (NRC). In accordance with 10 CFR Part 50.64, Limitations on the Use of Highly Enriched Uranium in Domestic Non-Power Reactors, MURR is required to send a letter annually to the NRC documenting if Federal funds are available to convert to low-enriched uranium (LEU) fuel.You are hereby notified that, although DOE funding is being made available for conducting feasibility studies, the fact that MURR's current compact core cannot be converted to LEU fuel with any of the currently approved fuel loading densities precludes DOE from providing Federal funding for the conversion to LEU fuel during fiscal year 2010..You will be notified in the event these circumstances change. If you have any questions, please contact me on (208) 526-6876.Sincerely, ames R. Wade, Manager Research Reactor Infrastructure Program Office of Nuclear Energy cc: Parrish A. Staples, NA-212 Tracey Bishop, DOE-HQ, NE-32}}
 
The University of Missouri's Research Reactor (MURR) applied for a unique purpose exemption as defined in 10 CFR Part 50.2, which is still under review by the Nuclear Regulatory Commission (NRC). In accordance with 10 CFR Part 50.64, Limitations on the Use of Highly Enriched Uranium in Domestic Non-Power Reactors, MURR is required to send a letter annually to the NRC documenting if Federal funds are available to convert to low-enriched uranium (LEU) fuel.
You are hereby notified that, although DOE funding is being made available for conducting feasibility studies, the fact that MURR's current compact core cannot be converted to LEU fuel with any of the currently approved fuel loading densities precludes DOE from providing Federal funding for the conversion to LEU fuel during fiscal year 2010..
You will be notified in the event these circumstances change. If you have any questions, please contact me on (208) 526-6876.
Sincerely, ames R. Wade, Manager Research Reactor Infrastructure Program Office of Nuclear Energy cc: Parrish A. Staples, NA-212 Tracey Bishop, DOE-HQ, NE-32}}

Latest revision as of 20:07, 13 November 2019

University of Missouri - Columbia Research Reactor, Submittal of U.S. Department of Energy (DOE) Letter Stating Federal Funding for the Conversion from Highly-Enriched Uranium Fuel to Low-Enriched Uranium Fuel
ML100960044
Person / Time
Site: University of Missouri-Columbia
Issue date: 03/31/2010
From: Rhonda Butler, Foyto L
Univ of Missouri - Columbia
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML100960044 (2)


Text

Research Park Research Reactor Center Columbia, MO 65211 University of Missouri-Columbia PHONE (573) 882-4211 FAX (573) 882-6360 March 31, 2010 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-37 Washington, DC 20555-0001

REFERENCE:

Docket Number 50-186 University of Missouri - Columbia Research Reactor Amended Facility License R-103

SUBJECT:

Federal Funding for the Conversion of the University of Missouri -

Columbia Research Reactor from Highly-Enriched Uranium Fuel to Low-Enriched Uranium Fuel Enclosed is a copy of the U.S. Department of Energy (DOE) letter stating Federal funding under the DOE's University Research Reactor Infrastructure Program for the conversion of the University of Missouri - Columbia Research Reactor (MURR) from highly-enriched uranium (HEU) fuel to low-enriched uranium (LEU) fuel will not be available during fiscal year 2010.

ENDORSEMENT:

Sincerely, Reviewed and Approved Les P. Foyto Ralph A. Butler, P.E.

Reactor Manager Director Enclosure xc: Mr. Alexander Adams, Jr., U.S. NRC Mr. Craig Bassett, U.S. NRC AN EQUAL OPPORTUNITY/ADA INSTITUTION Aj V_ lt

Department of Energy Idaho Operations Office 1955 Fremont Avenue ES ~Idaho Falls, ID 83401 March 18, 2010 Mr. Ralph Butler University of Missouri - Columbia Research Reactor Facility Columbia, MO 65211

SUBJECT:

Notification that No Federal Funding will be Available in Fiscal Year 2010 to Support the University of Missouri Research Reactor Conversion from Highly-Enriched Uranium Fuel to Low-Enriched Uranium (IS- 10-0 13)

Dear Mr. Butler:

The University of Missouri's Research Reactor (MURR) applied for a unique purpose exemption as defined in 10 CFR Part 50.2, which is still under review by the Nuclear Regulatory Commission (NRC). In accordance with 10 CFR Part 50.64, Limitations on the Use of Highly Enriched Uranium in Domestic Non-Power Reactors, MURR is required to send a letter annually to the NRC documenting if Federal funds are available to convert to low-enriched uranium (LEU) fuel.

You are hereby notified that, although DOE funding is being made available for conducting feasibility studies, the fact that MURR's current compact core cannot be converted to LEU fuel with any of the currently approved fuel loading densities precludes DOE from providing Federal funding for the conversion to LEU fuel during fiscal year 2010..

You will be notified in the event these circumstances change. If you have any questions, please contact me on (208) 526-6876.

Sincerely, ames R. Wade, Manager Research Reactor Infrastructure Program Office of Nuclear Energy cc: Parrish A. Staples, NA-212 Tracey Bishop, DOE-HQ, NE-32