{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257
{{#Wiki_filter:UNITED STATES
  April 3, 2013  
                                NUCLEAR REGULATORY COMMISSION
                                                REGION II
Mr. Tom E. Tynan  
                            245 PEACHTREE CENTER AVENUE NE, SUITE 1200
Vice President  
                                      ATLANTA, GEORGIA 30303-1257
                                            April 3, 2013
Mr. Tom E. Tynan
Vice President
Southern Nuclear Operating Company, Inc.
Vogtle Electric Generating Plant
7821 River Road
Waynesboro, GA 30830
SUBJECT:        NOTIFICATION OF VOGTLE ELECTRIC GENERATING PLANT -
                COMPONENT DESIGN BASES INSPECTION - NRC INSPECTION REPORT
                05000424/2013007 AND 05000425/2013007
Dear Mr. Tynan:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
Region II staff will conduct a component design bases inspection (CDBI) at your Vogtle Electric
Generating Plant during the weeks of July 15 - 19, July 29 - August 2, and August 12 - 16,
2013. The inspection team will be led by Geoffrey Ottenberg, a Senior Reactor Inspector from
the NRC's Region II Office. This inspection will be conducted in accordance with the baseline
inspection procedure, Procedure 71111.21, Component Design Bases Inspection, issued
August 14, 2012.
The inspection will evaluate the capability of risk significant / low margin components to function
as designed and to support proper system operation. The inspection will also include a review
of selected operator actions, operating experience, and modifications.
During a telephone conversation on March 28, 2013, Mr. Ottenberg confirmed with George
Gunn of your staff, arrangements for an information-gathering site visit and the three-week
onsite inspection. The schedule is as follows:
    *  Information-gathering visit: Week of June 24 - 28, 2013
    *  Onsite weeks: July 15 - 19, July 29 - August 2, and August 12 - 16, 2013
The purpose of the information-gathering visit is to meet with members of your staff to identify
risk-significant components and operator actions. Information and documentation needed to
support the inspection will also be identified. Mr. George Macdonald, a Region II Senior
Reactor Analyst, will support Mr. Ottenberg during the information-gathering visit to review
probabilistic risk assessment data and identify risk significant components, which will be
examined during the inspection.
The Enclosure lists documents that will be needed prior to the information-gathering visit.
Please provide the referenced information to the Region II office by June 10, 2013. The
inspectors will try to minimize your administrative burden by specifically identifying only those
documents required for inspection preparation.


Southern Nuclear Operating Company, Inc.  
T. Tynan                                      2
Vogtle Electric Generating Plant  
Additional documents will be requested during the information-gathering visit. The additional
7821 River Road
information will need to be made available to the team in the Region II office prior to the
Waynesboro, GA 30830
inspection teams preparation week of July 8, 2013. Mr. Ottenberg will also discuss the
following inspection support administrative details: (1) availability of knowledgeable plant
engineering and licensing personnel to serve as points of contact during the inspection, (2)
method of tracking inspector requests during the inspection, (3) licensee computer access, (4)
working space, (5) arrangements for site access, and (6) other applicable information.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
Enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC
Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding the
information requested or the inspection, please contact Mr. Ottenberg at 404-997-4658 or me at
404-997-4530.
                                              Sincerely,
                                                /RA/
                                              Rebecca L. Nease, Chief
                                              Engineering Branch 1
                                              Division of Reactor Safety
Docket Nos. 50-424, 50-425
License Nos. NPF-68, NPF-81
Enclosure:
Information Request for Vogtle Electric
Generating Plant - Component Design
Bases Inspection
cc: (See page 3)


SUBJECT: NOTIFICATION OF VOGTLE ELECTRIC GENERATING PLANT
- COMPONENT DESIGN BASES INSPECTION - NRC INSPECTION REPORT
05000424/2013007 AND 05000425/2013007
Dear Mr. Tynan:


   
_________________________              GX SUNSI REVIEW COMPLETE G FORM 665 ATTACHED
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
OFFICE            RII: DRS      RII: DRS
Region II staff will conduct a component design bases inspection (CDBI) at your Vogtle Electric Generating Plant during the weeks of July 15 - 19, July 29 - August 2, and August 12 - 16, 2013. The inspection team will be led by Geoffrey
SIGNATURE          RA            RA
Ottenberg, a Senior Reactor Inspector from the NRC's Region II Office. This inspection will be conducted in accordance with the baseline
NAME              Ottenberg      Nease
inspection procedure, Procedure 71111.21, "Component Design Bases Inspection," issued
DATE                    4/3/2012      4/3/2013    4/ /2013      4/ /2013      4/ /2013      4/ /2013    4/ /2013
August 14, 2012.  
E-MAIL COPY?        YES      NO  YES      NO  YES    NO      YES    NO    YES    NO      YES    NO    YES    NO
The inspection will evaluate the capability of risk significant / low margin components to function
       
as designed and to support proper system operation. The inspection will also include a review
T. Tynan                                3
of selected operator actions, operating experience, and modifications.
cc:                                        Leigh Perry
C. Russ Dedrickson                        SVP & General Counsel-Ops & SNC
Fleet Support Supervisor                  Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company, Inc.  Electronic Mail Distribution
Electronic Mail Distribution
                                          T. E. Tynan
S. Kuczynski                              Site Vice President
Chairman, President and CEO                Vogtle Electric Generating Plant
Southern Nuclear Operating Company, Inc.  Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution              Electronic Mail Distribution
Todd L. Youngblood                        C. R. Pierce
Vice President                            Nuclear Licensing Director
Fleet Oversight                            Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company, Inc.  Electronic Mail Distribution
Electronic Mail Distribution
                                          B. D. McKinney, Jr.
W. L. Bargeron                            Regulatory Response Manager
Plant Manager                              Southern Nuclear Operating Company, Inc.
Vogtle Electric Generating Plant           Electronic Mail Distribution
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution              D. W. Daughhetee
                                          Licensing Engineer
D. G. Bost                                Southern Nuclear Operating Company, Inc.
Chief Nuclear Officer                      Electronic Mail Distribution
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution              Bradley J. Adams
                                          Vice President
N. J. Stringfellow                        Fleet Operations Support
Licensing Manager                          Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company, Inc.  Electronic Mail Distribution
Electronic Mail Distribution
                                          T. D. Honeycutt
Paula Marino                              Regulatory Response Supervisor
Vice President                            Southern Nuclear Operating Company, Inc.
Engineering                                Electronic Mail Distribution
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution              L. P. Hill
                                          Licensing Supervisor
T. A. Lynch                                Southern Nuclear Operating Company, Inc.
Vice President                            Electronic Mail Distribution
Joseph M. Farley Nuclear Plant
Southern Nuclear Operating Company, Inc.  L. L. Crumpton
Electronic Mail Distribution              Administrative Assistant, Sr.
                                          Southern Nuclear Operating Company, Inc.
Dennis R. Madison                          Electronic Mail Distribution
Vice President
Edwin I. Hatch Nuclear Plant
Southern Nuclear Operating Company, Inc.   (cc contd - See page 3)
Electronic Mail Distribution


During a telephone conversation on March 28, 2013, Mr. Ottenberg confirmed with George Gunn of your staff, arrangements for an information-gathering site visit and the three-week
T. Tynan                                4
onsite inspection.  The schedule is as follows:
(cc contd)                              Richard Haynes
Hickox, T. Mark                          Director, Division of Waste Management
Vogtle Electric Generating Plant          Bureau of Land and Waste Management
Electronic Mail Distribution              S.C. Department of Health and
                                          Environmental Control
Mark Rauckhorst                          2600 Bull Street
Site Vice President                      Columbia, SC 29201
Vogtle Units 3 and 4
Southern Nuclear Operating Company        Lee Foley
Electronic Mail Distribution              Manager of Contracts Generation
                                          Oglethorpe Power Corporation
S. C. Swanson                            Electronic Mail Distribution
Site Support Manager
Vogtle Electric Generating Plant          Mark Williams
Electronic Mail Distribution              Commissioner
                                          Georgia Department of Natural Resources
Senior Resident Inspector                Electronic Mail Distribution
U.S. Nuclear Regulatory Commission
Vogtle Electric Generating Plant          Chuck Mueller
U.S. NRC                                  Manager
7821 River Road                          Policy and Radiation Program
Waynesboro, GA 30830                      Georgia Department of Natural Resources
                                          Electronic Mail Distribution
Arthur H. Domby, Esq.
Troutman Sanders                          Cynthia A. Sanders
Electronic Mail Distribution              Radioactive Materials Program Manager
                                          Environmental Protection Division
Jerry Ranalli                            Georgia Department of Natural Resources
Municipal Electric Authority of Georgia  Electronic Mail Distribution
Power
Electronic Mail Distribution              James C. Hardeman
                                          Environmental Radiation Program Manager
Sandra Threatt, Manager                  Environmental Protection Division
Nuclear Response and Emergency            Georgia Department of Natural Resources
Environmental Surveillance                Electronic Mail Distribution
Bureau of Land and Waste Management
Department of Health and Environmental    Mr. Steven M. Jackson
Control                                  Senior Engineer - Power Supply
Electronic Mail Distribution              Municipal Electric Authority of Georgia
                                          Electronic Mail Distribution
Division of Radiological Health
TN Dept. of Environment & Conservation    Reece McAlister
401 Church Street                        Executive Secretary
Nashville, TN 37243-1532                  Georgia Public Service Commission
                                          Electronic Mail Distribution
                                          Office of the Attorney General
                                          40 Capitol Square, SW
                                          Atlanta, GA 30334
                                          (cc contd - See page 4)


* Information-gathering visit:  Week of June 24 - 28, 2013
T. Tynan                              5
* Onsite weeks:  July 15 - 19, July 29 - August 2, and August 12 - 16, 2013
(cc contd)
The purpose of the information-gathering visit is to meet with members of your staff to identify
Office of the County Commissioner
risk-significant components and operator actions. Information and documentation needed to
Burke County Commission
support the inspection will also be identified. Mr. George Macdonald, a Region II Senior Reactor Analyst, will support Mr. Ottenberg during the information-gathering visit to review probabilistic risk assessment data and identify risk significant components, which will be examined during the inspection.
Electronic Mail Distribution
Director
Consumers' Utility Counsel Division
Governor's Office of Consumer Affairs
2 M. L. King, Jr. Drive
Plaza Level East; Suite 356
Atlanta, GA 30334-4600
Amy Whaley
Resident Manager
Electronic Mail Distribution


Letter to Tom E. Tynan from Rebecca L. Nease dated April 3, 2013
The Enclosure lists documents that will be needed prior to the information-gathering visit. Please provide the referenced information to the Region II office by June 10, 2013.  The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation. 
SUBJECT:      NOTIFICATION OF VOGTLE ELECTRIC GENERATING PLANT -
T. Tynan 2
              COMPONENT DESIGN BASES INSPECTION - NRC INSPECTION REPORT
Additional documents will be requested during the information-gathering visit.  The additional information will need to be made available to the team in the Region II office prior to the
              05000424/2013007 AND 05000425/2013007
inspection teams' preparation week of July 8, 2013.  Mr. Ottenberg will also discuss the following inspection support administrative details: (1) availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection, (2)
DISTRIBUTION:
method of tracking inspector requests during the inspection, (3) licensee computer access, (4)
RIDSNRRDIRS
working space, (5) arrangements for site access, and (6) other applicable information.
PUBLIC
RidsNrrPMVogtle Resource


   
        INFORMATION REQUEST FOR VOGTLE ELECTRIC GENERATING PLANT
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
                            COMPONENT DESIGN BASES INSPECTION
Enclosure will be available electr
Please provide the information electronically in .pdf files, Excel, or other searchable format on
onically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide
CDROM. (or FTP site, SharePoint, etc.) The CDROM (or website) should be indexed and
Documents Access and Management System (ADAMS).  ADAMS is accessible from the NRC
hyperlinked to facilitate ease of use.
Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
1. From your most-recent probabilistic safety analysis (PSA) excluding external events and
  Thank you for your cooperation in this matterIf you have any questions regarding the information requested or the inspection, please contact Mr. Ottenberg at 404-997-4658 or me at
    fires:
          a. Two risk rankings of components from your site-specific probabilistic safety
              analysis (PSA): one sorted by Risk Achievement Worth (RAW), and the other
              sorted by Birnbaum Importance
          b. A list of the top 500 cutsets
2.  From your most-recent probabilistic safety analysis (PSA) including external events and
    fires:
          a.  Two risk rankings of components from your site-specific probabilistic safety
              analysis (PSA): one sorted by Risk Achievement Worth (RAW), and the other
              sorted by Birnbaum Importance
          b.  A list of the top 500 cutsets
3.  Risk ranking of operator actions from your site-specific PSA sorted by RAW. Provide
    human reliability worksheets for these items.
4.  List of time critical operator actions with a brief description of each action.
5.  List of Emergency and Abnormal Operating Procedures revised (significant) since June 14,
    2010, with a brief description of each revision.
6List of components with low design margins (i.e., pumps closest to the design limit for flow
    or pressure, diesel generator close to design-required output, heat exchangers close to
    rated design heat removal, and MOV risk-margin rankings, etc.), and associated
    evaluations or calculations.
7. List of station operating experience evaluations/reviews performed, and documented in the
    stations corrective action program, for industry events and safety related equipment
    failures/vulnerabilities [as communicated by NRC Generic Communications, Industry
    Communications, 10 CFR Part 21 Notifications, etc.] since June 14, 2010.
8. List and brief description of safety related SSC design modifications implemented since
    June 14, 2010.
9List and brief description of common-cause component failures that have occurred since
    June 14, 2010.
                                                                                          Enclosure


404-997-4530.  
                                                  2
10. List and brief description of operability evaluations completed since June 14, 2010.
11. List of equipment on the sites Station Equipment Reliability Issues List, including a
    description of the reason(s) why each component is on that list, and summaries (if
    available) of your plans to address the issue(s).
12. List and brief description of equipment currently in degraded or nonconforming status as
    described in RIS 05-020.
13. List and reason for equipment classified in maintenance rule (a)(1) status since
    June 14, 2010, to present.
14. Copies of System Descriptions (or the like design basis documents) for Safety-Related
    Systems.
15. Copy of UFSAR(s).
16. Copy of Technical Specification(s).
17. Copy of Technical Specifications Bases.
18. Copy of Technical Requirements Manual(s).
19. List and brief description of Root Cause Evaluations that have been performed since June
    14, 2010.
20. In-service Testing Program Procedure(s).
21. Corrective Action Program Procedure(s).
22. One line diagram of electrical plant. (Electronic and full size - hard copy week of June 24,
    2013)
23. Index and legend for electrical plant one-line diagrams.
24. Primary AC calculation(s) for safety-related buses.
25. Primary DC calculation(s) for safety-related buses.
26. PI&Ds for Safety-Related systems. (Electronic and 1/2 size - hard copy week of June 24,
    2013)
27. Index and Legend for PI&Ds.
28. Copy of Operability determination procedure(s).
30. Copies of condition reports associated with findings from previous CDBI. (If applicable)
                                                                                        Enclosure


Sincerely,  /RA/  Rebecca L. Nease, Chief
                                                3
Engineering Branch 1
31. Index (procedure number, titles, and current revision) of station Emergency Operating
Division of Reactor Safety
    Procedures (EOPs), Abnormal Operating Procedures (AOPs), and Annunciator Response
    Procedures (ARPs).
32. Copy of any self-assessments performed in preparation for this inspection.
Docket Nos.  50-424, 50-425
33. List of any condition reports generated in preparation for this inspection.
 
34. Copies of condition reports generated from previous CDBI (2010).
License Nos.  NPF-68, NPF-81
35. Contact information for a person to discuss PRA information prior to and during the
 
    information-gathering trip. (Name, title, phone number, and e-mail address)
Enclosure:
                                                                                      Enclosure
Information Request for Vogtle Electric
Generating Plant - Component Design
Bases Inspection
cc:  (See page 3)
 
_________________________ 
GX SUNSI REVIEW COMPLETE
G FORM 665 ATTACHED OFFICE RII: DRS RII: DRS      SIGNATURE RA RA      NAME Ottenberg Nease      DATE 4/3/2012 4/3/2013 4/    /2013 4/    /2013 4/    /2013 4/    /2013 4/    /2013 E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO     
T. Tynan 3  
cc: C. Russ Dedrickson
 
Fleet Support Supervisor
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
 
S. Kuczynski
Chairman, President and CEO
 
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
Todd L. Youngblood
Vice President
 
Fleet Oversight
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
 
W. L. Bargeron
 
Plant Manager Vogtle Electric Generating Plant
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
 
D. G. Bost
 
Chief Nuclear Officer
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
 
N. J. Stringfellow
Licensing Manager
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
 
Paula Marino
Vice President
Engineering
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
 
T. A. Lynch
Vice President
Joseph M. Farley Nuclear Plant
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
 
Dennis R. Madison
Vice President Edwin I. Hatch Nuclear Plant
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
 
Leigh Perry SVP & General Counsel-Ops & SNC
 
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
T. E. Tynan
Site Vice President
Vogtle Electric Generating Plant
 
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
C. R. Pierce
Nuclear Licensing Director
 
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
B. D. McKinney, Jr.
Regulatory Response Manager
 
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
D. W. Daughhetee
Licensing Engineer
 
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Bradley J. Adams
Vice President
Fleet Operations Support
 
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
T. D. Honeycutt
 
Regulatory Response Supervisor
 
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
L. P. Hill
Licensing Supervisor
 
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
L. L. Crumpton
Administrative Assistant, Sr.
 
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
 
  (cc cont'd - See page 3) 
T. Tynan 4
(cc cont'd) Hickox, T. Mark
Vogtle Electric Generating Plant Electronic Mail Distribution
Mark Rauckhorst
Site Vice President
 
Vogtle Units 3 and 4
 
Southern Nuclear Operating Company Electronic Mail Distribution
S. C. Swanson
 
Site Support Manager
Vogtle Electric Generating Plant Electronic Mail Distribution
Senior Resident Inspector
U.S. Nuclear Regulatory Commission
Vogtle Electric Generating Plant U.S. NRC 7821 River Road
 
Waynesboro, GA  30830
 
Arthur H. Domby, Esq.
 
Troutman Sanders Electronic Mail Distribution
Jerry Ranalli
Municipal Electric Authority of Georgia
Power Electronic Mail Distribution
Sandra Threatt, Manager
Nuclear Response and Emergency
Environmental Surveillance
 
Bureau of Land and Waste Management Department of Health and Environmental 
Control
Electronic Mail Distribution
 
Division of Radiological Health TN Dept. of Environment & Conservation
401 Church Street
 
Nashville, TN  37243-1532
 
 
Richard Haynes Director, Division of Waste Management
 
Bureau of Land and Waste Management S.C. Department of Health and Environmental Control
 
2600 Bull Street
 
Columbia, SC  29201
 
Lee Foley Manager of Contracts Generation Oglethorpe Power Corporation
Electronic Mail Distribution
 
Mark Williams Commissioner
Georgia Department of Natural Resources
Electronic Mail Distribution
 
Chuck Mueller
Manager Policy and Radiation Program
 
Georgia Department of Natural Resources
Electronic Mail Distribution
 
Cynthia A. Sanders Radioactive Materials Program Manager Environmental Protection Division
 
Georgia Department of Natural Resources
Electronic Mail Distribution
 
James C. Hardeman Environmental Radiation Program Manager
Environmental Protection Division
 
Georgia Department of Natural Resources
Electronic Mail Distribution
 
Mr. Steven M. Jackson
Senior Engineer - Power  Supply
Municipal Electric Authority of Georgia
Electronic Mail Distribution
 
Reece McAlister
Executive Secretary
Georgia Public Service Commission
Electronic Mail Distribution
 
Office of the Attorney General
40 Capitol Square, SW
Atlanta, GA  30334
 
(cc cont'd - See page 4)
T. Tynan 5
  (cc cont'd)
Office of the County Commissioner Burke County Commission Electronic Mail Distribution
 
Director
Consumers' Utility Counsel Division
Governor's Office of Consumer Affairs
2 M. L. King, Jr. Drive Plaza Level East; Suite 356
 
Atlanta, GA  30334-4600
 
Amy Whaley
Resident Manager Electronic Mail Distribution 
Letter to Tom E. Tynan from Rebecca L. Nease dated April 3, 2013
SUBJECT: NOTIFICATION OF VOGTLE ELECTRIC GENERATING PLANT
- COMPONENT DESIGN BASES INSPECTION - NRC INSPECTION REPORT
05000424/2013007 AND 05000425/2013007
DISTRIBUTION
: RIDSNRRDIRS PUBLIC RidsNrrPMVogtle Resource 
  Enclosure
INFORMATION REQUEST FOR VOGTLE ELECTRIC GENERATING PLANT COMPONENT DESIGN BASES INSPECTION
Please provide the information electronically in ".pdf" files, Excel, or other searchable format on CDROM.  (or FTP site, SharePoint, etc.)  The CDROM (or website) should be indexed and
hyperlinked to facilitate ease of use. 
 
1. From your most-recent probabilistic safety analysis (PSA)
excluding external events and fires:  a. Two risk rankings of components from your site-specific probabilistic safety
analysis (PSA):  one sorted by Risk Achievement Worth (RAW), and the other sorted by Birnbaum Importance
 
b. A list of the top 500 cutsets
2. From your most-recent probabilistic safety analysis (PSA)
including external events and fires:
a.  Two risk rankings of components from your site-specific probabilistic safety
analysis (PSA):  one sorted by Risk Achievement Worth (RAW), and the other sorted by Birnbaum Importance
 
b.  A list of the top 500 cutsets 
3. Risk ranking of operator actions from y
our site-specific PSA sorted by RAW.  Provide human reliability worksheets for these items.
4. List of time critical operator actions with a brief description of each action.
 
5. List of Emergency and Abnormal Operating Procedures revised (significant) since June 14, 2010, with a brief description of each revision.
6. List of components with low design margins (i.e., pumps closest to the design limit for flow or pressure, diesel generator close to design-required output, heat exchangers close to
rated design heat removal, and MOV risk-margin rankings, etc.), and associated
evaluations or calculations.
7.  List of station operating experience evaluations/reviews performed, and documented in the station's corrective action program, fo
r industry events and safety related equipment failures/vulnerabilities [as communicated by NRC Generic Communications, Industry Communications, 10 CFR Part 21 Notifications, etc.] since June 14, 2010.
8. List and brief description of safety related SSC design modifications implemented since June 14, 2010.
9. List and brief description of common-cause component failures that have occurred since June 14, 2010.
 
2  Enclosure 10. List and brief description of operability evaluations completed since June 14, 2010.
11. List of equipment on the site's Station Equipment Reliability Issues List, including a description of the reason(s) why each component is on that list, and summaries (if available) of your plans to address the issue(s).
12. List and brief description of equipment currently in degraded or nonconforming status as described in RIS 05-020.
13.  List and reason for equipment classified in maintenance rule (a)(1) status since  June 14, 2010, to present.
 
14. Copies of System Descriptions (or the like design basis documents) for Safety-Related Systems.  15. Copy of UFSAR(s).
16.  Copy of Technical Specification(s).
 
17.  Copy of Technical Specifications Bases.
 
18.  Copy of Technical Requirements Manual(s).
19.  List and brief description of Root Cause Evaluations that have been performed since June
14, 2010.
20.  In-service Testing Program Procedure(s).
21.  Corrective Action Program Procedure(s).
 
22.  One line diagram of electrical plant.  (Electronic and full size - hard copy week of June 24, 2013)  23.  Index and legend for electrical plant one-line diagrams.
24.  Primary AC calculation(s) for safety-related buses.
 
25.  Primary DC calculation(s) for safety-related buses.
 
26.  PI&D's for Safety-Related systems.  (Electronic and 1/2 size - hard copy week of June 24, 2013) 
27.  Index and Legend for PI&Ds.
 
28.  Copy of Operability determination procedure(s).
30.  Copies of condition reports associated with findings from previous CDBI.  (If applicable)
 
3  Enclosure 31. Index (procedure number, titles, and current revision) of station Emergency Operating Procedures (EOPs), Abnormal Operating Procedures (AOPs), and Annunciator Response Procedures (ARPs).  
32. Copy of any self-assessments performed in preparation for this inspection.  
33. List of any condition reports generated in preparation for this inspection.  
 
34. Copies of condition reports generated from previous CDBI (2010).  
35. Contact information for a person to discuss PRA information prior to and during the information-gathering trip. (Name, title, phone number, and e-mail address)
}}
}}

Latest revision as of 19:55, 4 November 2019

IR 05000424-13-007 and 05000425-13-007, on 07/15-19, 07/29 -008/02, 08/12-16/2013, Notification of Vogtle Electric Generating Plant - Component Design Bases Inspection
ML13094A213
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/03/2013
From: Nease R
NRC/RGN-II/DRS/EB1
To: Tynan T
Southern Nuclear Operating Co
References
IR-13-007
Download: ML13094A213 (10)


See also: IR 05000424/2013007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

April 3, 2013

Mr. Tom E. Tynan

Vice President

Southern Nuclear Operating Company, Inc.

Vogtle Electric Generating Plant

7821 River Road

Waynesboro, GA 30830

SUBJECT: NOTIFICATION OF VOGTLE ELECTRIC GENERATING PLANT -

COMPONENT DESIGN BASES INSPECTION - NRC INSPECTION REPORT

05000424/2013007 AND 05000425/2013007

Dear Mr. Tynan:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a component design bases inspection (CDBI) at your Vogtle Electric

Generating Plant during the weeks of July 15 - 19, July 29 - August 2, and August 12 - 16,

2013. The inspection team will be led by Geoffrey Ottenberg, a Senior Reactor Inspector from

the NRC's Region II Office. This inspection will be conducted in accordance with the baseline

inspection procedure, Procedure 71111.21, Component Design Bases Inspection, issued

August 14, 2012.

The inspection will evaluate the capability of risk significant / low margin components to function

as designed and to support proper system operation. The inspection will also include a review

of selected operator actions, operating experience, and modifications.

During a telephone conversation on March 28, 2013, Mr. Ottenberg confirmed with George

Gunn of your staff, arrangements for an information-gathering site visit and the three-week

onsite inspection. The schedule is as follows:

  • Information-gathering visit: Week of June 24 - 28, 2013
  • Onsite weeks: July 15 - 19, July 29 - August 2, and August 12 - 16, 2013

The purpose of the information-gathering visit is to meet with members of your staff to identify

risk-significant components and operator actions. Information and documentation needed to

support the inspection will also be identified. Mr. George Macdonald, a Region II Senior

Reactor Analyst, will support Mr. Ottenberg during the information-gathering visit to review

probabilistic risk assessment data and identify risk significant components, which will be

examined during the inspection.

The Enclosure lists documents that will be needed prior to the information-gathering visit.

Please provide the referenced information to the Region II office by June 10, 2013. The

inspectors will try to minimize your administrative burden by specifically identifying only those

documents required for inspection preparation.

T. Tynan 2

Additional documents will be requested during the information-gathering visit. The additional

information will need to be made available to the team in the Region II office prior to the

inspection teams preparation week of July 8, 2013. Mr. Ottenberg will also discuss the

following inspection support administrative details: (1) availability of knowledgeable plant

engineering and licensing personnel to serve as points of contact during the inspection, (2)

method of tracking inspector requests during the inspection, (3) licensee computer access, (4)

working space, (5) arrangements for site access, and (6) other applicable information.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

Enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC

Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding the

information requested or the inspection, please contact Mr. Ottenberg at 404-997-4658 or me at

404-997-4530.

Sincerely,

/RA/

Rebecca L. Nease, Chief

Engineering Branch 1

Division of Reactor Safety

Docket Nos. 50-424, 50-425

License Nos. NPF-68, NPF-81

Enclosure:

Information Request for Vogtle Electric

Generating Plant - Component Design

Bases Inspection

cc: (See page 3)

_________________________ GX SUNSI REVIEW COMPLETE G FORM 665 ATTACHED

OFFICE RII: DRS RII: DRS

SIGNATURE RA RA

NAME Ottenberg Nease

DATE 4/3/2012 4/3/2013 4/ /2013 4/ /2013 4/ /2013 4/ /2013 4/ /2013

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

T. Tynan 3

cc: Leigh Perry

C. Russ Dedrickson SVP & General Counsel-Ops & SNC

Fleet Support Supervisor Southern Nuclear Operating Company, Inc.

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

Electronic Mail Distribution

T. E. Tynan

S. Kuczynski Site Vice President

Chairman, President and CEO Vogtle Electric Generating Plant

Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Electronic Mail Distribution

Todd L. Youngblood C. R. Pierce

Vice President Nuclear Licensing Director

Fleet Oversight Southern Nuclear Operating Company, Inc.

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

Electronic Mail Distribution

B. D. McKinney, Jr.

W. L. Bargeron Regulatory Response Manager

Plant Manager Southern Nuclear Operating Company, Inc.

Vogtle Electric Generating Plant Electronic Mail Distribution

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution D. W. Daughhetee

Licensing Engineer

D. G. Bost Southern Nuclear Operating Company, Inc.

Chief Nuclear Officer Electronic Mail Distribution

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Bradley J. Adams

Vice President

N. J. Stringfellow Fleet Operations Support

Licensing Manager Southern Nuclear Operating Company, Inc.

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

Electronic Mail Distribution

T. D. Honeycutt

Paula Marino Regulatory Response Supervisor

Vice President Southern Nuclear Operating Company, Inc.

Engineering Electronic Mail Distribution

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution L. P. Hill

Licensing Supervisor

T. A. Lynch Southern Nuclear Operating Company, Inc.

Vice President Electronic Mail Distribution

Joseph M. Farley Nuclear Plant

Southern Nuclear Operating Company, Inc. L. L. Crumpton

Electronic Mail Distribution Administrative Assistant, Sr.

Southern Nuclear Operating Company, Inc.

Dennis R. Madison Electronic Mail Distribution

Vice President

Edwin I. Hatch Nuclear Plant

Southern Nuclear Operating Company, Inc. (cc contd - See page 3)

Electronic Mail Distribution

T. Tynan 4

(cc contd) Richard Haynes

Hickox, T. Mark Director, Division of Waste Management

Vogtle Electric Generating Plant Bureau of Land and Waste Management

Electronic Mail Distribution S.C. Department of Health and

Environmental Control

Mark Rauckhorst 2600 Bull Street

Site Vice President Columbia, SC 29201

Vogtle Units 3 and 4

Southern Nuclear Operating Company Lee Foley

Electronic Mail Distribution Manager of Contracts Generation

Oglethorpe Power Corporation

S. C. Swanson Electronic Mail Distribution

Site Support Manager

Vogtle Electric Generating Plant Mark Williams

Electronic Mail Distribution Commissioner

Georgia Department of Natural Resources

Senior Resident Inspector Electronic Mail Distribution

U.S. Nuclear Regulatory Commission

Vogtle Electric Generating Plant Chuck Mueller

U.S. NRC Manager

7821 River Road Policy and Radiation Program

Waynesboro, GA 30830 Georgia Department of Natural Resources

Electronic Mail Distribution

Arthur H. Domby, Esq.

Troutman Sanders Cynthia A. Sanders

Electronic Mail Distribution Radioactive Materials Program Manager

Environmental Protection Division

Jerry Ranalli Georgia Department of Natural Resources

Municipal Electric Authority of Georgia Electronic Mail Distribution

Power

Electronic Mail Distribution James C. Hardeman

Environmental Radiation Program Manager

Sandra Threatt, Manager Environmental Protection Division

Nuclear Response and Emergency Georgia Department of Natural Resources

Environmental Surveillance Electronic Mail Distribution

Bureau of Land and Waste Management

Department of Health and Environmental Mr. Steven M. Jackson

Control Senior Engineer - Power Supply

Electronic Mail Distribution Municipal Electric Authority of Georgia

Electronic Mail Distribution

Division of Radiological Health

TN Dept. of Environment & Conservation Reece McAlister

401 Church Street Executive Secretary

Nashville, TN 37243-1532 Georgia Public Service Commission

Electronic Mail Distribution

Office of the Attorney General

40 Capitol Square, SW

Atlanta, GA 30334

(cc contd - See page 4)

T. Tynan 5

(cc contd)

Office of the County Commissioner

Burke County Commission

Electronic Mail Distribution

Director

Consumers' Utility Counsel Division

Governor's Office of Consumer Affairs

2 M. L. King, Jr. Drive

Plaza Level East; Suite 356

Atlanta, GA 30334-4600

Amy Whaley

Resident Manager

Electronic Mail Distribution

Letter to Tom E. Tynan from Rebecca L. Nease dated April 3, 2013

SUBJECT: NOTIFICATION OF VOGTLE ELECTRIC GENERATING PLANT -

COMPONENT DESIGN BASES INSPECTION - NRC INSPECTION REPORT

05000424/2013007 AND 05000425/2013007

DISTRIBUTION:

RIDSNRRDIRS

PUBLIC

RidsNrrPMVogtle Resource

INFORMATION REQUEST FOR VOGTLE ELECTRIC GENERATING PLANT

COMPONENT DESIGN BASES INSPECTION

Please provide the information electronically in .pdf files, Excel, or other searchable format on

CDROM. (or FTP site, SharePoint, etc.) The CDROM (or website) should be indexed and

hyperlinked to facilitate ease of use.

1. From your most-recent probabilistic safety analysis (PSA) excluding external events and

fires:

a. Two risk rankings of components from your site-specific probabilistic safety

analysis (PSA): one sorted by Risk Achievement Worth (RAW), and the other

sorted by Birnbaum Importance

b. A list of the top 500 cutsets

2. From your most-recent probabilistic safety analysis (PSA) including external events and

fires:

a. Two risk rankings of components from your site-specific probabilistic safety

analysis (PSA): one sorted by Risk Achievement Worth (RAW), and the other

sorted by Birnbaum Importance

b. A list of the top 500 cutsets

3. Risk ranking of operator actions from your site-specific PSA sorted by RAW. Provide

human reliability worksheets for these items.

4. List of time critical operator actions with a brief description of each action.

5. List of Emergency and Abnormal Operating Procedures revised (significant) since June 14,

2010, with a brief description of each revision.

6. List of components with low design margins (i.e., pumps closest to the design limit for flow

or pressure, diesel generator close to design-required output, heat exchangers close to

rated design heat removal, and MOV risk-margin rankings, etc.), and associated

evaluations or calculations.

7. List of station operating experience evaluations/reviews performed, and documented in the

stations corrective action program, for industry events and safety related equipment

failures/vulnerabilities [as communicated by NRC Generic Communications, Industry

Communications, 10 CFR Part 21 Notifications, etc.] since June 14, 2010.

8. List and brief description of safety related SSC design modifications implemented since

June 14, 2010.

9. List and brief description of common-cause component failures that have occurred since

June 14, 2010.

Enclosure

2

10. List and brief description of operability evaluations completed since June 14, 2010.

11. List of equipment on the sites Station Equipment Reliability Issues List, including a

description of the reason(s) why each component is on that list, and summaries (if

available) of your plans to address the issue(s).

12. List and brief description of equipment currently in degraded or nonconforming status as

described in RIS 05-020.

13. List and reason for equipment classified in maintenance rule (a)(1) status since

June 14, 2010, to present.

14. Copies of System Descriptions (or the like design basis documents) for Safety-Related

Systems.

15. Copy of UFSAR(s).

16. Copy of Technical Specification(s).

17. Copy of Technical Specifications Bases.

18. Copy of Technical Requirements Manual(s).

19. List and brief description of Root Cause Evaluations that have been performed since June

14, 2010.

20. In-service Testing Program Procedure(s).

21. Corrective Action Program Procedure(s).

22. One line diagram of electrical plant. (Electronic and full size - hard copy week of June 24,

2013)

23. Index and legend for electrical plant one-line diagrams.

24. Primary AC calculation(s) for safety-related buses.

25. Primary DC calculation(s) for safety-related buses.

26. PI&Ds for Safety-Related systems. (Electronic and 1/2 size - hard copy week of June 24,

2013)

27. Index and Legend for PI&Ds.

28. Copy of Operability determination procedure(s).

30. Copies of condition reports associated with findings from previous CDBI. (If applicable)

Enclosure

3

31. Index (procedure number, titles, and current revision) of station Emergency Operating

Procedures (EOPs), Abnormal Operating Procedures (AOPs), and Annunciator Response

Procedures (ARPs).

32. Copy of any self-assessments performed in preparation for this inspection.

33. List of any condition reports generated in preparation for this inspection.

34. Copies of condition reports generated from previous CDBI (2010).

35. Contact information for a person to discuss PRA information prior to and during the

information-gathering trip. (Name, title, phone number, and e-mail address)

Enclosure