ML13122A143: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:2012 POINT BEACH NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADDITIONAL OUTLINE SUBMITTAL FORMS-ES-301-1 ES-301 Administrative Topics Outline Form ES-301-1 Facility:
{{#Wiki_filter:2012 POINT BEACH NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADDITIONAL OUTLINE SUBMITTAL FORMS- ES-301-1
Point Beach U1/U2 Date of Examination:
 
Dec 3, 2012 Examination Level: RO IZI SRO 0 Operating Test Number: 2012301 Administrative Topic Type Describe activity to be performed (see Note) Code* Conduct of Operations R,D Perform Shutdown Margin Calculation 2.1.25 (3.9/4.2)
ES-301                               Administrative Topics Outline                               Form ES-301-1 Facility: Point Beach U1/U2                                           Date of Examination: Dec 3, 2012 Examination Level: RO IZI         SRO   0                           Operating Test Number: 2012301 Administrative Topic           Type                     Describe activity to be performed (see Note)               Code*
Ability to interpret reference materials, such as graphs, curves, tables, etc. Conduct a Control Board Walk-down for Shift Conduct of Operations S,M Turnover 2.1.3 (3.7 /3.9) Knowledge of shift or short-term relief turnover practices Equipment Control S,D Perform Containment Isolation Valve test 2.2.12 (3. 7/4.1) Knowledge of surveillance procedures Radiation Control N/A Operate Technical Support Center Ventilation Emergency System R,D,P 2.4.35 (3.8/4.0)
R,D         Perform Shutdown Margin Calculation Conduct of Operations 2.1.25 (3.9/4.2) Ability to interpret reference materials, such as graphs, curves, tables, etc.
Knowledge oflocal auxiliary operator tasks Procedures/Plan during an emergency and the resultant operational effects. (2009 Exam) NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.  
Conduct a Control Board Walk-down for Shift S,M         Turnover Conduct of Operations 2.1.3 (3.7/3.9) Knowledge of shift or short-term relief turnover practices Equipment Control                     S,D         Perform Containment Isolation Valve test 2.2.12 (3. 7/4.1) Knowledge of surveillance procedures Radiation Control N/A Operate Technical Support Center Ventilation System Emergency R,D,P         2.4.35 (3.8/4.0) Knowledge oflocal auxiliary operator tasks Procedures/Plan                                   during an emergency and the resultant operational effects.
*Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (S 3 for ROs;::; 4 for SROs & RO retakes) (N)ew or (M)odified from bank (;:: 1) (P)revious 2 exams (S 1; randomly selected)}}
(2009 Exam)
NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
*Type Codes & Criteria:           (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (S 3 for ROs;::; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank (;:: 1)
(P)revious 2 exams (S 1; randomly selected)}}

Latest revision as of 18:58, 4 November 2019

2012 Point Beach Nuclear Plant Initial License Examination Additional Outline Submittal Forms - Es - 301 - 1
ML13122A143
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/29/2013
From: Chuck Zoia
NRC/RGN-III/DRS/OLB
To:
Shared Package
ML13120A406 List:
References
Download: ML13122A143 (2)


Text

2012 POINT BEACH NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADDITIONAL OUTLINE SUBMITTAL FORMS- ES-301-1

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Point Beach U1/U2 Date of Examination: Dec 3, 2012 Examination Level: RO IZI SRO 0 Operating Test Number: 2012301 Administrative Topic Type Describe activity to be performed (see Note) Code*

R,D Perform Shutdown Margin Calculation Conduct of Operations 2.1.25 (3.9/4.2) Ability to interpret reference materials, such as graphs, curves, tables, etc.

Conduct a Control Board Walk-down for Shift S,M Turnover Conduct of Operations 2.1.3 (3.7/3.9) Knowledge of shift or short-term relief turnover practices Equipment Control S,D Perform Containment Isolation Valve test 2.2.12 (3. 7/4.1) Knowledge of surveillance procedures Radiation Control N/A Operate Technical Support Center Ventilation System Emergency R,D,P 2.4.35 (3.8/4.0) Knowledge oflocal auxiliary operator tasks Procedures/Plan during an emergency and the resultant operational effects.

(2009 Exam)

NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (S 3 for ROs;::; 4 for SROs & RO retakes)

(N)ew or (M)odified from bank (;:: 1)

(P)revious 2 exams (S 1; randomly selected)