IR 05000346/2018410: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 05/02/2018
| issue date = 05/02/2018
| title = NRC Security Baseline Inspection Report 05000346/2018410 - Cover Letter Only (DRS-N.Egan)
| title = NRC Security Baseline Inspection Report 05000346/2018410 - Cover Letter Only (DRS-N.Egan)
| author name = Orth S K
| author name = Orth S
| author affiliation = NRC/RGN-III/DRS/PSB
| author affiliation = NRC/RGN-III/DRS/PSB
| addressee name = Bezilla M
| addressee name = Bezilla M
Line 20: Line 20:
{{#Wiki_filter:May 2, 2018
{{#Wiki_filter:May 2, 2018


SUBJECT: DAVIS-BESSE NUCLEAR POWER STATIONNRC SECURITY BASELINE INSPECTION REPORT 05000346/2018410
==SUBJECT:==
DAVIS-BESSE NUCLEAR POWER STATIONNRC SECURITY BASELINE INSPECTION REPORT 05000346/2018410


==Dear March 29,==
==Dear Mr. Bezilla,==
2018
March 29, 2018


SUBJECT: DAVIS-BESSE NUCLEAR POWER STATIONNRC SECURITY BASELINE INSPECTION REPORT 05000346/2018410 DISTRIBUTION: N. Simonian, NSIR/DSO/DDSO/ST E. Wharton, NSIR F. Sullivan, NSIR R. McKinley, RI B. Desai, RII S. West, RIII D. Roberts, RIII J. Groom, RIV DISTRIBUTION w/o encl: Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Steven West Darrell Roberts Richard Skokowski Allan Barker DRPIII DRSIII ROPreports.Resource@nrc.gov  ADAMS Accession Number ML: 18123A490 OFFICE RIII RIII RIII RIII NAME NEgan via email:cl SOrth DATE 04/27/18 05/02/18 OFFICIAL RECORD COPY May 2, 2018 Mr. Mark Bezilla Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 434499760 SUBJECT: DAVIS-BESSE NUCLEAR POWER STATIONNRC SECURITY BASELINE INSPECTION REPORT 05000346/2018410 Dear M
==SUBJECT:==
DAVIS-BESSE NUCLEAR POWER STATIONNRC SECURITY BASELINE INSPECTION REPORT 05000346/2018410  
 
Dear M
}}
}}

Latest revision as of 22:57, 5 January 2025

NRC Security Baseline Inspection Report 05000346/2018410 - Cover Letter Only (DRS-N.Egan)
ML18123A490
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/02/2018
From: Steven Orth
Plant Support Branch II
To: Bezilla M
FirstEnergy Nuclear Operating Co
References
IR 2018410
Download: ML18123A490 (3)


Text

May 2, 2018

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATIONNRC SECURITY BASELINE INSPECTION REPORT 05000346/2018410

Dear Mr. Bezilla,

March 29, 2018

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATIONNRC SECURITY BASELINE INSPECTION REPORT 05000346/2018410

Dear M