ML15083A059: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:ES-201, Rev. 9 Examination Preparation Checklist Form ES-201-1   Facility:
{{#Wiki_filter:ES-201, Rev. 9                           Examination Preparation Checklist                           Form ES-201-1 Facility:   Point Beach Nuclear Power Plant                                 Date of Examination: 03/04/2015 Developed by: Written - Facility                   NRC       // Operating - Facility         NRC     n/a Chief Target Task Description (Reference)                               Examiner=s Date*
Point Beach Nuclear Power Plant Date of Examination:
Initials
0 3/04/20 1 5  Developed by: Written  
    -180         1. Examination administration date confirmed (C.1.a; C.2.a and b)                         dm
- Facility       NRC     //   Operating  
    -120         2. NRC examiners and facility contact assigned (C.1.d; C.2.e)                             dm
- Facility      NRC    n/a Target Date* Task Description (Reference)
    -120         3. Facility contact briefed on security and other requirements (C.2.c)                   dm
Chief Examiner=s Initials -180 1. Examination administration date confirmed (C.1.a; C.2.a and b) dm -120 2. NRC examiners and facility contact assigned (C.1.d; C.2.e) dm -120 3. Facility contact briefed on security and other requirements (C.2.c) dm -120 4. Corporate notification letter sent (C.2.d) dm [-90] [5. Reference material due (C.1.e; C.3.c; Attachment 2)]
    -120         4. Corporate notification letter sent (C.2.d)                                             dm
dm  {-75} 6. Integrated examination outline(s) due, including Forms ES
[-90]         [5. Reference material due (C.1.e; C.3.c; Attachment 2)]                                   dm
-201-2, ES-201-3, ES-301-1, ES-301-2, ES-301-5, ES-D-1's, ES-401-1/2, ES-401-3, and ES-401-4, as applicable (C.1.e and f; C.3.d) dm  {-70} {7. Examination outline(s) reviewed by NRC and feedback provided to facility licensee (C.2.h; C.3.e)}
: 6. Integrated examination outline(s) due, including Forms ES-201-2, ES-201-
dm  {-45} 8. Proposed examinations (including written, walk
{-75}              3, ES-301-1, ES-301-2, ES-301-5, ES-D-1's, ES-401-1/2, ES-401-3, and                   dm ES-401-4, as applicable (C.1.e and f; C.3.d)
-through JPMs, and scenarios, as applicable), supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, and any Form ES-201-3 updates), and reference materials due (C.1.e, f, g and h; C.3.d) dm  -30 9. Preliminary license applications (NRC Form 398s) due (C.1.l; C.2.g; ES-202) dm  -14 10. Final license applications due and Form ES
{7. Examination outline(s) reviewed by NRC and feedback provided to facility
-201-4 prepared (C.1.l; C.2.i; ES-202) dm  -14 11. Examination approved by NRC supervisor for facility licensee review (C.2.h; C.3.f) dm  -14 12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g) dm -7 13. Written examinations and operating tests approved by NRC supervisor (C.2.i; C.3.h) dm  -7 14. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm qualifications / eligibility; and examination approval and waiver letters sent (C.2.i; Attachment 4; ES
{-70}                                                                                                    dm licensee (C.2.h; C.3.e)}
-202, C.2.e; ES
: 8. Proposed examinations (including written, walk-through JPMs, and scenarios, as applicable), supporting documentation (including Forms
-204) dm  -7 15. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k) dm  -7 16. Approved scenarios, job performance measures, and questions distributed to NRC examiners (C.3.i) dm
{-45}                                                                                                    dm ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, and any Form ES-201-3 updates), and reference materials due (C.1.e, f, g and h; C.3.d)
* Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case
: 9. Preliminary license applications (NRC Form 398s) due (C.1.l; C.2.g;
-by-case basis in coordination with the facility licensee.
    -30                                                                                                      dm ES-202)
: 10. Final license applications due and Form ES-201-4 prepared (C.1.l; C.2.i;
    -14                                                                                                      dm ES-202)
: 11. Examination approved by NRC supervisor for facility licensee review
    -14                                                                                                      dm (C.2.h; C.3.f)
    -14         12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g)               dm
: 13. Written examinations and operating tests approved by NRC supervisor
      -7                                                                                                      dm (C.2.i; C.3.h)
: 14. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm
      -7              qualifications / eligibility; and examination approval and waiver letters sent         dm (C.2.i; Attachment 4; ES-202, C.2.e; ES-204)
: 15. Proctoring/written exam administration guidelines reviewed
      -7                                                                                                      dm with facility licensee (C.3.k)
: 16. Approved scenarios, job performance measures, and questions
      -7                                                                                                      dm distributed to NRC examiners (C.3.i)
* Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.
[Applies only] {Does not apply} to examinations prepared by the NRC.}}
[Applies only] {Does not apply} to examinations prepared by the NRC.}}

Latest revision as of 15:02, 31 October 2019

2015 Point Beach Nuclear Plant Initial License Examination Form ES-201-1
ML15083A059
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/06/2015
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Florida Power & Light Energy Point Beach
References
Download: ML15083A059 (1)


Text

ES-201, Rev. 9 Examination Preparation Checklist Form ES-201-1 Facility: Point Beach Nuclear Power Plant Date of Examination: 03/04/2015 Developed by: Written - Facility NRC // Operating - Facility NRC n/a Chief Target Task Description (Reference) Examiner=s Date*

Initials

-180 1. Examination administration date confirmed (C.1.a; C.2.a and b) dm

-120 2. NRC examiners and facility contact assigned (C.1.d; C.2.e) dm

-120 3. Facility contact briefed on security and other requirements (C.2.c) dm

-120 4. Corporate notification letter sent (C.2.d) dm

[-90] [5. Reference material due (C.1.e; C.3.c; Attachment 2)] dm

6. Integrated examination outline(s) due, including Forms ES-201-2, ES-201-

{-75} 3, ES-301-1, ES-301-2, ES-301-5, ES-D-1's, ES-401-1/2, ES-401-3, and dm ES-401-4, as applicable (C.1.e and f; C.3.d)

{7. Examination outline(s) reviewed by NRC and feedback provided to facility

{-70} dm licensee (C.2.h; C.3.e)}

8. Proposed examinations (including written, walk-through JPMs, and scenarios, as applicable), supporting documentation (including Forms

{-45} dm ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, and any Form ES-201-3 updates), and reference materials due (C.1.e, f, g and h; C.3.d)

9. Preliminary license applications (NRC Form 398s) due (C.1.l; C.2.g;

-30 dm ES-202)

10. Final license applications due and Form ES-201-4 prepared (C.1.l; C.2.i;

-14 dm ES-202)

11. Examination approved by NRC supervisor for facility licensee review

-14 dm (C.2.h; C.3.f)

-14 12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g) dm

13. Written examinations and operating tests approved by NRC supervisor

-7 dm (C.2.i; C.3.h)

14. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm

-7 qualifications / eligibility; and examination approval and waiver letters sent dm (C.2.i; Attachment 4; ES-202, C.2.e; ES-204)

15. Proctoring/written exam administration guidelines reviewed

-7 dm with facility licensee (C.3.k)

16. Approved scenarios, job performance measures, and questions

-7 dm distributed to NRC examiners (C.3.i)

  • Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.

[Applies only] {Does not apply} to examinations prepared by the NRC.