ML101890224: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(One intermediate revision by the same user not shown) | |||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Serial No. 10-345 ATTACHMENT 2 | {{#Wiki_filter:Serial No. 10-345 ATTACHMENT 2 LICENSE AMENDMENT REQUEST 249: KEWAUNEE POWER STATION CONVERSION TO IMPROVED TECHNICAL SPECIFICATIONS (TAC NO. ME2139) - | ||
SUPPLEMENT TO LICENSE AMENDMENT REQUEST - CLOSED REQUESTS FOR ADDITIONAL INFORMATION AND PROPOSED LICENSE CONDITIONS PROPOSED NEW LICENSE CONDITIONS KEWAUNEE POWER STATION DOMINION ENERGY KEWAUNEE, INC. | |||
Serial No. 10-345 Docket No. 50-305 Attachment 2 Page 1 of 1 PROPOSED NEW LICENSE CONDITIONS License Condition 2.C(12) is proposed to address the schedule for relocating certain CTS requirements to licensee-controlled documents, as approved by the NRC, as follows: | |||
(12) Relocation of Certain Technical Specification Requirements License Amendment No. XXX authorizes the relocation of certain Technical Specifications previously included in Appendix A to other licensee-controlled documents. Implementation of this amendment shall include relocation of the requirements to the specified documents, as described in Table R, Relocated Specifications and Removed Detail Changes, attached to the NRC staffs Safety Evaluation, which is enclosed in this amendment. | |||
License Condition 2.C(13) is proposed to address the schedule for implementing new and revised Surveillance Requirements, as approved by the NRC, as follows: | |||
(13) Schedule for New and Revised Surveillance Requirements (SRs) | |||
Serial No. 10-345 Docket No. 50-305 Page 1 of 1 PROPOSED NEW LICENSE CONDITIONS License Condition 2.C(12) is proposed to address the schedule for relocating certain CTS requirements to licensee-controlled documents, as approved by the NRC, as follows: | |||
(12) Relocation of Certain | |||
License Condition 2.C(13) is proposed to address the schedule for implementing new and revised Surveillance Requirements, as approved by the NRC, as follows: | |||
(13) Schedule for New and | |||
The schedule for performing SRs that are new or revised in Amendment No. XXX shall be as follows: | The schedule for performing SRs that are new or revised in Amendment No. XXX shall be as follows: | ||
(a) For SRs that are new in this amendment, the first performance is due at the end of the first Surveillance interval, which begins on the date of implementation of this amendment. (b) For SRs that existed prior to this amendment, whose intervals of performance are being reduced, the first reduced Surveillance interval begins upon completion of the first Surveillance performed after implementation of this amendment. (c) For SRs that existed prior to this amendment, whose intervals of performance are being extended, the first extended Surveillance interval begins upon completion of the last Surveillance performed prior to implementation of this amendment. (d) For SRs that existed prior to this amendment that have modified acceptance criteria, the first performance subject to the modified acceptance criteria is due at the end of the first Surveillance interval that began on the date the Surveillance was last performed prior to the implementation of this amendment.}} | (a) For SRs that are new in this amendment, the first performance is due at the end of the first Surveillance interval, which begins on the date of implementation of this amendment. | ||
(b) For SRs that existed prior to this amendment, whose intervals of performance are being reduced, the first reduced Surveillance interval begins upon completion of the first Surveillance performed after implementation of this amendment. | |||
(c) For SRs that existed prior to this amendment, whose intervals of performance are being extended, the first extended Surveillance interval begins upon completion of the last Surveillance performed prior to implementation of this amendment. | |||
(d) For SRs that existed prior to this amendment that have modified acceptance criteria, the first performance subject to the modified acceptance criteria is due at the end of the first Surveillance interval that began on the date the Surveillance was last performed prior to the implementation of this amendment.}} |
Latest revision as of 21:31, 11 March 2020
ML101890224 | |
Person / Time | |
---|---|
Site: | Kewaunee |
Issue date: | 07/01/2010 |
From: | Dominion Energy Kewaunee |
To: | Office of Nuclear Reactor Regulation |
References | |
10-345, TAC ME2139 | |
Download: ML101890224 (2) | |
Text
Serial No.10-345 ATTACHMENT 2 LICENSE AMENDMENT REQUEST 249: KEWAUNEE POWER STATION CONVERSION TO IMPROVED TECHNICAL SPECIFICATIONS (TAC NO. ME2139) -
SUPPLEMENT TO LICENSE AMENDMENT REQUEST - CLOSED REQUESTS FOR ADDITIONAL INFORMATION AND PROPOSED LICENSE CONDITIONS PROPOSED NEW LICENSE CONDITIONS KEWAUNEE POWER STATION DOMINION ENERGY KEWAUNEE, INC.
Serial No.10-345 Docket No. 50-305 Attachment 2 Page 1 of 1 PROPOSED NEW LICENSE CONDITIONS License Condition 2.C(12) is proposed to address the schedule for relocating certain CTS requirements to licensee-controlled documents, as approved by the NRC, as follows:
(12) Relocation of Certain Technical Specification Requirements License Amendment No. XXX authorizes the relocation of certain Technical Specifications previously included in Appendix A to other licensee-controlled documents. Implementation of this amendment shall include relocation of the requirements to the specified documents, as described in Table R, Relocated Specifications and Removed Detail Changes, attached to the NRC staffs Safety Evaluation, which is enclosed in this amendment.
License Condition 2.C(13) is proposed to address the schedule for implementing new and revised Surveillance Requirements, as approved by the NRC, as follows:
(13) Schedule for New and Revised Surveillance Requirements (SRs)
The schedule for performing SRs that are new or revised in Amendment No. XXX shall be as follows:
(a) For SRs that are new in this amendment, the first performance is due at the end of the first Surveillance interval, which begins on the date of implementation of this amendment.
(b) For SRs that existed prior to this amendment, whose intervals of performance are being reduced, the first reduced Surveillance interval begins upon completion of the first Surveillance performed after implementation of this amendment.
(c) For SRs that existed prior to this amendment, whose intervals of performance are being extended, the first extended Surveillance interval begins upon completion of the last Surveillance performed prior to implementation of this amendment.
(d) For SRs that existed prior to this amendment that have modified acceptance criteria, the first performance subject to the modified acceptance criteria is due at the end of the first Surveillance interval that began on the date the Surveillance was last performed prior to the implementation of this amendment.