ML12137A895: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 05/16/2012
| issue date = 05/16/2012
| title = Entergy'S Answer Opposing Jones River Watershed Association'S and Pilgrim Watch'S Motion to Reopen Hearing Request on Contention Related to the Roseate Tern
| title = Entergy'S Answer Opposing Jones River Watershed Association'S and Pilgrim Watch'S Motion to Reopen Hearing Request on Contention Related to the Roseate Tern
| author name = Lewis D R, Walsh T J
| author name = Lewis D, Walsh T
| author affiliation = Entergy Nuclear Generation Co, Entergy Nuclear Operations, Inc, Pillsbury, Winthrop, Shaw, Pittman, LLP
| author affiliation = Entergy Nuclear Generation Co, Entergy Nuclear Operations, Inc, Pillsbury, Winthrop, Shaw, Pittman, LLP
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:May 16, 2012 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board
{{#Wiki_filter:May 16, 2012 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of                                    )
                                                    )
Entergy Nuclear Generation Company and )                    Docket No. 50-293-LR Entergy Nuclear Operations, Inc.                    )        ASLBP No. 06-848-02-LR
                                                    )
(Pilgrim Nuclear Power Station)                    )
ENTERGYS ANSWER OPPOSING JONES RIVER WATERSHED ASSOCIATIONS AND PILGRIM WATCHS MOTION TO REOPEN HEARING REQUEST ON CONTENTION RELATED TO THE ROSEATE TERN I.      Introduction Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc. (collectively Entergy) hereby oppose the late-filed motion to reopen the record that Jones River Watershed Association and Pilgrim Watch (collectively, JRWA/PW or Petitioners) filed on May 2, 20121 seeking to raise a new contention challenging the assessment of the roseate tern in the July 2007 final Supplemental Environmental Impact Statement (FSEIS)2 for license renewal of the Pilgrim Nuclear Power Station (Pilgrim or PNPS). This is the seventh such motion filed by Pilgrim Watch, now joined by JRWA, and like the preceding six, it is untimely and meritless.
II.      Statement of the Case Entergy has previously summarized the relevant procedural history of this case in its response opposing the JRWA/PW contention concerning Endangered Species Act- (ESA-)
1 Jones River Watershed Association and Pilgrim Watch Motion to Reopen, Request for Hearing and Permission to File New Contention in the Above-Captioned License Renewal Proceeding on Violations of the Endangered Species Act with Regard to the Roseate Tern (May 2, 2012) (JRWA/PW Motion).
2 NUREG-1437, Supplement 29, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Pilgrim Nuclear Power Station (July 2007) (FSEIS).


In the Matter of   )  
listed aquatic species,3 and that summary will not be repeated here. This proceeding, now in its seventh year, involves the application submitted by Entergy in January 2006 seeking renewal of the operating license for Pilgrim (Application).4 Prior to submitting the Application to the NRC, Entergy contacted the U.S. Fish and Wildlife Service (FWS) in order to facilitate the ESA Section 7 consultation process that would later occur between FWS and NRC. By letter dated February 3, 2005, Entergy submitted a letter to FWS requesting information on threatened or endangered species in the vicinity of the Pilgrim plant in order to assess the impact of Pilgrims license renewal on any such species.5 Entergy stated that no Federally listed terrestrial species occur on the PNPS site proper, but noted that [s]everal listed terrestrial species are known to occur in the general vicinity of the PNPS site, including the roseate tern, and that those species cannot be ruled out as occasional visitors to the PNPS site. Entergy Feb.
      )
2005 Letter to FWS at 1, 2. Entergys letter further explained that
Entergy Nuclear Generation Company and ) Docket No. 50-293-LR Entergy Nuclear Operations, Inc. ) ASLBP No. 06-848-02-LR      )
[t]he roseate tern nests in colonies along the Massachusetts coast in summer. The roseate tern nests in dune areas with thick vegetative cover, always in association with the common tern. Although suitable nesting habitat has not been identified at PNPS, migrating terns may move through the site in late spring (en route to nesting areas in Maine and Nova Scotia) and late summer (en route to wintering areas in the West Indies and Latin America).
(Pilgrim Nuclear Power Station)  )  
Id. at 2. Entergys letter also explained that it has no plans to alter current operations over the license renewal period, [a]ny maintenance activities necessary to support license renewal would be limited to previously disturbed areas, and that [n]o expansion of existing facilities is planned, and no additional land disturbance is anticipated in support of license renewal. Id. at
: 3. Accordingly, Entergy requested that FWS concur with its determination that license renewal 3
Entergys Answer Opposing Jones River Watershed Associations and Pilgrim Watchs Motion to Reopen and Hearing Request (Mar. 19, 2012) at 6-10.
4 See 71 Fed. Reg. 15,222 (Mar. 27, 2006).
2


ENTERGY'S ANSWER OPPOSING JONES RIVER WATERSHED ASSOCIATION'S AND PILGRIM WATCH'S MOTION TO REOPEN  HEARING REQUEST ON CONTENTION RELATED TO THE ROSEATE TERN I. Introduction Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc. (collectively "Entergy") hereby oppose the late-filed motion to reopen the r ecord that Jones River Watershed Association and Pilgrim Watch (collectively, "JRWA/PW" or "Petitioners") filed on May 2, 2012 1 seeking to raise a new contention challenging the assessment of the roseate tern in the July 2007 final Supplemental Environmental Impact Statement ("FSEIS")
would have no effect on threatened or endangered species . . . and that formal consultation is not necessary. Entergy Feb. 2005 Letter to FWS at 3.
2 for license renewal of the Pilgrim Nuclear Power Station ("Pilgrim" or "PNPS"). This is the seventh such motion filed by Pilgrim Watch, now joined by JRWA, and like the preceding six, it is untimely and meritless.
By letter dated March 9, 2005, FWS responded to Entergys February 3, 2005 letter and concurred with Entergys determination that formal consultation was not required.6 FWS stated that the federally-endangered roseate tern . . . [is] known to occur along Plymouth Beach, just north of the PNPS, but that none . . . are known to frequent the immediate vicinity of PNPS and, therefore, the presence of [this] species near the power station is probably transient in nature. FWS Mar. 2005 Letter to Entergy at 1. Thus, FWS concluded that,
II. Statement of the Case Entergy has previously summari zed the relevant procedural hi story of this case in its response opposing the JRWA/PW contention con cerning Endangered Species Act- ("ESA-")  
[s]ince no expansion of existing facilities is planned and no additional land disturbance is anticipated, we concur with your determination that license renewal for PNPS is not likely to adversely affect federally-listed species subject to the jurisdiction of the [FWS], and that formal consultation with us is not required.
Id. at 2 (emphasis added).
In January 2006, Entergy submitted the Application. The Application included an Environmental Report (ER), which provided an assessment of ESA-listed species that may occur in the vicinity of the station. ER, §§ 2.5, 4.10. With respect to the roseate tern, the ER noted that the species is known to occur in the general vicinity of the PNPS site . . . and cannot be ruled out as [an] occasional visitor[] to the PNPS site and environs. ER at 2-9. More specifically, the ER stated:
[T]he roseate tern nests in colonies along the Massachusetts coast in summer . . . .
The roseate tern nests in areas with thick vegetative cover, always in association with the common tern. Although suitable nesting habitat has not been identified at PNPS, migrating terns may move through the site in late spring (en route to nesting areas in Maine and Nova Scotia) and late summer (en route to wintering areas in the West Indies and Latin America).
5 Pilgrim Nuclear Power Station, Applicants Environmental Report (ER) Attachment B, Special Status Species Correspondence at 1 (Entergy Feb. 2005 Letter to FWS).
6 Pilgrim Nuclear Power Station, ER Attachment B, Special Status Species Correspondence at 6 (FWS Mar. 2005 Letter to Entergy).
3


1  Jones River Watershed Association and Pilgrim Watch Motion to Reopen, Request for Hearing and Permission to File New Contention in the Above-Captioned License Renewal Proceeding on Violations of the Endangered Species Act with Regard to the Roseate Tern (May 2, 2012) ("JRWA/PW Motion").
Id. at 2-10. The ER further explained that:
2  NUREG-1437, Supplement 29, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Pilgrim Nuclear Power Station (July 2007) ("FSEIS").
Entergy has no plans to conduct refurbishment or construction activities at PNPS during the license renewal term. Therefore, there will be no impact to threatened or endangered species from refurbishment activities.
2 listed aquatic species, 3 and that summary will not be repeated here. This proceeding, now in its seventh year, involves the application submitted by Entergy in January 2006 seeking renewal of the operating license for Pilgrim ("Application").
Id. at 4-18. Entergys assessment concluded:
4  Prior to submitting th e Application to the NRC, Entergy contacted the U.S. Fish and Wildlife Service ("FWS") in order to facilitate the
Renewal of the operating license for PNPS is not expected to result in the taking of any threatened or endangered species. Renewal of the license is not likely to jeopardize the continued existence of any threatened or endangered species or result in the destruction or adverse modifications of any critical habitat.
 
ESA Section 7 consultation process that would later occur between FWS and NRC. By letter dated February 3, 2005, Entergy submitted a letter to FWS requesting information on threatened
 
or endangered species in the vicinity of the Pilgrim plant in order to assess the impact of Pilgrim's license renewal on any such species.
5  Entergy stated that "no Federally listed terrestrial species occur on the PNPS site proper,"
but noted that "[s]everal listed terrestrial species are known to occur in the general vicinity of the PNPS site," in cluding the roseate tern, and that those species "cannot be ruled out as occasional visitors to the PNPS site."  Entergy Feb. 2005 Letter to FWS at 1, 2. Entergy' s letter further explained that [t]he roseate tern nests in colonies along the Massachusetts coast in summer. The roseate tern nests in dune areas with thick vegetative cover, always in association with the common tern. Although suitable ne sting habitat has not been identified at PNPS, migrating terns may move through the site in late spring (en route to nesting areas in Maine and Nova Scotia) and late summ er (en route to wintering areas in the West Indies and Latin America).
Id. at 2. Entergy's letter also explained that it "has no plans to alter current operations over the license renewal period," "[a]ny maintenance activities necessar y to support license renewal would be limited to previously disturbed areas,"
and that "[n]o expansion of existing facilities is planned, and no additional land di sturbance is anticipated in s upport of license renewal."  Id. at 3. Accordingly, Entergy requested that FWS concur with its "determination that license renewal
 
3  Entergy's Answer Opposing Jones River Watershed Association's and Pilgrim Watch's Motion to Reopen and Hearing Request (Mar. 19, 2012) at 6-10.
4  See 71 Fed. Reg. 15,222 (Mar. 27, 2006).
3 would have no effect on threatened or endangered species . . . and that formal consultation is not necessary."  Entergy Feb. 2005 Letter to FWS at 3. By letter dated March 9, 2005, FWS responded to Entergy's February 3, 2005 letter and concurred with Entergy's determination that formal consultation was not required.
6  FWS stated that the "federally-endangered roseate tern . . . [is] known to occur along Plymouth Beach, just north of the PNPS," but that "non e . . . are known to frequent the immediate vicinity of PNPS and, therefore, the presence of [t his] species near the power st ation is probably transient in nature."  FWS Mar. 2005 Letter to Enter gy at 1. Thus, FWS concluded that,  [s]ince no expansion of existing facilities is planned and no additional land disturbance is anticipated , we concur with your determ ination that license renewal for PNPS is not likely to adversely affect federally-listed species subject to the jurisdiction of the [FWS], and that formal consultation with us is not required.
Id. at 2 (emphasis added). In January 2006, Entergy submitted the App lication. The Application included an Environmental Report ("ER"), which provided an assessment of ESA-listed species that may occur in the vicinity of the station. ER, §§ 2.5, 4.10. With respect to the roseate tern, the ER noted that the species is "known to occur in the general vicinity of the PNPS site . . . and cannot be ruled out as [an] occasional visitor[] to th e PNPS site and environs."  ER at 2-9. More specifically, the ER stated:  [T]he roseate tern nests in colonies along the Massachusetts coast in summer . . . . The roseate tern nests in areas with thic k vegetative cover, always in association with the common tern. Although suitable ne sting habitat has not been identified at PNPS, migrating terns may move through the site in late spring (en route to nesting areas in Maine and Nova Scotia) and late summ er (en route to wintering areas in the West Indies and Latin America).
 
5  Pilgrim Nuclear Power Station, Applicant's Environmental Report ("ER") Attachment B, Special Status Species Correspondence at 1 ("Entergy Feb. 2005 Letter to FWS").
6  Pilgrim Nuclear Power Station, ER Attachment B, Special Status Species Correspondence at 6 ("FWS Mar. 2005 Letter to Entergy").
4 Id. at 2-10. The ER further explained that:
Entergy has no plans to conduct refurbishm ent or construction activities at PNPS during the license renewal term. Therefore, there will be no impact to threatened or endangered species from refurbishment activities.
Id. at 4-18. Entergy's assessment concluded: Renewal of the operating license for PNPS is not expected to result in the taking of any threatened or endangered species.
Renewal of the license is not likely to jeopardize the continued existence of a ny threatened or endangered species or result in the destruction or adverse m odifications of any critical habitat.
Id. The ER included copies of the correspondence between Entergy and FWS. See ER Attachment B.
Id. The ER included copies of the correspondence between Entergy and FWS. See ER Attachment B.
By letter dated April 25, 2006, 7 the NRC notified FWS that it was reviewing the Application and preparing a supplemental environmental impact statement analyzing "pertinent environmental issues, including endangered or threatened species and impacts to fish and wildlife.NRC April 2006 Letter to FWS at 1. The NRC letter noted that the "Pilgrim industrial facility covers approximately 140 acres" and that the "proposed action would include the use and continued maintenance of existing plant facilities and transmission lines," id., and did not indicate that renewal of Pilgrim's operating license would resu lt in any expansion of existing facilities, or construction of new facilities. The NRC requested "a list of species and information on protected, proposed, and candidate species and critical habitat that may be in the vicinity of Pilgrim" in order to "support the SEIS preparation process and to ensure compliance with Section 7 of the [ESA].Id.
By letter dated April 25, 2006,7 the NRC notified FWS that it was reviewing the Application and preparing a supplemental environmental impact statement analyzing pertinent environmental issues, including endangered or threatened species and impacts to fish and wildlife. NRC April 2006 Letter to FWS at 1. The NRC letter noted that the Pilgrim industrial facility covers approximately 140 acres and that the proposed action would include the use and continued maintenance of existing plant facilities and transmission lines, id., and did not indicate that renewal of Pilgrims operating license would result in any expansion of existing facilities, or construction of new facilities. The NRC requested a list of species and information on protected, proposed, and candidate species and critical habitat that may be in the vicinity of Pilgrim in order to support the SEIS preparation process and to ensure compliance with Section 7 of the [ESA]. Id. at 2.
at 2.
7 Letter from Mr. Rani Franovich, NRC, to Mr. Michael Bartlett, U.S. Fish and Wildlife Service,  
7 Letter from Mr. Rani Franovich, NRC, to Mr. Michael Bartlett, U.S. Fish and Wildlife Service,  


==Subject:==
==Subject:==
Request for a List of Protected Species Within the Area Under Evaluation for the Pilgrim Nuclear Power Station License Renewal Application Review (Apr. 25, 2006) (ADAMS Accession No. ML061160303) ("NRC April 2006 Letter to FWS").
Request for a List of Protected Species Within the Area Under Evaluation for the Pilgrim Nuclear Power Station License Renewal Application Review (Apr. 25, 2006) (ADAMS Accession No. ML061160303) (NRC April 2006 Letter to FWS).
5 By letter dated May 23, 2006, FWS responded to the NRC's request by transmitting its March 9, 2005 response to Entergy's Februa ry 3, 2005 letter, which provided the FWS determination that "license renewal for PNPS is not likely to adversely affect federally-listed species subject to the jurisdiction of the [FWS] and that formal cons ultation . . . is not required."
4
8     On May 25, 2006, Pilgrim Watch filed a petition to intervene requesting a hearing on five proposed contentions, none of which sought to raise any issue concerning impact on ESA-listed species, including the roseate tern.
 
9 JRWA did not seek to intervene in the proceeding. In December 2006, the NRC published its draft supplemental environmental impact statement ("DSEIS").
By letter dated May 23, 2006, FWS responded to the NRCs request by transmitting its March 9, 2005 response to Entergys February 3, 2005 letter, which provided the FWS determination that license renewal for PNPS is not likely to adversely affect federally-listed species subject to the jurisdiction of the [FWS] and that formal consultation . . . is not required.8 On May 25, 2006, Pilgrim Watch filed a petition to intervene requesting a hearing on five proposed contentions, none of which sought to raise any issue concerning impact on ESA-listed species, including the roseate tern.9 JRWA did not seek to intervene in the proceeding.
10 The DSEIS identifies the roseate tern as a Federally-listed endangered species that nests in Massachusetts on coastal beaches, and is "known to occur along Plymouth Beach just north of PNPS" and "may pass through the PNPS site during northward migration in late spring or southward migration in early fall.DSEIS at 2-96; see also id. at 2-92, 4-58.
In December 2006, the NRC published its draft supplemental environmental impact statement (DSEIS).10 The DSEIS identifies the roseate tern as a Federally-listed endangered species that nests in Massachusetts on coastal beaches, and is known to occur along Plymouth Beach just north of PNPS and may pass through the PNPS site during northward migration in late spring or southward migration in early fall. DSEIS at 2-96; see also id. at 2-92, 4-58.
Although the northeastern U.S. roseate tern population has declined by approximately 70% since 1935 "due to factors such as alteration of nesting habitats, displacement from nesting areas by gulls, erosion, flooding, and human predat ion on their wintering grounds," id.
Although the northeastern U.S. roseate tern population has declined by approximately 70% since 1935 due to factors such as alteration of nesting habitats, displacement from nesting areas by gulls, erosion, flooding, and human predation on their wintering grounds, id. at 2-96, the roseate population in Massachusetts has been increasing during the period in which PNPS has been operating - from 1600 breeding pairs in 1978 to 1810 breeding pairs in 1999. Id. at 4-58. The NRC Staff found that there is no evidence that these species have been adversely affected by previous operation of the PNPS facility and concluded that, [g]iven that no expansion of existing facilities or disturbance of additional land is anticipated, the roseate tern and other 8
at 2-96, the roseate population in Massachusetts has been increasing during the period in which PNPS has been operating - from 1600 breeding pairs in 1978 to 1810 breeding pairs in 1999. Id.
Letter from Michael J. Amaral, Endangered Species Specialist, New England Field Office, US FWS, to Rani Franovich, NRC (May 23, 2006) (ADAMS Accession No. ML061650016) (FWS May 2006 Letter to NRC).
at 4-58. The NRC Staff found that "there is no evidence that these species ha ve been adversely affected by previous operation of the PNPS facility" and concluded that, "[g]iven that no expansion of existing facilities or disturbance of additional land is anticipated," the roseate tern and other  
9 Request for Hearing and Petition to Intervene by Pilgrim Watch (May 25, 2006).
5


8  Letter from Michael J. Amaral, Endangered Species Specialist, New England Field Office, US FWS, to Rani Franovich, NRC (May 23, 2006) (ADAMS Accession No. ML061650016) ("FWS May 2006 Letter to NRC").
Federally- and State-listed species are unlikely to be adversely affected during the renewal period. Id. Because FWS had already determined that formal consultation was not required, the NRC Staff did not prepare a separate biological assessment (BA) on the roseate tern or any other terrestrial or freshwater aquatic species. Id. at 4-59.
9  Request for Hearing and Petition to Intervene by Pilgrim Watch (May 25, 2006).
With respect to cumulative impacts, the NRC Staff found that operation of PNPS is not likely to have a detectable effect on terrestrial or freshwater aquatic species located in the vicinity of the PNPS and that [n]o other Federal or non Federal activities have been identified that would have an adverse effect on terrestrial and freshwater aquatic species in the area. Id. at 4-70. The Staff concluded that the incremental contribution to cumulative impacts on terrestrial and freshwater aquatic resources resulting from continued operation of PNPS and its associated transmission line ROW would be SMALL and that no additional mitigation would be warranted. Id.
6 Federally- and State-listed species are "unlikel y to be adversely affected during the renewal period.Id. Because FWS had already determined that formal consultation was not required, the NRC Staff did not prepare a separate biological assessment ("BA
") on the roseate tern or any other terrestrial or freshwater aquatic species. Id.
at 4-59. With respect to cumulative impacts, the N RC Staff found that "operation of PNPS is not likely to have a detectable effect on terrestrial or freshwater aquatic species located in the vicinity of the PNPS" and that "[n]o other Federa l or non Federal activities have been identified that would have an adverse effect on terrestrial and freshwater aquatic species in the area.Id. at 4-70. The Staff concluded that the "incremental contribution to cumulative impacts on terrestrial and freshwater aquatic resources resulting from continued operation of PNPS and its associated transmission line ROW would be SMALL and that no additional mitigation would be warranted.Id.
The Staff published the FSEIS in July 2007, and the information, data, and conclusions provided therein with respect to the roseate tern are identical to those presented in the DSEIS.
The Staff published the FSEIS in July 2007, and the information, data, and conclusions provided therein with respect to the roseate tern are identical to those presented in the DSEIS.
See FSEIS at 2-92, 2-96, 4 4-65 (the roseate tern is "unlikely to be adversely affected during the renewal period"), 4-77 (cumulative impacts are "SMALL"). The FSEIS states that  
See FSEIS at 2-92, 2-96, 4 4-65 (the roseate tern is unlikely to be adversely affected during the renewal period), 4-77 (cumulative impacts are SMALL). The FSEIS states that
"[n]o Federally or State-listed threatened or endangered terrestr ial species have been observed on the PNPS site," and that although th e roseate tern and other "Federal ly listed birds occur in the vicinity of" PNPS, "they are not dependent on habitats within the facility and are unlikely to be affected by facility operations.Id. at 4-64. In response to a comment received on the DSEIS concerning the need to "resolve[]" any issues with Federally-listed species, including the roseate  
[n]o Federally or State-listed threatened or endangered terrestrial species have been observed on the PNPS site, and that although the roseate tern and other Federally listed birds occur in the vicinity of PNPS, they are not dependent on habitats within the facility and are unlikely to be affected by facility operations. Id. at 4-64. In response to a comment received on the DSEIS concerning the need to resolve[] any issues with Federally-listed species, including the roseate 10 NUREG-1437, Supplement 29, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Pilgrim Nuclear Power Station - Draft Report for Comment (Dec. 2006) (ADAMS Accession No. ML063260173) (DSEIS).
6
 
tern, related to continued operation of Pilgrim, the Staff summarized its conclusion that impacts to Federally-listed species would be small, stated that it had consulted with FWS under ESA Section 7, and noted that FWS had concurred with the NRCs conclusion and informally concluded the consultation. Id. at A-104 - A-105. The Staff reiterated its ultimate conclusions and determination not to prepare a BA. Id. at 4 4-66 ([g]iven that no expansion of existing facilities or disturbance of additional land is anticipated, the roseate tern and other Federally-and State-listed species are unlikely to be adversely affected during the renewal period; and the impacts on ESA-listed species of an additional 20 years of operation and maintenance of PNPS
. . . would be SMALL, and no additional mitigation would be warranted).
Although Pilgrim Watch was an admitted party to the proceeding when the DSEIS and FSEIS were published, Pilgrim Watch never sought to challenge the adequacy of the ESA Section 7 consultation between the NRC and FWS, or the information, data, and conclusions reached with respect to the roseate tern at those times. Similarly, the publication of those documents did not prompt any hearing request from JRWA. In addition, neither Pilgrim Watch nor JRWA submitted any comments relating to the Staffs consultation and assessment concerning the roseate tern.
Now, nearly five years later, after this Board has terminated the proceeding11 and the NRC Staff has requested Commission authorization to issue the renewed license,12 JRWA/PW have filed the seventh motion to reopen the proceeding, this time claiming that (1) the NRC Staff failed to prepare a BA on the roseate tern and should be required to do so; (2) FWS erroneously consented to the NRC Staffs decision to not prepare a BA; (3) information contained in the 11 LBP-12-01, 75 N.R.C. __, slip op. at 2, 27 (Jan. 11, 2012) 12 SECY-12-0062, Renewal of Full-Power Operating License for Pilgrim Nuclear Power Station (Apr. 20, 2012).
7


10  NUREG-1437, Supplement 29, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Pilgrim Nuclear Power Station - Draft Report for Comment  (Dec. 2006) (ADAMS Accession No. ML063260173) ("DSEIS").
Application and the FSEIS concerning the roseate tern is materially incomplete and inaccurate; and (4) there is significant potential for adverse effects on the roseate terns during the relicensing period. JRWA/PW Motion at 5-6.
7 tern, related to continued operation of Pilgrim, the Staff summarized its conclusion that impacts to Federally-listed species would be small, stated that it had consulted with FWS under ESA Section 7, and noted that FWS had concurred with the NRC's conclusion and informally concluded the consultation. Id. at A-104 - A-105. The Staff reiterated its ultimate conclusions and determination not to prepare a BA. Id.
III.      The NRC Was Not Required to Prepare a Biological Assessment for the Roseate Tern Because the JRWA/PW Motion focuses on the question of whether the NRC was required to prepare a BA on the roseate tern, this Answer will first provide a short overview of when a Federal agency must prepare a BA under ESA Section 7 before addressing the Motions multiple failures to comply with the Commissions requirements reopening the record, late-filed contentions, and admissible contentions.
at 4 4-66 ("[g]iven th at no expansion of existing facilities or disturbance of additional land is anticipated," the ro seate tern and other Federally- and State-listed species are "unlik ely to be adversely affected dur ing the renewal period"; and the impacts on ESA-listed species "of an additional 20 years of operation and maintenance of PNPS . . . would be SMALL, and no additional mitigation would be warranted"). Although Pilgrim Watch was an admitted part y to the proceeding when the DSEIS and FSEIS were published, Pilgrim Watch never sought to challenge the adequacy of the ESA Section 7 consultation between the NRC and FWS, or the information, data, and conclusions reached with respect to the roseate tern at those times. Similarly, the publication of those documents did not prompt any hearing request from JRWA. In addition, neither Pilgrim Watch nor JRWA submitted any comments relating to the Staff's consultation and assessment
Entergy has previously summarized portions of the requirements under Section 7 of the ESA.13 Relevant to the claims made in the JRWA/PW Motion on the roseate tern, under ESA Section 7, the NRC is required, in consultation with FWS,14 to ensure that any NRC action is not likely to jeopardize the continued existence of any threatened or endangered terrestrial and freshwater aquatic species, or result in the destruction or adverse modification of habitat critical to such species. 16 U.S.C. § 1536(a)(2). To facilitate compliance with the consultation requirements, ESA Section 7(c) calls on Federal agencies to prepare a BA only if ESA-listed species may be present in the area of proposed projects involving construction authorized by the agency. 16 U.S.C. § 1536(c). The statute does not, however, specify how a federal agency should determine whether its actions are likely to affect ESA-listed species in other types of 13 Entergys Answer Opposing Jones River Watershed Associations and Pilgrim Watchs Motion to Reopen and Hearing Request (Mar. 19, 2012) at 3-5.
14 The ESA refers to the Secretary of Commerce and the Secretary of the Interior, but these Departments have delegated their authority to the National Marine Fisheries Service (NMFS) and FWS. Because the roseate tern falls under the jurisdiction of FWS, this Answer will refer only to FWS.
8


concerning the roseate tern. Now, nearly five years later, after this Board has terminated the proceeding 11 and the NRC Staff has requested Commission authorization to issue the renewed license, 12 JRWA/PW have filed the seventh motion to reopen the proceeding, this time claiming that (1) the NRC Staff failed to prepare a BA on the roseate tern and should be required to do so; (2) FWS erroneously consented to the NRC Staff's decision to not prepare a BA; (3) information contained in the  
proceedings that do not involve major construction activities (such as renewing the operating license of a nuclear plant).
The FWS regulations implementing ESA Section 7 mirror the requirements of the statute:
in the case of major construction activities, the Federal agency authorizing the construction activity must prepare a BA. 50 C.F.R. § 402.12(b). But for Federal actions that do not involve major construction activities, no BA is required. When promulgating Part 402, FWS explicitly stated that it will not require biological assessments for actions that do not involve construction or activities having physical impacts similar to construction, such as dredging, blasting, etc. This limitation derives support from the 1979 Conference Report reference to actions designed primarily to result in the building or erection of various projects.
Final Rule, Interagency Cooperation, Endangered Species Act of 1973, 51 Fed. Reg. 19,926, 19,936 (June 3, 1986) (emphasis in original). A major construction activity encompasses dams, buildings, pipelines, roads, water resource developments, channel improvements, and other such undertakings which significantly modify the physical environment. Id. The Statement of Considerations is clear that a BA is required only for major Federal actions that are also construction projects. Id.
Federal Courts have held that a BA be prepared only for major construction activities. In Water Keeper Alliance v. U.S. Dept of Defense, 271 F.3d 21 (1st Cir. 2001), the First Circuit ruled that [w]hat triggers the requirement of a biological assessment is that the action is a major construction activity. 271 F.3d at 31. At issue in that case were military exercises on the island of Vieques off Puerto Rico, specifically short term exercises using inert ordinance, and a request for a preliminary injunction to stay those exercises. Id. at 24, 33. The First Circuit noted some ambiguity in the regulations as to who decides whether an agency action is a major construction 9


11  LBP-12-01, 75 N.R.C. __, slip op. at 2, 27 (Jan. 11, 2012) 12  SECY-12-0062, Renewal of Full-Power Operating License for Pilgrim Nuclear Power Station (Apr. 20, 2012).
activity, but pointed to the Statement of Considerations for the regulation, which suggests that the Federal agency authorizing the action at issue makes the determination. Id. at 33, n.8 (quoting 51 Fed. Reg. at 19,946 (The biological assessment process begins when a Federal agency decides that its action is a major construction activity)). The First Circuit concluded that the petitioner had failed to show the required probability of success on the merits to require a preliminary injunction in light of the Navys conclusion that the activities at issue did not constitute a major construction activity necessitating a BA. Id. at 33.15 Applying the requirements of ESA Section 7 and its implementing regulations, and Federal case law interpreting those provisions to the circumstances here, the NRC was not required to prepare a BA for the renewal of Pilgrims operating license. The record is clear that, during the license renewal term, Entergy planned [n]o expansion of existing facilities and anticipated no additional land disturbance. Entergy Feb. 2005 Letter to FWS at 3. See also FWS Mar. 2005 Letter to Entergy at 2; DSEIS at 4-58; FSEIS at 4-64. Thus, renewal of Pilgrims operating license does not involve major construction activities. Consequently, the NRC was not required to prepare a BA.
8 Application and the FSEIS concerning the roseate tern is materially incomplete and inaccurate; and (4) "there is significant potential for a dverse effects on the roseate terns during the relicensing period."  JRWA
The cases on which Pilgrim Watch relies for support are inapposite because, unlike renewal of Pilgrims operating license, they concern activities involving the building of new facilities, the expansion or existing facilities, or land disturbances. Thomas v. Peterson, 753 F.2d 754 (9th Cir. 1985) (cited at JRWA/PW Motion at 8, 10-12, 25-27, 35, 39, 56) concerned the construction of timber road in formal national forest roadless area. 753 F.2d at 755. City of Sausalito v. ONeill, 386 F.3d 1186 (9th Cir. 2004) (cited at JRWA/PW Motion at 8) concerned 15 Similarly, the Eighth Circuit has held that the requirement to prepare a BA does not apply to timber sales because such sales are not major construction activities under 50 C.F.R. § 402.12. Newton Cnty. Wildlife Assn v.
/PW Motion at 5-6.
Rogers, 141 F.3d 803, 811 (8th Cir. 1998).
III. The NRC Was Not Required to Prepare a Biological Assessment for the Roseate Tern Because the JRWA/PW Motion focuses on the question of whether the NRC was required to prepare a BA on the roseate tern, this Answer will first provid e a short overview of when a Federal agency must prepare a BA unde r ESA Section 7 before addressing the Motion's multiple failures to comply with the Commission's requirements reopening the record, late-filed contentions, and admissible contentions. Entergy has previously summarized portions of the requirements under Section 7 of the ESA.13  Relevant to the claims made in the JRWA/PW Motion on the roseate tern, under ESA Section 7, the NRC is required, in consultation with FWS, 14 to ensure that any NRC action is not likely to jeopardize the continued existence of any threatened or endangered terrestrial and freshwater aquatic species, or result in the destruction or adverse modification of habitat critical to such species. 16 U.S.C. § 1536(a)(2). To facilitate compliance with the consultation requirements, ESA Section 7(c) calls on Federal agencies to prepare a BA only if ESA-listed species may be present in the area of proposed projects involving construction authorized by the agency. 16 U.S.C. § 1536(c). The statute does not, however, specify how a federal agency should determine whether its actions are likely to affect ESA-listed spec ies in other types of
10


13  Entergy's Answer Opposing Jones River Watershed Association's and Pilgrim Watch's Motion to Reopen and Hearing Request (Mar. 19, 2012) at 3-5.
the development and rehabilitation of Fort Baker, including the establishment of a 350 guest-room conference and retreat center, expansion of certain buildings, the relocation and expansion of parking facilities, and beach restoration. 386 F.3d at 1194, 1196.
14  The ESA refers to the Secretary of Commerce and the Secretary of the Interior, but these Departments have delegated their authority to the National Marine Fisheries Service ("NMFS") and FWS. Because the roseate tern falls under the jurisdiction of FWS, this Answer will refer only to FWS.
In any event, the existing NRC Staff NEPA analysis satisfies the requirements established for a BA. ESA Section 7 expressly provides that a BA may be undertaken as part of a Federal agencys compliance with the requirements of section 102 of NEPA (42 U.S.C. § 4332), i.e., the preparation of an environmental impact statement. 16 U.S.C. 1536(c)(1). The statute does not prescribe the contents of a BA other than to say that it must be based on the best scientific and commercial data available. Id. The FWS regulations, however, make clear that
9 proceedings that do not involve major construction activities (such as renewing the operating license of a nuclear plant). The FWS regulations implementing ESA Section 7 mirror the requirement s of the statute:  in the case of "major construction activities,"
[t]he contents of a biological assessment are at the discretion of the Federal agency and will depend on the nature of the Federal action, and may include (among other things) whether listed . . . species are present or occur seasonally, [a] review of the literature and other information, and an analysis of the effects of the action on the species and habitat, including consideration of cumulative effects. 50 C.F.R. § 402.12(f) (emphasis added).
the Federal agency authorizing the construction activity must prepare a BA. 50 C.F.R. § 402.12(b).
Here, the NRC Staff found that renewal of Pilgrims operating license will not involve any expansion of existing facilities or disturbance of additional land, and that the roseate tern is not dependent on habitats within the facility and [is] unlikely to be affected by facility operations. FSEIS at 4 4-65. Thus, the Staff determined that the roseate tern was unlikely to be adversely affected during the renewal period. Id. at 4-66. With respect to cumulative impacts, the NRC Staff found that operation of PNPS is not likely to have a detectable effect on terrestrial or freshwater aquatic species located in the vicinity of the PNPS and that [n]o other Federal or non Federal activities have been identified that would have an adverse effect on terrestrial and freshwater aquatic species in the area. Id. at 4-77.
But for Federal actions that do not involve major construction activities, no BA is required. When promulgating Part 402, FWS explicitly stated that it will not require biological assessments for ac tions that do not involve construction or activities having physical impacts sim ilar to construction, such as dredging, blasting, etc. This limitation derives support from the 1979 Conference Report reference to actions designed primarily to result in the building or erection of various projects.
11
Final Rule, Interagency Cooperation, Endangered Species Act of 1973, 51 Fed. Reg. 19,926, 19,936 (June 3, 1986) (emphasis in original). A "major construction activity" "encompasses dams, buildings, pipelines, roads, water resource developments, channel improvements, and other such undertakings which significantly modify the physical environment."  Id.
The Statement of Considerations is cl ear that a BA is required only for major Federal actions that are also construction projects. Id.
Federal Courts have held that a BA be prepared only for major construction activities. In Water Keeper Alliance v. U.S. Dep't of Defense , 271 F.3d 21 (1st Cir. 2001), the First Circuit ruled that "[w]hat triggers the requirement of a biological assessment is that the action is a major construction activity."  271 F.3d at 31. At issue in that case were military exercises on the island of Vieques off Puerto Rico, specifically short term exercises using inert or dinance, and a request for a preliminary injunction to stay those exercises. Id. at 24, 33. The First Circuit noted some ambiguity in the regulations as to who decides whether an agency action is a major construction 10 activity, but pointed to the Statement of Considerations for the regulation, which suggests that the Federal agency authorizing the action at issue makes the determination. Id.
at 33, n.8 (quoting 51 Fed. Reg. at 19,946 ("The biological assessment process begins when a Federal agency decides that its action is a major construc tion activity")). The First Circuit concluded that the petitioner had failed to show the required probability of success on the merits to require a preliminary injunction in light of the Navy's conclusion that the activities at issue did not constitute a major construction activity necessitating a BA. Id.
at 33.15  Applying the requirements of ESA Section 7 and its implementing regulations, and Federal case law interpreting those provisions to the circumstances here, the NRC was not required to prepare a BA for the renewal of Pilgrim's operating license. The record is clear that, during the license renewal term, Entergy planne d "[n]o expansion of existing facilities" and anticipated "no additional land disturbance."  Entergy Feb. 2005 Letter to FWS at 3. See also FWS Mar. 2005 Letter to Entergy at 2; DSEIS at 4-58; FSEIS at 4-64. Thus, renewal of Pilgrim's operating license does not involve "major construction activities."  C onsequently, the NRC was not required to prepare a BA. The cases on which Pilgrim Watch relies for support are inapposite because, unlike renewal of Pilgrim's operating license, they c oncern activities involving the building of new facilities, the expansion or existing facilities, or land dist urbances. Thomas v. Peterson , 753 F.2d 754 (9th Cir. 1985) (cited at JRWA/PW Mo tion at 8, 10-12, 25-27, 35, 39, 56) concerned the "construction of timber road in formal national forest roadless area."
753 F.2d at 755. City of Sausalito v. O'Neill , 386 F.3d 1186 (9th Cir. 2004) (cited at JRWA/PW Motion at 8) concerned


15  Similarly, the Eighth Circuit has held that the requirement to prepare a BA does not apply to timber sales because such sales are not "major construction activities" under 50 C.F.R. § 402.12. Newton Cnty. Wildlife Ass'n v. Rogers, 141 F.3d 803, 811 (8th Cir. 1998).
Accordingly, even if a BA were required for the roseate tern, the Board should find the NRC Staffs existing NEPA analysis on the roseate tern sufficient for that purpose. See Water Keeper Alliance, 271 F.3d at 33 (finding that, although not required to prepare a separate BA, the documents prepared by the Navy met the functional equivalent of a [BA]).
11 the "development and rehabilita tion of Fort Baker," including the establishment of a 350 guest-room conference and retreat center, expansion of certain buildings, the relocation and expansion of parking facilities, and beach restoration. 386 F.3d at 1194, 1196. In any event, the existing NRC Staff NEPA analysis satisfies the requirements established for a BA. ESA Section 7 expressly provides that a BA "may be undertaken as part of a Federal agency's compliance w ith the requirements of section 102" of NEPA (42 U.S.C. § 4332), i.e., the preparation of an environmental impact statement. 16 U.S.C. 1536(c)(1). The statute does not prescribe the contents of a BA other than to say that it must be based on the "best scientific and commercial data available."  Id. The FWS regulations, however, make clear that
IV. The Board Should Reject the Contention A.     Applicable Legal Standards for Reopening the Record, Late Contentions, and Admissible Contentions The NRC does not look with favor on amended or new contentions filed after the initial filing. Dominion Nuclear Connecticut, Inc. (Millstone Nuclear Power Station, Units 2 and 3),
"[t]he contents of a biological assessment are at the discretion of the Federal agency and will depend on the nature of the Federal action," and "may" include (among other things) whether "listed . . . species are present or occur seasona lly," "[a] review of the literature and other information," and "an analysis of the effects of the action on th e species and habitat, including consideration of cumulative effects."  50 C.F.R. § 402.12(f) (emphasis added). Here, the NRC Staff found that renewal of Pilgrim's operatin g license will not involve any "expansion of existing facilities or disturbance of additional land," and that the roseate tern is "not dependent on habitats within the facility and [is] unlikely to be affected by facility operations."  FSEIS at 4 4-65. Thus, the Staff determined that the roseate tern was "unlikely to be adversely affected during the renewal period."  Id. at 4-66. With respect to cumulative impacts, the NRC Staff found that "o peration of PNPS is not likely to have a detectable effect on terrestrial or freshwater aquatic species locate d in the vicinity of the PNPS" and that "[n]o other Federal or non Federal activities have been id entified that would have an adverse effect on terrestrial and freshwater aquatic species in the area."  Id.
CLI-04-36, 60 N.R.C. 631, 638 (2004). As the Commission has repeatedly stressed, our contention admissibility and timeliness rules require a high level of discipline and preparation by petitioners who must examine the publicly available material and set forth their claims and the support for their claims at the outset. There simply would be no end to NRC licensing proceedings if petitioners could disregard our timeliness requirements and add new contentions at their convenience during the course of a proceeding based on information that could have formed the basis for a timely contention at the outset of the proceeding. Our expanding adjudicatory docket makes it critically important that parties comply with our pleading requirements and that the Board enforce those requirements.
at 4-77.
AmerGen Energy Co., LLC (Oyster Creek Nuclear Generating Station), CLI-09-7, 69 N.R.C.
12 Accordingly, even if a BA were required for the roseate tern, the Board should find the NRC Staff's existing NEPA analysis on the roseat e tern sufficient for that purpose. See Water Keeper Alliance , 271 F.3d at 33 (finding that, although not re quired to prepare a separate BA, the documents prepared by the Navy met "the functional equivalent of a [BA]").
235, 271-72 (2009) (emphasis added) (citations omitted).
IV. The Board Should Reject the Contention A. Applicable Legal Standards for Reopen ing the Record, Late Contentions, and Admissible Contentions The NRC does not look with favor on amended or new contentions fi led after the initial filing. Dominion Nuclear Connecticut, Inc. (Millstone Nuclear Powe r Station, Units 2 and 3), CLI-04-36, 60 N.R.C. 631, 638 (2004). As the Commission has repeatedly stressed, our contention admissibility and timeliness rules require a high level of discipline and preparation by petitioners "who must examine the publicly available material and set forth their claims and the support for their claims at the outset.There simply would be "no end to NRC licen sing proceedings if petitioners could disregard our timeliness requirements" and add new contentions at their convenience during the course of a proceeding based on information that could have formed the basis for a timely conten tion at the outset of the proceeding. Our expanding adjudicatory docket makes it critically important that parties comply with our pleading requirements and that the Board enforce those requirements. AmerGen Energy Co., LLC (Oyster Creek Nuclear Generatin g Station), CLI-09-7, 69 N.R.C. 235, 271-72 (2009) (emphasis added) (citations omitted). Where, as here, the adjudicatory record has been closed, the Comm ission's rules specify that a motion to reopen that record to consider additional evidence - including evidence on a new  
Where, as here, the adjudicatory record has been closed, the Commissions rules specify that a motion to reopen that record to consider additional evidence - including evidence on a new contention (see 10 C.F.R. § 2.326(d)) - will not be granted unless the following criteria are satisfied:
(1) The motion must be timely. However, an exceptionally grave issue may be considered in the discretion of the presiding officer even if untimely presented; (2) The motion must address a significant safety or environmental issue; and 12


contention (see 10 C.F.R. § 2.326(d)) - will not be granted unless the following criteria are satisfied: (1)  The motion must be timely. However, an exceptionally grave issue may be considered in the discretion of the presiding officer even if untimely presented; (2)  The motion must address a significant safety or environmental issue; and 13 (3) The motion must demonstrate that a materially different result would be or would have been likely had the newly proffered evidence been considered initially. 10 C.F.R. § 2.326(a). Further, under the NRC rules, The motion must be accompanied by affidavits that set forth the factual and/or technical bases for the movant's claim that the criteria of paragraph (a) of this section have been satisfied. Affidavits must be given by competent individuals with knowledge of the facts a lleged, or by experts in the disciplines appropriate to the issues raised. Evidence contained in affidavits must meet the admissibility standards of this subpart. Each of the criteria must be separately addressed, with a specific explanation of why it has been met. When multiple allegations are involved, the movant must identify with particularity each issue it seeks to litigate and specify the factual and/or technical bases which it believes support the claim that this issue meets the criteria in paragraph (a) of this section.
(3) The motion must demonstrate that a materially different result would be or would have been likely had the newly proffered evidence been considered initially.
10 C.F.R. § 2.326(b) (emphasis added). "All of the factors in section 2.326 must be met in order for a motion to reopen to be granted.Entergy Nuclear Generation Co.
10 C.F.R. § 2.326(a). Further, under the NRC rules, The motion must be accompanied by affidavits that set forth the factual and/or technical bases for the movant's claim that the criteria of paragraph (a) of this section have been satisfied. Affidavits must be given by competent individuals with knowledge of the facts alleged, or by experts in the disciplines appropriate to the issues raised. Evidence contained in affidavits must meet the admissibility standards of this subpart. Each of the criteria must be separately addressed, with a specific explanation of why it has been met. When multiple allegations are involved, the movant must identify with particularity each issue it seeks to litigate and specify the factual and/or technical bases which it believes support the claim that this issue meets the criteria in paragraph (a) of this section.
(Pilgrim Nuclear Power Station), CLI-12-03, 75 N.R.C. __, slip op.
10 C.F.R. § 2.326(b) (emphasis added). All of the factors in section 2.326 must be met in order for a motion to reopen to be granted. Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-12-03, 75 N.R.C. __, slip op. at 15 (Feb. 22, 2012) (CLI-12-03).
at 15 (Feb. 22, 2012) ("CLI-12-03"). Further, the Commission repeatedly has emphasized that "[t]he burden of satisfying the reopening requirements is a heavy one.Oyster Creek , CLI-09-7, 69 N.R.C. at 287 (citing Louisiana Power & Light Co. (Waterford Steam Electric Stati on, Unit 3), CLI-86-1, 23 N.R.C. 1, 5 (1986)). "[P]roponents of a reopening motion bear the burden of meeting all of [these] requirements.Id. (citing Public Service Co. of New Hampshire (Seabrook Station, Units 1 and 2), CLI-90-10, 32 N.R.C. 218, 221 (1990)). "Bare assertions and speculation . . . do not supply the requisite support.Id. (citing AmerGen Energy Co., LLC (Oyster Creek Nuclear Generating Station), CLI-08-28, 68 N.R.C. 658, 674 (2008)).
Further, the Commission repeatedly has emphasized that [t]he burden of satisfying the reopening requirements is a heavy one. Oyster Creek, CLI-09-7, 69 N.R.C. at 287 (citing Louisiana Power & Light Co. (Waterford Steam Electric Station, Unit 3), CLI-86-1, 23 N.R.C. 1, 5 (1986)). [P]roponents of a reopening motion bear the burden of meeting all of [these]
Evidence contained in the Section 2.326(b) affidavits must meet the admissibility st andards in 10 C.F.R. § 2.337. Entergy Nuclear Generation Co.
requirements. Id. (citing Public Service Co. of New Hampshire (Seabrook Station, Units 1 and 2), CLI-90-10, 32 N.R.C. 218, 221 (1990)). Bare assertions and speculation . . . do not supply the requisite support. Id. (citing AmerGen Energy Co., LLC (Oyster Creek Nuclear Generating Station), CLI-08-28, 68 N.R.C. 658, 674 (2008)). Evidence contained in the Section 2.326(b) affidavits must meet the admissibility standards in 10 C.F.R. § 2.337. Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-12-06, 75 N.R.C. __, slip op. at 18 (Mar.
(Pilgrim Nuclear Power Station), CLI 06, 75 N.R.C. __, slip op. at 18 (Mar. 8, 2012) ("CLI-12-06"). In other words, the evidence must be relevant, material, and reliable.
8, 2012) (CLI-12-06). In other words, the evidence must be relevant, material, and reliable.
Id.
Id.
14 In addition, where a motion to reopen rela tes to a contention not previously in controversy, as is the case here, a motion to reopen must also satisfy the standards for non-timely contentions in 10 C.F.R. § 2.309(c). 10 C.F.R. § 2.326(d); Pilgrim , CLI-12-03 at 9.
13
16 Section 2.309(c) provides that non-timely contentions will not be entertained, absent a determination by the Board that the contentions should be admitted based upon a balancing of the following factors: (i) Good cause, if any, for the failure to file on time; (ii) The nature of the requestor's/petitioner's right under the Act to be made a party to the proceeding; (iii) The nature and extent of the requestor's/petitioner's property, financial or other interest in the proceeding; (iv) The possible effect of any order that may be entered in the proceeding on the requestor's/petitioner's interest; (v) The availability of other means whereby the requestor's/petitioner's interest will be protected; (vi) The extent to which the requestor's/petitioner's interests will be represented by existing parties; (vii) The extent to which the requestor's/petitioner's participation will broaden the issues or delay the proceeding; and (viii) The extent to which the requestor's/petitioner's participation may reasonably be expected to assist in developing a sound record.
 
In addition, where a motion to reopen relates to a contention not previously in controversy, as is the case here, a motion to reopen must also satisfy the standards for non-timely contentions in 10 C.F.R. § 2.309(c). 10 C.F.R. § 2.326(d); Pilgrim, CLI-12-03 at 9.16 Section 2.309(c) provides that non-timely contentions will not be entertained, absent a determination by the Board that the contentions should be admitted based upon a balancing of the following factors:
(i) Good cause, if any, for the failure to file on time; (ii) The nature of the requestor's/petitioner's right under the Act to be made a party to the proceeding; (iii) The nature and extent of the requestor's/petitioner's property, financial or other interest in the proceeding; (iv) The possible effect of any order that may be entered in the proceeding on the requestor's/petitioner's interest; (v) The availability of other means whereby the requestor's/petitioner's interest will be protected; (vi) The extent to which the requestor's/petitioner's interests will be represented by existing parties; (vii) The extent to which the requestor's/petitioner's participation will broaden the issues or delay the proceeding; and (viii) The extent to which the requestor's/petitioner's participation may reasonably be expected to assist in developing a sound record.
10 C.F.R. § 2.309(c)(1).
10 C.F.R. § 2.309(c)(1).
In keeping with the Commission's disfavor of contentions after the initial filing, these factors are "stringent.Oyster Creek, CLI-09-7, 69 N.R.C. at 260, citing Florida Power & Light Co. (Calvert Cliffs Nuclear Power Plant, Units 1 and 2, et al.), CLI-06-21, 64 N.R.C. 30, 33
In keeping with the Commissions disfavor of contentions after the initial filing, these factors are stringent. Oyster Creek, CLI-09-7, 69 N.R.C. at 260, citing Florida Power & Light Co. (Calvert Cliffs Nuclear Power Plant, Units 1 and 2, et al.), CLI-06-21, 64 N.R.C. 30, 33 16 See also Dominion Nuclear Connecticut, Inc. (Millstone Nuclear Power Station, Unit 3), CLI-09-5, 69 N.R.C.
115, 125 (2009); Oyster Creek, CLI-08-28, 68 N.R.C. at 668.
14


16  See also Dominion Nuclear Connecticut, Inc. (Millstone Nuclear Power Station, Unit 3), CLI-09-5, 69 N.R.C. 115, 125 (2009); Oyster Creek, CLI-08-28, 68 N.R.C. at 668.
(2006). Late petitioners properly have a substantial burden in justifying their tardiness.
15 (2006). "Late petitioners properl y have a substantial burden in justifying their tardiness."
Nuclear Fuel Services, Inc. (West Valley Reprocessing Plant), CLI-75-4, 1 N.R.C. 273, 275 (1975).
Nuclear Fuel Services, Inc. (West Valley Reprocessing Plan t), CLI-75-4, 1 N.R.C. 273, 275 (1975). Commission case law places most importance on whether the petitioner has demonstrated sufficient good cause for the untimely filing.
Commission case law places most importance on whether the petitioner has demonstrated sufficient good cause for the untimely filing. Tennessee Valley Authority (Watts Bar Nuclear Plant, Unit 2), CLI-10-12, 71 N.R.C. 319, 323 (2010); Private Fuel Storage, L.L.C. (Independent Spent Fuel Storage Installation), CLI-00-02, 51 N.R.C. 77, 79 (2000); Millstone, CLI-09-5, 69 N.R.C. at 125. Indeed, failure to demonstrate good cause requires the petitioner to make a compelling showing with respect to the other factors. Texas Utilities Electric Co. (Comanche Peak Steam Electric Station, Unit 2), CLI-93-4, 37 N.R.C. 156, 165 (1993). In other words, A petitioners showing must be highly persuasive; it would be a rare case where
Tennessee Valley Authority (Watts Bar Nuclear Plant, Unit 2), CLI-10-12, 71 N.R.C. 319, 323 (2010); Private Fuel Storage, L.L.C. (Independent Spent Fuel Storage Installation), CL I-00-02, 51 N.R.C. 77, 79 (2000); Millstone , CLI-09-5, 69 N.R.C. at 125. Indeed, failure to demonstrat e good cause requires the petitioner to make a "compelling" showing with respect to the other factors. Texas Utilities Electric Co. (Comanche Peak Steam Electric Station, Unit 2), CLI-93-4, 37 N.R.C. 156, 165 (1993). In other words, A petitioner's showing must be highly pe rsuasive; it would be a rare case where [the Commission] would excuse a non-timely petition absent good cause. Watts Bar, CLI-10-12, 71 N.R.C. at 323 (footnote omitted). Finally, any new contention must also satisfy the strict standards for admissibility in 10 C.F.R. § 2.309(f)(1). These standards also are enforced rigorously. "If any one . . . is not met, a contention must be rejected.Arizona Public Service Co. (Palo Verde Nuclear Generating Station, Unit Nos. 1, 2, and 3), CLI-91-12, 34 N.R.C. 149, 155 (1991) (citation omitted); USEC, Inc. (American Centrifuge Plant), CLI-06-9, 63 N.R.C. 433, 437 (2006) ("These requirements are deliberately strict, and we will reject any contention that does not satisfy the requirements." (footnotes omitted)). A licensing board is not to overlook a deficiency in a contention or assume the existence of missing information. Palo Verde, CLI-91-12, 34 N.R.C.
[the Commission] would excuse a non-timely petition absent good cause.
at 155; Oyster Creek , CLI-09-7, 69 N.R.C. at 260 (the contention admissi bility rules "require the petitioner (not the board) to supply all of the required elements for a valid intervention petition" (emphasis added) (footnote omitted)).
Watts Bar, CLI-10-12, 71 N.R.C. at 323 (footnote omitted).
16 B. The JRWA/PW Motion Fails to Meet the Reopening Standards The JRWA/PW Motion fails to satisfy all of the standards for reopening a closed record in 10 C.F.R. § 2.326. As a threshold matter, the JRWA/PW Motion should be rejected out of hand because its supporting affidavits fail to meet the Section 2.326(b) requirement that such affidavits specifically address why each one of the Section 2
Finally, any new contention must also satisfy the strict standards for admissibility in 10 C.F.R. § 2.309(f)(1). These standards also are enforced rigorously. If any one . . . is not met, a contention must be rejected. Arizona Public Service Co. (Palo Verde Nuclear Generating Station, Unit Nos. 1, 2, and 3), CLI-91-12, 34 N.R.C. 149, 155 (1991) (citation omitted); USEC, Inc. (American Centrifuge Plant), CLI-06-9, 63 N.R.C. 433, 437 (2006) (These requirements are deliberately strict, and we will reject any contention that does not satisfy the requirements.
.326(a) reopening standards has been met. Despite Petitioners' assertion that thei r affiants have addressed the relevant criteria, JRWA/PW Motion at 36, the affiants fail to do so. The affidavit from E. Pine duBois nowhere addresses the Section 2.326(a) criteria. Indeed, Ms. DuBois' affidavit never mentions the roseate tern. While the affidavit from Dr. Nisbet pays lip service to two of th e Section 2.326(a) criteria, he fails to separately address each criterion and provide "a spec ific explanation of why [each] has been met" or "specif[ies] the factual and/or technical bases" why each of the Section 2.326 criteria has been met for each of the multiple allegations raised in the JRWA/PW Motion. 10 C.F.R. § 2.326(b). Dr. Nisbet nowhere asserts that the issues raised in the Contention are timely under Section 2.326(a)(1). With re spect to the other two reopeni ng criteria, Dr. Nisbet provides a conclusory assertion that the Contention raises significant environmental issues and that a materially different result would have been likely if those issues had been considered initially.
(footnotes omitted)). A licensing board is not to overlook a deficiency in a contention or assume the existence of missing information. Palo Verde, CLI-91-12, 34 N.R.C. at 155; Oyster Creek, CLI-09-7, 69 N.R.C. at 260 (the contention admissibility rules require the petitioner (not the board) to supply all of the required elements for a valid intervention petition (emphasis added)
Nisbet Aff. at ¶ 21. Such bare assertions and speculation are insufficient to meet the requirements of Section 2.326. Oyster Creek, CLI-09-7, 69 N.R.C. at 287. The JRWA/PW Motion's failure to meet the requirements of Section 2.326(b) alone is sufficient grounds to reject the Motion. Texa s Utilities Electric Co. (Comanche Peak Steam Electric Station, Units 1 17 and 2), CLI-92-12, 36 N.R.C. 62, 76 (1992), citing Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), CLI-89-1, 29 N.R.C. 89, 93-94 (1989).
(footnote omitted)).
17  1. JRWA/PW's Claims Are Untimely Neither JRWA/PW nor their affiants demonstrate that the issues raised in the JRWA/PW Motion are timely, nor could they. The bases for JRWA/PW's challenges are not new information and could have been raised long ago. Except in certain circumstances inapplicable here, the NRC rules allow new contentions to be filed only with the leave of the presiding officer upon a showing that: (i) The information upon which the amende d or new contention is based was not previously available; (ii) The information upon which the ame nded or new contention is based is materially different than inform ation previously available; and (iii) The amended or new contention has been submitted in a timely fashion based on the availability of the subsequent information.
15
10 C.F.R. § 2.309(f)(2)(i)-(iii). In essence, a proponent of a new contention must show that it could not have raised its contention earlier.  "[T]he unavailability of [a] document does not constitute a showing of good cause for admitting a late-filed contention when the factual predicate for that contention is available from other sources in a timely manner."  Duke Power Co. (Catawba Nuclear Station, Units 1 a nd 2), CLI-83-19, 17 N.R.C.1041, 1043 (1983).
Consequently, an intervenor cannot establish good cause for fili ng a late contention when the information on which the contention is based was publicly available "for some time" prior to the


filing of the contention.
B. The JRWA/PW Motion Fails to Meet the Reopening Standards The JRWA/PW Motion fails to satisfy all of the standards for reopening a closed record in 10 C.F.R. § 2.326. As a threshold matter, the JRWA/PW Motion should be rejected out of hand because its supporting affidavits fail to meet the Section 2.326(b) requirement that such affidavits specifically address why each one of the Section 2.326(a) reopening standards has been met. Despite Petitioners assertion that their affiants have addressed the relevant criteria, JRWA/PW Motion at 36, the affiants fail to do so. The affidavit from E. Pine duBois nowhere addresses the Section 2.326(a) criteria. Indeed, Ms. DuBois affidavit never mentions the roseate tern. While the affidavit from Dr. Nisbet pays lip service to two of the Section 2.326(a) criteria, he fails to separately address each criterion and provide a specific explanation of why [each]
Philadelphia Electric Co. (Limerick Generating Station, Units 1 and 2), ALAB-828, 23 N.R.C. 13, 21 (1986). The NRC typically applies a "30-day clock" to the filing
has been met or specif[ies] the factual and/or technical bases why each of the Section 2.326 criteria has been met for each of the multiple allegations raised in the JRWA/PW Motion. 10 C.F.R. § 2.326(b). Dr. Nisbet nowhere asserts that the issues raised in the Contention are timely under Section 2.326(a)(1). With respect to the other two reopening criteria, Dr. Nisbet provides a conclusory assertion that the Contention raises significant environmental issues and that a materially different result would have been likely if those issues had been considered initially.
Nisbet Aff. at ¶ 21. Such bare assertions and speculation are insufficient to meet the requirements of Section 2.326. Oyster Creek, CLI-09-7, 69 N.R.C. at 287. The JRWA/PW Motions failure to meet the requirements of Section 2.326(b) alone is sufficient grounds to reject the Motion. Texas Utilities Electric Co. (Comanche Peak Steam Electric Station, Units 1 16


17 See also Pilgrim, CLI-12-03 at 16 (ruling that Pilgrim Watch failed to meet the Section 2.326 reopening standards because it did "not demonstrate, with the level of support required under section 2.326(b), that a materially different result would have been likely") (emphasis added).
and 2), CLI-92-12, 36 N.R.C. 62, 76 (1992), citing Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), CLI-89-1, 29 N.R.C. 89, 93-94 (1989).17
18 of a new contention based on new information, 18 and this has been the standard established in this proceeding.
: 1.      JRWA/PWs Claims Are Untimely Neither JRWA/PW nor their affiants demonstrate that the issues raised in the JRWA/PW Motion are timely, nor could they. The bases for JRWA/PWs challenges are not new information and could have been raised long ago.
19 JRWA/PW's claim that the NRC Staff was required to prepar e a BA on the roseate tern, e.g., JRWA/PW Motion at 5, could have been brought as early as December 2006 when the Staff issued the DSEIS. Likewise, the claim that FWS inappropriately acquiesced to the NRC's conclusions with respect to the roseate tern, e.g., id., could have been brought at that same time, if not in July 2007 with the Staff's publication of the FSEIS. The NRC Staff made public its determination that a BA was not required with the publication of the DSEIS in December 2006. DSEIS at 4-59. The FWS May 2006 Letter to NRC transmitting FWS's determination from the
Except in certain circumstances inapplicable here, the NRC rules allow new contentions to be filed only with the leave of the presiding officer upon a showing that:
(i) The information upon which the amended or new contention is based was not previously available; (ii) The information upon which the amended or new contention is based is materially different than information previously available; and (iii) The amended or new contention has been submitted in a timely fashion based on the availability of the subsequent information.
10 C.F.R. § 2.309(f)(2)(i)-(iii). In essence, a proponent of a new contention must show that it could not have raised its contention earlier. [T]he unavailability of [a] document does not constitute a showing of good cause for admitting a late-filed contention when the factual predicate for that contention is available from other sources in a timely manner. Duke Power Co. (Catawba Nuclear Station, Units 1 and 2), CLI-83-19, 17 N.R.C.1041, 1043 (1983).
Consequently, an intervenor cannot establish good cause for filing a late contention when the information on which the contention is based was publicly available for some time prior to the filing of the contention. Philadelphia Electric Co. (Limerick Generating Station, Units 1 and 2),
ALAB-828, 23 N.R.C. 13, 21 (1986). The NRC typically applies a 30-day clock to the filing 17 See also Pilgrim, CLI-12-03 at 16 (ruling that Pilgrim Watch failed to meet the Section 2.326 reopening standards because it did not demonstrate, with the level of support required under section 2.326(b), that a materially different result would have been likely) (emphasis added).
17


year prior that "license renewal for PNPS is not likely to adversely affect federally-listed species subject to the jurisdiction of the [FWS], and that formal consultation . . . is not required" was both referenced and included in the December 2006 DSEIS (at 2-92, 2-140, E-11). In addition, the FSEIS expressly states that the Staff concluded "that impacts on [ESA-listed species within the jurisdiction of FWS]
of a new contention based on new information,18 and this has been the standard established in this proceeding.19 JRWA/PWs claim that the NRC Staff was required to prepare a BA on the roseate tern, e.g., JRWA/PW Motion at 5, could have been brought as early as December 2006 when the Staff issued the DSEIS. Likewise, the claim that FWS inappropriately acquiesced to the NRCs conclusions with respect to the roseate tern, e.g., id., could have been brought at that same time, if not in July 2007 with the Staffs publication of the FSEIS. The NRC Staff made public its determination that a BA was not required with the publication of the DSEIS in December 2006.
during the license renewal period would be small," and that FWS concurred with that conclusion on May 23, 2006.
DSEIS at 4-59. The FWS May 2006 Letter to NRC transmitting FWSs determination from the year prior that license renewal for PNPS is not likely to adversely affect federally-listed species subject to the jurisdiction of the [FWS], and that formal consultation . . . is not required was both referenced and included in the December 2006 DSEIS (at 2-92, 2-140, E-11). In addition, the FSEIS expressly states that the Staff concluded that impacts on [ESA-listed species within the jurisdiction of FWS] during the license renewal period would be small, and that FWS concurred with that conclusion on May 23, 2006. FSEIS at A-105. Thus, any challenge to the NRC Staffs determination not to prepare a BA, or FWSs concurrence with the NRC Staffs conclusions with respect to the lack of significant impacts on the roseate tern, could have been brought years ago.
FSEIS at A-105. Thus, any challenge to the NRC Staff's determination not to prepare a BA, or FWS's concurrence with the NRC Staff's conclusions with respect to the lack of significant impacts on the roseate tern, could have been brought years ago. None of the claims made by JRWA/PW attempting to challenge the sufficiency of the Entergy, NRC Staff, and FWS determinations with respect to impacts on the roseate tern is timely raised. Indeed, the untimeliness of these claims is evident on the face of the JRWA/PW  
None of the claims made by JRWA/PW attempting to challenge the sufficiency of the Entergy, NRC Staff, and FWS determinations with respect to impacts on the roseate tern is timely raised. Indeed, the untimeliness of these claims is evident on the face of the JRWA/PW 18 Southern Nuclear Operating Co. (Vogtle Electric Generating Plant, Units 3 and 4), CLI-11-08, 74 N.R.C. __, slip op. at 3 n.8 (Sept. 27, 2011).
19 See Order (Establishing Schedule for Proceeding and Addressing Related Matters) (Dec. 20, 2006) at 6-7.
18


18  Southern Nuclear Operating Co. (Vogtle Electric Generating Plant, Units 3 and 4), CLI-11-08, 74 N.R.C. __, slip op. at 3 n.8 (Sept. 27, 2011).
Motion. JRWA/PW purport to rely on information that predates or is contained in the DSEIS and FSEIS, or otherwise could have been raised many months if not years ago. For example, JRWA/PW and their witness purport to rely on (1) widely available scientific data available in 2006 and 2007, JRWA/PW Motion at 7; (2) a paper published in 1999 and information dating back to 1988 on the existence the roseate tern at Long Point Beach (LPB), id. at 16, 18, 19, 29, citing Nisbet Aff. at ¶¶ 4, 14, 16; (3) information contained in the July 2007 FSEIS concerning the location of Pilgrim, the impingement and entrainment of small fish prey for the roseate tern, and cooling water discharges, id. at 20-21; (4) a September 2010 FWS Study, id. at 21 n.15; (5) a September 2008 EPA publication on guidance for renewing nuclear power plant environmental impact statements, id. at 22 n.19; (6) Pilgrim NPDES permit limit violations occurring in 2010-2011, id. at 21-23 & n. 20; and (7) a 2007-2009 Massachusetts Audubon Society study, id. at 33, citing Nisbet Aff. at ¶ 11. Obviously none of this information is new. In some cases, the information is more than a decade old.
19  See Order (Establishing Schedule for Proceeding and Addressing Related Matters) (Dec. 20, 2006) at 6-7.
Further, none of Petitioners claims are made timely by their receipt of the year 2000 ENSR report in mid-April 2012. JRWA/PW Motion at 23, 31, 34, 45-46. As JRWA/PW acknowledge, the ENSR 2000 report was referenced in Entergys ER and the NRC Staffs FSEIS. Id. at 23; see ER at 2-36, 3-20, 4-54; see, e.g., FSEIS at 2-137. Further, the NRC Staffs Environmental Audit Summary identified ENSR 2000 as one of the documents that the NRC had obtained during the audit and provided an ADAMS accession number.20 While JRWA/PW apparently had to ask the NRCs public document room for a copy, the reality is that JRWA/PW simply made no attempt to do so until recently. Their failure to request this document does not make their present claims timely.
19 Motion. JRWA/PW purport to rely on information th at predates or is co ntained in the DSEIS and FSEIS, or otherwise could have been raised many months if not years ago. For example, JRWA/PW and their witness purport to rely on (1) "widely available scientific data available in 2006 and 2007," JRWA/PW Motion at 7; (2) a paper published in 1999 and information dating back to 1988 on the existence the roseate tern at Long Point Beach ("LPB"), id.
19
at 16, 18, 19, 29, citing Nisbet Aff. at ¶¶ 4, 14, 16; (3) informati on contained in the July 2007 FSEIS concerning the location of Pilgrim, the impingement and entrainment of small fish prey for the roseate tern, and cooling water discharges, id. at 20-21; (4) a September 2010 FWS Study, id.
at 21 n.15; (5) a September 2008 EPA publication on guidance for renewing nuclear power plant environmental impact statements, id. at 22 n.19; (6) Pilgrim NPDES permit limit violations occurring in 2010-2011, id. at 21-23 & n. 20; and (7) a 2007-2009 Ma ssachusetts Audubon Society study, id.
at 33, citing Nisbet Aff. at ¶ 11. Obviously none of this information is new. In some cases, the information is more than a decade old. Further, none of Petitioners' claims are made timely by their receipt of the year 2000 ENSR report in mid-April 2012. JRWA/PW Motion at 23, 31, 34, 45-46. As JRWA/PW acknowledge, the ENSR 2000 report was referen ced in Entergy's ER and the NRC Staff's FSEIS. Id.
at 23; see ER at 2-36, 3-20, 4-54; see , e.g., FSEIS at 2-137. Furt her, the NRC Staff's Environmental Audit Summary id entified ENSR 2000 as one of the documents that the NRC had obtained during the audit and provided an ADAMS accession number.
20 While JRWA/PW apparently had to ask the NRC's public document room for a copy, the reality is that JRWA/PW simply made no attempt to do so until recently. Their failure to request this document does not make their present claims timely.
20 Moreover, JRWA/PW do not in fact rely on the ENSR 2000 docum ent to support their claims, but instead disavow its "sweeping" "no 'adverse impact'" and "no [adverse] effect" conclusion. JRWA/PW Motion at 23, 23 nn.21-22, 34. Thus, JRWA/PW cannot claim that this document provides timely support for their allegations. Finally, JRWA/PW fail to show that the information contained in the document is any different, let alone materially different, than information previously available under Section 2.309(f)(2)(ii). As summarized by JRWA/PW, the ENSR 2000 document discusses impingement and entrainment of aquatic species at Pilgrim, the temperature of Pilgrim's water discharges, and the impact of Pilgrim's cooling water system. JRWA/PW Motion at 23. All of this information is discussed in Entergy's ER and the Staff's DSEIS and FSEIS, see , e.g., ER §§ 4.2-4.4, FSEIS § 4.1. In fact, the ENSR 2000 report is often referenced to support the information c ontained in the ER and FSEIS. Because Petitioners' claims are untimely, in order to reopen the record Petitioners must demonstrate that their issues are "excep tionally grave."  10 C.F.R. § 2.326(a)(1).
21  When promulgating the "exceptionally grave" standard to consider untimely claims, the Commission made clear that "exceptionally grave" means that an in issue presents "a sufficiently grave threat to public safety."
22  None of the allegations in the JRWA/PW Motion or its s upporting affidavits raises any issue that could be characterized as a sufficiently grave threat to public safety. JRWA/PW present no evidence that continued operation of Pilgrim during the license renewal term will endanger any roseate tern. JRWA/PW claim that they have raised an "exceptionally grave" issue only by speculating that a "significant potential for adverse impacts" on the roseate


20 Summary of Environmental Site Audit Related to the Review of the License Renewal Application for Pilgrim Nuclear Power Station (July 25, 2006), Encl. 2 at 3 (available at ADAMS Accession No. ML062070305).
Moreover, JRWA/PW do not in fact rely on the ENSR 2000 document to support their claims, but instead disavow its sweeping no adverse impact and no [adverse] effect conclusion. JRWA/PW Motion at 23, 23 nn.21-22, 34. Thus, JRWA/PW cannot claim that this document provides timely support for their allegations. Finally, JRWA/PW fail to show that the information contained in the document is any different, let alone materially different, than information previously available under Section 2.309(f)(2)(ii). As summarized by JRWA/PW, the ENSR 2000 document discusses impingement and entrainment of aquatic species at Pilgrim, the temperature of Pilgrims water discharges, and the impact of Pilgrims cooling water system.
21 Vogtle, CLI-11-08 at 14 n.44 ("when a motion to reopen is untimely, the § 2.326(a)(1) 'exceptionally grave' test supplants the § 2.326(a)(2) 'significant safety or environmental issue' test") (citation omitted).
JRWA/PW Motion at 23. All of this information is discussed in Entergys ER and the Staffs DSEIS and FSEIS, see, e.g., ER §§ 4.2-4.4, FSEIS § 4.1. In fact, the ENSR 2000 report is often referenced to support the information contained in the ER and FSEIS.
21 tern exists, and that they have "proffered evidence of potential effects" on the roseate tern. JRWA/PW Motion at 5, 33, 34 (emphasis added), citing Nisbet Aff. at ¶ 19. These allegations simply cannot be characterized as presenting any threat, let alone a "sufficiently grave" threat, to public safety. Furthermore, such speculation is insufficient to meet the stringent Section 2.326 reopening requirements. Oyster Creek, CLI-09-7, 69 N.R.C. at 287. Consequently, JRWA/PW have failed to raise any exceptionally grave issue.
Because Petitioners claims are untimely, in order to reopen the record Petitioners must demonstrate that their issues are exceptionally grave. 10 C.F.R. § 2.326(a)(1).21 When promulgating the exceptionally grave standard to consider untimely claims, the Commission made clear that exceptionally grave means that an in issue presents a sufficiently grave threat to public safety.22 None of the allegations in the JRWA/PW Motion or its supporting affidavits raises any issue that could be characterized as a sufficiently grave threat to public safety.
: 2. JRWA/PW's Claims Do Not Address any Significant Environmental or Safety Issue  In addition to being untimely, JRWA/PW's claims fail to demonstrate the existence of a significant environmental or safety issue. The Commission has directly held that "bare assertions and speculation . . . do not supply the requisite support" to satisfy the Section 2.326 standards.
JRWA/PW present no evidence that continued operation of Pilgrim during the license renewal term will endanger any roseate tern. JRWA/PW claim that they have raised an exceptionally grave issue only by speculating that a significant potential for adverse impacts on the roseate 20 Summary of Environmental Site Audit Related to the Review of the License Renewal Application for Pilgrim Nuclear Power Station (July 25, 2006), Encl. 2 at 3 (available at ADAMS Accession No. ML062070305).
23  Merely asserting that something "might turn up" to support an intervenor's concerns does not raise a significant issue sufficient to restart the hearing process.
21 Vogtle, CLI-11-08 at 14 n.44 (when a motion to reopen is untimely, the § 2.326(a)(1) exceptionally grave test supplants the § 2.326(a)(2) significant safety or environmental issue test) (citation omitted).
24  In order to demonstrate the existence of a significant environmental issue, the information Petitioners present must paint a "seriously different picture of the environmental landscape."
20
25 None of JRWA/PW's claims (or their affiants' assertions) raises any significant environmental issue. JRWA/PW have come forward with no credible evidence that the roseate tern will be adversely affected by Pilgrim's c ontinued operation. Nor have they provided any


22 Final Rule, Criteria for Reopening Records in Formal Licensing Proceedings, 51 Fed. Reg. 19,535, 19,536 (May 30, 1986), quoting Vermont Yankee Nuclear Power Corp. (Vermont Yankee Nuclear Power Station), ALAB-124, 6 A.E.C. 358, 365 n.10 (1973).
tern exists, and that they have proffered evidence of potential effects on the roseate tern.
23 Oyster Creek, CLI-09-7, 69 N.R.C. at 287 (citing Oyster Creek, CLI-08-28, 68 N.R.C. at 674).
JRWA/PW Motion at 5, 33, 34 (emphasis added), citing Nisbet Aff. at ¶ 19. These allegations simply cannot be characterized as presenting any threat, let alone a sufficiently grave threat, to public safety. Furthermore, such speculation is insufficient to meet the stringent Section 2.326 reopening requirements. Oyster Creek, CLI-09-7, 69 N.R.C. at 287. Consequently, JRWA/PW have failed to raise any exceptionally grave issue.
24 Oyster Creek, CLI-08-23, 68 N.R.C. 461, 486 (2008) (rejecting a motion to reopen where movants provided only mere speculation that the contention might materially alter conclusions in the final safety evaluation report) (emphasis in original).
: 2.      JRWA/PWs Claims Do Not Address any Significant Environmental or Safety Issue In addition to being untimely, JRWA/PWs claims fail to demonstrate the existence of a significant environmental or safety issue. The Commission has directly held that bare assertions and speculation . . . do not supply the requisite support to satisfy the Section 2.326 standards.23 Merely asserting that something might turn up to support an intervenors concerns does not raise a significant issue sufficient to restart the hearing process.24 In order to demonstrate the existence of a significant environmental issue, the information Petitioners present must paint a seriously different picture of the environmental landscape.25 None of JRWA/PWs claims (or their affiants assertions) raises any significant environmental issue. JRWA/PW have come forward with no credible evidence that the roseate tern will be adversely affected by Pilgrims continued operation. Nor have they provided any 22 Final Rule, Criteria for Reopening Records in Formal Licensing Proceedings, 51 Fed. Reg. 19,535, 19,536 (May 30, 1986), quoting Vermont Yankee Nuclear Power Corp. (Vermont Yankee Nuclear Power Station), ALAB-124, 6 A.E.C. 358, 365 n.10 (1973).
25 See Private Fuel Storage, L.L.C. (Independent Spent Fuel Storage Installation), CLI-06-03, 63 N.R.C. 19, 28-29 (2006) ("PFS") (holding that claimed additional environmental impacts were "not so significant or central to the FEIS's discussion of environmental impacts that an FEIS supplement (and the consequent reopening of our adjudicatory record) is reasonable or necessary").
23 Oyster Creek, CLI-09-7, 69 N.R.C. at 287 (citing Oyster Creek, CLI-08-28, 68 N.R.C. at 674).
22 evidence disputing the NRC Staff's conclusion that the roseate tern is "unlikely to be adversely affected during the renewal period."  FSEIS at 4 4-65. Indeed, JRWA/PW never assert that there will be any adverse impact to the roseate tern, and their expert, Dr. Nisbet, never provides any expert opinion that there will be any adverse impact. Rather, JRWA/PW and Dr. Nisbet erroneously suggest that Entergy, the NRC Staff, and FWS have overlooked information concerning the existence of the roseate tern near Pilgrim. JRWA/PW Motion at 16-20, 35; Nisbet Aff. at ¶¶ 7-9, 14, 17, 18. As a result, JRWA/PW claim that the Entergy, Staff, and FWS environmental documents addressing impact s to the roseate tern are materially incomplete, inaccurate, or inadequate. JRWA/PW Motion at 5-6. These manufactured claims are both unseemly and baseless. For example, JRWA/PW assert that Entergy, the NRC Staff, and FWS ignored the existe nce of the roseate tern at specified locations within two to four miles of the Pilgrim site, and considered only that roseate tern appeared in the area "exclusively" during migration. JRWA/PW Motion at 16-18. These assertions mischaracterize information plainly stated by Entergy, the NRC Staff, and FWS. Entergy's February 2005 letter to FWS stated that "[s]everal listed terrestrial species are known to occur in the general vicinity of the PNPS site," including the roseate ter n, and that those species "cannot be ruled out as occasional visitors to the PNPS site."  Entergy Feb. 2005 Letter to FWS at 1, 2. The March 2005 FWS response to Entergy stated that the "federally-endange red roseate tern . . . [is] known to occur along Plymouth Beach, just north of the PNPS
24 Oyster Creek, CLI-08-23, 68 N.R.C. 461, 486 (2008) (rejecting a motion to reopen where movants provided only mere speculation that the contention might materially alter conclusions in the final safety evaluation report)
," but that "none . . . are known to frequent the immediate vicinity of PNPS and, therefore, the presence of [this] species near the power station is probably transient in nature."  FWS Mar. 2005 Letter to Entergy at 1 (emphasis added). The NRC Staff stated that the roseate tern is "known to occur along Plymouth Beach just north of PNPS" and "may pass through the PNPS site during northward migration in 23 late spring or southward migrati on in early fall."  DSEIS at 2-96 (emphasis added). JRWA/PW's mischaracterizations of clear statements in the record cannot raise a significant environmental issue. Pilgrim Watch nowhere explains (nor can it explain) how information concerning the existence of the roseate tern on LPB 2-4 miles away from the Pilgrim site is any different, let alone seriously different, than the information presented by Entergy, the NRC Staff, and FWS. JRWA/PW speculate about the "significant potential for adverse effects" on the roseate tern's food sources that might result from entrainment, impingement, and cooling water discharges. JRWA/PW Motion at 20-23, 22 n.20, 34 (emphasis added). JRWA/PW also raise potential adverse impacts from a limited number of incidents where Pilgrim has exceeded the chlorine-related discharge limits in its NPDES permit. Id. at 22 & n.20. Notably absent from Dr. Nisbet's Affidavit is any discussion of the potential impacts on the roseate tern from operation of the Pilgrim cooling water system, including chlorination exceedance incidents.
(emphasis in original).
Rather, Dr. Nisbet claims only that Entergy has failed to consider the "potential for adverse effects" on roseate tern, or its fish prey, resulting from impingement, entrainment, and alleged pollutant discharges. Nisbet Aff. at ¶ 19. As pr eviously noted, such spec ulation is not sufficient to meet the very high standards for reopening a closed record. Pilgrim , CLI-12-03 at 23-24. The attached Affidavits from Drs. Scherer and Barnum of Normandeau Associates, 26 and Mr. Scheffer from Pilgrim 27 demonstrate that JRWA/PW's claims raise no significant issue:
25 See Private Fuel Storage, L.L.C. (Independent Spent Fuel Storage Installation), CLI-06-03, 63 N.R.C. 19, 28-29 (2006) (PFS) (holding that claimed additional environmental impacts were not so significant or central to the FEISs discussion of environmental impacts that an FEIS supplement (and the consequent reopening of our adjudicatory record) is reasonable or necessary).
* 95% of the roseate tern breeding popul ation in Massachusetts can be found on Bird Island and Ram Island in Buzzards bay, which are in a geographically
21


26  Affidavit of Michael D. Scherer, Ph.D. and Sarah A. Barnum, Ph.D., in Support of Entergy's Answer Opposing Jones River Watershed Association's and Pilgrim Watch's Motion to Reopen, Request for Hearing and Permission to File New Contention (May 16, 2012) ("Scherer & Barnum Aff.").
evidence disputing the NRC Staffs conclusion that the roseate tern is unlikely to be adversely affected during the renewal period. FSEIS at 4 4-65. Indeed, JRWA/PW never assert that there will be any adverse impact to the roseate tern, and their expert, Dr. Nisbet, never provides any expert opinion that there will be any adverse impact.
24 distinct subgroup with little connection to any roseate terns that might be present near PNPS. Scherer & Barnum Aff. at ¶ 8.
Rather, JRWA/PW and Dr. Nisbet erroneously suggest that Entergy, the NRC Staff, and FWS have overlooked information concerning the existence of the roseate tern near Pilgrim.
* The bulk of the roseate tern diet in Massachusetts is comprised of American sand lance, hake, and Atlantic herring. At times, sand lance make up 95 % of the roseate tern's fish prey. Scherer & Barnum Aff. at ¶¶ 12, 18.
JRWA/PW Motion at 16-20, 35; Nisbet Aff. at ¶¶ 7-9, 14, 17, 18. As a result, JRWA/PW claim that the Entergy, Staff, and FWS environmental documents addressing impacts to the roseate tern are materially incomplete, inaccurate, or inadequate. JRWA/PW Motion at 5-6. These manufactured claims are both unseemly and baseless. For example, JRWA/PW assert that Entergy, the NRC Staff, and FWS ignored the existence of the roseate tern at specified locations within two to four miles of the Pilgrim site, and considered only that roseate tern appeared in the area exclusively during migration. JRWA/PW Motion at 16-18. These assertions mischaracterize information plainly stated by Entergy, the NRC Staff, and FWS. Entergys February 2005 letter to FWS stated that [s]everal listed terrestrial species are known to occur in the general vicinity of the PNPS site, including the roseate tern, and that those species cannot be ruled out as occasional visitors to the PNPS site. Entergy Feb. 2005 Letter to FWS at 1, 2.
* There is no indication that any lack of prey fish availability during the summer months - if any such lack of prey fish availability exists - when roseate tern are present in Massachusetts has caused or contributed to the decrease in roseate tern nesting sites or the decline in the north eastern roseate tern population. Scherer & Barnum Aff. at ¶ 14.
The March 2005 FWS response to Entergy stated that the federally-endangered roseate tern . . .
* Impingement and entrainment of the roseate tern's main fish prey species will have no discernible impact in on the availability of these fish species as prey for the roseate tern. Scherer & Barnum Aff. at ¶¶ 17-28.
[is] known to occur along Plymouth Beach, just north of the PNPS, but that none . . . are known to frequent the immediate vicinity of PNPS and, therefore, the presence of [this] species near the power station is probably transient in nature. FWS Mar. 2005 Letter to Entergy at 1 (emphasis added). The NRC Staff stated that the roseate tern is known to occur along Plymouth Beach just north of PNPS and may pass through the PNPS site during northward migration in 22
* In an average year, approximately 1,648 pounds of age 1 equivalent sand lance are impinged and entrained at Pilgrim each year. Conservatively assuming 100 % mortality of impinged and entrained individual sand lance, this is less than the amount that two humpback whales concentrating their foraging efforts on sand lance would consume in one day. In addition, annual consumption of sand lance by North American seals, approximately 831 million pounds per year, dwarfs impingement and entrainment losses at PNPS. Thus, it is not scientifically


27  Affidavit of Jacob J. Scheffer in Support of Entergy's Answer Opposing Jones River Watershed Association's and Pilgrim Watch's Motion to Reopen and Hearing Request on Contention Related to the Roseate Tern (May 16, 2012) ("Scheffer Aff.").
late spring or southward migration in early fall. DSEIS at 2-96 (emphasis added). JRWA/PWs mischaracterizations of clear statements in the record cannot raise a significant environmental issue. Pilgrim Watch nowhere explains (nor can it explain) how information concerning the existence of the roseate tern on LPB 2-4 miles away from the Pilgrim site is any different, let alone seriously different, than the information presented by Entergy, the NRC Staff, and FWS.
25 credible to suggest that the annual magnitude of impingement and entrainment mortality at PNPS could potentially affect the availabili ty of sand lance as prey for the roseate tern. Scherer & Barnum Aff. at ¶¶ 19-23.
JRWA/PW speculate about the significant potential for adverse effects on the roseate terns food sources that might result from entrainment, impingement, and cooling water discharges. JRWA/PW Motion at 20-23, 22 n.20, 34 (emphasis added). JRWA/PW also raise potential adverse impacts from a limited number of incidents where Pilgrim has exceeded the chlorine-related discharge limits in its NPDES permit. Id. at 22 & n.20. Notably absent from Dr. Nisbets Affidavit is any discussion of the potential impacts on the roseate tern from operation of the Pilgrim cooling water system, including chlorination exceedance incidents.
* Atlantic herring and hake may also make up a portion of the roseate tern's diet.
Rather, Dr. Nisbet claims only that Entergy has failed to consider the potential for adverse effects on roseate tern, or its fish prey, resulting from impingement, entrainment, and alleged pollutant discharges. Nisbet Aff. at ¶ 19. As previously noted, such speculation is not sufficient to meet the very high standards for reopening a closed record. Pilgrim, CLI-12-03 at 23-24.
On average, again conservatively assuming 100 % impingement and entrainment mortality, Atlantic herring losses at PNPS average 296 pounds per year. This is a minute fraction of the estimated hundreds of millions of pounds of Atlantic
The attached Affidavits from Drs. Scherer and Barnum of Normandeau Associates,26 and Mr. Scheffer from Pilgrim27 demonstrate that JRWA/PWs claims raise no significant issue:
* 95% of the roseate tern breeding population in Massachusetts can be found on Bird Island and Ram Island in Buzzards bay, which are in a geographically 26 Affidavit of Michael D. Scherer, Ph.D. and Sarah A. Barnum, Ph.D., in Support of Entergys Answer Opposing Jones River Watershed Associations and Pilgrim Watchs Motion to Reopen, Request for Hearing and Permission to File New Contention (May 16, 2012) (Scherer & Barnum Aff.).
23


herring available for predation by the roseate tern. The annual combined estimate of age 1 hake impingement and entrainment losses at PNPS, assuming 100 % mortality, is approximately 14,070 pounds, which is a minute fraction of the more than 50 million of pounds of hake estimated in the Cape Cod area. Thus, impingement and entrainment losses of A tlantic herring and hake at PNPS cannot reasonably be expected to affect the availabi lity of such prey for the roseate tern. Scherer & Barnum Aff. at ¶¶ 24-28.
distinct subgroup with little connection to any roseate terns that might be present near PNPS. Scherer & Barnum Aff. at ¶ 8.
* The asserted turbulence associated with PNPS's cooling water discharge is not expected to bring an abundance of sand lance to the surface where they can be captured, and thus the area near the cooli ng water discharge is unlikely to provide desirable foraging conditions for the roseat e tern. Moreover, to the extent any roseate terns might be attracted to the turbulence created by PNPS's cooling water discharge, if prey fish are absent from the water, any such attractiveness would likely be short lived, as the roseate tern's flexible foraging st rategy would allow it to either move or concentrate its feedi ng efforts where prey are abundant. Scherer & Barnum Aff. at ¶¶ 29-30.
* The bulk of the roseate tern diet in Massachusetts is comprised of American sand lance, hake, and Atlantic herring. At times, sand lance make up 95 % of the roseate terns fish prey. Scherer & Barnum Aff. at ¶¶ 12, 18.
26
* There is no indication that any lack of prey fish availability during the summer months - if any such lack of prey fish availability exists - when roseate tern are present in Massachusetts has caused or contributed to the decrease in roseate tern nesting sites or the decline in the northeastern roseate tern population. Scherer &
* Contrary to Petitioners' assertion (JRWA/PW Motion at 21), the Pilgrim NPDES permit has been administratively continued during the pendency of permit renewal proceedings, and, as a result, the conditions and limitations of the most recent NPDES permit remain valid and in full force and effect. Scheffer Aff. at ¶
Barnum Aff. at ¶ 14.
: 7.
* Impingement and entrainment of the roseate terns main fish prey species will have no discernible impact in on the availability of these fish species as prey for the roseate tern. Scherer & Barnum Aff. at ¶¶ 17-28.
* As allowed under its NPDES permit, Pilgrim uses chlorine as a biocide for the Circulating Water System ("CWS") and (Salt) Service Water System ("SWS"). Chlorination of the CWS is limited to a maximum of two hours per day, with the frequency of chlorination ranging from on ce a day to once a week, and to a Total Residual Oxidant ("TRO") c oncentration of 0.1 mg/L, stricter than the federal effluent limitation guideline of 0.2 mg/L. The NPDES permit allows constant chlorination of the SWS system, with an average monthly limit of 0.5 mg/L and an instantaneous maximum limit of 1.0 mg/L. Scheffer Aff. at ¶¶ 8-9.
* In an average year, approximately 1,648 pounds of age 1 equivalent sand lance are impinged and entrained at Pilgrim each year. Conservatively assuming 100 %
* Pilgrim samples CWS and SWS water to ensure compliance with their respective TRO concentration limits. Water discharged from the CWS is sampled in the discharge canal at least 8 times during each chlorination period, assuming a 2 hour run. Pilgrim samples SWS water (downstream of the heat exchanges and prior to entering the discharge canal) for chlorine twice daily when chlorination is in service. These sampling results are documented in Pilgrim's Discharge Monitoring Reports ("DMRs").
mortality of impinged and entrained individual sand lance, this is less than the amount that two humpback whales concentrating their foraging efforts on sand lance would consume in one day. In addition, annual consumption of sand lance by North American seals, approximately 831 million pounds per year, dwarfs impingement and entrainment losses at PNPS. Thus, it is not scientifically 27 Affidavit of Jacob J. Scheffer in Support of Entergys Answer Opposing Jones River Watershed Associations and Pilgrim Watchs Motion to Reopen and Hearing Request on Contention Related to the Roseate Tern (May 16, 2012) (Scheffer Aff.).
Scheffer Aff. at ¶¶ 10-12.
24
* Chlorination permit exceedances are extraordin arily rare. Over the past ten years, PNPS has documented only two instances in which the chlorine concentration exceeded the CWS's maximum permitted level of 0.1 mg/L, each resulting from 27 minor and unanticipated equipment malfunctions, and each lasting less than 20 minutes in duration. Both exceedances, while over the NPDES permit limit, were less than the 0.2 mg/L federal effluent limitation guideline, and the amount of residual chlorine discharged into Cap Cod Bay is expected to have been minimal. Scheffer Aff. at ¶¶ 12-13.
* Similarly, over the past ten years, PNPS has documented only 6 instances (out of thousands of sampling events) in which the chlorine concentration of SWS water (measured prior to entering the discharge canal) exceeded the daily maximum permitted limit of 1.0 mg/L. Because SWS water is substantially diluted when mixed with the CWS stream prior to the point of discharge into Cape Cod Bay, and "chlorine demand" further reduces TRO concentration, even where an SWS exceedance has occurred, the concentration is typically undetectable prior, and is always at or below the 0.1 mg/L limit for CWS discharges set in the station's NPDES permit. Scheffer Aff. at ¶ 14.
* Heavy metals such as zinc, copper, and chromium are believed to be absent from the Pilgrim Station's regularly discharg ed effluent. The use of the corrosion inhibitor Tolyltriazole in Pilgrim systems has been authorized by the U.S. EPA.
When Tolyltriazole has been discharged, it has been in diluted concentrations well below EPA approved limits and reported in the Station's DMRs. Scheffer Aff. at
¶¶ 18-19.
* The chlorine discharge limitations set forth in Pilgrim's NPDES permit are considered protective of marine organisms in Cape Cod Bay. Although PNPS has, on rare occasion experienced exceedances of its chlorine discharge limits at 28 certain outfall locations, it is highly unlikely that those exceedances would affect the environment, or have any impact on th e biota in Cape Cod Bay. Thus, there is no credible scientific evidence that discha rges from PNPS have any adverse effect on roseate tern. Scherer & Barnum Aff. at ¶¶ 15, 31. For all of the reasons set forth above, JRWA/PW's claims fail to raise a significant environmental or safety issue as required under Section 2.326(a)(2).
: 3. JRWA/PW Have Failed to Demonstrate That a Materially Different Result Would Be Likely JRWA/PW and their affiants fail to "demonstrate" that a materially different result would have been likely had their newly proffered evidence been considered initially, as required by 10 C.F.R. § 2.326(a)(3) (emphasis added). Petitio ners have a "deliberat ely heavy" burden to demonstrate that a materially different result would be likely. Oyster Creek , CLI-08-28, 68 N.R.C. at 674; see also Pilgrim, CLI-12-03 at 8; Oyster Creek, CLI-09-7, 69 N.R.C. at 287. At this late stage of the proceeding, is it not sufficient simply to ra ise an issue.  "The level of support required for a motion to reopen is greate r than that required for a contention under the general admissibility requirements of 10 C.F.R. § 2.309(f)(1)."  Pilgrim , CLI-12-06 at 18.  "'[N]o reopening of the evidentiary hearing will be required if the [documents] submitted in response to the motion demonstrate that there is no genuine unresolve d issue of fact.'" PFS , CLI-05-12, 61 N.R.C. 345, 350 (2005), citing Vermont Yankee Nuclear Power Corp. (Vermont Yankee Nuclear Power Station), ALAB-138, 6 A.E.
C. 520, 523-24 (1973). A petitioner will fail to demonstrate that a materially different result will be likely where the petitioner seeks to litigate issues outside the scope of a proceeding, or fails to challenge pertinent information contained in the existing licensing documents. See Pilgrim , CLI-12-06 at 26-27.
29 The sole claim that JRWA/PW make with respect to this criterion is that, had their information been considered initially, "a mate rially different result would have been likely because there would be a biological assessment as to whether PNPS relicensing would be likely to effect [sic] the roseate tern," which would in clude "information cited in the Nisbet Affidavit and Petitioners' documents and this information w ould be taken into account in the balance of alternatives under NEPA."  JRWA/PW Motion at 36. Dr. Nisbet merely asserts his opinion that "a materially different result would have been likely" if the information in his affidavit had been considered previously, Nisbet Aff. at ¶ 21, but nowhere explains what would be different, and why that difference would be material. JRWA/PW and Dr. Nisbet are incorrect.
As previously discussed, no BA is required where, as here, the Federal action does not involve any "major construction activities."
16 U.S.C. § 1536; 50 C.F.R. § 402.12(b); 51 Fed. Reg. at 19,936; Water Keeper Alliance , 271 F.3d at 31. As FWS explained, The Service will not require [BAs] for actions that do not involve construction or activities having physical impacts simila r to construction, such as dredging, blasting, etc. This limitation derive s support from the 1979 Conference Report reference to actions designed primarily to result in the building or erection of various projects. 51 Fed. Reg. at 19,936 (some emphasis added). Renewal of Pilgrim's operating license involves no such "building or erection of various projects."  Entergy Feb. 2005 Letter to FWS at 3. ("[n]o expansion of existing facilities" is planned and "no additional land disturbance" is anticipated).
See also FWS Mar. 2005 Letter to Entergy at 2; DSEIS at 4-58; FSEIS at 4-64. Further, even if a BA were required, the NRC Staff's existing NEPA analysis satisfies the requirement. 16 U.S.C. 1536(c)(1) (permitting that a BA "may be undertaken as part of" the NRC's preparation of an environmental impact statement). In additi on, as discussed supra , FWS regulations provide that the cont ents of a BA are discretionary, and the Staff's analysis already 30 contains discussion on multiple items recommended for inclusion in a BA. 50 C.F.R. § 402.12(f); see FSEIS at 4-64, 4-66, 4-70. Petitioners' claim (JRWA/PW Motion at 18-19) that the NRC has overlooked certain studies developed since 2006/2007, i.e., after the time period when NRC and FWS made their determinations, does not violate the ESA's procedural requirements. Water Keeper Alliance , 271 F.3d at 33. Consequently, Petitioners can not demonstrate that their claims are likely to succeed on the merits. Finally, the attached Affidavits from Dr
: s. Scherer and Barnum and Mr. Scheffer demonstrate that JRWA/PW's claims do not demonstrate that a materially different outcome would be likely because continued operation of Pilgrim is not likely to result in any discernible impacts on the roseate tern. As previously summarized, Petitioners have failed in their obligation to raise any significant environmental issue warranting supplementation of the FSEIS, or otherwise undermining the FWS determinatio n that no consultation was required, and the Staff determination that it woul d not prepare a BA. There is no evidence suggesting that PNPS will have any credible indirect impact on the roseate tern through impacts on the availability of fish prey due to impingement and entrainment mortality, or the impacts of pollution. Scherer & Barnum Aff. at ¶¶ 15, 31. Average annual estimates of the annual impact to sand lance, the roseate tern's main fish prey, from impingement and entrainment are comparable to one day's consumption by just two whales. Id. at ¶ 22. The estimates of impingement and entrainment impacts to the roseate tern's other significant prey species, Atlantic herring and hake, are miniscule when compared to the total availa ble stocks for those fish species. Id.
at ¶¶ 25-28.
Over the past ten years, there are only two documented instances where chlorinated water discharges into Cape Cod Bay from the CWS exceeded the 0.1 mg/L limit prescribed in Pilgrim's (currently valid) NPDES permit. Scheffer Aff. at ¶ 13. Those exceedances will have 31 little, if any, potential for adverse impact on roseate tern fish prey. Scherer & Barnum Aff. at ¶¶ 15, 31. For all of the reasons set forth above, JRWA/PW's claims fail to demonstrate that a materially different outcome would be likely under S ection 2.326(a)(3).
C. The Contention fails to meet 10 C.F.R.
§ 2.309(c) standards for considering a late-filed contention JRWA/PW's belated contention should not be admitted because Petitioners have shown no good cause for their extreme tardiness, and a balancing of the remaining factors in 10 C.F.R. § 2.309(c) does not outweigh this failure to timely file the Contention. To demonstrate good cause, the first and most important late-filed factor, JRWA/PW must establish that the information on which their Contention is based is new information not already in the public domain that could not ha ve been presented earlier. Comanche Peak , CLI-92-12, 36 N.R.C. at 69-73; Millstone , CLI-09-5, 69 N.R.C. at 126.
Petitioners have failed to demonstrate good cause under Section 2.309(c)(1) for the same reasons that their Contention is untimely under Section 2.326(a) an d 2.309(f)(2), discussed supra. All of Petitioners' claims (such as sitings and observations of the roseat e tern on LPB dating back to 1988) could have been raised years ago. JRWA/PW's reliance on a document they received a few weeks ago, JRWA/PW Motion at 45-46, does not show good cau se. The ENSR 2000 report was referenced numerous times in the ER, the DSEIS, and the FSEIS. Thus, JRWA/PW c ould have requested it years ago. Moreover, JRWA/PW do not rely on any information contained in that document, but instead disavow its contents. And they nowhere show that the ENSR 2000 report's discussion of impingement, entrainment and cooling water impacts is any different than information already available.
32 Having failed to show good cause, the demonstra tion regarding the other factors must be "compelling" in order to justify admitting the Contentions. Dominion Nuclear Connecticut, Inc.
(Millstone Nuclear Power Station, Units 2 and 3), CLI-05-24, 62 N.R.C. 551, 565 (2005); Comanche Peak , CLI-92-12, 36 N.R.C. at 73. In balancing the remaining late-filed contention factors, the Commission grants considerab le weight to factors seven and eight. We regard as highly important the intervenor's ability to contribute to the development of a sound record on a partic ular contention. We also are giving significant weight to the potential delay, if any, which might ensue from admitting a particular contention. Consumers Power Co. (Midland Plant, Units 1 and 2) LBP-82-63, 16 N.R.C. 571, 577 (1982) (citations omitted), citing South Carolina Electric & Gas Co. (Virgil C. Summer Nuclear Station, Unit 1), ALAB-642, 13 N.R.C. 881, 895 (1981); see also Commonwealth Edison Co.
(Braidwood Nuclear Power Stat ion, Units 1 and 2), CLI-86-8, 23 N.R.C. 241, 246-47 (1986). JRWA/PW cannot make a compelling showing on the remaining factors because factors seven and eight heavily weigh against admitting the Contention. Factor seven, the extent to which admission of the Contention will broaden the issues or delay the proceeding, weighs heavily against admitting the Contention. All admitted contentions have been resolved, and the proposed Contenti on pending before the Board concerns ESA-listed aquatic species and thus has li ttle, if any, relation to the roseate tern Contention. The Commission has made clear that "the introductio n of a new contention, we ll after the contested proceeding closed, would broaden the issues and delay the proceeding."  Vogtle , CLI-11-08 at 18. Where, as here, the proceeding has been ongoing for over six years, the NRC's Staff's view has long since been complete, all admitted contentions have been resolved, and there is less than one month before the expiration of the Pilgrim license, there can be no question that admission of the Contention would broaden the issues and delay the proceeding.
33 Factor eight, the ability to contribute to a sound record, al so weighs heavily against admitting the Contention. As explained throughout this Answer, JRWA and their affiants provide no information, let alone significant information, demons trating the existence of any significant environmental issue calling into question the conclu sions reached by Entergy, the NRC Staff, and FWS concerning impacts to the roseate tern. Furt her, Entergy has demonstrated that no materially different result would be likely were JRWA/PW's claims considered. Petitioners have thus failed to demonstrate any ability to contribute to a sound record.
Thus, factors one (good cause), seven (broaden and delay proceeding), and eight (contribution to a sound record) - the three most significant factors - count heavily against Petitioners. The other fact ors in 10 C.F.R. § 2.309(c)(1) are less important (see , e.g., Pacific Gas & Electric Co. (Diablo Canyon Power Plant Independent Spent Fuel Storage Installation), CLI-08-1, 67 N.R.C. 1, 6 (2008); Comanche Peak , CLI-93-4, 37 N.R.C. at 165), and therefore cannot outweigh Petitioners' failure to demonstrate good cause or meet the criteria in factors seven and eight. V. The Roseate Tern Contention is Inadmissible Even if JRWA/PW had met the standards for reopening a closed record and the standards for a late contention (which they have not), th eir contention would still be inadmissible because it does not satisfy the pleading requirements in 10 C.F.R. § 2.309(f)(1). Petitioners are still required to demonstrate that their contention satisfies the admissibi lity standards in 10 C.F.R. § 2.309(f)(1)(i)-(vi). Sacramento Municipal Utility District (Rancho Seco Nuclear Generating Station), CLI-93-12, 37 N.R.C. 355, 362-63 (1993). Petitioners' Contention does not meet these standards.
34 JRWA/PW's claim that the NRC failed to prepare a BA on the roseate tern is not material to the findings the NRC must make, and fails to raise a genuine dispute on any material issue. 10 C.F.R. §§ 2.309(f)(1)(iv), (vi). As previously discussed, the NRC Staf f was not required to prepare a BA because renewal of Pilgrim's operating license involves no "major construction activities." Also immaterial, as well as beyond the scope of this proceeding, is JRWA/PW's claim that FWS "unlawfully ignored the requirement for a biological assessment and without a scientific basis declared the roseate tern to be 'probabl y transient.'"  10 C.F.R. §§ 2.309(f)(1)(iii), (iv). The Comm ission has long held that the scope of a licensing proceeding does not include litigating issues that are the primary responsib ility of other agencies. The Commission has made clear that licensing boards "should narrowly construe their scope to avoid where possible the litigation of issues that are the primary respons ibility of other agencies and whose regulation is not necessary to meet [the Commission's] statut ory responsibilities."
28  Congress gave the Commission "no roving mandate to determine other agencies' permit authority." Id. Thus, any claim that FWS failed to adequately perform its f unctions is beyond the purview of the Licensing Board. The Contention is also inadmissible because it is not supported by sufficient information to show that a genuine dispute exists on a material issue of law or fact, as required by 10 C.F.R. § 2.309(f)(1)(v), (vi). Under the NRC's Rules of Practice, "a protestant does not become entitled to an evidentiary hearing merely on request, or on a bald or conclusory allegation that such a dispute exists. The protestant must make a minimal showing that material facts are in dispute, thereby demonstrating that an 'inqui ry in depth' is appropriate."  Rules of Practice for Domestic 35 Licensing Proceedings - Procedural Change s in the Hearing Process, 54 Fed. Reg. 33,168, 33,171 (Aug. 11, 1989) (quoting Conn. Banke rs Ass'n v. Bd. of Governors , 627 F.2d 245, 251 (D.C. Cir. 1980)). JRWA/PW make multiple assertions that fall far short of this strict standard. First, JRWA/PW mischaracterize the inform ation on which Entergy, the NRC Staff, and FWS relied when concluding that continued operation of Pilgrim woul d likely result in no adverse impact to the roseate tern. Despite the claim to the contra ry, JRWA/PW Motion at 15-17, Entergy did not describe the roseate tern as being near Pilgrim "exclusively" during its migration. Entergy stated that, although no "suita ble nesting habitat" for the roseate tern had been identified at the Pilgrim site , it was "known to occur in the ge neral vicinity of the PNPS site . . . and cannot be ruled out as [an] occasional visitor[] to the PNPS site and environs."  Entergy Feb. 2005 Letter to FWS at 1, 2; ER at 2-9. Likewise, both FWS and the NRC acknowledged the existence of the roseate tern on "Plymouth Beach, just north of th e PNPS."  FWS Mar. 2005 Letter to Entergy at 1; DSEIS at 2-96. JRWA/PW nowhere show any material difference between these statements and the information they raise in the Contention, i.e., the existence of the roseate tern on LPB. Petitioners' mischaracterizations of information plainly evident in the Entergy, Staff, and FWS documents ca nnot create a genuine dispute.
In addition, Petitioners provide no expert support for their claims that continued operation of Pilgrim will result in adverse impacts to the roseate tern's food sources by impingement, entrainment, and waste water discharges. Dr. Nisbet merely suggests that such impacts ought to be further investigated, e.g., Nisbet Aff. at ¶ 19, without providing any information indicating that the ro seate tern's food sources would be adversely impacted. Neither 


28  Hydro Resources, Inc. (2929 Coors Road, Suite 101, Albuquerque, NM 87120), CLI-98-16, 48 N.R.C. 119, 121-22 (1998) (footnote omitted).
credible to suggest that the annual magnitude of impingement and entrainment mortality at PNPS could potentially affect the availability of sand lance as prey for the roseate tern. Scherer & Barnum Aff. at ¶¶ 19-23.
36 Petitioners nor their expert cha llenge the fact that the roseate tern population near Pilgrim has been increasing during its operation, and provide no evidence disputing the NRC Staff's determination that "there is no evidence that these species have been adversely affected by previous operation of the PNPS facility" FSEIS at 4-64. Petitioners' and Dr. Nisbet's "bare assertions are insufficient to demonstrate a genuine dispute on a material issue of law or fact under . . . section 2.309(f)(1)(vi)."  Pilgrim, CLI-12-03 at 23-24.
* Atlantic herring and hake may also make up a portion of the roseate terns diet.
VI. Conclusion For the reasons set forth above, JRWA/PW's Motion should be denied. Respectfully Submitted, /signed electronically by David R. Lewis
On average, again conservatively assuming 100 % impingement and entrainment mortality, Atlantic herring losses at PNPS average 296 pounds per year. This is a minute fraction of the estimated hundreds of millions of pounds of Atlantic herring available for predation by the roseate tern. The annual combined estimate of age 1 hake impingement and entrainment losses at PNPS, assuming 100 %
/ ________________________________
mortality, is approximately 14,070 pounds, which is a minute fraction of the more than 50 million of pounds of hake estimated in the Cape Cod area. Thus, impingement and entrainment losses of Atlantic herring and hake at PNPS cannot reasonably be expected to affect the availability of such prey for the roseate tern.
Scherer & Barnum Aff. at ¶¶ 24-28.
* The asserted turbulence associated with PNPSs cooling water discharge is not expected to bring an abundance of sand lance to the surface where they can be captured, and thus the area near the cooling water discharge is unlikely to provide desirable foraging conditions for the roseate tern. Moreover, to the extent any roseate terns might be attracted to the turbulence created by PNPSs cooling water discharge, if prey fish are absent from the water, any such attractiveness would likely be short lived, as the roseate terns flexible foraging strategy would allow it to either move or concentrate its feeding efforts where prey are abundant. Scherer
  & Barnum Aff. at ¶¶ 29-30.
25
* Contrary to Petitioners assertion (JRWA/PW Motion at 21), the Pilgrim NPDES permit has been administratively continued during the pendency of permit renewal proceedings, and, as a result, the conditions and limitations of the most recent NPDES permit remain valid and in full force and effect. Scheffer Aff. at ¶ 7.
* As allowed under its NPDES permit, Pilgrim uses chlorine as a biocide for the Circulating Water System (CWS) and (Salt) Service Water System (SWS).
Chlorination of the CWS is limited to a maximum of two hours per day, with the frequency of chlorination ranging from once a day to once a week, and to a Total Residual Oxidant (TRO) concentration of 0.1 mg/L, stricter than the federal effluent limitation guideline of 0.2 mg/L. The NPDES permit allows constant chlorination of the SWS system, with an average monthly limit of 0.5 mg/L and an instantaneous maximum limit of 1.0 mg/L. Scheffer Aff. at ¶¶ 8-9.
* Pilgrim samples CWS and SWS water to ensure compliance with their respective TRO concentration limits. Water discharged from the CWS is sampled in the discharge canal at least 8 times during each chlorination period, assuming a 2 hour run. Pilgrim samples SWS water (downstream of the heat exchanges and prior to entering the discharge canal) for chlorine twice daily when chlorination is in service. These sampling results are documented in Pilgrims Discharge Monitoring Reports (DMRs). Scheffer Aff. at ¶¶ 10-12.
* Chlorination permit exceedances are extraordinarily rare. Over the past ten years, PNPS has documented only two instances in which the chlorine concentration exceeded the CWSs maximum permitted level of 0.1 mg/L, each resulting from 26


David R. Lewis Timothy J.V. Walsh PILLSBURY WINTHROP SHAW PITTMAN LLP 2300 N Street, NW 
minor and unanticipated equipment malfunctions, and each lasting less than 20 minutes in duration. Both exceedances, while over the NPDES permit limit, were less than the 0.2 mg/L federal effluent limitation guideline, and the amount of residual chlorine discharged into Cap Cod Bay is expected to have been minimal.
Scheffer Aff. at ¶¶ 12-13.
* Similarly, over the past ten years, PNPS has documented only 6 instances (out of thousands of sampling events) in which the chlorine concentration of SWS water (measured prior to entering the discharge canal) exceeded the daily maximum permitted limit of 1.0 mg/L. Because SWS water is substantially diluted when mixed with the CWS stream prior to the point of discharge into Cape Cod Bay, and chlorine demand further reduces TRO concentration, even where an SWS exceedance has occurred, the concentration is typically undetectable prior, and is always at or below the 0.1 mg/L limit for CWS discharges set in the stations NPDES permit. Scheffer Aff. at ¶ 14.
* Heavy metals such as zinc, copper, and chromium are believed to be absent from the Pilgrim Stations regularly discharged effluent. The use of the corrosion inhibitor Tolyltriazole in Pilgrim systems has been authorized by the U.S. EPA.
When Tolyltriazole has been discharged, it has been in diluted concentrations well below EPA approved limits and reported in the Stations DMRs. Scheffer Aff. at
  ¶¶ 18-19.
* The chlorine discharge limitations set forth in Pilgrims NPDES permit are considered protective of marine organisms in Cape Cod Bay. Although PNPS has, on rare occasion experienced exceedances of its chlorine discharge limits at 27


Washington, DC  20037-1128
certain outfall locations, it is highly unlikely that those exceedances would affect the environment, or have any impact on the biota in Cape Cod Bay. Thus, there is no credible scientific evidence that discharges from PNPS have any adverse effect on roseate tern. Scherer & Barnum Aff. at ¶¶ 15, 31.
For all of the reasons set forth above, JRWA/PWs claims fail to raise a significant environmental or safety issue as required under Section 2.326(a)(2).
: 3.      JRWA/PW Have Failed to Demonstrate That a Materially Different Result Would Be Likely JRWA/PW and their affiants fail to demonstrate that a materially different result would have been likely had their newly proffered evidence been considered initially, as required by 10 C.F.R. § 2.326(a)(3) (emphasis added). Petitioners have a deliberately heavy burden to demonstrate that a materially different result would be likely. Oyster Creek, CLI-08-28, 68 N.R.C. at 674; see also Pilgrim, CLI-12-03 at 8; Oyster Creek, CLI-09-7, 69 N.R.C. at 287. At this late stage of the proceeding, is it not sufficient simply to raise an issue. The level of support required for a motion to reopen is greater than that required for a contention under the general admissibility requirements of 10 C.F.R. § 2.309(f)(1). Pilgrim, CLI-12-06 at 18.
[N]o reopening of the evidentiary hearing will be required if the [documents] submitted in response to the motion demonstrate that there is no genuine unresolved issue of fact. PFS, CLI-05-12, 61 N.R.C. 345, 350 (2005), citing Vermont Yankee Nuclear Power Corp. (Vermont Yankee Nuclear Power Station), ALAB-138, 6 A.E.C. 520, 523-24 (1973). A petitioner will fail to demonstrate that a materially different result will be likely where the petitioner seeks to litigate issues outside the scope of a proceeding, or fails to challenge pertinent information contained in the existing licensing documents. See Pilgrim, CLI-12-06 at 26-27.
28


Tel. (202) 663-8000      E-mail: david.lewis@pillsburylaw.com
The sole claim that JRWA/PW make with respect to this criterion is that, had their information been considered initially, a materially different result would have been likely because there would be a biological assessment as to whether PNPS relicensing would be likely to effect [sic] the roseate tern, which would include information cited in the Nisbet Affidavit and Petitioners documents and this information would be taken into account in the balance of alternatives under NEPA. JRWA/PW Motion at 36. Dr. Nisbet merely asserts his opinion that a materially different result would have been likely if the information in his affidavit had been considered previously, Nisbet Aff. at ¶ 21, but nowhere explains what would be different, and why that difference would be material. JRWA/PW and Dr. Nisbet are incorrect.
As previously discussed, no BA is required where, as here, the Federal action does not involve any major construction activities. 16 U.S.C. § 1536; 50 C.F.R. § 402.12(b); 51 Fed.
Reg. at 19,936; Water Keeper Alliance, 271 F.3d at 31. As FWS explained, The Service will not require [BAs] for actions that do not involve construction or activities having physical impacts similar to construction, such as dredging, blasting, etc. This limitation derives support from the 1979 Conference Report reference to actions designed primarily to result in the building or erection of various projects.
51 Fed. Reg. at 19,936 (some emphasis added). Renewal of Pilgrims operating license involves no such building or erection of various projects. Entergy Feb. 2005 Letter to FWS at 3. ([n]o expansion of existing facilities is planned and no additional land disturbance is anticipated).
See also FWS Mar. 2005 Letter to Entergy at 2; DSEIS at 4-58; FSEIS at 4-64.
Further, even if a BA were required, the NRC Staffs existing NEPA analysis satisfies the requirement. 16 U.S.C. 1536(c)(1) (permitting that a BA may be undertaken as part of the NRCs preparation of an environmental impact statement). In addition, as discussed supra, FWS regulations provide that the contents of a BA are discretionary, and the Staffs analysis already 29


Counsel for Entergy
contains discussion on multiple items recommended for inclusion in a BA. 50 C.F.R. § 402.12(f); see FSEIS at 4-64, 4-66, 4-70. Petitioners claim (JRWA/PW Motion at 18-19) that the NRC has overlooked certain studies developed since 2006/2007, i.e., after the time period when NRC and FWS made their determinations, does not violate the ESAs procedural requirements. Water Keeper Alliance, 271 F.3d at 33. Consequently, Petitioners can not demonstrate that their claims are likely to succeed on the merits.
Finally, the attached Affidavits from Drs. Scherer and Barnum and Mr. Scheffer demonstrate that JRWA/PWs claims do not demonstrate that a materially different outcome would be likely because continued operation of Pilgrim is not likely to result in any discernible impacts on the roseate tern. As previously summarized, Petitioners have failed in their obligation to raise any significant environmental issue warranting supplementation of the FSEIS, or otherwise undermining the FWS determination that no consultation was required, and the Staff determination that it would not prepare a BA. There is no evidence suggesting that PNPS will have any credible indirect impact on the roseate tern through impacts on the availability of fish prey due to impingement and entrainment mortality, or the impacts of pollution. Scherer &
Barnum Aff. at ¶¶ 15, 31. Average annual estimates of the annual impact to sand lance, the roseate terns main fish prey, from impingement and entrainment are comparable to one days consumption by just two whales. Id. at ¶ 22. The estimates of impingement and entrainment impacts to the roseate terns other significant prey species, Atlantic herring and hake, are miniscule when compared to the total available stocks for those fish species. Id. at ¶¶ 25-28.
Over the past ten years, there are only two documented instances where chlorinated water discharges into Cape Cod Bay from the CWS exceeded the 0.1 mg/L limit prescribed in Pilgrims (currently valid) NPDES permit. Scheffer Aff. at ¶ 13. Those exceedances will have 30


Dated: May 16, 2012 1 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board
little, if any, potential for adverse impact on roseate tern fish prey. Scherer & Barnum Aff. at ¶¶ 15, 31.
For all of the reasons set forth above, JRWA/PWs claims fail to demonstrate that a materially different outcome would be likely under Section 2.326(a)(3).
C.      The Contention fails to meet 10 C.F.R. § 2.309(c) standards for considering a late-filed contention JRWA/PWs belated contention should not be admitted because Petitioners have shown no good cause for their extreme tardiness, and a balancing of the remaining factors in 10 C.F.R.
§ 2.309(c) does not outweigh this failure to timely file the Contention.
To demonstrate good cause, the first and most important late-filed factor, JRWA/PW must establish that the information on which their Contention is based is new information not already in the public domain that could not have been presented earlier. Comanche Peak, CLI-92-12, 36 N.R.C. at 69-73; Millstone, CLI-09-5, 69 N.R.C. at 126. Petitioners have failed to demonstrate good cause under Section 2.309(c)(1) for the same reasons that their Contention is untimely under Section 2.326(a) and 2.309(f)(2), discussed supra. All of Petitioners claims (such as sitings and observations of the roseate tern on LPB dating back to 1988) could have been raised years ago. JRWA/PWs reliance on a document they received a few weeks ago, JRWA/PW Motion at 45-46, does not show good cause. The ENSR 2000 report was referenced numerous times in the ER, the DSEIS, and the FSEIS. Thus, JRWA/PW could have requested it years ago. Moreover, JRWA/PW do not rely on any information contained in that document, but instead disavow its contents. And they nowhere show that the ENSR 2000 reports discussion of impingement, entrainment and cooling water impacts is any different than information already available.
31


In the Matter of  
Having failed to show good cause, the demonstration regarding the other factors must be compelling in order to justify admitting the Contentions. Dominion Nuclear Connecticut, Inc.
(Millstone Nuclear Power Station, Units 2 and 3), CLI-05-24, 62 N.R.C. 551, 565 (2005);
Comanche Peak, CLI-92-12, 36 N.R.C. at 73. In balancing the remaining late-filed contention factors, the Commission grants considerable weight to factors seven and eight.
We regard as highly important the intervenor's ability to contribute to the development of a sound record on a particular contention. We also are giving significant weight to the potential delay, if any, which might ensue from admitting a particular contention.
Consumers Power Co. (Midland Plant, Units 1 and 2) LBP-82-63, 16 N.R.C. 571, 577 (1982)
(citations omitted), citing South Carolina Electric & Gas Co. (Virgil C. Summer Nuclear Station, Unit 1), ALAB-642, 13 N.R.C. 881, 895 (1981); see also Commonwealth Edison Co.
(Braidwood Nuclear Power Station, Units 1 and 2), CLI-86-8, 23 N.R.C. 241, 246-47 (1986).
JRWA/PW cannot make a compelling showing on the remaining factors because factors seven and eight heavily weigh against admitting the Contention.
Factor seven, the extent to which admission of the Contention will broaden the issues or delay the proceeding, weighs heavily against admitting the Contention. All admitted contentions have been resolved, and the proposed Contention pending before the Board concerns ESA-listed aquatic species and thus has little, if any, relation to the roseate tern Contention. The Commission has made clear that the introduction of a new contention, well after the contested proceeding closed, would broaden the issues and delay the proceeding. Vogtle, CLI-11-08 at
: 18. Where, as here, the proceeding has been ongoing for over six years, the NRCs Staffs view has long since been complete, all admitted contentions have been resolved, and there is less than one month before the expiration of the Pilgrim license, there can be no question that admission of the Contention would broaden the issues and delay the proceeding.
32


Entergy Nuclear Generation
Factor eight, the ability to contribute to a sound record, also weighs heavily against admitting the Contention. As explained throughout this Answer, JRWA and their affiants provide no information, let alone significant information, demonstrating the existence of any significant environmental issue calling into question the conclusions reached by Entergy, the NRC Staff, and FWS concerning impacts to the roseate tern. Further, Entergy has demonstrated that no materially different result would be likely were JRWA/PWs claims considered.
Petitioners have thus failed to demonstrate any ability to contribute to a sound record.
Thus, factors one (good cause), seven (broaden and delay proceeding), and eight (contribution to a sound record) - the three most significant factors - count heavily against Petitioners. The other factors in 10 C.F.R. § 2.309(c)(1) are less important (see, e.g., Pacific Gas
& Electric Co. (Diablo Canyon Power Plant Independent Spent Fuel Storage Installation), CLI-08-1, 67 N.R.C. 1, 6 (2008); Comanche Peak, CLI-93-4, 37 N.R.C. at 165), and therefore cannot outweigh Petitioners failure to demonstrate good cause or meet the criteria in factors seven and eight.
V.      The Roseate Tern Contention is Inadmissible Even if JRWA/PW had met the standards for reopening a closed record and the standards for a late contention (which they have not), their contention would still be inadmissible because it does not satisfy the pleading requirements in 10 C.F.R. § 2.309(f)(1). Petitioners are still required to demonstrate that their contention satisfies the admissibility standards in 10 C.F.R. § 2.309(f)(1)(i)-(vi). Sacramento Municipal Utility District (Rancho Seco Nuclear Generating Station), CLI-93-12, 37 N.R.C. 355, 362-63 (1993). Petitioners Contention does not meet these standards.
33


Company Entergy Nuclear Operations, Inc.  
JRWA/PWs claim that the NRC failed to prepare a BA on the roseate tern is not material to the findings the NRC must make, and fails to raise a genuine dispute on any material issue. 10 C.F.R. §§ 2.309(f)(1)(iv), (vi). As previously discussed, the NRC Staff was not required to prepare a BA because renewal of Pilgrims operating license involves no major construction activities.
Also immaterial, as well as beyond the scope of this proceeding, is JRWA/PWs claim that FWS unlawfully ignored the requirement for a biological assessment and without a scientific basis declared the roseate tern to be probably transient. 10 C.F.R. §§ 2.309(f)(1)(iii), (iv). The Commission has long held that the scope of a licensing proceeding does not include litigating issues that are the primary responsibility of other agencies. The Commission has made clear that licensing boards should narrowly construe their scope to avoid where possible the litigation of issues that are the primary responsibility of other agencies and whose regulation is not necessary to meet [the Commissions] statutory responsibilities.28 Congress gave the Commission no roving mandate to determine other agencies permit authority. Id. Thus, any claim that FWS failed to adequately perform its functions is beyond the purview of the Licensing Board.
The Contention is also inadmissible because it is not supported by sufficient information to show that a genuine dispute exists on a material issue of law or fact, as required by 10 C.F.R.
§ 2.309(f)(1)(v), (vi). Under the NRCs Rules of Practice, a protestant does not become entitled to an evidentiary hearing merely on request, or on a bald or conclusory allegation that such a dispute exists. The protestant must make a minimal showing that material facts are in dispute, thereby demonstrating that an inquiry in depth is appropriate. Rules of Practice for Domestic 34


(Pilgrim Nuclear Power Station)  
Licensing Proceedings - Procedural Changes in the Hearing Process, 54 Fed. Reg. 33,168, 33,171 (Aug. 11, 1989) (quoting Conn. Bankers Assn v. Bd. of Governors, 627 F.2d 245, 251 (D.C. Cir. 1980)). JRWA/PW make multiple assertions that fall far short of this strict standard.
First, JRWA/PW mischaracterize the information on which Entergy, the NRC Staff, and FWS relied when concluding that continued operation of Pilgrim would likely result in no adverse impact to the roseate tern. Despite the claim to the contrary, JRWA/PW Motion at 15-17, Entergy did not describe the roseate tern as being near Pilgrim exclusively during its migration. Entergy stated that, although no suitable nesting habitat for the roseate tern had been identified at the Pilgrim site, it was known to occur in the general vicinity of the PNPS site
. . . and cannot be ruled out as [an] occasional visitor[] to the PNPS site and environs. Entergy Feb. 2005 Letter to FWS at 1, 2; ER at 2-9. Likewise, both FWS and the NRC acknowledged the existence of the roseate tern on Plymouth Beach, just north of the PNPS. FWS Mar. 2005 Letter to Entergy at 1; DSEIS at 2-96. JRWA/PW nowhere show any material difference between these statements and the information they raise in the Contention, i.e., the existence of the roseate tern on LPB. Petitioners mischaracterizations of information plainly evident in the Entergy, Staff, and FWS documents cannot create a genuine dispute.
In addition, Petitioners provide no expert support for their claims that continued operation of Pilgrim will result in adverse impacts to the roseate terns food sources by impingement, entrainment, and waste water discharges. Dr. Nisbet merely suggests that such impacts ought to be further investigated, e.g., Nisbet Aff. at ¶ 19, without providing any information indicating that the roseate terns food sources would be adversely impacted. Neither 28 Hydro Resources, Inc. (2929 Coors Road, Suite 101, Albuquerque, NM 87120), CLI-98-16, 48 N.R.C. 119, 121-22 (1998) (footnote omitted).
35


Docket No. 50-293-LR
Petitioners nor their expert challenge the fact that the roseate tern population near Pilgrim has been increasing during its operation, and provide no evidence disputing the NRC Staffs determination that there is no evidence that these species have been adversely affected by previous operation of the PNPS facility FSEIS at 4-64. Petitioners and Dr. Nisbets bare assertions are insufficient to demonstrate a genuine dispute on a material issue of law or fact under . . . section 2.309(f)(1)(vi). Pilgrim, CLI-12-03 at 23-24.
VI. Conclusion For the reasons set forth above, JRWA/PWs Motion should be denied.
Respectfully Submitted,
                                                /signed electronically by David R. Lewis/
David R. Lewis Timothy J.V. Walsh PILLSBURY WINTHROP SHAW PITTMAN LLP 2300 N Street, NW Washington, DC 20037-1128 Tel. (202) 663-8000 E-mail: david.lewis@pillsburylaw.com Counsel for Entergy Dated: May 16, 2012 36


AFFIDAVIT OF MICHAEL D. SCHERER, Ph.D. AND SARAH A. BARNUM, PH.D. IN SUPPORT OF ENTERGY'S ANSWER OPPOSING JONES RIVER WATERSHED ASSOCIATION'S AND PILGRIM WATCH'S MOTION TO REOPEN, REQUEST FOR HEARING AND PERMISSION TO FILE NEW CONTENTION We, Michael D. Scherer, Ph.D. and Sarah A. Barnum, Ph.D., do hereby depose and say on the basis of personal knowledge and our professional opinion, and under penalties of perjury, that: BACKGROUND AND QUALIFICATIONS
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of Entergy Nuclear Generation                        Docket No. 50-293-LR Company Entergy Nuclear Operations, Inc.
: 1. My name is Dr. Michael D. Scherer. I am a Vice President and Senior Marine Scientist with Normandeau Associates, Inc. ("Normandeau"), a professional consulting firm that specializes in ecological, environmental and natural resources management services. I hold a Ph.D. degree with a Fisheries Biology major and Biometrics minor from the University of Massachusetts, a Master of Science degree in Fisheries Biology from the University of Massachusetts, and a Bachelor of Science degree in Fisheries Biology from Cornell University. My most recent curriculum vitae, and additional detail regarding my qualifications, are described in and attached to my March 19, 2012 Declaration, also submitted in this proceeding and hereby incorporated by reference as if set forth fully herein.
(Pilgrim Nuclear Power Station)
See Affidavit of Michael D. Scherer, Ph.D.
AFFIDAVIT OF MICHAEL D. SCHERER, Ph.D. AND SARAH A. BARNUM, PH.D. IN SUPPORT OF ENTERGYS ANSWER OPPOSING JONES RIVER WATERSHED ASSOCIATIONS AND PILGRIM WATCHS MOTION TO REOPEN, REQUEST FOR HEARING AND PERMISSION TO FILE NEW CONTENTION We, Michael D. Scherer, Ph.D. and Sarah A. Barnum, Ph.D., do hereby depose and say on the basis of personal knowledge and our professional opinion, and under penalties of perjury, that:
2 in Support of Entergy's Answer Opposing Jones River Watershed Association's and Pilgrim Watch's Motion to Reopen and Hearing Request.
BACKGROUND AND QUALIFICATIONS
: 2. My name is Dr. Sarah A. Barnum. I am a Senior Wildlife Ecologist with Normandeau. I hold a Ph.D. degree from the School of Architecture and Planning with a concentration in Conservation Planning from the University of Colorado, a Master of Science degree in Wildlife Ecology from Utah State University, and a Bachelor of Science degree in Wildlife Biology from the University of Vermont. My most recent curriculum vitae is attached hereto as Exhibit 1. I have over 15 years experience as a wildlife ecologist, with a focus on avian ecology, and I have significant experience in assessing the potential impacts of energy facilities and technologies on birds, including the roseate tern and other seabirds that may occur in portions of Cape Cod Bay and, more generally, the Gulf of Maine. In particular, I have worked as an avian biologist and project mana ger assessing potential im pacts of proposed wind turbine projects in Massachusetts (e.g., the Madaket Wind Turbine Project and the Saugus Community Wind Project) on avian resources, including terns and ot her shorebirds. In addition, from 2005-2007, I was a Conservation Program Manager for New Hampshire Audubon, where I oversaw multiple on-going research and conservation programs, including the Tern Restoration Project. PURPOSE AND METHODOLOGY
: 1.     My name is Dr. Michael D. Scherer. I am a Vice President and Senior Marine Scientist with Normandeau Associates, Inc. (Normandeau), a professional consulting firm that specializes in ecological, environmental and natural resources management services. I hold a Ph.D. degree with a Fisheries Biology major and Biometrics minor from the University of Massachusetts, a Master of Science degree in Fisheries Biology from the University of Massachusetts, and a Bachelor of Science degree in Fisheries Biology from Cornell University.
: 3. This Declaration is made in response to the Jones River Wate rshed Association's and Pilgrim Watch's Motion to Reopen, Request for Hearing and Permission to File New Contention (collectively, "the Petition"), dated May 2, 2012. The Petition alleges certain deficiencies in the NRC's evaluation of the potential impacts of continued operation of Pilgrim Nuclear Power Station ("PNPS") on the roseate tern (Sterna dougallii) which is listed as 3 endangered under the federal Endangered Species Act ("ESA"). 16 U.S.C. § 1531 et seq. In this Declaration, we will offer our expert opinion that the continued operation of PNPS will have no discernible effects on the northeas t population of roseate tern, its habitat or recovery goals.
My most recent curriculum vitae, and additional detail regarding my qualifications, are described in and attached to my March 19, 2012 Declaration, also submitted in this proceeding and hereby incorporated by reference as if set forth fully herein. See Affidavit of Michael D. Scherer, Ph.D.
: 4. The opinions expressed in this Declaration are in part based on our review of the sources identified in Exhibit 2. To the best of our knowledge, the factual statements in this Declaration are true and accurate, and the opinions expressed therein are based on our best professional judgment. DISCUSSION Description of PNPS and its Environment
1
: 5. A description of PNPS and its location and environment is provided in paragraphs 7 through 16 of Dr. Scherer's previous Declaration submitted in this proceeding. Additional information on the operation of PNPS is provided in the Declaration of Mr. Jacob J. Scheffer, which we have reviewed and understand is being submitted contemporaneously with this Declaration. Relevant Biology and Ecology of the Roseate Tern
: 6. The roseate tern, a medium sized, fish eating, shore bird, is a migratory species that spends at least half the year in tropical latitudes with a scattered distribution primarily in the tropical and sub-tropical Atlantic, Indian, and Pacific Oceans. Gochfeld et al., 1998. During the summer, a subpopulation of roseate terns breeds in the northeast region of North America, from New York to Nova Scotia.
Id. 7. Roseate terns arrive in Massachusetts from late-April to mid-May to nest at several coastal locations, typically on islands (as discussed below). Mostello 2007. These birds then abandon their breeding loca tions in late-July and August, although they temporarily may 4 congregate in "staging areas" around Cape Cod a nd the Islands of Nantucket and Martha's Vineyard, before departing by mid- to late-September for wintering grounds in the West Indies and off the northern and eastern coasts of South America, where they will remain for upwards of six months out of the year.
See US FWS. 1998 (Hereinafter, "Recovery Plan"). Roseate terns appear to disperse throughout th e breeding range in July and A ugust, re-aggregating at staging areas primarily on outer Cape Cod in late August and early September prior to southward migration. US FWS 2010 (Hereinafter, "5-Year Review"); Trull et al., 1999; Blake 2010. Staging areas are transitory relative to breedi ng colonies, and individuals may remain in one place foraging for as little as a few hours or overnight (i.e., roosting) before moving on to the next spot.
See e.g., Trull et al. 1999. In short, because staging roseate terns are not "anchored" to a single area by the presence of a nest, they are free to move to alternative staging areas if the fishing or other ambient conditions are not advantageous in a particular area.
: 8. Roseate terns typically nest in coloni es on sandy, gravell y, or rocky islands (which are less likely than the mainland to have mammalian and certain avian predators) and, less commonly, in small numbers at the ends of long barrier beaches. Recovery Plan; Mostello 2007. In Massachusetts, the roseat e tern invariably nests in association with common terns, forming clusters or sub-colonies within larger common tern colonies. Mostello 2007. Compared to the common tern, the roseate tern selects nest sites with denser vegetation, such as seaside goldenrod and beach pea, which provide cover for eggs and chicks.
Id. In Massachusetts, significant nesting colonies of roseate terns are found at Bird Island and Ram Island, in Buzzards Bay, with 735 and 584 breeding pairs in 2010, resp ectively, which accounts for 95% of the Massachusetts breeding population.
MADEP 2011. Birds in these tw o colonies are not expected to be influenced by PNPS, as they belong to a subgroup of the northeast population that is 5 separate from birds near PNPS. Specifically, a long-term banding study of roseate terns indicates that the northeast popul ation is split into two sepa rate subgroups: a "cold water" subgroup nesting north and east of Cape Cod, wh ich would include any birds nesting near Plymouth, Massachusetts; and a "warm water" s ubgroup nesting south and west of Cape Cod, which includes the major colonies in Buzzards Bay. 5-Year review. The interchange of individual birds between these two groups is thought to be limited.
Id. 9. Long Beach, in Plymouth, Massachusetts has historically been a minor nesting site. Recovery Plan Appendix B; 5-Year Review). From 1999 through 2009, only a single nesting pair was recorded, in 2008. 5-Year Review.
Dr. Nisbet states in his Affidavit that three pairs of roseate tern nested at Long Beach in 2011, though the source of this information is not stated and does not appear to have been published. Nisbet Aff. ¶ 8.
: 10. Roseate terns are highly mobile foragers, flying much faster than common terns (Recovery Plan), which allows them to forage over large areas. In Massachusetts, roseate terns may forage 25-30 km (about 15 to 18 miles) away from the breeding colony. Mostello 2007; Recovery Plan. Published data on the roseate te rn's foraging range from staging areas are not available, due to the difficulty in monitoring the movements of individuals that are not anchored to a single location for a significant period of time, as is the cas e for nesting birds. However, there is nothing that would indicate that roseate tern's foragi ng range from staging areas is smaller than from breeding colonies. In fact, because they are not anchored to a nest, they may be able to forage over a larger range.
: 11. Roseate terns also exhibit a flexible foraging strategy, adapting to foraging conditions within their range by co ncentrating their feeding efforts in areas where prey are more abundant. See Heinemann 1992. For example, Heinema nn (1992) observed over the course of a 6 summer the foraging behaviors of individuals ne sting in the breeding co lony located at Bird Island, Massachusetts. He reporte d significant variation in foragi ng intensity over the course of the summer at different locations around Buzzards Bay, separated by distances of more than 20 km (12.5 miles).
See id. The flexible foraging strategy exhibited by this colony demonstrates the ability of roseate terns to ad apt to local conditions and to con centrate their feeding efforts in areas within their relatively large foraging range where prey are more plentiful.
: 12. The roseate tern is a fairly specialized forager, usually feeding over shallow sandbars, shoals, inlets, tide rips, which bring prey fish close to the surface, making them easier to catch. Recovery Plan; 5-yr Review. They feed almost exclusively on small, schooling marine fish, though occasionally they include crustaceans in their diet.
See Gochfeld et al., 1998. Although the composition of their diet varies from year to year and with location, the bulk of the roseate tern diet in Massachusetts is comprised of sand lance (Ammodytes spp.
), hake (Urophycis spp.), and Atlantic herring (Clupea harengus). 5-Year Review. The roseate tern captures prey fish mainly by plunge-diving from heights of up to 20 m and often submerging 50 cm or more, but also by surface-dipping and contact-dipping. Mostello 2007; Recovery Plan.
: 13. The northeastern population of the roseate tern was listed as endangered under the federal ESA in 1987, principally due to contrac tion of the population into a small number of breeding sites and secondarily because of its declining numbers. Recovery Plan; see also DOI 1987. From the 1920s through the 1970s, roseate terns were displaced from at least 30 nesting colonies, due primarily to occupation of those sites by herring gulls and great black-backed gulls, and secondarily to animal predation (which may have intensified as terns were displaced by gulls to sites closer to the mainland), and erosion of the shoreline. Recovery Plan. By 1979, the northeast population (i.e., from New York to Nova Scotia) was estimated to be approximately 7 2,500 pairs. Mostello 2007. Fo llowing two decades of fairly steady increase, the northeast population peaked at 4,310 pairs in 2000 (id.) and is currently estimated at approximately 3,000 nesting pairs. 5-Year Review. The cause of this more recent population decline has not been identified, but data suggest that this decline is likely related to mortality at the wintering grounds in South America. Mostello 2007.
: 14. The primary range-wide threat s to the northeastern rose ate tern population include habitat displacement by gulls, predation of eggs and chicks by a number of birds and mammals, including owls, black crowned night herons, great black-backed gulls, peregrine falcons, mink, raccoon, rats and other rodents and fox, as well as physical human disturbance of, and activities in, staging areas (i.e., habitat loss
). 5-Year Review. There is no indication that a lack of prey fish availability in Massachusetts during the summer months (even assuming any such lack of availability exists) has caused or contributed to the decrease in nesting sites or the decline in the northeastern roseat e tern population. Absence of Potential Impacts of PNPS on the Roseate Tern No Credible Evidence of Direct Impacts
: 15. Based on available information, PNPS is not expected to have any direct impact on the roseate tern. There clearly is no risk to the roseate tern of impingement or entrainment in PNPS's cooling water intake system ("CWIS"). Furthermore, although JRWA does allege and infer that discharges of chlorine, corrosion inhibitors, and "heavy metals" from PNPS to Cape Cod Bay could directly affect the roseate tern, as explained in the Declaration of Mr. Scheffer: (i) heavy metals (such as chromium, zinc, and copper) are believed to be absent from the Station's regularly discharged effluent (Scheffer Aff. at
¶ 18); (ii) periodic discharges of corrosion inhibitors are subject to and we ll below EPA-authorized effluent limitations (Scheffer Aff. at ¶ 8 19); and (iii) chlorination of PNPS's CWS and SW S is conducted subject to and with the benefit of a NPDES permit (Scheffer Aff. at ¶ 9), the federal chlorine effluent limitations for which are considered protective of marine organisms in Cape Cod Bay. While PNPS has, on rare occasion, experienced exceedances of its chlorine discharge limits at certain outfall locations, it is well-established that chlorine decays rapidly in sea water following a predictable relationship (see e.g., Wang et al., 2008; Høstgaard-Je nsen, et al., 1977) such that, irrespective of dilution, it is highly unlikely that chlorine discharges from even occasional exceedances would affect the environment. In short, the chlorine discharges from PNPS are small, infrequent, and decay quickly and there is no expectation they will have any impact on the biota in Cape Cod Bay.
Consequently, there is no credible scientific evidence that di scharges from PNPS have any adverse effect on roseate terns. Indeed, because PNPS is not expected to directly (or, as discussed below, indirectly) impact the roseate tern, the PNPS property in fact may provide especially suitable nesting or staging habitat, as human entry is restricted and the birds would likely be protected from human disturbance.
No Credible Evidence of Indirect Impacts
: 16. Based on available information, PNPS is not expected to have any indirect impact on the roseate tern. Although JRWA also alleges that PNPS's operation has potential indirect impacts on the roseate tern through: 1) impact s on the availability of fish prey due to impingement and entrainment ("I&E") mortality; and 2) impacts of "pollution" on their fish prey, there is no technical evidence to suggest that either alleged impact is scientifically credible (or even plausible).
9 No Impacts on Roseate Tern Prey Species
: 17. In its Petition, JRWA refers to statements in the PNPS Final Supplemental Environmental Impact Statement ("FSEIS") regarding historical I&E  of the roseate tern's main fish prey species by PNPS's CWIS (see Petition at 20-21) and, based on these statements, suggests that PNPS may adversely impact the roseat e tern's food supply. Petition at 34. While PNPS does result in some I&E of the roseate tern's main fish prey species, as explained below, the evidence indicates that PNPS I&E will have no discernable impact on the availability of these fish species as prey for the roseate tern.
Sand Lance
: 18. As discussed above, roseate terns eat almost exclusively small marine fish that they capture by plunge diving, feeding primarily on sand lance, which at times represents 95% of the bird's diet.
See Uttley et al., 1989, Safina 1990, Heinemann 1992, Shealer and Kress 1994, Goyert 2010. Sand lance typically occur in de nse schools, with indivi dual fish reportedly numbering from 500 to tens of thousands. Meyer et al., 1979.
Because they do not support a commercial or recreational fishery, estimates of sand lance populations in the Gulf of Maine, such as the spawning stock assessments conducted by the National Marine Fisheries Service ("NMFS") for many other species, are not availa ble. However, a thorough review of the available literature reveals no in dication that the abundan ce of sand lance in the Gulf of Maine is low or declining, and they remain a significant proportion of the diet of a number of marine predators, including piscivorous fi sh, various shorebirds, and severa l species of seals and whales. Robards, et al., 1999. Moreover, PNPS monitoring indicates that the number of sand lance has been relatively stable over the past decade. Entergy 2012.
10 19. Sand lance are known to be impinged at PNPS, though in low numbers, and primarily during November and December, well after roseate terns have migrated to their southern winter habitat. Setting aside a single year reflecting an aberrational event, the annual average number of sand lance impinged is only 147 individuals. Even in cluding the aberrational year (2003, in which a three-day impingement of 13,758 sand lance resulted an anomalous annual estimate of 30,765 fish that year), the annu al average over the last decade is only 3,209 sand lance per year impinged at PNPS. Although the age of impinged sand lance is not known, the size range of those impinged corresponds to age 1 and age 2 fish. If impinged sand lance are assumed to be age 1 fish, which weigh on average 0.00384 pounds (EPA 2004), the annual
 
average of 147 fish would weigh a total of 0.56 pounds. Indeed, even if one includes the anomalous year (2003) in these calculations, th e annual average weight of 3,209 fish is only 12.3 pounds. 20. Sand lance eggs are demersal and adhere to the ocean bottom, and are therefore rarely subject to entrainment at PNPS, as evidenced by eggs being found in entrainment samples in only one year  -  1979 - over the last th ree decades. Entergy 2012. Sand lance larvae do appear in PNPS entrainment samples during their wi nter spawning season. Over the last decade, the number of sand lance larvae entrained, expressed in terms of age 1 fish, averaged approximately 426,000 individuals each year, which, applying the same per fish weight of 0.00384 pounds, converts to an estimated total wei ght of 1,636 pounds of fish annually. Thus, absent a declining population, entrainment of sand lance at PNPS ca nnot reasonably be considered to have a potential impact , even indirectly, on roseate tern.
: 21. Moreover, the I&E losses reported above (and below) are conservative because they assume 100% mortality. In a review of entrainment mortality studies conducted at 21 11 power plants, the Electric Power Research Institute ("EPRI") concluded "it is clear that for most species survival can be quite high. The availa ble data do not support the assumption that all entrained organisms are killed."  EPRI (2000). Considering an array of species, EPRI found that entrainment survival rates ranged from approximately 25% for sensitive species to greater than 50% for hardier ones.
Id. Likewise, impingement studies co nducted at PNPS indicate that latent survival rates (56 hours after being impinged) ranged from 0 to 25% depending on species (MRI 1983). Accordingly, the I&E losses reported in this Declaration likely overstate actual losses.
: 22. As a reference point, humpback whales, which are known to feed on sand lance in New England waters (Weinrich et al., 1992; Overholtz and Ni colas 1979; Payne et al., 1990; Weinrich et al., 1997; Friedlaender et al., 2009), are estimated to consume food at the rate of approximately 471 kg/day (1,036 lbs/day). Roman and McCarthy 2010. In addition, humpback whales in Cape Cod Bay are known to employ sp ecialized feeding behaviors, known as "bubble net"  feeding or the similar "lobtail" feeding, that allow the whales to increase their foraging efficiency by concentrating schooling fish near the surface. Weinrich et al., 1992; Hain et al., 1982; Hazen et al., 2009. When employing these behaviors, humpbacks may target schools of sand lance.
Id. Indeed, in some areas of the Gulf of Maine, humpback whales are known to specialize in feeding on sa nd lance, and their spatial distribu tion is highly correlated with sand lance density. Payne et al., 1986. Based on their daily consumption, when humpback whales are concentrating on sand lance, two whales would eat more sand lance in one day than would be impinged and entrained at PNPS in an average year. It is, therefore, simply not scientifically credible to suggest that the annual magnitude of I&E  mortality at PNPS could potentially affect the availability of sand lance as prey for the roseate tern.
12 23. Another reference point for appreciating the miniscule scale of I&E  losses at PNPS, as well as the general a bundance of sand lance in the North Atlantic is provided by Hammill and Stenson (2000), who estimated the number of fish of various species that are consumed by the seal population in Atlantic wa ters of Canada. Over a seven-year period (1990-1996), an average of 5.4 million seals consumed 831 million pounds of sand lance annually, which would be equivalent to 216.5 billion age 1 sand lance. Thus, the consumption of sand lance by seals in the North Atlantic dwarfs I&E  losses at PNPS. Further, where seals presumably consume only a fraction of the sand la nce present in their foraging area, these data illustrate the overall abundance of sand lance.
Atlantic Herring and Hake
: 24. In addition to sand lance, Atlantic herring (Clupea harengus) as well as three species of hake in the genus Urophycis may make up a portion of the roseate tern's diet. Heinemann 1992. Atlantic Herring
: 25. Young-of-the-year Atlantic herring are impinged in minimal numbers at PNPS, with an annual average (again, expressed in terms of age 1 fish) of 140 individuals per year over the last decade. Atlantic herring eggs are not entrained at PNPS because they are spawned on offshore banks and, like the sand lance, are demersal and adhesive. Larval Atlantic herring are subject to entrainment at PNPS, with annual losses (expressed in terms of age 1 fish) of 9,294 individuals per year over the la st decade. Entergy 2012. Conservatively assuming 100% I&E  mortality, annual mortality of Atlantic herring at PNPS averages 9,434 fish. Where an age 1 Atlantic herring weighs on average 0.0314 pounds, th is represents an a nnual loss of 296 pounds of fish. EPA 2004.
13 26. By comparison, the Atlantic herring spawning stock biomass of the Gulf of Maine-Georges Bank herring complex was estimated to be 400,000 metric tons, or 900 million pounds, of adult fish in 2008. TRAC 2009. Spawning stock biomass consists of fish age 3 and older. Based on these estimates and accounting for the additional mortality experienced between age 1 and age 3 (to adult), the number of Atlant ic herring entrained and impinged at PNPS is a minute fraction of the northeast population available for predati on by roseate terns, and cannot reasonably be expected to impact the availability of these fish or the feeding success of the roseate tern.
Hake 27. Three species of hake - red hake (Urophycis chuss
), white hake (U. tenuis), and spotted hake (U. regia) - are impinged and entrained at PN PS. Early life stage hake are impinged at PNPS in minimal numbers, with an a nnual average over the last decade for all three species combined of 150 fish (Entergy 2012), wh ich is the equivalent of 35 pounds, per year.
Eggs and larvae of the three species cannot readily be distinguished from one another, and so their entrainment numbers are combined. The average annual entrainment rate for hake over the last decade, expressed as age 1 fish, is 60,759 per year, which represents an annual total of 14,035 pounds. Thus, the annual combined estimate of hake entrainment and impingement losses at PNPS, again conservatively assuming 100% I&E mortality, is approximately 14,070 pounds. 28. Stock assessments are completed periodi cally by NMFS for both red and white hake. The latest stock assessment in 2010 for red hake alone provided a stock estimate of 4,706 metric tons or 10,374,000 pounds (spring and fall estimates averaged) for the northern stock defined as the Gulf of Maine to Northern Geor ges Bank region. NEFSC 2011. The most recent 14 spawning stock biomass assessment for white hake was completed in 2007, at which time the Gulf of Maine to Northern Georges Bank population was estimated to be 19,800 metric tons or 43,651,100 pounds. NEFSC 2008. Based on these data, which do not include the spotted hake, losses due to I&E  at PNPS are a minute fraction of the hake population in the Cape Cod area, and the continued operation of PNPS cannot reasonabl y be expected to affect the availability of hake prey to roseate terns. Miscellaneous Responses
: 29. The Petition also asserts that "turbulent water around [PNPS's] two breakwaters,"
and "turbulence created by regular and periodic cooling water discharges" are "expected to be prime locations for foraging roseate terns" and goes so far as to state that "PNPS is thus an attractive nuisance" for the roseat e tern. Petition at 20. These a ssertions are erroneous. First, the currents flowing past PNPS's two intake embayment breakwaters are relatively slow, even during thermal backwashing, and do not result in any additional turbulence that is not already associated with the shoreline generally (i.e., during storms). Second, as discussed above, while roseate terns often forage over turbulent waters, such turbulence is associated with shoreline hydrodynamic features, such as tide rips, that act to bring fish in these areas to the surface, making them more easily preyed upon by diving bi rds. Although roseate tern prey such as sand lance do occur in the vicinity of PNPS, as evidenced by their appearing in I&E  samples, the sea floor in the vicinity of Rocky Po int, where PNPS is located, is ro cky, and therefore is not suitable habitat for sand lance, which prefer substrates into which they can burrow such as clean sand, sand and shell, and fine gravel. Meyer 1979. T hus, the asserted turbulence associated with PNPS's cooling water discharge is not expected to bring an abundance of sand lance to the 15 surface where they can be captured, and should therefore not provide desirable foraging conditions for the roseate tern.
: 30. Moreover, to the extent any roseate terns might be attracted to the turbulence created by PNPS's cooling water discharge, if prey fish are absent from the water, any such attractiveness would likely be short lived, as th e roseate tern's flexib le foraging strategy, as described above, would allow it to either move or concentrate its feeding efforts where prey are abundant. See Heinemann 1992. Consequently, even if PNPS did adversely affect local prey fish abundance (which there is no evidence that it does) there is no credible evidence that, were significant numbers of roseate terns to nest or stage in areas near PNPS in the future, their ability to forage adequately would be impa ired by continued operation of PNPS.
: 31. JRWA also alleges that discharges of pollution from PNPS potentially affect the roseate tern through their fish pr ey. For the reasons discussed a bove in ¶ 15, and as explained in Mr. Scheffer's Declaration, there is no credible scientific evid ence such discharges have any adverse effect on roseate tern fish prey.
: 32. Finally, JRWA alleges that "thermal releases" from PNPS, including "backwash operations," may adversely affect the roseate tern's prey fish.
See Petition at 21. First, there is no evidence that the thermal plume created by PNPS's CWIS, as authorized by its NPDES permit, adversely affects roseate te rn prey fish in Cape Cod Bay.
Moreover, as explained in Mr.
Scheffer's Declaration, backwash operations are performed infrequently - 3 to 5 times per year - and, due to the low volume of water discharged, the temporal and spatial extent of the thermal plume associated with backwashing is very limite d - occurring for only a few hours in 3 to 5 feet of water at the surface of the intake embayment.
Scheffer Aff. ¶ 16. Consequently, there is no 16 credible scientific evidence that thermal discharges from PNPS have any adverse effect on roseate tern prey fish.


I declare under penalty of perjury that the foregoing is true and correct.
in Support of Entergys Answer Opposing Jones River Watershed Associations and Pilgrim Watchs Motion to Reopen and Hearing Request.
Executed in Accord with 10 C.F.R. § 2.304(d)
: 2.      My name is Dr. Sarah A. Barnum. I am a Senior Wildlife Ecologist with Normandeau. I hold a Ph.D. degree from the School of Architecture and Planning with a concentration in Conservation Planning from the University of Colorado, a Master of Science degree in Wildlife Ecology from Utah State University, and a Bachelor of Science degree in Wildlife Biology from the University of Vermont. My most recent curriculum vitae is attached hereto as Exhibit 1. I have over 15 years experience as a wildlife ecologist, with a focus on avian ecology, and I have significant experience in assessing the potential impacts of energy facilities and technologies on birds, including the roseate tern and other seabirds that may occur in portions of Cape Cod Bay and, more generally, the Gulf of Maine. In particular, I have worked as an avian biologist and project manager assessing potential impacts of proposed wind turbine projects in Massachusetts (e.g., the Madaket Wind Turbine Project and the Saugus Community Wind Project) on avian resources, including terns and other shorebirds. In addition, from 2005-2007, I was a Conservation Program Manager for New Hampshire Audubon, where I oversaw multiple on-going research and conservation programs, including the Tern Restoration Project.
Michael D. Scherer
PURPOSE AND METHODOLOGY
: 3.     This Declaration is made in response to the Jones River Watershed Associations and Pilgrim Watchs Motion to Reopen, Request for Hearing and Permission to File New Contention (collectively, the Petition), dated May 2, 2012. The Petition alleges certain deficiencies in the NRCs evaluation of the potential impacts of continued operation of Pilgrim Nuclear Power Station (PNPS) on the roseate tern (Sterna dougallii) which is listed as 2


Vice President and Senior Marine Scientist Normandeau Associates, Inc.
endangered under the federal Endangered Species Act (ESA). 16 U.S.C. § 1531 et seq. In this Declaration, we will offer our expert opinion that the continued operation of PNPS will have no discernible effects on the northeast population of roseate tern, its habitat or recovery goals.
141 Falmouth Heights Rd.
: 4.      The opinions expressed in this Declaration are in part based on our review of the sources identified in Exhibit 2. To the best of our knowledge, the factual statements in this Declaration are true and accurate, and the opinions expressed therein are based on our best professional judgment.
Falmouth, Massachusetts 02540
DISCUSSION Description of PNPS and its Environment
: 5.      A description of PNPS and its location and environment is provided in paragraphs 7 through 16 of Dr. Scherers previous Declaration submitted in this proceeding. Additional information on the operation of PNPS is provided in the Declaration of Mr. Jacob J. Scheffer, which we have reviewed and understand is being submitted contemporaneously with this Declaration.
Relevant Biology and Ecology of the Roseate Tern
: 6.      The roseate tern, a medium sized, fish eating, shore bird, is a migratory species that spends at least half the year in tropical latitudes with a scattered distribution primarily in the tropical and sub-tropical Atlantic, Indian, and Pacific Oceans. Gochfeld et al., 1998. During the summer, a subpopulation of roseate terns breeds in the northeast region of North America, from New York to Nova Scotia. Id.
: 7.      Roseate terns arrive in Massachusetts from late-April to mid-May to nest at several coastal locations, typically on islands (as discussed below). Mostello 2007. These birds then abandon their breeding locations in late-July and August, although they temporarily may 3


Phone: 508.548.0700 Email: mscherer@normandeau.com
congregate in staging areas around Cape Cod and the Islands of Nantucket and Marthas Vineyard, before departing by mid- to late-September for wintering grounds in the West Indies and off the northern and eastern coasts of South America, where they will remain for upwards of six months out of the year. See US FWS. 1998 (Hereinafter, Recovery Plan). Roseate terns appear to disperse throughout the breeding range in July and August, re-aggregating at staging areas primarily on outer Cape Cod in late August and early September prior to southward migration. US FWS 2010 (Hereinafter, 5-Year Review); Trull et al., 1999; Blake 2010.
Staging areas are transitory relative to breeding colonies, and individuals may remain in one place foraging for as little as a few hours or overnight (i.e., roosting) before moving on to the next spot. See e.g., Trull et al. 1999. In short, because staging roseate terns are not anchored to a single area by the presence of a nest, they are free to move to alternative staging areas if the fishing or other ambient conditions are not advantageous in a particular area.
: 8.      Roseate terns typically nest in colonies on sandy, gravelly, or rocky islands (which are less likely than the mainland to have mammalian and certain avian predators) and, less commonly, in small numbers at the ends of long barrier beaches. Recovery Plan; Mostello 2007. In Massachusetts, the roseate tern invariably nests in association with common terns, forming clusters or sub-colonies within larger common tern colonies. Mostello 2007. Compared to the common tern, the roseate tern selects nest sites with denser vegetation, such as seaside goldenrod and beach pea, which provide cover for eggs and chicks. Id. In Massachusetts, significant nesting colonies of roseate terns are found at Bird Island and Ram Island, in Buzzards Bay, with 735 and 584 breeding pairs in 2010, respectively, which accounts for 95% of the Massachusetts breeding population. MADEP 2011. Birds in these two colonies are not expected to be influenced by PNPS, as they belong to a subgroup of the northeast population that is 4


I declare under penalty of perjury that the foregoing is true and correct.
separate from birds near PNPS. Specifically, a long-term banding study of roseate terns indicates that the northeast population is split into two separate subgroups: a cold water subgroup nesting north and east of Cape Cod, which would include any birds nesting near Plymouth, Massachusetts; and a warm water subgroup nesting south and west of Cape Cod, which includes the major colonies in Buzzards Bay. 5-Year review. The interchange of individual birds between these two groups is thought to be limited. Id.
Executed in Accord with 10 C.F.R. § 2.304(d)
: 9.      Long Beach, in Plymouth, Massachusetts has historically been a minor nesting site. Recovery Plan Appendix B; 5-Year Review). From 1999 through 2009, only a single nesting pair was recorded, in 2008. 5-Year Review. Dr. Nisbet states in his Affidavit that three pairs of roseate tern nested at Long Beach in 2011, though the source of this information is not stated and does not appear to have been published. Nisbet Aff. ¶ 8.
Sarah A. Barnum Senior Wildlife Ecologist Normandeau Associates, Inc.
: 10. Roseate terns are highly mobile foragers, flying much faster than common terns (Recovery Plan), which allows them to forage over large areas. In Massachusetts, roseate terns may forage 25-30 km (about 15 to 18 miles) away from the breeding colony. Mostello 2007; Recovery Plan. Published data on the roseate terns foraging range from staging areas are not available, due to the difficulty in monitoring the movements of individuals that are not anchored to a single location for a significant period of time, as is the case for nesting birds. However, there is nothing that would indicate that roseate terns foraging range from staging areas is smaller than from breeding colonies. In fact, because they are not anchored to a nest, they may be able to forage over a larger range.
Bedford, New Hampshire
: 11. Roseate terns also exhibit a flexible foraging strategy, adapting to foraging conditions within their range by concentrating their feeding efforts in areas where prey are more abundant. See Heinemann 1992. For example, Heinemann (1992) observed over the course of a 5


25 Nashua Road Bedford, New Hampshire 03110-5500
summer the foraging behaviors of individuals nesting in the breeding colony located at Bird Island, Massachusetts. He reported significant variation in foraging intensity over the course of the summer at different locations around Buzzards Bay, separated by distances of more than 20 km (12.5 miles). See id. The flexible foraging strategy exhibited by this colony demonstrates the ability of roseate terns to adapt to local conditions and to concentrate their feeding efforts in areas within their relatively large foraging range where prey are more plentiful.
: 12. The roseate tern is a fairly specialized forager, usually feeding over shallow sandbars, shoals, inlets, tide rips, which bring prey fish close to the surface, making them easier to catch. Recovery Plan; 5-yr Review. They feed almost exclusively on small, schooling marine fish, though occasionally they include crustaceans in their diet. See Gochfeld et al., 1998.
Although the composition of their diet varies from year to year and with location, the bulk of the roseate tern diet in Massachusetts is comprised of sand lance (Ammodytes spp.), hake (Urophycis spp.), and Atlantic herring (Clupea harengus). 5-Year Review. The roseate tern captures prey fish mainly by plunge-diving from heights of up to 20 m and often submerging 50 cm or more, but also by surface-dipping and contact-dipping. Mostello 2007; Recovery Plan.
: 13. The northeastern population of the roseate tern was listed as endangered under the federal ESA in 1987, principally due to contraction of the population into a small number of breeding sites and secondarily because of its declining numbers. Recovery Plan; see also DOI 1987. From the 1920s through the 1970s, roseate terns were displaced from at least 30 nesting colonies, due primarily to occupation of those sites by herring gulls and great black-backed gulls, and secondarily to animal predation (which may have intensified as terns were displaced by gulls to sites closer to the mainland), and erosion of the shoreline. Recovery Plan. By 1979, the northeast population (i.e., from New York to Nova Scotia) was estimated to be approximately 6


Phone: 603.472.5191 Email: sbarnum@normandeau.com LIBA/2303188.4
2,500 pairs. Mostello 2007. Following two decades of fairly steady increase, the northeast population peaked at 4,310 pairs in 2000 (id.) and is currently estimated at approximately 3,000 nesting pairs. 5-Year Review. The cause of this more recent population decline has not been identified, but data suggest that this decline is likely related to mortality at the wintering grounds in South America. Mostello 2007.
: 14. The primary range-wide threats to the northeastern roseate tern population include habitat displacement by gulls, predation of eggs and chicks by a number of birds and mammals, including owls, black crowned night herons, great black-backed gulls, peregrine falcons, mink, raccoon, rats and other rodents and fox, as well as physical human disturbance of, and activities in, staging areas (i.e., habitat loss). 5-Year Review. There is no indication that a lack of prey fish availability in Massachusetts during the summer months (even assuming any such lack of availability exists) has caused or contributed to the decrease in nesting sites or the decline in the northeastern roseate tern population.
Absence of Potential Impacts of PNPS on the Roseate Tern No Credible Evidence of Direct Impacts
: 15. Based on available information, PNPS is not expected to have any direct impact on the roseate tern. There clearly is no risk to the roseate tern of impingement or entrainment in PNPSs cooling water intake system (CWIS). Furthermore, although JRWA does allege and infer that discharges of chlorine, corrosion inhibitors, and heavy metals from PNPS to Cape Cod Bay could directly affect the roseate tern, as explained in the Declaration of Mr. Scheffer: (i) heavy metals (such as chromium, zinc, and copper) are believed to be absent from the Stations regularly discharged effluent (Scheffer Aff. at ¶ 18); (ii) periodic discharges of corrosion inhibitors are subject to and well below EPA-authorized effluent limitations (Scheffer Aff. at ¶ 7


EXHIBIT ONE 1 SARAH A. BARNUM, Ph.D.
19); and (iii) chlorination of PNPSs CWS and SWS is conducted subject to and with the benefit of a NPDES permit (Scheffer Aff. at ¶ 9), the federal chlorine effluent limitations for which are considered protective of marine organisms in Cape Cod Bay. While PNPS has, on rare occasion, experienced exceedances of its chlorine discharge limits at certain outfall locations, it is well-established that chlorine decays rapidly in sea water following a predictable relationship (see e.g., Wang et al., 2008; Høstgaard-Jensen, et al., 1977) such that, irrespective of dilution, it is highly unlikely that chlorine discharges from even occasional exceedances would affect the environment. In short, the chlorine discharges from PNPS are small, infrequent, and decay quickly and there is no expectation they will have any impact on the biota in Cape Cod Bay.
Senior Wildlife Ecologist Dr.BarnumisaSeniorWildlifeEcologistatNormandeauwithover15yearsofprofessionalexperience.Herbackgroundincludesprovidingexpertisetothetransportationandenergysectors,aswellasavarietyofgeneraldevelopmentprojects.Shehashands onexperiencewithawithawiderangeofspeciesincludingforestbirds,waterfowl,raptors,smallmammals,largemammals,amphibians,andreptiles.Dr.Barnumsprojectshaveemphasizedexamininghabitatrelationships,impactassessmentforthreatenedandendangeredspecies,mitigationplanning,andFederalESAcompliance.Dr.Barnumalsohasextensiveexperienceinprojectplanning,projectmanagement,experimentaldesign,anddataanalysis.SELECTED PROJECT EXPERIENCE Confidential(2011present)-WindDevelopment,NorthernMA.Avianandacousticbatsurveystosupportenvironmentalpermittingforaproposedsixturbineproject.Aviansurveysincluderaptorsurveysandbreedingbirdsurveys.ProjectManagerandAvianBiologist.Confidential(2011present)-WindDevelopment,DownEastME.Avianandacousticbatsurveystosupportenvironmentalpermittingforaproposed20plusturbineproject.Aviansurveysincluderaptorsurveysandeaglesurveys.WildlifeTaskManagerandAvianBiologist.Confidential(2011)-WindDevelopment,NorthernME.Avianandacousticbatsurveystosupportenvironmentalpermittingforaproposedsixturbineproject.Aviansurveysincluderaptorsurveys,eaglesurveys,andbreedingbirdsurveys.WildlifeTaskManagerandAvianBiologist.FirstWind(20102011)Post ConstructionMortalityMonitoring,StetsonWindPowerFacility,WashingtonCounty,Maine.ManagedpersonneltosearchallturbinesonsiteforbirdandbatfatalitiesfromApril October,2010,andconductsearcherefficiencytrialsandscavengertrialstoestimatetruenumberoffatalities;reportwriting.ProjectManager.NorthernPass(2010Present)HVDCPowerLineUpgrade.Conductwildlifeassessmentsinsupportofstateandfederalpermittingforinstallationofanew,200 milelongHVDClineinNewHampshire.Tasksincludeconsultationwithstateandfederalagencies(ESA,NEPA),desktopanalysis,anddesignandcoordinationoffieldsurveys.Speciesofinterestincludeforestcarnivores,bats,raptors,songbirds,turtles,snakes,andlepidopterons.TaskManager.TownofNantucket(20102011)-MadaketWind.AssessmentofavianandT&Eresourcesintheprojectareatodeterminepotentialimpactsandpermittingrequirements.Specieofinterestincludedlong tailedduck,northernharrier,andnightmigrants.Workincludesbothdesktopandfieldassessment.ProjectManagerMACleanEnergyCenter(20092010)-AvianImpactAssessmentforMadaketWind.DesktopanalysisofbiologicalandpermittingissuesassociatedwithaproposedwinddevelopmentinNantucket,MA.ProjectManagerandAvianBiologist.EDUCATION Ph.D. 2003, Conservation Planning, University of Colorado M.S. 1993, Wildlife Biology, Utah State University B.S. 1988, (cum laude) Wildlife Biology, University of Vermont PROFESSIONAL EXPERIENCE 2007-Present Normandeau Associates 2005-2007 New Hampshire Audubon, Concord, NH 2004-2005 Baystate Environmental Consultants, East Longmeadow, MA 2001-2003 Environmental Planning and Policy Unit, Colorado DOT, Denver, CO 1998-2000 Office of Environmental Services, Colorado DOT, Denver, CO 1996-1998 Dames & Moore, Denver, CO1993-1994 Bio-Resources, Inc., Logan, UT Normandeau Associates, Inc. Sarah A. Barnum, PH.D.
Consequently, there is no credible scientific evidence that discharges from PNPS have any adverse effect on roseate terns. Indeed, because PNPS is not expected to directly (or, as discussed below, indirectly) impact the roseate tern, the PNPS property in fact may provide especially suitable nesting or staging habitat, as human entry is restricted and the birds would likely be protected from human disturbance.
2 FirstWind(20092010)-BrimfieldWind.Avianandacousticbatsurveystosupportenvironmentalpermittingforaproposed20MWprojectinsouthwesternMA.Aviansurveysincluderaptorsurveysandbreedingbirdsurveys.ProjectManagerandAvianBiologist.FederalHighwayAdministration(20092011)-AnalysisofMethodstoIdentifyDeer VehicleCollisionHotspots.QualitativeandquantitativemethodstoidentifyDVChotspotswillbecomparedbasedondataneeds,easeofimplementation,expertiserequired,andrelevancytosolvingsafetyandecologicalissues.ProjectresponsibilitiesincludereviewofmethodsthroughliteraturereviewandinterviewswithDOTstaff,creatingandimplementingcomparisonprotocols,staffmanagementandreportwriting.ProjectManager.Confidential(2007 Present)MaineWindEnergyDeveloper.Wildlifesurveystosupportenvironmentalpermittingforaproposed50MWprojectinwesternMaine.PermitcurrentlyinpreparationincludeaSiteLocationofDevelopmentActpermit,aNaturalResourcesProtectionActpermit,andlikelyaCorpsSection404individualpermit.TaskManager.FederalHighwayAdministration(20082010)-MitigationWetlandFunctionalAssessment.Wetlandsconstructedtomitigateforhighwayproject relatedimpactsweresurveyedandcompared,andlevelsofinvasivecoverandwildlifefunctionswerecomparedtonaturalwetlands.Projectresponsibilitiesincludedidentifyingandselectingstudysites,conductingsurveys,semi quantitativeanalysis,reportwriting,andmanagingstaff.ProjectManager.FloridaPowerandLight(2008 2010)SeabrookNuclearFacilityRelicensing.Reviewandsummarizeallterrestrialecologyissuesassociateswithfacilityconstructionandoperationswithafocusonthreatenedandendangeredspecies,andimpactassessment;resultspresentedinanEnvironmentalReporttosupportrelicensing.TaskManager.TheMountWashingtonResort(20072008)-DartmouthBrookHabitatAssessment.ProvidedexpertopinionregardingthesuitabilityoftheresortspropertyforCanadalynxandAmericanmarten.Tasksincludedfieldassessmentoftheproperty,reviewofcurrentliterature,producingawrittenreportdetailinganalysisapproachandfindings,andongoingconsultationwithregulatingagencies.SeniorWildlifeEcologist.U.S.Navy(2008)CascoBayFuelLineRemoval.WildlifestudiestosupportCorps404andMaineNRPApermittinginBrunswickandHarpswell,ME.Conductedhabitatsurveyofprojectarea,wildlifehabitatmapping,fieldreviewandimpactassessment,withafocusofidentifyingsuitablehabitatforandpresenceofspecieslistedbytheStateofMaineand/orUSFWS.Compiledresultsinareporttosupportalllocalandfederalpermittingefforts.SeniorWildlifeEcologist.MountSnowResort(2008)-Reviewallthreatenedandendangeredspeciesissuesassociatedwithasnowmakingupgrade;analyzeimpactsandsummarizeresultsinaForestServiceBiologicalAssessmentandaNEPAEnvironmentalAssessment.SeniorWildlifeEcologist.WasteManagement(2008)-CrossroadsLandfillDeerWinteringHabitatAssessment.SurveyofdeerwinteringareasassociatedwiththeCrossroadslandfilltodeterminevalueofhabitat.Compileresultsinletterreportsuitableforreferenceinfutureexpansionplanningandpermitting.SeniorWildlifeEcologist.Noble(2007)-GraniteReliableWindBreedingBirdSurveys.Oversawdesignandimplementationofbreedingbirdsurveysatprojectarea.Managedstaffandconductedqualityassurancetasksforfieldactivitiesandreportwriting.ManagingPrincipal.NewHampshireAudubon(20052007)-NHRoute2WildlifeCrossingInvestigation.Designed,implementandmanagedatrackingstudytoindentifythelocationswherewildlifecrossedthehighway,andtodeterminethecharacteristicsofpreferredcrossinglocations.TasksincludedextensivequantitativeandqualitativeanalysisofGISbaseddatasets.PrincipleInvestigatorandProjectManager.
No Credible Evidence of Indirect Impacts
EXHIBIT TWO 2 Sources Reviewed1.Blake, K. 2010. Roseate (Sterna dougallii) and common tern (Sterna hirundo) use of staging sites during the post-breeding period in coastal Massachusetts. M.Sc. thesis, Antioch University, Keene, New Hampshire. 87 pp. 2.DOI (Department of the Interior). 1987. Endangered and Threatened Wildlife and Plants; Determination of Endangered and Threatened Status for Two Populations of the Roseate
: 16. Based on available information, PNPS is not expected to have any indirect impact on the roseate tern. Although JRWA also alleges that PNPSs operation has potential indirect impacts on the roseate tern through: 1) impacts on the availability of fish prey due to impingement and entrainment (I&E) mortality; and 2) impacts of pollution on their fish prey, there is no technical evidence to suggest that either alleged impact is scientifically credible (or even plausible).
8


Tern, Final Rule. 52 Fed. Reg. 42064. 3.Entergy. 2012. Marine Ecology Studies Pilgrim Nuclear Power Station. Report No. 79. Report Period: January 2011 - December 2011. Chemistry Dept. -Environmental Group, Entergy Nuclear-Pilgrim Station, Plymouth, MA. 4.EPA (Environmental Protection Agency). 2004. Technical Development Document for the Final Section 316(b) Phase II Existing Facilities Rule. Attachment A to Chapter 4:
No Impacts on Roseate Tern Prey Species
Cooling Water Intake Structure Technology Fact Sheets. EPA Document Number
: 17. In its Petition, JRWA refers to statements in the PNPS Final Supplemental Environmental Impact Statement (FSEIS) regarding historical I&E of the roseate terns main fish prey species by PNPSs CWIS (see Petition at 20-21) and, based on these statements, suggests that PNPS may adversely impact the roseate terns food supply. Petition at 34. While PNPS does result in some I&E of the roseate terns main fish prey species, as explained below, the evidence indicates that PNPS I&E will have no discernable impact on the availability of these fish species as prey for the roseate tern.
Sand Lance
: 18. As discussed above, roseate terns eat almost exclusively small marine fish that they capture by plunge diving, feeding primarily on sand lance, which at times represents 95% of the birds diet. See Uttley et al., 1989, Safina 1990, Heinemann 1992, Shealer and Kress 1994, Goyert 2010. Sand lance typically occur in dense schools, with individual fish reportedly numbering from 500 to tens of thousands. Meyer et al., 1979. Because they do not support a commercial or recreational fishery, estimates of sand lance populations in the Gulf of Maine, such as the spawning stock assessments conducted by the National Marine Fisheries Service (NMFS) for many other species, are not available. However, a thorough review of the available literature reveals no indication that the abundance of sand lance in the Gulf of Maine is low or declining, and they remain a significant proportion of the diet of a number of marine predators, including piscivorous fish, various shorebirds, and several species of seals and whales.
Robards, et al., 1999. Moreover, PNPS monitoring indicates that the number of sand lance has been relatively stable over the past decade. Entergy 2012.
9
: 19. Sand lance are known to be impinged at PNPS, though in low numbers, and primarily during November and December, well after roseate terns have migrated to their southern winter habitat. Setting aside a single year reflecting an aberrational event, the annual average number of sand lance impinged is only 147 individuals. Even including the aberrational year (2003, in which a three-day impingement of 13,758 sand lance resulted an anomalous annual estimate of 30,765 fish that year), the annual average over the last decade is only 3,209 sand lance per year impinged at PNPS. Although the age of impinged sand lance is not known, the size range of those impinged corresponds to age 1 and age 2 fish. If impinged sand lance are assumed to be age 1 fish, which weigh on average 0.00384 pounds (EPA 2004), the annual average of 147 fish would weigh a total of 0.56 pounds. Indeed, even if one includes the anomalous year (2003) in these calculations, the annual average weight of 3,209 fish is only 12.3 pounds.
: 20. Sand lance eggs are demersal and adhere to the ocean bottom, and are therefore rarely subject to entrainment at PNPS, as evidenced by eggs being found in entrainment samples in only one year - 1979 - over the last three decades. Entergy 2012. Sand lance larvae do appear in PNPS entrainment samples during their winter spawning season. Over the last decade, the number of sand lance larvae entrained, expressed in terms of age 1 fish, averaged approximately 426,000 individuals each year, which, applying the same per fish weight of 0.00384 pounds, converts to an estimated total weight of 1,636 pounds of fish annually. Thus, absent a declining population, entrainment of sand lance at PNPS cannot reasonably be considered to have a potential impact, even indirectly, on roseate tern.
: 21. Moreover, the I&E losses reported above (and below) are conservative because they assume 100% mortality. In a review of entrainment mortality studies conducted at 21 10


821R04007.5.EPRI. 2000. Review of entrainment survival studies: 1970 - 2000. Electric Power Research Institute, Palo Alto, CA. Technical Report 1000757. 6.Friedlaender, A.S., E.L. Hazen, D.P. Nowacek, P.N. Halpin, C. Ware, M.T. Weinrich, T. Hurst, D. Wiley. 2009. Diel changes in humpback whale Megaptera novaeangliae feeding behavior in response to sand lance Ammodytes spp. behavior and distribution.Marine Ecology Progress Series 395:91-100. 7.Gochfeld, M., J. Burger, and I.C. Nisbet. 1998. Roseate Tern (Sterna dougallii
power plants, the Electric Power Research Institute (EPRI) concluded it is clear that for most species survival can be quite high. The available data do not support the assumption that all entrained organisms are killed. EPRI (2000). Considering an array of species, EPRI found that entrainment survival rates ranged from approximately 25% for sensitive species to greater than 50% for hardier ones. Id. Likewise, impingement studies conducted at PNPS indicate that latent survival rates (56 hours after being impinged) ranged from 0 to 25% depending on species (MRI 1983). Accordingly, the I&E losses reported in this Declaration likely overstate actual losses.
), The Birds of North America Online (A. Poole, Ed.). Ithaca, Cornell Lab of Ornithology.
: 22. As a reference point, humpback whales, which are known to feed on sand lance in New England waters (Weinrich et al., 1992; Overholtz and Nicolas 1979; Payne et al., 1990; Weinrich et al., 1997; Friedlaender et al., 2009), are estimated to consume food at the rate of approximately 471 kg/day (1,036 lbs/day). Roman and McCarthy 2010. In addition, humpback whales in Cape Cod Bay are known to employ specialized feeding behaviors, known as bubble net feeding or the similar lobtail feeding, that allow the whales to increase their foraging efficiency by concentrating schooling fish near the surface. Weinrich et al., 1992; Hain et al.,
Retrieved from the Birds of North America Online:
1982; Hazen et al., 2009. When employing these behaviors, humpbacks may target schools of sand lance. Id. Indeed, in some areas of the Gulf of Maine, humpback whales are known to specialize in feeding on sand lance, and their spatial distribution is highly correlated with sand lance density. Payne et al., 1986. Based on their daily consumption, when humpback whales are concentrating on sand lance, two whales would eat more sand lance in one day than would be impinged and entrained at PNPS in an average year. It is, therefore, simply not scientifically credible to suggest that the annual magnitude of I&E mortality at PNPS could potentially affect the availability of sand lance as prey for the roseate tern.
11
: 23. Another reference point for appreciating the miniscule scale of I&E losses at PNPS, as well as the general abundance of sand lance in the North Atlantic is provided by Hammill and Stenson (2000), who estimated the number of fish of various species that are consumed by the seal population in Atlantic waters of Canada. Over a seven-year period (1990-1996), an average of 5.4 million seals consumed 831 million pounds of sand lance annually, which would be equivalent to 216.5 billion age 1 sand lance. Thus, the consumption of sand lance by seals in the North Atlantic dwarfs I&E losses at PNPS. Further, where seals presumably consume only a fraction of the sand lance present in their foraging area, these data illustrate the overall abundance of sand lance.
Atlantic Herring and Hake
: 24. In addition to sand lance, Atlantic herring (Clupea harengus) as well as three species of hake in the genus Urophycis may make up a portion of the roseate terns diet.
Heinemann 1992.
Atlantic Herring
: 25. Young-of-the-year Atlantic herring are impinged in minimal numbers at PNPS, with an annual average (again, expressed in terms of age 1 fish) of 140 individuals per year over the last decade. Atlantic herring eggs are not entrained at PNPS because they are spawned on offshore banks and, like the sand lance, are demersal and adhesive. Larval Atlantic herring are subject to entrainment at PNPS, with annual losses (expressed in terms of age 1 fish) of 9,294 individuals per year over the last decade. Entergy 2012. Conservatively assuming 100% I&E mortality, annual mortality of Atlantic herring at PNPS averages 9,434 fish. Where an age 1 Atlantic herring weighs on average 0.0314 pounds, this represents an annual loss of 296 pounds of fish. EPA 2004.
12
: 26. By comparison, the Atlantic herring spawning stock biomass of the Gulf of Maine-Georges Bank herring complex was estimated to be 400,000 metric tons, or 900 million pounds, of adult fish in 2008. TRAC 2009. Spawning stock biomass consists of fish age 3 and older. Based on these estimates and accounting for the additional mortality experienced between age 1 and age 3 (to adult), the number of Atlantic herring entrained and impinged at PNPS is a minute fraction of the northeast population available for predation by roseate terns, and cannot reasonably be expected to impact the availability of these fish or the feeding success of the roseate tern.
Hake
: 27. Three species of hake - red hake (Urophycis chuss), white hake (U. tenuis), and spotted hake (U. regia) - are impinged and entrained at PNPS. Early life stage hake are impinged at PNPS in minimal numbers, with an annual average over the last decade for all three species combined of 150 fish (Entergy 2012), which is the equivalent of 35 pounds, per year.
Eggs and larvae of the three species cannot readily be distinguished from one another, and so their entrainment numbers are combined. The average annual entrainment rate for hake over the last decade, expressed as age 1 fish, is 60,759 per year, which represents an annual total of 14,035 pounds. Thus, the annual combined estimate of hake entrainment and impingement losses at PNPS, again conservatively assuming 100% I&E mortality, is approximately 14,070 pounds.
: 28. Stock assessments are completed periodically by NMFS for both red and white hake. The latest stock assessment in 2010 for red hake alone provided a stock estimate of 4,706 metric tons or 10,374,000 pounds (spring and fall estimates averaged) for the northern stock defined as the Gulf of Maine to Northern Georges Bank region. NEFSC 2011. The most recent 13


http://bna.birds.cornell.edu/bna/species/370. Accessed on May 10, 2012. 8.Goyert, Holly. 2010. Offshore foraging behavior and ecology of roseate (Sterna dougallii) and common terns (S. hirundo). 37th Annual Meeting of the Pacific Seabird Group February 17, 2010. 9.Hain, J.H.W., G.R. Carter, S.D. Kraus, C.A. Mayo, and H.E. Winn. 1982. Feeding behavior of the humpback whale, Megaptera novaeangliae , in the western North Atlantic. Fish. Bull., 80(2):259-268. 10.Hammill, M.O. and G.B. Stenson. 2000. Estimated prey consumption by harp seals (Phoca groenlandica
spawning stock biomass assessment for white hake was completed in 2007, at which time the Gulf of Maine to Northern Georges Bank population was estimated to be 19,800 metric tons or 43,651,100 pounds. NEFSC 2008. Based on these data, which do not include the spotted hake, losses due to I&E at PNPS are a minute fraction of the hake population in the Cape Cod area, and the continued operation of PNPS cannot reasonably be expected to affect the availability of hake prey to roseate terns.
), hooded seals (Cystophora cristata), grey seals (Halichoerus grypus) and harbour seals (Phoca vitulina) in Atlantic Canada. J. Northwest Atlantic Fisheries Science 26:1-23.
Miscellaneous Responses
3 11.Hazen, E.L., A.S. Friedlaender, M.A. Thompson, C.R. Ware, M.T. Weinrich, P.N. Halpin, D.N. Wiley. 2009. Fine-scale prey aggregations and foraging ecology of humpback whales, Megaptera novaeangliae. Marine Ecology Progress Series 395:75-89. 12.Heinemann, D. 1992. Foraging ecology of Roseate terns breeding on Bird Island, Buzzards bay, Massachusetts. Final report. 55 pp. 13.Høstgaard-Jensen, P., Klitgaard, J., Pedersen, K.M. 1977. Chlorine Decay in Cooling Water and Discharge into Seawater. Journal Water Pollution Control Federation, 49:1832-1841.14.MADFW (Massachusetts Division of Fisheries and Wildlife). 2011. Buzzards Bay Tern Restoration Project, available at
: 29. The Petition also asserts that turbulent water around [PNPSs] two breakwaters, and turbulence created by regular and periodic cooling water discharges are expected to be prime locations for foraging roseate terns and goes so far as to state that PNPS is thus an attractive nuisance for the roseate tern. Petition at 20. These assertions are erroneous. First, the currents flowing past PNPSs two intake embayment breakwaters are relatively slow, even during thermal backwashing, and do not result in any additional turbulence that is not already associated with the shoreline generally (i.e., during storms). Second, as discussed above, while roseate terns often forage over turbulent waters, such turbulence is associated with shoreline hydrodynamic features, such as tide rips, that act to bring fish in these areas to the surface, making them more easily preyed upon by diving birds. Although roseate tern prey such as sand lance do occur in the vicinity of PNPS, as evidenced by their appearing in I&E samples, the sea floor in the vicinity of Rocky Point, where PNPS is located, is rocky, and therefore is not suitable habitat for sand lance, which prefer substrates into which they can burrow such as clean sand, sand and shell, and fine gravel. Meyer 1979. Thus, the asserted turbulence associated with PNPSs cooling water discharge is not expected to bring an abundance of sand lance to the 14
:http://www.mass.gov/dfwele/dfw/nhesp/conservation/birds/tern_restoration.htm (Updated Feb. 16, 2011). 15.Meyer, Thomas L., Richard A. Cooper, and Richard W. Langton. 1979. Relative abundance, behavior, and food habits of the American sand lance, Ammodytes americanus, from the Gulf of Maine. Fishery Bulletin 77(1):243-253. 16.Mostello, C.S. 2007. Roseate Tern (Sterna dougallii) Fact Sheet. Massachusetts Division of Fisheries and Wildlife, Natural Heritage Endangered Species Program. 4pp. 17.MRI (Marine Research, Inc.). 1983. Assessment of finfish survival at Pilgrim Nuclear Power Station, 1982. Submitted to Boston Edison Company, Boston, MA. 38 pp. 18.NEFSC (Northeast Fisheries Science Center). 2008. Assessment of 19 Northeast Groundfish Stocks through 2007. Report of the 3rd Groundfish Assessment Review Meeting (GARM III), Northeast Fisheries Science Center, Woods Hole, Massachusetts, August 4-8, 2008. Northeast Fisheries Science Center Reference Document, 08-15 ; 884


p + xvii. 19.NEFSC. 2011. 51st Northeast Regional Stock Assessment Workshop (51st SAW) Assessment Report. US Dept Commer, Northeast Fish Sci Cent Ref Doc. 11-01; 70 p. 20.Overholtz W.J. and Nicholas J.R. (1979). "Apparent feeding by the fin whale, Balaenoptera physalus, and humpback whale, Megaptera novaeangliae, on the American sand lance, Ammodytes americanus , in the Northwest Atlantic". Fish. Bull., 77: 285-287.21.Payne, P. M., J. R. Nicolas, L. O'Brien, and K. D. Powers. 1986. The distribution of the humpback whales Megaptera novaeangliae on Georges Bank and in the Gulf of Maine in relation to densities of the sand eel Ammodytes americanus. Fish. Bull. 84:271277.22.Payne, P.M., D.N. Wiley, S.B. Young, S. Pittman, P.J. Clapham, J.W. Jossi. 1990. Recent fluctuations in the abundance of baleen whales in the southern Gulf of Maine in
surface where they can be captured, and should therefore not provide desirable foraging conditions for the roseate tern.
: 30. Moreover, to the extent any roseate terns might be attracted to the turbulence created by PNPSs cooling water discharge, if prey fish are absent from the water, any such attractiveness would likely be short lived, as the roseate terns flexible foraging strategy, as described above, would allow it to either move or concentrate its feeding efforts where prey are abundant. See Heinemann 1992. Consequently, even if PNPS did adversely affect local prey fish abundance (which there is no evidence that it does) there is no credible evidence that, were significant numbers of roseate terns to nest or stage in areas near PNPS in the future, their ability to forage adequately would be impaired by continued operation of PNPS.
: 31. JRWA also alleges that discharges of pollution from PNPS potentially affect the roseate tern through their fish prey. For the reasons discussed above in ¶ 15, and as explained in Mr. Scheffers Declaration, there is no credible scientific evidence such discharges have any adverse effect on roseate tern fish prey.
: 32. Finally, JRWA alleges that thermal releases from PNPS, including backwash operations, may adversely affect the roseate terns prey fish. See Petition at 21. First, there is no evidence that the thermal plume created by PNPSs CWIS, as authorized by its NPDES permit, adversely affects roseate tern prey fish in Cape Cod Bay. Moreover, as explained in Mr.
Scheffers Declaration, backwash operations are performed infrequently - 3 to 5 times per year -
and, due to the low volume of water discharged, the temporal and spatial extent of the thermal plume associated with backwashing is very limited - occurring for only a few hours in 3 to 5 feet of water at the surface of the intake embayment. Scheffer Aff. ¶ 16. Consequently, there is no 15


relation to changes in selected prey. Fish. Bull., 88(4):687-696.
credible scientific evidence that thermal discharges from PNPS have any adverse effect on roseate tern prey fish.
4 23.Robbards, M.D, Willson, M.F., Armstrong, R.H, and Piatt, J.F. 1999. Sand Lance: A Review of Biology and Predator Relations and Annotated Bibliography. Res. Pap. PNW-RP-521. Portland, OR: U.S. Department of Agriculture, Forest Service, Pacific Northwest
I declare under penalty of perjury that the foregoing is true and correct.
Executed in Accord with 10 C.F.R. § 2.304(d)
Michael D. Scherer Vice President and Senior Marine Scientist Normandeau Associates, Inc.
141 Falmouth Heights Rd.
Falmouth, Massachusetts 02540 Phone: 508.548.0700 Email: mscherer@normandeau.com I declare under penalty of perjury that the foregoing is true and correct.
Executed in Accord with 10 C.F.R. § 2.304(d)
Sarah A. Barnum Senior Wildlife Ecologist Normandeau Associates, Inc.
Bedford, New Hampshire 25 Nashua Road Bedford, New Hampshire 03110-5500 Phone: 603.472.5191 Email: sbarnum@normandeau.com LIBA/2303188.4 16


Research Station. 24.Roman, J. and McCarthy, J.J. 2010. The Whale Pump: Marine Mammals Enhance Primary Productivity in a Coastal Basin. PLoS ONE 5(10):e13255. Doi:10.1371. 25.Safina, C. 1990. Foraging habitat partitioning between roseate and common terns. Auk 107:351 to 358. 26.Shealer, D.A. and S.W. Kress. 1994. Post-breeding movements and prey selection of roseate terns at Stratton Island, Maine. Journal of Field Ornithology 65(3):349-362. 27.TRAC (Transboundary Resources Assessment Committee). 2009. Status Report: Gulf Of Maine-Georges Bank Herring Stock Complex. 28.Trull, P., S. Hecker, M.J. Watson, and I.C.T. Nisbet. 1999. Staging of roseate terns Sterna dougallii in the post-breeding period around Cape Cod, Massachusetts, United States. Atlantic Seabirds 1: 145 to 158. 29.Wang, J., Chen M., Lee H., Chen, C., Pai, S., and Meng, P. 2008. A Model to Predict Total Chlorine Residue in the Cooling Seawater of a Power Plant Using Iodine Colorimetric Method. Int J Mol Sci., 9(4): 542-553. 30.Weinrich, M.T., Schilling, M.R. and Belt, C.R. 1992. Evidence for acquisition of a novel feeding behaviour: lobtail feeding in humpbackwhales, Megaptera novaeangliae, Animal Behaviour, 44(6): 1059-1072. 31.Weinrich, Martin T., R. Griffiths, J. Bove, M. Schilling. 1997. A shift in distribution of humpback whales, Megaptera novaeangliae, in response to prey in the southern Gulf of Maine. Fish. Bull., 95:826-836. 32.US FWS (U.S. Fish and Wildlife Service). 1998. Roseate Tern (Sterna dougalii
EXHIBIT ONE SARAH A. BARNUM, Ph.D.
)Northeastern Population Recovery Plan.33.US FWS. 2010. Caribbean Roseate Tern and North Atlantic Roseate Tern (Sterna dougallii dougallii). 5-Year Review:  Summary and Evaluation. 148 pp. 34.Uttley, J., P. Monaghan, and S. White. 1989. Differential effects of reduced sand eel availability on two sympatrically breeding species of tern.Ornis Scandinavica
Senior Wildlife Ecologist EDUCATION Dr.BarnumisaSeniorWildlifeEcologistatNormandeauwithover            Ph.D. 2003, Conservation Planning, 15yearsofprofessionalexperience.Herbackgroundincludes                            University of Colorado providingexpertisetothetransportationandenergysectors,aswell            M.S. 1993, Wildlife Biology, Utah State University asavarietyofgeneraldevelopmentprojects.Shehashandson                  B.S. 1988, (cum laude) Wildlife Biology, experiencewithawithawiderangeofspeciesincludingforestbirds,                  University of Vermont waterfowl,raptors,smallmammals,largemammals,amphibians,and
reptiles.Dr.Barnumsprojectshaveemphasizedexamininghabitat              PROFESSIONAL EXPERIENCE 2007-Present    Normandeau Associates relationships,impactassessmentforthreatenedandendangered
2005-2007        New Hampshire species,mitigationplanning,andFederalESAcompliance.Dr.                                  Audubon, Concord, NH Barnumalsohasextensiveexperienceinprojectplanning,project                2004-2005        Baystate Environmental management,experimentaldesign,anddataanalysis.                                              Consultants, East Longmeadow, MA 2001-2003        Environmental Planning SELECTED PROJECT EXPERIENCE                                                                        and Policy Unit, Colorado DOT, Denver, CO Confidential(2011present)-WindDevelopment,NorthernMA.              1998-2000        Office of Environmental Avianandacousticbatsurveystosupportenvironmentalpermitting                                Services, Colorado DOT, foraproposedsixturbineproject.Aviansurveysincluderaptor                                Denver, CO 1996-1998        Dames & Moore, Denver, surveysandbreedingbirdsurveys.ProjectManagerandAvian                                      CO Biologist.                                                                      1993-1994        Bio-Resources, Inc.,
Logan, UT Confidential(2011present)-WindDevelopment,DownEastME.
Avianandacousticbatsurveystosupportenvironmentalpermitting
foraproposed20plusturbineproject.Aviansurveysincluderaptorsurveysandeaglesurveys.WildlifeTaskManager
andAvianBiologist.
Confidential(2011)-WindDevelopment,NorthernME.Avianandacousticbatsurveystosupportenvironmental
permittingforaproposedsixturbineproject.Aviansurveysincluderaptorsurveys,eaglesurveys,andbreedingbird
surveys.WildlifeTaskManagerandAvianBiologist.
FirstWind(20102011)PostConstructionMortalityMonitoring,StetsonWindPowerFacility,WashingtonCounty,
Maine.ManagedpersonneltosearchallturbinesonsiteforbirdandbatfatalitiesfromAprilOctober,2010,and
conductsearcherefficiencytrialsandscavengertrialstoestimatetruenumberoffatalities;reportwriting.Project
Manager.
NorthernPass(2010Present)HVDCPowerLineUpgrade.Conductwildlifeassessmentsinsupportofstateand
federalpermittingforinstallationofanew,200milelongHVDClineinNewHampshire.Tasksincludeconsultationwith
stateandfederalagencies(ESA,NEPA),desktopanalysis,anddesignandcoordinationoffieldsurveys.Speciesof
interestincludeforestcarnivores,bats,raptors,songbirds,turtles,snakes,andlepidopterons.TaskManager.
TownofNantucket(20102011)-MadaketWind.AssessmentofavianandT&Eresourcesintheprojectareato
determinepotentialimpactsandpermittingrequirements.Specieofinterestincludedlongtailedduck,northern
harrier,andnightmigrants.Workincludesbothdesktopandfieldassessment.ProjectManager
MACleanEnergyCenter(20092010)-AvianImpactAssessmentforMadaketWind.Desktopanalysisofbiological
andpermittingissuesassociatedwithaproposedwinddevelopmentinNantucket,MA.ProjectManagerandAvian
Biologist.
1


20(4):273-277.
Normandeau Associates, Inc.                                                                        Sarah A. Barnum, PH.D.
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of  
FirstWind(20092010)-BrimfieldWind.Avianandacousticbatsurveystosupportenvironmentalpermittingfora
proposed20MWprojectinsouthwesternMA.Aviansurveysincluderaptorsurveysandbreedingbirdsurveys.Project
ManagerandAvianBiologist.
FederalHighwayAdministration(20092011)-AnalysisofMethodstoIdentifyDeerVehicleCollisionHotspots.
QualitativeandquantitativemethodstoidentifyDVChotspotswillbecomparedbasedondataneeds,easeof
implementation,expertiserequired,andrelevancytosolvingsafetyandecologicalissues.Projectresponsibilities
includereviewofmethodsthroughliteraturereviewandinterviewswithDOTstaff,creatingandimplementing
comparisonprotocols,staffmanagementandreportwriting.ProjectManager.
Confidential(2007Present)MaineWindEnergyDeveloper.Wildlifesurveystosupportenvironmentalpermitting
foraproposed50MWprojectinwesternMaine.PermitcurrentlyinpreparationincludeaSiteLocationof
DevelopmentActpermit,aNaturalResourcesProtectionActpermit,andlikelyaCorpsSection404individualpermit.
TaskManager.
FederalHighwayAdministration(20082010)-MitigationWetlandFunctionalAssessment.Wetlandsconstructed
tomitigateforhighwayprojectrelatedimpactsweresurveyedandcompared,andlevelsofinvasivecoverandwildlife
functionswerecomparedtonaturalwetlands.Projectresponsibilitiesincludedidentifyingandselectingstudysites,
conductingsurveys,semiquantitativeanalysis,reportwriting,andmanagingstaff.ProjectManager.
FloridaPowerandLight(20082010)SeabrookNuclearFacilityRelicensing.Reviewandsummarizeallterrestrial
ecologyissuesassociateswithfacilityconstructionandoperationswithafocusonthreatenedandendangeredspecies,
andimpactassessment;resultspresentedinanEnvironmentalReporttosupportrelicensing.TaskManager.
TheMountWashingtonResort(20072008)-DartmouthBrookHabitatAssessment.Providedexpertopinion
regardingthesuitabilityoftheresortspropertyforCanadalynxandAmericanmarten.Tasksincludedfield
assessmentoftheproperty,reviewofcurrentliterature,producingawrittenreportdetailinganalysisapproachand
findings,andongoingconsultationwithregulatingagencies.SeniorWildlifeEcologist.
U.S.Navy(2008)CascoBayFuelLineRemoval.WildlifestudiestosupportCorps404andMaineNRPApermitting
inBrunswickandHarpswell,ME.Conductedhabitatsurveyofprojectarea,wildlifehabitatmapping,fieldreviewand
impactassessment,withafocusofidentifyingsuitablehabitatforandpresenceofspecieslistedbytheStateofMaine
and/orUSFWS.Compiledresultsinareporttosupportalllocalandfederalpermittingefforts.SeniorWildlife
Ecologist.
MountSnowResort(2008)-Reviewallthreatenedandendangeredspeciesissuesassociatedwithasnowmaking
upgrade;analyzeimpactsandsummarizeresultsinaForestServiceBiologicalAssessmentandaNEPAEnvironmental
Assessment.SeniorWildlifeEcologist.
WasteManagement(2008)-CrossroadsLandfillDeerWinteringHabitatAssessment.Surveyofdeerwintering
areasassociatedwiththeCrossroadslandfilltodeterminevalueofhabitat.Compileresultsinletterreportsuitablefor
referenceinfutureexpansionplanningandpermitting.SeniorWildlifeEcologist.
Noble(2007)-GraniteReliableWindBreedingBirdSurveys.Oversawdesignandimplementationofbreedingbird
surveysatprojectarea.Managedstaffandconductedqualityassurancetasksforfieldactivitiesandreportwriting.
ManagingPrincipal.
NewHampshireAudubon(20052007)-NHRoute2WildlifeCrossingInvestigation.Designed,implementand
managedatrackingstudytoindentifythelocationswherewildlifecrossedthehighway,andtodeterminethe
characteristicsofpreferredcrossinglocations.TasksincludedextensivequantitativeandqualitativeanalysisofGIS
baseddatasets.PrincipleInvestigatorandProjectManager.
    
2


Entergy Nuclear Generation Company Entergy Nuclear Operations, Inc.  
EXHIBIT TWO Sources Reviewed
: 1. Blake, K. 2010. Roseate (Sterna dougallii) and common tern (Sterna hirundo) use of staging sites during the post-breeding period in coastal Massachusetts. M.Sc. thesis, Antioch University, Keene, New Hampshire. 87 pp.
: 2. DOI (Department of the Interior). 1987. Endangered and Threatened Wildlife and Plants; Determination of Endangered and Threatened Status for Two Populations of the Roseate Tern, Final Rule. 52 Fed. Reg. 42064.
: 3. Entergy. 2012. Marine Ecology Studies Pilgrim Nuclear Power Station. Report No. 79.
Report Period: January 2011 - December 2011. Chemistry Dept. -Environmental Group, Entergy Nuclear-Pilgrim Station, Plymouth, MA.
: 4. EPA (Environmental Protection Agency). 2004. Technical Development Document for the Final Section 316(b) Phase II Existing Facilities Rule. Attachment A to Chapter 4:
Cooling Water Intake Structure Technology Fact Sheets. EPA Document Number 821R04007.
: 5. EPRI. 2000. Review of entrainment survival studies: 1970 - 2000. Electric Power Research Institute, Palo Alto, CA. Technical Report 1000757.
: 6. Friedlaender, A.S., E.L. Hazen, D.P. Nowacek, P.N. Halpin, C. Ware, M.T. Weinrich, T.
Hurst, D. Wiley. 2009. Diel changes in humpback whale Megaptera novaeangliae feeding behavior in response to sand lance Ammodytes spp. behavior and distribution.
Marine Ecology Progress Series 395:91-100.
: 7. Gochfeld, M., J. Burger, and I.C. Nisbet. 1998. Roseate Tern (Sterna dougallii), The Birds of North America Online (A. Poole, Ed.). Ithaca, Cornell Lab of Ornithology.
Retrieved from the Birds of North America Online:
http://bna.birds.cornell.edu/bna/species/370. Accessed on May 10, 2012.
: 8. Goyert, Holly. 2010. Offshore foraging behavior and ecology of roseate (Sterna dougallii) and common terns (S. hirundo). 37th Annual Meeting of the Pacific Seabird Group February 17, 2010.
: 9. Hain, J.H.W., G.R. Carter, S.D. Kraus, C.A. Mayo, and H.E. Winn. 1982. Feeding behavior of the humpback whale, Megaptera novaeangliae, in the western North Atlantic. Fish. Bull., 80(2):259-268.
: 10. Hammill, M.O. and G.B. Stenson. 2000. Estimated prey consumption by harp seals (Phoca groenlandica), hooded seals (Cystophora cristata), grey seals (Halichoerus grypus) and harbour seals (Phoca vitulina) in Atlantic Canada. J. Northwest Atlantic Fisheries Science 26:1-23.
2
: 11. Hazen, E.L., A.S. Friedlaender, M.A. Thompson, C.R. Ware, M.T. Weinrich, P.N.
Halpin, D.N. Wiley. 2009. Fine-scale prey aggregations and foraging ecology of humpback whales, Megaptera novaeangliae. Marine Ecology Progress Series 395:75-89.
: 12. Heinemann, D. 1992. Foraging ecology of Roseate terns breeding on Bird Island, Buzzards bay, Massachusetts. Final report. 55 pp.
: 13. Høstgaard-Jensen, P., Klitgaard, J., Pedersen, K.M. 1977. Chlorine Decay in Cooling Water and Discharge into Seawater. Journal Water Pollution Control Federation, 49:1832-1841.
: 14. MADFW (Massachusetts Division of Fisheries and Wildlife). 2011. Buzzards Bay Tern Restoration Project, available at:
http://www.mass.gov/dfwele/dfw/nhesp/conservation/birds/tern_restoration.htm (Updated Feb. 16, 2011).
: 15. Meyer, Thomas L., Richard A. Cooper, and Richard W. Langton. 1979. Relative abundance, behavior, and food habits of the American sand lance, Ammodytes americanus, from the Gulf of Maine. Fishery Bulletin 77(1):243-253.
: 16. Mostello, C.S. 2007. Roseate Tern (Sterna dougallii) Fact Sheet. Massachusetts Division of Fisheries and Wildlife, Natural Heritage Endangered Species Program. 4pp.
: 17. MRI (Marine Research, Inc.). 1983. Assessment of finfish survival at Pilgrim Nuclear Power Station, 1982. Submitted to Boston Edison Company, Boston, MA. 38 pp.
: 18. NEFSC (Northeast Fisheries Science Center). 2008. Assessment of 19 Northeast Groundfish Stocks through 2007. Report of the 3rd Groundfish Assessment Review Meeting (GARM III), Northeast Fisheries Science Center, Woods Hole, Massachusetts, August 4-8, 2008. Northeast Fisheries Science Center Reference Document, 08-15 ; 884 p + xvii.
: 19. NEFSC. 2011. 51st Northeast Regional Stock Assessment Workshop (51st SAW)
Assessment Report. US Dept Commer, Northeast Fish Sci Cent Ref Doc. 11-01; 70 p.
: 20. Overholtz W.J. and Nicholas J.R. (1979). "Apparent feeding by the fin whale, Balaenoptera physalus, and humpback whale, Megaptera novaeangliae, on the American sand lance, Ammodytes americanus, in the Northwest Atlantic". Fish. Bull., 77: 285-287.
: 21. Payne, P. M., J. R. Nicolas, L. OBrien, and K. D. Powers. 1986. The distribution of the humpback whales Megaptera novaeangliae on Georges Bank and in the Gulf of Maine in relation to densities of the sand eel Ammodytes americanus. Fish. Bull. 84:271í277.
: 22. Payne, P.M., D.N. Wiley, S.B. Young, S. Pittman, P.J. Clapham, J.W. Jossi. 1990.
Recent fluctuations in the abundance of baleen whales in the southern Gulf of Maine in relation to changes in selected prey. Fish. Bull., 88(4):687-696.
3
: 23. Robbards, M.D, Willson, M.F., Armstrong, R.H, and Piatt, J.F. 1999. Sand Lance: A Review of Biology and Predator Relations and Annotated Bibliography. Res. Pap. PNW-RP-521. Portland, OR: U.S. Department of Agriculture, Forest Service, Pacific Northwest Research Station.
: 24. Roman, J. and McCarthy, J.J. 2010. The Whale Pump: Marine Mammals Enhance Primary Productivity in a Coastal Basin. PLoS ONE 5(10):e13255. Doi:10.1371.
: 25. Safina, C. 1990. Foraging habitat partitioning between roseate and common terns. Auk 107:351 to 358.
: 26. Shealer, D.A. and S.W. Kress. 1994. Post-breeding movements and prey selection of roseate terns at Stratton Island, Maine. Journal of Field Ornithology 65(3):349-362.
: 27. TRAC (Transboundary Resources Assessment Committee). 2009. Status Report: Gulf Of Maine-Georges Bank Herring Stock Complex.
: 28. Trull, P., S. Hecker, M.J. Watson, and I.C.T. Nisbet. 1999. Staging of roseate terns Sterna dougallii in the post-breeding period around Cape Cod, Massachusetts, United States. Atlantic Seabirds 1: 145 to 158.
: 29. Wang, J., Chen M., Lee H., Chen, C., Pai, S., and Meng, P. 2008. A Model to Predict Total Chlorine Residue in the Cooling Seawater of a Power Plant Using Iodine Colorimetric Method. Int J Mol Sci., 9(4): 542-553.
: 30. Weinrich, M.T., Schilling, M.R. and Belt, C.R. 1992. Evidence for acquisition of a novel feeding behaviour: lobtail feeding in humpbackwhales, Megaptera novaeangliae, Animal Behaviour, 44(6): 1059-1072.
: 31. Weinrich, Martin T., R. Griffiths, J. Bove, M. Schilling. 1997. A shift in distribution of humpback whales, Megaptera novaeangliae, in response to prey in the southern Gulf of Maine. Fish. Bull., 95:826-836.
: 32. US FWS (U.S. Fish and Wildlife Service). 1998. Roseate Tern (Sterna dougalii)
Northeastern Population Recovery Plan.
: 33. US FWS. 2010. Caribbean Roseate Tern and North Atlantic Roseate Tern (Sterna dougallii dougallii). 5-Year Review: Summary and Evaluation. 148 pp.
: 34. Uttley, J., P. Monaghan, and S. White. 1989. Differential effects of reduced sand eel availability on two sympatrically breeding species of tern. Ornis Scandinavica 20(4):273-277.

4


UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of                                    Docket No. 50-293-LR ASLBP No. 06-848-02-LR Entergy Nuclear Generation Company Entergy Nuclear Operations, Inc.
(Pilgrim Nuclear Power Station)
(Pilgrim Nuclear Power Station)
Docket No. 50-293-LR ASLBP No. 06-848-02-LR AFFIDAVIT OF JACOB J. SCHEFFER IN SUPPORT OF ENTERGY'S ANSWER OPPOSING JONES RIVER WATERSHED ASSOCIATION'S AND PILGRIM WATCH'S MOTION TO REOPEN HEARING REQUEST ON CONTENTION RELATED TO THE ROSEATE TERN I, Jacob J. Scheffer, do hereby depose and state, on the basis of personal knowledge, and under penalties of perjury, that:
AFFIDAVIT OF JACOB J. SCHEFFER IN SUPPORT OF ENTERGYS ANSWER OPPOSING JONES RIVER WATERSHED ASSOCIATIONS AND PILGRIM WATCHS MOTION TO REOPEN HEARING REQUEST ON CONTENTION RELATED TO THE ROSEATE TERN I, Jacob J. Scheffer, do hereby depose and state, on the basis of personal knowledge, and under penalties of perjury, that:
: 1. I am Chemistry Supervisor for Entergy Nuclear Operations, Inc., the operating entity for the Pilgrim Nuclear Power Station ("PNPS" or "the Station"), which is located in Plymouth, Massachusetts and is owned by Entergy Nuclear Generation Company (collectively, "Entergy"). I have held this position since June 2008. Prior to that time, I served as Superintendent of Environmental Protection for PNPS (October 1999-June 2007), a position in which I held substantially the same responsibilities as my current role. From 1970 until October 1999, when Entergy acquired PNPS, I was employed by Boston Edison Company ("BECO"), where, for close to three decades, I served in a variety of environmental and engineering roles at various BECO facilities, including at PNPS.
: 1.     I am Chemistry Supervisor for Entergy Nuclear Operations, Inc., the operating entity for the Pilgrim Nuclear Power Station (PNPS or the Station), which is located in Plymouth, Massachusetts and is owned by Entergy Nuclear Generation Company (collectively, Entergy). I have held this position since June 2008.       Prior to that time, I served as Superintendent of Environmental Protection for PNPS (October 1999-June 2007), a position in which I held substantially the same responsibilities as my current role. From 1970 until October 1999, when Entergy acquired PNPS, I was employed by Boston Edison Company (BECO),
: 2. As Chemistry Supervisor, I oversee PNPS's compliance with local, state and federal environmental regulations, including, without limitation, all environmental monitoring performed in accordance with the Federal Clean Water Act, 33 U.S.C. § 1251 et seq., the 2Massachusetts Clean Water Act, M.G.L. ch.
where, for close to three decades, I served in a variety of environmental and engineering roles at various BECO facilities, including at PNPS.
21, 26-53, and the Station's National Pollution Discharge Elimination System permit (the "NPDES Permit" or the "Permit"), as well as all reporting provided to the United States Environmental Protection Agency ("USEPA"), the Massachusetts Department of Environmental Protection ("MADEP"), and any other local, state and federal regulators in connection with same. As such, I have personal knowledge regarding the Station's operations, its NPDES Permit, the effluent limitations, monitoring requirements, and other conditions authorized or required under that Permit, and any relevant discharge monitoring reports that may be submitted in connection with same.
: 2.     As Chemistry Supervisor, I oversee PNPSs compliance with local, state and federal environmental regulations, including, without limitation, all environmental monitoring performed in accordance with the Federal Clean Water Act, 33 U.S.C. § 1251 et seq., the
: 3. I have reviewed the Motion to Reopen, Request for Hearing and Permission to File New Contention in Above-Captioned License Renewal Proceeding on Violations of the Endangered Species Act with Regard to the Roseate Tern (the "Motion"), which was filed by


Jones River Watershed Association and Pilgrim Watch (collectivel y, "JRWA") on May 2, 2012, and which alleges certain deficiencies in the Nuclear Regulatory Commission's ("NRC") evaluation of the potential impact (assuming any) of continued PNPS operations on the roseate tern, an ESA-listed species, during the relicensing period. In support of this Motion, JRWA makes certain incomplete and/or erroneous statements concerning the Station's operations, its NPDES-regulated discharges, and the NPDES Permit itself. I am providing this Affidavit to correct and clarify those statements, includi ng those concerning the in cidence and perceived magnitude of any chlorine discharges by PNPS into Cape Cod Bay (alternatively, the "Bay"). Description of PNPS and Its Cooling Water Intake System
Massachusetts Clean Water Act, M.G.L. ch. 21, 26-53, and the Stations National Pollution Discharge Elimination System permit (the NPDES Permit or the Permit), as well as all reporting provided to the United States Environmental Protection Agency (USEPA), the Massachusetts Department of Environmental Protection (MADEP), and any other local, state and federal regulators in connection with same. As such, I have personal knowledge regarding the Stations operations, its NPDES Permit, the effluent limitations, monitoring requirements, and other conditions authorized or required under that Permit, and any relevant discharge monitoring reports that may be submitted in connection with same.
: 3. I have reviewed the Motion to Reopen, Request for Hearing and Permission to File New Contention in Above-Captioned License Renewal Proceeding on Violations of the Endangered Species Act with Regard to the Roseate Tern (the Motion), which was filed by Jones River Watershed Association and Pilgrim Watch (collectively, JRWA) on May 2, 2012, and which alleges certain deficiencies in the Nuclear Regulatory Commissions (NRC) evaluation of the potential impact (assuming any) of continued PNPS operations on the roseate tern, an ESA-listed species, during the relicensing period. In support of this Motion, JRWA makes certain incomplete and/or erroneous statements concerning the Stations operations, its NPDES-regulated discharges, and the NPDES Permit itself. I am providing this Affidavit to correct and clarify those statements, including those concerning the incidence and perceived magnitude of any chlorine discharges by PNPS into Cape Cod Bay (alternatively, the Bay).
Description of PNPS and Its Cooling Water Intake System
: 4. PNPS is a nuclear power generating facility consisting of a single boiling water reactor and associated steam-electric and auxiliary systems. PNPS continuously generates power at a rated capacity of approximately 680 net MWe (711 gross MWe), which is enough electricity for approximately 550,000 homes in Massachusetts.
: 4. PNPS is a nuclear power generating facility consisting of a single boiling water reactor and associated steam-electric and auxiliary systems. PNPS continuously generates power at a rated capacity of approximately 680 net MWe (711 gross MWe), which is enough electricity for approximately 550,000 homes in Massachusetts.
3 5. PNPS was designed for and actually utilizes once-through cooling This means that sea water is drawn from an intake embayment created by two large breakwaters, the walls of which effectively separate the embayment from the open waters of Cape Cod Bay at all points except an approximate 800 foot opening to the inlet. Once water is drawn into the Station through an intake structure, a series of pumps direct the water to either the Station's Circulating Water System ("CWS") or its (Salt) Service Water System ("SWS").
2
1 As its name suggests, the purpose of the CWS is to remove heat from the Station's condenser; the primary purpose of the SWS, on the other hand, is to provide cooling water for the Station's heat exchangers, which act as the Station's safety-related ultimate heat sink (though the SWS is also one of the two water sources for PNPS's marine screen wash system). Once it has passed through the SWS or CWS, effluent from both systems flows to a 900-foot long discharge canal located northwest of the intake structure. Like the intake embayment, the discharge canal is created by two man-made breakwaters (one of which is shared with the intake embayment). Upon entry into the discharge canal, effluent from the CWS and SWS systems merge and become fully mixed prior to discharge into the Bay, though the CWS is the larger of the two systems, and therefore typically discharges approximately thirty (30) to sixty (60) times the water volume discharged by the much smaller SWS, depending on the number of circulating and service water pumps in service at any given time.
: 5.     PNPS was designed for and actually utilizes once-through cooling This means that sea water is drawn from an intake embayment created by two large breakwaters, the walls of which effectively separate the embayment from the open waters of Cape Cod Bay at all points except an approximate 800 foot opening to the inlet. Once water is drawn into the Station through an intake structure, a series of pumps direct the water to either the Stations Circulating Water System (CWS) or its (Salt) Service Water System (SWS).1 As its name suggests, the purpose of the CWS is to remove heat from the Stations condenser; the primary purpose of the SWS, on the other hand, is to provide cooling water for the Stations heat exchangers, which act as the Stations safety-related ultimate heat sink (though the SWS is also one of the two water sources for PNPSs marine screen wash system). Once it has passed through the SWS or CWS, effluent from both systems flows to a 900-foot long discharge canal located northwest of the intake structure. Like the intake embayment, the discharge canal is created by two man-made breakwaters (one of which is shared with the intake embayment).
2 The temperature of the effluent upon discharge to Cape Cod Bay is typically between 85-95 degrees Fahrenheit in the summer, but in any event below the 102 degrees Fahrenheit limit authorized by the Station's NPDES Permit. NPDES Permit at Part A.2.a (NRC ADAMS Accession No. ML061420166).  
Upon entry into the discharge canal, effluent from the CWS and SWS systems merge and become fully mixed prior to discharge into the Bay, though the CWS is the larger of the two systems, and therefore typically discharges approximately thirty (30) to sixty (60) times the water volume discharged by the much smaller SWS, depending on the number of circulating and service water pumps in service at any given time.2 The temperature of the effluent upon discharge to Cape Cod Bay is typically between 85-95 degrees Fahrenheit in the summer, but in any event below the 102 degrees Fahrenheit limit authorized by the Stations NPDES Permit.
NPDES Permit at Part A.2.a (NRC ADAMS Accession No. ML061420166).
1 The intake structure houses two circulating water pumps and five service water pumps, though the number of service water pumps in operation at any given time is dictated by operational needs and ambient environmental conditions.
2 Indeed, even under those infrequent circumstances when CWS flow is at its lowest (e.g., during an outage, when only one circulating water pump and five service water pumps might be in service), the discharge volume from the CWS still outpaces SWS discharge volume by a full 12.5 to 1.
3


The intake structure houses two circulating water pumps and five service water pumps, though the number of service water pumps in operation at any given time is dictated by operational needs and ambient environmental conditions.
The NPDES Permit and Relevant NPDES-Regulated Discharges
2  Indeed, even under those infrequent circumstances when CWS flow is at its lowest (e.g., during an outage, when only one circulating water pump and five service water pumps might be in service), the discharge volume from the CWS still outpaces SWS discharge volume by a full 12.5 to 1.
: 6.     Since at least 1975, PNPS continuously has conducted its operations subject to an NPDES Permit jointly issued (and repeatedly renewed) by USEPA and MADEP. The current NPDES Permit (Permit No. MA0003557), like its predecessors, sets out a variety of operational, monitoring, and reporting requirements that, consistent with the federal Clean Water Act (33 U.S.C. § 1251 et seq.) and applicable Massachusetts law, regulate the Stations discharge of effluent into Cape Cod Bay, satisfy Massachusetts water quality standards, and safeguard the aquatic ecosystem and biota of the Bay. See NPDES Permit at 1. In furtherance of those goals, PNPSs NPDES Permit sets forth, among other things, maximum daily and average monthly concentration limits for any residual chlorine which may be discharged from the CWS (referenced in the NPDES Permit as Outfall # 001) and/or the SWS (referenced in same as Outfall # 010). NPDES Permit at Parts A.2.a and A.5.a. The Permit further regulates the Stations thermal backwashes (as discussed more fully below). Id. at Part A.3.
4The NPDES Permit and Relevant NPDES-Regulated Discharges
: 7.     JRWA alleges in its Motion that the Stations Clean Water Act NPDES permit expired 16 years ago. Motion at 21. This statement - which implies, either purposefully or inadvertently, that PNPS has been operating in violation of the Clean Water Act - is incomplete and misleading. To the contrary, and as confirmed by USEPA via written correspondence on multiple occasions, the Stations NPDES Permit has been administratively continued during the pendency of permit renewal proceedings, which USEPA acknowledges have been delayed through no fault of the Stations despite having filed a timely renewal application.         See Correspondence from Jane Downing, USEPA to E.T. Boulette, Boston Edison (Mar. 1, 1996)
: 6. Since at least 1975, PNPS continuously has conducted its operations subject to an NPDES Permit jointly issued (and repeatedly renewed) by USEPA and MADEP. The current NPDES Permit (Permit No. MA0003557), like its predecessors, sets out a variety of operational, monitoring, and reporting requirements that, consistent with the federal Clean Water Act (33 U.S.C. § 1251 et seq.) and applicable Massachusetts law, regulate the Station's discharge of effluent into Cape Cod Bay, satisfy Massachusetts water quality standards, and safeguard the aquatic ecosystem and biota of the Bay.
(attached hereto as Exhibit 1); Correspondence from Olga Vergara, USEPA to Jacob Scheffer, Entergy (Dec. 2 1999) (attached hereto as Exhibit 2); Correspondence from David M. Webster, USEPA to Jacob Scheffer, Entergy (Oct. 25, 2004) (attached hereto as Exhibit 3); see also 5 4
See NPDES Permit at 1. In furtherance of those goals, PNPS's NPDES Permit sets forth, among other things, maximum daily and average monthly concentration limits for any residual chlorine which may be discharged from the CWS (referenced in the NPDES Permit as Outfall # 001) and/or the SWS (referenced in same as Outfall # 010). NPDES Permit at Parts A.2.a and A.5.a. The Permit further regulates the Station's thermal backwashes (as discussed more fully below).
Id. at Part A.3.
: 7. JRWA alleges in its Motion that the Station's "Clean Water Act NPDES permit expired 16 years ago.Motion at 21. This statement - which implies, either purposefully or inadvertently, that PNPS has been operating in violation of the Clean Water Act - is incomplete and misleading. To the contrary, and as confirmed by USEPA via written correspondence on multiple occasions, the Station's NPDES Permit has been administratively continued during the pendency of permit renewal proceedings, which USEPA acknowledges have been delayed through no fault of the Station's despite having filed a timely renewal application.
See Correspondence from Jane Downing, USEPA to E.T. Boulette, Boston Edison (Mar. 1, 1996) (attached hereto as Exhibit 1); Correspondence from Olga Vergara, USEPA to Jacob Scheffer, Entergy (Dec. 2 1999) (attached hereto as Exhibit 2); Correspondence from David M. Webster, USEPA to Jacob Scheffer, Entergy (Oct. 25, 2004) (attached hereto as Exhibit 3);
see also 5 5U.S.C. § 558(c) ("When the licensee has made timely and sufficient application for a renewal or a new license in accordance with agency rules, a license with reference to an activity of a continuing nature does not expire until the application has been finally determined by the agency."). As such, the conditions and limitations of the most recent NPDES Permit remain valid and in full force and effect. a. NPDES-Regulated Chlorination of the CWS and SWS
: 8. In order to control biofouling, PNPS utilizes chlorine (sodium hypochlorite) as a biocide for its CWS and SWS. No other biocide is used in the operating systems at PNPS. Sodium hypochlorite is intended to and actually rapidly dissipates during its use, with dissipation accelerated through heat and sunlight. Nonetheless, the use, and subsequent discharge, of any residual chlorine concentration in PNPS's effluent is conducted subject to a nd with the benefit of its NPDES Permit.
: 9. Specifically, pursuant to the Station's NPDES Permit, chlorination of the CWS is limited to a maximum of two hours per day (although the chlorination schedule is variable and dependent on environmental and operational conditions, ranging from once a day to once a week). Chlorination is further limited to a Total Residual Oxidant ("TRO") concentration of 0.10 mg/L in the Station discharge prior to release into Cape Cod Bay, and is stricter than the federal effluent limitation guideline of 0.20 mg/L set by USEPA.
See 40 C.F.R. § 423.13(b)(1). While continuous chlorination of the SWS is permitted in accordance with the NPDES Permit, the Station is limited to a monthly average TRO of 0.50 mg/L, as well as a maximum daily concentration of 1.0 mg/L.
: 10. In compliance with its NPDES monitoring and reporting requirements, PNPS carefully monitors TRO concentrations in the CWS and SWS. For example, during CWS chlorination, personnel at the Station take baseline measurements both before and after 6chlorination in order to ensure the TRO concentration is undetectable (i.e., <0.02 mg/L) except during the period of chlorine injection. They also take grab samples at the discharge canal every ten (10) to fifteen (15) minutes during chlorination, to monitor compliance with NPDES Permit limits. As such, the Station takes no less than eight (8) analytical chlorine readings during a typical CWS chlorination period (assuming a maximum two-hour run).
: 11. Similarly, Station personnel monitor chlorine levels in the SWS closely. In fact, the water used in that system is tested no less than twice daily when chlorination is in service, with sampling performed downstream of the heat exchangers (i.e., before the service cooling water has left the auxiliary building or mixed with cooling water from the CWS in the discharge canal) in compliance with the NPDES Permit.
See Correspondence from Jane Downing, USEPA to E.T. Boulette, Boston Edison re: Pilgrim Nuclear Power Station, NPDES Permit No. MA0003557, Sampling of Service Salt Water System (Aug. 26, 1998) (attached hereto as Exhibit 4) (authorizing twice daily sampling during chlorination at the SWS).
: 12. Pursuant to its NPDES Permit, Entergy documents the results of all chlorine discharge monitoring performed at PNPS in its Discharge Monitoring Reports ("DMRs"), which are submitted to USEPA and MADEP on a monthly basis.
3  These DMRs are organized by discharge/outfall point, and also contain a written summary of the Station's discharge data. As such, these reports provide a reliable snapshot of the sampling performed at PNPS on a daily and monthly basis. A review of those reports confirms, contrary to JRWA's assertions (Motion at 22 & n. 20), that NPDES Permit exceedances of chlorine concentrations discharged from the CWS and SWS are exceedingly rare. 


3  For ease of reference, a representative example of a DMR for PNPS is attached hereto as Exhibit 5. Copies of additional DMRs, as discussed in this Affidavit, will be provided upon request.
U.S.C. &sect; 558(c) (When the licensee has made timely and sufficient application for a renewal or a new license in accordance with agency rules, a license with reference to an activity of a continuing nature does not expire until the application has been finally determined by the agency.). As such, the conditions and limitations of the most recent NPDES Permit remain valid and in full force and effect.
7 13. Indeed, in the last ten years (2002-2011), 4 and as summarized in the attached Exhibit 6, PNPS has documented only two (2) instances in which the chlorine concentration in the CWS exceeded the instantaneous maximum permitted level of 0.1 mg/L. Those two exceedances, which occurred on February 3, 2005 (peak TRO of 0.14 mg/L) and December 14, 2011 (peak TRO of 0.18 mg/L), were each the result of minor and unanticipated equipment malfunctions, and each was less than twenty (20) minutes in duration.
: a.      NPDES-Regulated Chlorination of the CWS and SWS
See Exhibit 6. Furthermore, it is worth noting that both exceedances, while over the NPDES Permit limit, were well under the 0.2 mg/L federal effluent limitation guidelines set by USEPA.
: 8.     In order to control biofouling, PNPS utilizes chlorine (sodium hypochlorite) as a biocide for its CWS and SWS. No other biocide is used in the operating systems at PNPS.
See 40 C.F.R. &sect; 423.13(b)(1) (providing the federal standard for total residual chlorine). Given the brief duration and low concentrations involved with these two exceedances, the amount of residual chlorine discharged into the Bay is expected to have been minimal.
Sodium hypochlorite is intended to and actually rapidly dissipates during its use, with dissipation accelerated through heat and sunlight. Nonetheless, the use, and subsequent discharge, of any residual chlorine concentration in PNPSs effluent is conducted subject to and with the benefit of its NPDES Permit.
: 14. In that same ten year period, and as summarized in Exhibit 6, PNPS has documented only six (6) individual instances (out of literally thousands of sampling events) in which the chlorine concentration, as measured at the SWS, exceeded the daily maximum authorized limit of 1.0 mg/L. However, while those measurements reflect the chlorine concentration at the time of testing inside the SWS (i.e., an internal stream), they do not correlate to actual discharge levels into the Bay, which were in compliance with end point TRO limits during each of these occurrences. First, as mentioned above, prior to emptying into the Bay, water from the SWS (outfall # 010) must first travel to and through the main discharge canal, where it mixes with - and is substantially diluted by - the much more voluminous flow from the CWS (outfall # 001). As such, even assuming the Station were operating under maximum SWS and minimum CWS flow conditions, any residual chlorine concentration in the SWS would be
: 9.     Specifically, pursuant to the Stations NPDES Permit, chlorination of the CWS is limited to a maximum of two hours per day (although the chlorination schedule is variable and dependent on environmental and operational conditions, ranging from once a day to once a week). Chlorination is further limited to a Total Residual Oxidant (TRO) concentration of 0.10 mg/L in the Station discharge prior to release into Cape Cod Bay, and is stricter than the federal effluent limitation guideline of 0.20 mg/L set by USEPA. See 40 C.F.R. &sect; 423.13(b)(1).
While continuous chlorination of the SWS is permitted in accordance with the NPDES Permit, the Station is limited to a monthly average TRO of 0.50 mg/L, as well as a maximum daily concentration of 1.0 mg/L.
: 10. In compliance with its NPDES monitoring and reporting requirements, PNPS carefully monitors TRO concentrations in the CWS and SWS. For example, during CWS chlorination, personnel at the Station take baseline measurements both before and after 5


As evidenced by the Station's DMRs, there have been no chlorine concentration exceedances from the SWS or CWS outfalls in 2012.
chlorination in order to ensure the TRO concentration is undetectable (i.e., <0.02 mg/L) except during the period of chlorine injection. They also take grab samples at the discharge canal every ten (10) to fifteen (15) minutes during chlorination, to monitor compliance with NPDES Permit limits. As such, the Station takes no less than eight (8) analytical chlorine readings during a typical CWS chlorination period (assuming a maximum two-hour run).
8reduced by a minimum factor of 12.5 to 1 prior to the point of discharge into Cape Cod Bay. In actual operations, and as a function of the variability of the Station's service pump needs (which can further reduce the volume of water circulating through the SWS), however, the dilution factor is typically much greater, ranging from 30:1 to 60:1. Furthermore, upon mixing with water from the CWS, any residual chlorine concentration in the service water is subject to "chlorine decay" or "chlorine demand," whereby chlorinated water reacts with substances in unchlorinated water and spontaneously accelerates the TRO concentration reductions. As a result of these two factors, any residual chlorine in the SWS water stream is effectively reduced or eliminated before the point of discharge into Cape Cod Bay, such that the concentration prior to entering the Bay is typically undetectable, and is always at or below the stricter 0.1 mg/L ceiling set for circulating water in the Station's NPDES Permit. This is equally true for each of the six (6) chlorination Permit exceedances reported from the SWS outfall in the past decade.
: 11.      Similarly, Station personnel monitor chlorine levels in the SWS closely. In fact, the water used in that system is tested no less than twice daily when chlorination is in service, with sampling performed downstream of the heat exchangers (i.e., before the service cooling water has left the auxiliary building or mixed with cooling water from the CWS in the discharge canal) in compliance with the NPDES Permit. See Correspondence from Jane Downing, USEPA to E.T. Boulette, Boston Edison re: Pilgrim Nuclear Power Station, NPDES Permit No.
See e.g., Exhibit 5; supra Footnote 3. b. Thermal Backwashes
MA0003557, Sampling of Service Salt Water System (Aug. 26, 1998) (attached hereto as Exhibit 4) (authorizing twice daily sampling during chlorination at the SWS).
: 15. JRWA also implies in its Motion, without precise citation, that the Station's backwash operations may pose a "significant threat to roseate terns."  Motion at 21. But, in fact, this is incorrect. As an initial matter, thermal backwashes are performed as a further prophylactic measure to control biofouling in the intake structure, and thereby reduce the Station's chlorination needs. During a thermal backwash, the flow of water through the CWS is re-routed such that water is taken in on one side and discharged through the other side of the intake structure. All thermal backwashes are conducted in accordance with PNPS's NPDES
: 12.       Pursuant to its NPDES Permit, Entergy documents the results of all chlorine discharge monitoring performed at PNPS in its Discharge Monitoring Reports (DMRs), which are submitted to USEPA and MADEP on a monthly basis.3 These DMRs are organized by discharge/outfall point, and also contain a written summary of the Stations discharge data. As such, these reports provide a reliable snapshot of the sampling performed at PNPS on a daily and monthly basis. A review of those reports confirms, contrary to JRWAs assertions (Motion at 22
& n. 20), that NPDES Permit exceedances of chlorine concentrations discharged from the CWS and SWS are exceedingly rare.
3 For ease of reference, a representative example of a DMR for PNPS is attached hereto as Exhibit 5. Copies of additional DMRs, as discussed in this Affidavit, will be provided upon request.
6
: 13. Indeed, in the last ten years (2002-2011),4 and as summarized in the attached Exhibit 6, PNPS has documented only two (2) instances in which the chlorine concentration in the CWS exceeded the instantaneous maximum permitted level of 0.1 mg/L.                          Those two exceedances, which occurred on February 3, 2005 (peak TRO of 0.14 mg/L) and December 14, 2011 (peak TRO of 0.18 mg/L), were each the result of minor and unanticipated equipment malfunctions, and each was less than twenty (20) minutes in duration.                      See Exhibit 6.
Furthermore, it is worth noting that both exceedances, while over the NPDES Permit limit, were well under the 0.2 mg/L federal effluent limitation guidelines set by USEPA. See 40 C.F.R. &sect; 423.13(b)(1) (providing the federal standard for total residual chlorine). Given the brief duration and low concentrations involved with these two exceedances, the amount of residual chlorine discharged into the Bay is expected to have been minimal.
: 14. In that same ten year period, and as summarized in Exhibit 6, PNPS has documented only six (6) individual instances (out of literally thousands of sampling events) in which the chlorine concentration, as measured at the SWS, exceeded the daily maximum authorized limit of 1.0 mg/L.         However, while those measurements reflect the chlorine concentration at the time of testing inside the SWS (i.e., an internal stream), they do not correlate to actual discharge levels into the Bay, which were in compliance with end point TRO limits during each of these occurrences. First, as mentioned above, prior to emptying into the Bay, water from the SWS (outfall # 010) must first travel to and through the main discharge canal, where it mixes with - and is substantially diluted by - the much more voluminous flow from the CWS (outfall # 001). As such, even assuming the Station were operating under maximum SWS and minimum CWS flow conditions, any residual chlorine concentration in the SWS would be 4
As evidenced by the Stations DMRs, there have been no chlorine concentration exceedances from the SWS or CWS outfalls in 2012.
7


5 It is worth noting that the Station has also occasionally experienced non-conformances with the NPDES requirement to dechlorinate the fish sluice water (outfall #003) as discussed in its DMRs and the Supplemental Final Environmental Impact Statement ("FSEIS"). NRC, Generic Environmental Impact Statement for License Renewal of Nuclear Power Plants, Supplement 29 Regarding Pilgrim Nuclear Power Station, Final Report, Docket 5-293, at p. 4-5 (2007);
reduced by a minimum factor of 12.5 to 1 prior to the point of discharge into Cape Cod Bay. In actual operations, and as a function of the variability of the Stations service pump needs (which can further reduce the volume of water circulating through the SWS), however, the dilution factor is typically much greater, ranging from 30:1 to 60:1. Furthermore, upon mixing with water from the CWS, any residual chlorine concentration in the service water is subject to chlorine decay or chlorine demand, whereby chlorinated water reacts with substances in unchlorinated water and spontaneously accelerates the TRO concentration reductions. As a result of these two factors, any residual chlorine in the SWS water stream is effectively reduced or eliminated before the point of discharge into Cape Cod Bay, such that the concentration prior to entering the Bay is typically undetectable, and is always at or below the stricter 0.1 mg/L ceiling set for circulating water in the Stations NPDES Permit. This is equally true for each of the six (6) chlorination Permit exceedances reported from the SWS outfall in the past decade. 5 See e.g., Exhibit 5; supra Footnote 3.
see Exhibit 6.  
: b.      Thermal Backwashes
: 15. JRWA also implies in its Motion, without precise citation, that the Stations backwash operations may pose a significant threat to roseate terns. Motion at 21. But, in fact, this is incorrect.      As an initial matter, thermal backwashes are performed as a further prophylactic measure to control biofouling in the intake structure, and thereby reduce the Stations chlorination needs. During a thermal backwash, the flow of water through the CWS is re-routed such that water is taken in on one side and discharged through the other side of the intake structure. All thermal backwashes are conducted in accordance with PNPSs NPDES 5
It is worth noting that the Station has also occasionally experienced non-conformances with the NPDES requirement to dechlorinate the fish sluice water (outfall #003) as discussed in its DMRs and the Supplemental Final Environmental Impact Statement (FSEIS). NRC, Generic Environmental Impact Statement for License Renewal of Nuclear Power Plants, Supplement 29 Regarding Pilgrim Nuclear Power Station, Final Report, Docket 5-293, at p. 4-5 (2007); see Exhibit 6.
8


9Permit, which provides limitations on frequency, effluent temperature and flow (NPDES Permit MA 0003557 at Part A.3).
Permit, which provides limitations on frequency, effluent temperature and flow (NPDES Permit MA 0003557 at Part A.3).
: 16. Furthermore, the conditions created by a thermal backwash are not only environmentally limited, but actually represent a net reduction in thermal discharges. Thermal backwashes are a relatively infrequent occurrence at PNPS, conducted only three to five times per year. They are also relatively short in duration, typically lasting only two hours each from start to finish. Importantly, while effluent temperatures are elevated to approximately 110 degrees (and always less than 120 degrees) Fahrenheit during a thermal backwash, the flow is reduced by half, such that it results in an overall reduction in the total thermal effluent load released from the Station. Studies further indicate that the thermal plume created by the Station's backwashing operations is highly localized and surface-oriented in nature.
: 16. Furthermore, the conditions created by a thermal backwash are not only environmentally limited, but actually represent a net reduction in thermal discharges. Thermal backwashes are a relatively infrequent occurrence at PNPS, conducted only three to five times per year. They are also relatively short in duration, typically lasting only two hours each from start to finish. Importantly, while effluent temperatures are elevated to approximately 110 degrees (and always less than 120 degrees) Fahrenheit during a thermal backwash, the flow is reduced by half, such that it results in an overall reduction in the total thermal effluent load released from the Station. Studies further indicate that the thermal plume created by the Stations backwashing operations is highly localized and surface-oriented in nature.
Specifically, a thermal survey performed in 1977 to determine the effects of thermal backwashes at PNPS found that the procedure produced a relatively thin thermal plume at the surface, averaging three (3) to five (5) feet in depth, that spread from the intake structure across the western end of the intake embayment and along the breakwater, and completely dissipated within a few hours. Normandeau Associates, Inc. (1977) Thermal Surveys of Backwashing Operations at Pilgrim Station During July 1977. c. Allegations Concerning "Other Pollutants"
Specifically, a thermal survey performed in 1977 to determine the effects of thermal backwashes at PNPS found that the procedure produced a relatively thin thermal plume at the surface, averaging three (3) to five (5) feet in depth, that spread from the intake structure across the western end of the intake embayment and along the breakwater, and completely dissipated within a few hours. Normandeau Associates, Inc. (1977) Thermal Surveys of Backwashing Operations at Pilgrim Station During July 1977.
: 17. JRWA also raises allegations in its Motion concerning the discharge of metals and corrosion inhibitor by PNPS. Motion at 21. More specifically, JRWA asserts, without citation to a source document, that "[s]ince PNPS uses a corrosion inhibitor, and had to almost entirely replace corroded pipes in about 1984, corrosion of metal piping is obviously an issue at the facility.Id. at 21-22. The metals about which JRWA purports to raise concern are copper, zinc and chromium.
: c.     Allegations Concerning Other Pollutants
Id.
: 17. JRWA also raises allegations in its Motion concerning the discharge of metals and corrosion inhibitor by PNPS. Motion at 21. More specifically, JRWA asserts, without citation to a source document, that [s]ince PNPS uses a corrosion inhibitor, and had to almost entirely replace corroded pipes in about 1984, corrosion of metal piping is obviously an issue at the facility. Id. at 21-22. The metals about which JRWA purports to raise concern are copper, zinc and chromium. Id.
10 18. As an initial matter, the tubing in PNPS's cooling water condenser system is comprised entirely of elemental titanium, and has been since 1977, when the entire tubing configuration in the condenser was replaced. Titanium is highly resistant to sea water corrosion, and in any event, does not contain copper, zinc, or chromium. Furthermore, JRWA's reference to the replacement of certain other metal piping in 1984 is wholly inapposite, as the piping in question was used for internal water recirculation only, and as such did not make contact with or discharge into Cape Cod Bay or any other surface water in or around PNPS. Entergy also is not aware of any corrosion issues relative to its SWS system. Indeed, as stated in the Station's NPDES Permit Renewal Application, zinc, copper, and chromium are all believed to be absent from the Station's regularly discharged effluent.
9
See Correspondence from J.F. Alexander, Entergy to Kevin McSweeney, USEPA, re: NPDES Permit Renewal Application - Pilgrim (Dec. 1, 1999) (NRC ADAMS Accession No. ML993430072); Correspondence from E.T. Boulette, Boston Edison to Kevin McSweeney, USEPA re: NPDES Permit Renewal Application (Oct. 25, 1995) (cover letter for which is attached hereto as Exhibit 7). There have been no substantive changes or modifications to PNPS operations that would alter this conclusion since the time of that submission.
: 18. As an initial matter, the tubing in PNPSs cooling water condenser system is comprised entirely of elemental titanium, and has been since 1977, when the entire tubing configuration in the condenser was replaced. Titanium is highly resistant to sea water corrosion, and in any event, does not contain copper, zinc, or chromium. Furthermore, JRWAs reference to the replacement of certain other metal piping in 1984 is wholly inapposite, as the piping in question was used for internal water recirculation only, and as such did not make contact with or discharge into Cape Cod Bay or any other surface water in or around PNPS. Entergy also is not aware of any corrosion issues relative to its SWS system. Indeed, as stated in the Stations NPDES Permit Renewal Application, zinc, copper, and chromium are all believed to be absent from the Stations regularly discharged effluent. See Correspondence from J.F. Alexander, Entergy to Kevin McSweeney, USEPA, re: NPDES Permit Renewal Application - Pilgrim (Dec.
: 19. Pursuant to and as authorized by the USEPA, see Correspondence from Edward K. McSweeny, USEPA to E.T. Boulette, Boston Edison re: Pilgrim Nuclear Power Station, NPDES Permit No. MA0003557, Use of Tolytriazole [sic] as a Corrosion Inhibitor (June 30, 1995) (attached hereto as Exhibit 8), the Station does utilize Tolyltriazole (a corrosion inhibitor) in the facility's heating system, however that is largely an internal, processed water system which does not circulate to the discharge canal, save for once annually during planned, routine maintenance.
1, 1999) (NRC ADAMS Accession No. ML993430072); Correspondence from E.T. Boulette, Boston Edison to Kevin McSweeney, USEPA re: NPDES Permit Renewal Application (Oct. 25, 1995) (cover letter for which is attached hereto as Exhibit 7). There have been no substantive changes or modifications to PNPS operations that would alter this conclusion since the time of that submission.
In the past, and as reported in the DMRs, Tolyltriazole was occasionally discharged in diluted concentrations well below USEPA approved limits through either outfall 11011 (the neutralizing sump) or outfall 010 (the SWS) as a result of minor, erosion-related leaks from the Station's Turbine Building Closed Cooling Water ("TBCCW") and Reactor Building Closed Cooling Water ("RBCCW") system s, each of which has been corrected.
: 19. Pursuant to and as authorized by the USEPA, see Correspondence from Edward K. McSweeny, USEPA to E.T. Boulette, Boston Edison re: Pilgrim Nuclear Power Station, NPDES Permit No. MA0003557, Use of Tolytriazole [sic] as a Corrosion Inhibitor (June 30, 1995) (attached hereto as Exhibit 8), the Station does utilize Tolyltriazole (a corrosion inhibitor) in the facilitys heating system, however that is largely an internal, processed water system which does not circulate to the discharge canal, save for once annually during planned, routine maintenance.     In the past, and as reported in the DMRs, Tolyltriazole was occasionally discharged in diluted concentrations well below USEPA approved limits through either outfall 10
 
I declare under penalty of perjury that the foregoing is true and correct.


011 (the neutralizing sump) or outfall 010 (the SWS) as a result of minor, erosion-related leaks from the Stations Turbine Building Closed Cooling Water (TBCCW) and Reactor Building Closed Cooling Water (RBCCW) systems, each of which has been corrected.
I declare under penalty of perjury that the foregoing is true and correct.
Executed in Accord with 10 C.F.R. &sect; 2.304(d)
Executed in Accord with 10 C.F.R. &sect; 2.304(d)
Jacob J. Scheffer Chemistry Supervisor Pilgrim Nuclear Power Station  
Jacob J. Scheffer Chemistry Supervisor Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Phone: 508-830-8323 E-mail: jscheff@entergy.com 11
 
600 Rocky Hill Road Plymouth, MA 02360  


Phone: 508-830-8323 E-mail: jscheff@entergy.com
EXHIBIT ONE


EXHIBIT ONE 
EXHIBIT TWO


EXHIBIT TWO 
EXHIBIT THREE


EXHIBIT THREE 
EXHIBIT FOUR


EXHIBIT FOUR 
EXHIBIT FIVE


EXHIBIT FIVE 
EXHIBIT SIX Pilgrim Nuclear Power Station:
Circulating Water System (CWS) and (Salt) Service Water System (SWS), and Fish Sluice Water (FSW) Chlorination Exceedances for 2002-20111 Date                              System                          Maximum Concentration 05/25/2002                                FSW                            <0.1 mg/l*
11/11/2002                                FSW                            0.12 mg/l 2/3/2005                                CWS                            0.18 mg/l 1/5/2006                                FSW                            0.08 mg/l 2/2/2006                                FSW                              1.1 mg/l 7/19/2006                                FSW                            <0.5 mg/l*
8/16/2006                                FSW                            <0.5 mg/l*
8/16/2006                                SWS                            1.05 mg/l 9/20/2006                                FSW                            <0.4 mg/l*
10/15/2006                                FSW                            <0.5 mg/l*
2/19/2008                                SWS                            1.25 mg/l 1/27/2009                                FSW                            0.38 mg/l 2/10/2010                                FSW                            0.74 mg/l 1
Exceedances are based on a review of Discharge Monitoring Reports (DMRs) submitted monthly to the United States Environmental Protection Agency (USEPA) and Massachusetts Department of Environmental Protection (MADEP) between 2002-2011.
2


EXHIBIT SIX 2 Pilgrim Nuclear Power Station
3/31/2010           SWS 1.03 mg/l 10/29/2010           FSW 0.22 mg/l 11/27/2010           SWS 2.4 mg/l 4/5/2011           SWS 1.3 mg/l 7/20/2011           SWS 1.15 mg/l 12/14/2011           CWS 0.14 mg/l
:Circulating Water System ("CWS") and (Salt) Service Water System ("SWS"), and Fish Sluice Water ("FSW") Chlorination Exceedances for 2002-2011 1Date System Maximum Concentration05/25/2002 FSW <0.1 mg/l* 11/11/2002 FSW 0.12 mg/l 2/3/2005 CWS 0.18 mg/l 1/5/2006 FSW 0.08 mg/l 2/2/2006 FSW 1.1 mg/l 7/19/2006 FSW <0.5 mg/l* 8/16/2006 FSW <0.5 mg/l* 8/16/2006 SWS 1.05 mg/l 9/20/2006 FSW <0.4 mg/l* 10/15/2006 FSW <0.5 mg/l* 2/19/2008 SWS 1.25 mg/l 1/27/2009 FSW 0.38 mg/l 2/10/2010 FSW 0.74 mg/l 1  Exceedances are based on a review of Discharge Monitoring Reports ("DMRs") submitted monthly to the United States Environmental Protection Agency ("USEPA") and Massachusetts Department of Environmental Protection ("MADEP") between 2002-2011.
3 3/31/2010 SWS 1.03 mg/l 10/29/2010 FSW 0.22 mg/l 11/27/2010 SWS 2.4 mg/l 4/5/2011 SWS 1.3 mg/l 7/20/2011 SWS 1.15 mg/l 12/14/2011 CWS 0.14 mg/l
* Estimated concentrations.
* Estimated concentrations.
EXHIBIT SEVEN 
3
 
EXHIBIT EIGHT 
 
403470655v6 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board
 
In the Matter of    )
      )
Entergy Nuclear Generation Company and ) Docket No. 50-293-LR Entergy Nuclear Operations, Inc.  )  ASLBP No. 06-848-02-LR      )
(Pilgrim Nuclear Power Station)  ) 
 
CERTIFICATE OF SERVICE I hereby certify that copies of Entergy' s Answer Opposing Jones River Watershed Association's and Pilgrim Watch's Motion to Reopen and Hearing Request on Contention Related to the Roseate Tern, dated May 16, 2012, was provided to the Electronic Information Exchange for service on the individu als below, this 16th day of May, 2012.
Secretary Att'n:  Rulemakings and Adjudications Staff
 
Mail Stop O-16 C1
 
U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 hearingdocket@nrc.gov Office of Commission Appellate Adjudication Mail Stop O-16 C1
 
U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 OCAAmail@nrc.gov  Administrative Judge Ann Marshall Young, Esq., Chair Atomic Safety and Licensing Board
 
Mail Stop T-3 F23
 
U.S. Nuclear Regulatory Commission Washington, DC  20555-0001
 
Ann.Young@nrc.gov
 
Atomic Safety and Licensing Board Mail Stop T-3 F23
 
U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Administrative Judge Dr. Richard F. Cole Atomic Safety and Licensing Board
 
Mail Stop T-3 F23
 
U.S. Nuclear Regulatory Commission Washington, DC  20555-0001 
 
Richard.Cole@nrc.gov Administrative Judge Dr. Paul B. Abramson Atomic Safety and Licensing Board
 
Mail Stop T-3 F23
 
U.S. Nuclear Regulatory Commission Washington, DC  20555-0001
 
Paul.Abramson@nrc.gov 2 403470655v6 Susan L. Uttal, Esq. Maxwell C. Smith, Esq.
 
Joseph A. Lindell, Esq.
 
Office of the General Counsel
 
Mail Stop O-15 D21
 
U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Susan.Uttal@nrc.gov; Maxwell.Smith@nrc.gov;
 
Joseph.Lindell@nrc.gov
 
Matthew Brock, Assistant Attorney General Commonwealth of Massachusetts Office of the Attorney General
 
One Ashburton Place
 
Boston, MA 02108 Martha.Coakley@state.ma.us Matthew.Brock@state.ma.us   
 
Ms. Mary Lampert 148 Washington Street
 
Duxbury, MA 02332 mary.lampert@comcast.net  Margaret Sheehan, Esq.
61 Grozier Road Cambridge, MA 02138 meg@ecolaw.biz Sheila Slocum Hollis, Esq.
Duane Morris LLP 505 9th Street, NW 
 
Suite 1000 
 
Washington, DC  20006 sshollis@duanemorris.com Mr. Mark D. Sylvia Town Manager 
 
Town of Plymouth 
 
11 Lincoln St.
Plymouth, MA 02360 msylvia@townhall.plymouth.ma.us 
 
Chief Kevin M. Nord
 
Fire Chief and Director, Duxbury Emergency Management Agency 688 Tremont Street


P.O. Box 2824
EXHIBIT SEVEN


Duxbury, MA 02331 nord@town.duxbury.ma.us 
EXHIBIT EIGHT


Richard R. MacDonald Town Manager 878 Tremont Street
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of                                )
                                                )
Entergy Nuclear Generation Company and )              Docket No. 50-293-LR Entergy Nuclear Operations, Inc.                )    ASLBP No. 06-848-02-LR
                                                )
(Pilgrim Nuclear Power Station)                )
CERTIFICATE OF SERVICE I hereby certify that copies of Entergys Answer Opposing Jones River Watershed Associations and Pilgrim Watchs Motion to Reopen and Hearing Request on Contention Related to the Roseate Tern, dated May 16, 2012, was provided to the Electronic Information Exchange for service on the individuals below, this 16th day of May, 2012.
Secretary                                            Office of Commission Appellate Adjudication Attn: Rulemakings and Adjudications Staff            Mail Stop O-16 C1 Mail Stop O-16 C1                                    U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission                    Washington, DC 20555-0001 Washington, DC 20555-0001                            OCAAmail@nrc.gov hearingdocket@nrc.gov Administrative Judge                                  Atomic Safety and Licensing Board Ann Marshall Young, Esq., Chair                      Mail Stop T-3 F23 Atomic Safety and Licensing Board                    U.S. Nuclear Regulatory Commission Mail Stop T-3 F23                                    Washington, DC 20555-0001 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Ann.Young@nrc.gov Administrative Judge                                  Administrative Judge Dr. Richard F. Cole                                  Dr. Paul B. Abramson Atomic Safety and Licensing Board                    Atomic Safety and Licensing Board Mail Stop T-3 F23                                    Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission                    U.S. Nuclear Regulatory Commission Washington, DC 20555-0001                            Washington, DC 20555-0001 Richard.Cole@nrc.gov                                  Paul.Abramson@nrc.gov 403470655v6


Duxbury, MA 02332 macdonald@town.duxbury.ma.us
Susan L. Uttal, Esq.                            Matthew Brock, Assistant Attorney General Maxwell C. Smith, Esq.                          Commonwealth of Massachusetts Joseph A. Lindell, Esq.                          Office of the Attorney General Office of the General Counsel                    One Ashburton Place Mail Stop O-15 D21                              Boston, MA 02108 U.S. Nuclear Regulatory Commission              Martha.Coakley@state.ma.us Washington, DC 20555-0001                        Matthew.Brock@state.ma.us Susan.Uttal@nrc.gov; Maxwell.Smith@nrc.gov; Joseph.Lindell@nrc.gov Ms. Mary Lampert                                Margaret Sheehan, Esq.
  /signed electronically by Timothy J. V. Walsh/
148 Washington Street                            61 Grozier Road Duxbury, MA 02332                               Cambridge, MA 02138 mary.lampert@comcast.net                        meg@ecolaw.biz Sheila Slocum Hollis, Esq.                      Mr. Mark D. Sylvia Duane Morris LLP                                Town Manager 505 9th Street, NW                              Town of Plymouth Suite 1000                                      11 Lincoln St.
Timothy J. V. Walsh}}
Washington, DC 20006                            Plymouth, MA 02360 sshollis@duanemorris.com                        msylvia@townhall.plymouth.ma.us Chief Kevin M. Nord                              Richard R. MacDonald Fire Chief and Director, Duxbury Emergency      Town Manager Management Agency                                878 Tremont Street 688 Tremont Street                              Duxbury, MA 02332 P.O. Box 2824                                    macdonald@town.duxbury.ma.us Duxbury, MA 02331 nord@town.duxbury.ma.us
                                          /signed electronically by Timothy J. V. Walsh/
Timothy J. V. Walsh 2
403470655v6}}

Latest revision as of 16:15, 6 February 2020

Entergy'S Answer Opposing Jones River Watershed Association'S and Pilgrim Watch'S Motion to Reopen Hearing Request on Contention Related to the Roseate Tern
ML12137A895
Person / Time
Site: Pilgrim
Issue date: 05/16/2012
From: Doris Lewis, Walsh T
Entergy Nuclear Generation Co, Entergy Nuclear Operations, Pillsbury, Winthrop, Shaw, Pittman, LLP
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 22465, 50-293-LR, ASLBP 06-848-02-LR
Download: ML12137A895 (108)


Text

May 16, 2012 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of )

)

Entergy Nuclear Generation Company and ) Docket No. 50-293-LR Entergy Nuclear Operations, Inc. ) ASLBP No. 06-848-02-LR

)

(Pilgrim Nuclear Power Station) )

ENTERGYS ANSWER OPPOSING JONES RIVER WATERSHED ASSOCIATIONS AND PILGRIM WATCHS MOTION TO REOPEN HEARING REQUEST ON CONTENTION RELATED TO THE ROSEATE TERN I. Introduction Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc. (collectively Entergy) hereby oppose the late-filed motion to reopen the record that Jones River Watershed Association and Pilgrim Watch (collectively, JRWA/PW or Petitioners) filed on May 2, 20121 seeking to raise a new contention challenging the assessment of the roseate tern in the July 2007 final Supplemental Environmental Impact Statement (FSEIS)2 for license renewal of the Pilgrim Nuclear Power Station (Pilgrim or PNPS). This is the seventh such motion filed by Pilgrim Watch, now joined by JRWA, and like the preceding six, it is untimely and meritless.

II. Statement of the Case Entergy has previously summarized the relevant procedural history of this case in its response opposing the JRWA/PW contention concerning Endangered Species Act- (ESA-)

1 Jones River Watershed Association and Pilgrim Watch Motion to Reopen, Request for Hearing and Permission to File New Contention in the Above-Captioned License Renewal Proceeding on Violations of the Endangered Species Act with Regard to the Roseate Tern (May 2, 2012) (JRWA/PW Motion).

2 NUREG-1437, Supplement 29, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Pilgrim Nuclear Power Station (July 2007) (FSEIS).

listed aquatic species,3 and that summary will not be repeated here. This proceeding, now in its seventh year, involves the application submitted by Entergy in January 2006 seeking renewal of the operating license for Pilgrim (Application).4 Prior to submitting the Application to the NRC, Entergy contacted the U.S. Fish and Wildlife Service (FWS) in order to facilitate the ESA Section 7 consultation process that would later occur between FWS and NRC. By letter dated February 3, 2005, Entergy submitted a letter to FWS requesting information on threatened or endangered species in the vicinity of the Pilgrim plant in order to assess the impact of Pilgrims license renewal on any such species.5 Entergy stated that no Federally listed terrestrial species occur on the PNPS site proper, but noted that [s]everal listed terrestrial species are known to occur in the general vicinity of the PNPS site, including the roseate tern, and that those species cannot be ruled out as occasional visitors to the PNPS site. Entergy Feb.

2005 Letter to FWS at 1, 2. Entergys letter further explained that

[t]he roseate tern nests in colonies along the Massachusetts coast in summer. The roseate tern nests in dune areas with thick vegetative cover, always in association with the common tern. Although suitable nesting habitat has not been identified at PNPS, migrating terns may move through the site in late spring (en route to nesting areas in Maine and Nova Scotia) and late summer (en route to wintering areas in the West Indies and Latin America).

Id. at 2. Entergys letter also explained that it has no plans to alter current operations over the license renewal period, [a]ny maintenance activities necessary to support license renewal would be limited to previously disturbed areas, and that [n]o expansion of existing facilities is planned, and no additional land disturbance is anticipated in support of license renewal. Id. at

3. Accordingly, Entergy requested that FWS concur with its determination that license renewal 3

Entergys Answer Opposing Jones River Watershed Associations and Pilgrim Watchs Motion to Reopen and Hearing Request (Mar. 19, 2012) at 6-10.

4 See 71 Fed. Reg. 15,222 (Mar. 27, 2006).

2

would have no effect on threatened or endangered species . . . and that formal consultation is not necessary. Entergy Feb. 2005 Letter to FWS at 3.

By letter dated March 9, 2005, FWS responded to Entergys February 3, 2005 letter and concurred with Entergys determination that formal consultation was not required.6 FWS stated that the federally-endangered roseate tern . . . [is] known to occur along Plymouth Beach, just north of the PNPS, but that none . . . are known to frequent the immediate vicinity of PNPS and, therefore, the presence of [this] species near the power station is probably transient in nature. FWS Mar. 2005 Letter to Entergy at 1. Thus, FWS concluded that,

[s]ince no expansion of existing facilities is planned and no additional land disturbance is anticipated, we concur with your determination that license renewal for PNPS is not likely to adversely affect federally-listed species subject to the jurisdiction of the [FWS], and that formal consultation with us is not required.

Id. at 2 (emphasis added).

In January 2006, Entergy submitted the Application. The Application included an Environmental Report (ER), which provided an assessment of ESA-listed species that may occur in the vicinity of the station. ER, §§ 2.5, 4.10. With respect to the roseate tern, the ER noted that the species is known to occur in the general vicinity of the PNPS site . . . and cannot be ruled out as [an] occasional visitor[] to the PNPS site and environs. ER at 2-9. More specifically, the ER stated:

[T]he roseate tern nests in colonies along the Massachusetts coast in summer . . . .

The roseate tern nests in areas with thick vegetative cover, always in association with the common tern. Although suitable nesting habitat has not been identified at PNPS, migrating terns may move through the site in late spring (en route to nesting areas in Maine and Nova Scotia) and late summer (en route to wintering areas in the West Indies and Latin America).

5 Pilgrim Nuclear Power Station, Applicants Environmental Report (ER) Attachment B, Special Status Species Correspondence at 1 (Entergy Feb. 2005 Letter to FWS).

6 Pilgrim Nuclear Power Station, ER Attachment B, Special Status Species Correspondence at 6 (FWS Mar. 2005 Letter to Entergy).

3

Id. at 2-10. The ER further explained that:

Entergy has no plans to conduct refurbishment or construction activities at PNPS during the license renewal term. Therefore, there will be no impact to threatened or endangered species from refurbishment activities.

Id. at 4-18. Entergys assessment concluded:

Renewal of the operating license for PNPS is not expected to result in the taking of any threatened or endangered species. Renewal of the license is not likely to jeopardize the continued existence of any threatened or endangered species or result in the destruction or adverse modifications of any critical habitat.

Id. The ER included copies of the correspondence between Entergy and FWS. See ER Attachment B.

By letter dated April 25, 2006,7 the NRC notified FWS that it was reviewing the Application and preparing a supplemental environmental impact statement analyzing pertinent environmental issues, including endangered or threatened species and impacts to fish and wildlife. NRC April 2006 Letter to FWS at 1. The NRC letter noted that the Pilgrim industrial facility covers approximately 140 acres and that the proposed action would include the use and continued maintenance of existing plant facilities and transmission lines, id., and did not indicate that renewal of Pilgrims operating license would result in any expansion of existing facilities, or construction of new facilities. The NRC requested a list of species and information on protected, proposed, and candidate species and critical habitat that may be in the vicinity of Pilgrim in order to support the SEIS preparation process and to ensure compliance with Section 7 of the [ESA]. Id. at 2.

7 Letter from Mr. Rani Franovich, NRC, to Mr. Michael Bartlett, U.S. Fish and Wildlife Service,

Subject:

Request for a List of Protected Species Within the Area Under Evaluation for the Pilgrim Nuclear Power Station License Renewal Application Review (Apr. 25, 2006) (ADAMS Accession No. ML061160303) (NRC April 2006 Letter to FWS).

4

By letter dated May 23, 2006, FWS responded to the NRCs request by transmitting its March 9, 2005 response to Entergys February 3, 2005 letter, which provided the FWS determination that license renewal for PNPS is not likely to adversely affect federally-listed species subject to the jurisdiction of the [FWS] and that formal consultation . . . is not required.8 On May 25, 2006, Pilgrim Watch filed a petition to intervene requesting a hearing on five proposed contentions, none of which sought to raise any issue concerning impact on ESA-listed species, including the roseate tern.9 JRWA did not seek to intervene in the proceeding.

In December 2006, the NRC published its draft supplemental environmental impact statement (DSEIS).10 The DSEIS identifies the roseate tern as a Federally-listed endangered species that nests in Massachusetts on coastal beaches, and is known to occur along Plymouth Beach just north of PNPS and may pass through the PNPS site during northward migration in late spring or southward migration in early fall. DSEIS at 2-96; see also id. at 2-92, 4-58.

Although the northeastern U.S. roseate tern population has declined by approximately 70% since 1935 due to factors such as alteration of nesting habitats, displacement from nesting areas by gulls, erosion, flooding, and human predation on their wintering grounds, id. at 2-96, the roseate population in Massachusetts has been increasing during the period in which PNPS has been operating - from 1600 breeding pairs in 1978 to 1810 breeding pairs in 1999. Id. at 4-58. The NRC Staff found that there is no evidence that these species have been adversely affected by previous operation of the PNPS facility and concluded that, [g]iven that no expansion of existing facilities or disturbance of additional land is anticipated, the roseate tern and other 8

Letter from Michael J. Amaral, Endangered Species Specialist, New England Field Office, US FWS, to Rani Franovich, NRC (May 23, 2006) (ADAMS Accession No. ML061650016) (FWS May 2006 Letter to NRC).

9 Request for Hearing and Petition to Intervene by Pilgrim Watch (May 25, 2006).

5

Federally- and State-listed species are unlikely to be adversely affected during the renewal period. Id. Because FWS had already determined that formal consultation was not required, the NRC Staff did not prepare a separate biological assessment (BA) on the roseate tern or any other terrestrial or freshwater aquatic species. Id. at 4-59.

With respect to cumulative impacts, the NRC Staff found that operation of PNPS is not likely to have a detectable effect on terrestrial or freshwater aquatic species located in the vicinity of the PNPS and that [n]o other Federal or non Federal activities have been identified that would have an adverse effect on terrestrial and freshwater aquatic species in the area. Id. at 4-70. The Staff concluded that the incremental contribution to cumulative impacts on terrestrial and freshwater aquatic resources resulting from continued operation of PNPS and its associated transmission line ROW would be SMALL and that no additional mitigation would be warranted. Id.

The Staff published the FSEIS in July 2007, and the information, data, and conclusions provided therein with respect to the roseate tern are identical to those presented in the DSEIS.

See FSEIS at 2-92, 2-96, 4 4-65 (the roseate tern is unlikely to be adversely affected during the renewal period), 4-77 (cumulative impacts are SMALL). The FSEIS states that

[n]o Federally or State-listed threatened or endangered terrestrial species have been observed on the PNPS site, and that although the roseate tern and other Federally listed birds occur in the vicinity of PNPS, they are not dependent on habitats within the facility and are unlikely to be affected by facility operations. Id. at 4-64. In response to a comment received on the DSEIS concerning the need to resolve[] any issues with Federally-listed species, including the roseate 10 NUREG-1437, Supplement 29, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Pilgrim Nuclear Power Station - Draft Report for Comment (Dec. 2006) (ADAMS Accession No. ML063260173) (DSEIS).

6

tern, related to continued operation of Pilgrim, the Staff summarized its conclusion that impacts to Federally-listed species would be small, stated that it had consulted with FWS under ESA Section 7, and noted that FWS had concurred with the NRCs conclusion and informally concluded the consultation. Id. at A-104 - A-105. The Staff reiterated its ultimate conclusions and determination not to prepare a BA. Id. at 4 4-66 ([g]iven that no expansion of existing facilities or disturbance of additional land is anticipated, the roseate tern and other Federally-and State-listed species are unlikely to be adversely affected during the renewal period; and the impacts on ESA-listed species of an additional 20 years of operation and maintenance of PNPS

. . . would be SMALL, and no additional mitigation would be warranted).

Although Pilgrim Watch was an admitted party to the proceeding when the DSEIS and FSEIS were published, Pilgrim Watch never sought to challenge the adequacy of the ESA Section 7 consultation between the NRC and FWS, or the information, data, and conclusions reached with respect to the roseate tern at those times. Similarly, the publication of those documents did not prompt any hearing request from JRWA. In addition, neither Pilgrim Watch nor JRWA submitted any comments relating to the Staffs consultation and assessment concerning the roseate tern.

Now, nearly five years later, after this Board has terminated the proceeding11 and the NRC Staff has requested Commission authorization to issue the renewed license,12 JRWA/PW have filed the seventh motion to reopen the proceeding, this time claiming that (1) the NRC Staff failed to prepare a BA on the roseate tern and should be required to do so; (2) FWS erroneously consented to the NRC Staffs decision to not prepare a BA; (3) information contained in the 11 LBP-12-01, 75 N.R.C. __, slip op. at 2, 27 (Jan. 11, 2012) 12 SECY-12-0062, Renewal of Full-Power Operating License for Pilgrim Nuclear Power Station (Apr. 20, 2012).

7

Application and the FSEIS concerning the roseate tern is materially incomplete and inaccurate; and (4) there is significant potential for adverse effects on the roseate terns during the relicensing period. JRWA/PW Motion at 5-6.

III. The NRC Was Not Required to Prepare a Biological Assessment for the Roseate Tern Because the JRWA/PW Motion focuses on the question of whether the NRC was required to prepare a BA on the roseate tern, this Answer will first provide a short overview of when a Federal agency must prepare a BA under ESA Section 7 before addressing the Motions multiple failures to comply with the Commissions requirements reopening the record, late-filed contentions, and admissible contentions.

Entergy has previously summarized portions of the requirements under Section 7 of the ESA.13 Relevant to the claims made in the JRWA/PW Motion on the roseate tern, under ESA Section 7, the NRC is required, in consultation with FWS,14 to ensure that any NRC action is not likely to jeopardize the continued existence of any threatened or endangered terrestrial and freshwater aquatic species, or result in the destruction or adverse modification of habitat critical to such species. 16 U.S.C. § 1536(a)(2). To facilitate compliance with the consultation requirements, ESA Section 7(c) calls on Federal agencies to prepare a BA only if ESA-listed species may be present in the area of proposed projects involving construction authorized by the agency. 16 U.S.C. § 1536(c). The statute does not, however, specify how a federal agency should determine whether its actions are likely to affect ESA-listed species in other types of 13 Entergys Answer Opposing Jones River Watershed Associations and Pilgrim Watchs Motion to Reopen and Hearing Request (Mar. 19, 2012) at 3-5.

14 The ESA refers to the Secretary of Commerce and the Secretary of the Interior, but these Departments have delegated their authority to the National Marine Fisheries Service (NMFS) and FWS. Because the roseate tern falls under the jurisdiction of FWS, this Answer will refer only to FWS.

8

proceedings that do not involve major construction activities (such as renewing the operating license of a nuclear plant).

The FWS regulations implementing ESA Section 7 mirror the requirements of the statute:

in the case of major construction activities, the Federal agency authorizing the construction activity must prepare a BA. 50 C.F.R. § 402.12(b). But for Federal actions that do not involve major construction activities, no BA is required. When promulgating Part 402, FWS explicitly stated that it will not require biological assessments for actions that do not involve construction or activities having physical impacts similar to construction, such as dredging, blasting, etc. This limitation derives support from the 1979 Conference Report reference to actions designed primarily to result in the building or erection of various projects.

Final Rule, Interagency Cooperation, Endangered Species Act of 1973, 51 Fed. Reg. 19,926, 19,936 (June 3, 1986) (emphasis in original). A major construction activity encompasses dams, buildings, pipelines, roads, water resource developments, channel improvements, and other such undertakings which significantly modify the physical environment. Id. The Statement of Considerations is clear that a BA is required only for major Federal actions that are also construction projects. Id.

Federal Courts have held that a BA be prepared only for major construction activities. In Water Keeper Alliance v. U.S. Dept of Defense, 271 F.3d 21 (1st Cir. 2001), the First Circuit ruled that [w]hat triggers the requirement of a biological assessment is that the action is a major construction activity. 271 F.3d at 31. At issue in that case were military exercises on the island of Vieques off Puerto Rico, specifically short term exercises using inert ordinance, and a request for a preliminary injunction to stay those exercises. Id. at 24, 33. The First Circuit noted some ambiguity in the regulations as to who decides whether an agency action is a major construction 9

activity, but pointed to the Statement of Considerations for the regulation, which suggests that the Federal agency authorizing the action at issue makes the determination. Id. at 33, n.8 (quoting 51 Fed. Reg. at 19,946 (The biological assessment process begins when a Federal agency decides that its action is a major construction activity)). The First Circuit concluded that the petitioner had failed to show the required probability of success on the merits to require a preliminary injunction in light of the Navys conclusion that the activities at issue did not constitute a major construction activity necessitating a BA. Id. at 33.15 Applying the requirements of ESA Section 7 and its implementing regulations, and Federal case law interpreting those provisions to the circumstances here, the NRC was not required to prepare a BA for the renewal of Pilgrims operating license. The record is clear that, during the license renewal term, Entergy planned [n]o expansion of existing facilities and anticipated no additional land disturbance. Entergy Feb. 2005 Letter to FWS at 3. See also FWS Mar. 2005 Letter to Entergy at 2; DSEIS at 4-58; FSEIS at 4-64. Thus, renewal of Pilgrims operating license does not involve major construction activities. Consequently, the NRC was not required to prepare a BA.

The cases on which Pilgrim Watch relies for support are inapposite because, unlike renewal of Pilgrims operating license, they concern activities involving the building of new facilities, the expansion or existing facilities, or land disturbances. Thomas v. Peterson, 753 F.2d 754 (9th Cir. 1985) (cited at JRWA/PW Motion at 8, 10-12, 25-27, 35, 39, 56) concerned the construction of timber road in formal national forest roadless area. 753 F.2d at 755. City of Sausalito v. ONeill, 386 F.3d 1186 (9th Cir. 2004) (cited at JRWA/PW Motion at 8) concerned 15 Similarly, the Eighth Circuit has held that the requirement to prepare a BA does not apply to timber sales because such sales are not major construction activities under 50 C.F.R. § 402.12. Newton Cnty. Wildlife Assn v.

Rogers, 141 F.3d 803, 811 (8th Cir. 1998).

10

the development and rehabilitation of Fort Baker, including the establishment of a 350 guest-room conference and retreat center, expansion of certain buildings, the relocation and expansion of parking facilities, and beach restoration. 386 F.3d at 1194, 1196.

In any event, the existing NRC Staff NEPA analysis satisfies the requirements established for a BA. ESA Section 7 expressly provides that a BA may be undertaken as part of a Federal agencys compliance with the requirements of section 102 of NEPA (42 U.S.C. § 4332), i.e., the preparation of an environmental impact statement. 16 U.S.C. 1536(c)(1). The statute does not prescribe the contents of a BA other than to say that it must be based on the best scientific and commercial data available. Id. The FWS regulations, however, make clear that

[t]he contents of a biological assessment are at the discretion of the Federal agency and will depend on the nature of the Federal action, and may include (among other things) whether listed . . . species are present or occur seasonally, [a] review of the literature and other information, and an analysis of the effects of the action on the species and habitat, including consideration of cumulative effects. 50 C.F.R. § 402.12(f) (emphasis added).

Here, the NRC Staff found that renewal of Pilgrims operating license will not involve any expansion of existing facilities or disturbance of additional land, and that the roseate tern is not dependent on habitats within the facility and [is] unlikely to be affected by facility operations. FSEIS at 4 4-65. Thus, the Staff determined that the roseate tern was unlikely to be adversely affected during the renewal period. Id. at 4-66. With respect to cumulative impacts, the NRC Staff found that operation of PNPS is not likely to have a detectable effect on terrestrial or freshwater aquatic species located in the vicinity of the PNPS and that [n]o other Federal or non Federal activities have been identified that would have an adverse effect on terrestrial and freshwater aquatic species in the area. Id. at 4-77.

11

Accordingly, even if a BA were required for the roseate tern, the Board should find the NRC Staffs existing NEPA analysis on the roseate tern sufficient for that purpose. See Water Keeper Alliance, 271 F.3d at 33 (finding that, although not required to prepare a separate BA, the documents prepared by the Navy met the functional equivalent of a [BA]).

IV. The Board Should Reject the Contention A. Applicable Legal Standards for Reopening the Record, Late Contentions, and Admissible Contentions The NRC does not look with favor on amended or new contentions filed after the initial filing. Dominion Nuclear Connecticut, Inc. (Millstone Nuclear Power Station, Units 2 and 3),

CLI-04-36, 60 N.R.C. 631, 638 (2004). As the Commission has repeatedly stressed, our contention admissibility and timeliness rules require a high level of discipline and preparation by petitioners who must examine the publicly available material and set forth their claims and the support for their claims at the outset. There simply would be no end to NRC licensing proceedings if petitioners could disregard our timeliness requirements and add new contentions at their convenience during the course of a proceeding based on information that could have formed the basis for a timely contention at the outset of the proceeding. Our expanding adjudicatory docket makes it critically important that parties comply with our pleading requirements and that the Board enforce those requirements.

AmerGen Energy Co., LLC (Oyster Creek Nuclear Generating Station), CLI-09-7, 69 N.R.C.

235, 271-72 (2009) (emphasis added) (citations omitted).

Where, as here, the adjudicatory record has been closed, the Commissions rules specify that a motion to reopen that record to consider additional evidence - including evidence on a new contention (see 10 C.F.R. § 2.326(d)) - will not be granted unless the following criteria are satisfied:

(1) The motion must be timely. However, an exceptionally grave issue may be considered in the discretion of the presiding officer even if untimely presented; (2) The motion must address a significant safety or environmental issue; and 12

(3) The motion must demonstrate that a materially different result would be or would have been likely had the newly proffered evidence been considered initially.

10 C.F.R. § 2.326(a). Further, under the NRC rules, The motion must be accompanied by affidavits that set forth the factual and/or technical bases for the movant's claim that the criteria of paragraph (a) of this section have been satisfied. Affidavits must be given by competent individuals with knowledge of the facts alleged, or by experts in the disciplines appropriate to the issues raised. Evidence contained in affidavits must meet the admissibility standards of this subpart. Each of the criteria must be separately addressed, with a specific explanation of why it has been met. When multiple allegations are involved, the movant must identify with particularity each issue it seeks to litigate and specify the factual and/or technical bases which it believes support the claim that this issue meets the criteria in paragraph (a) of this section.

10 C.F.R. § 2.326(b) (emphasis added). All of the factors in section 2.326 must be met in order for a motion to reopen to be granted. Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-12-03, 75 N.R.C. __, slip op. at 15 (Feb. 22, 2012) (CLI-12-03).

Further, the Commission repeatedly has emphasized that [t]he burden of satisfying the reopening requirements is a heavy one. Oyster Creek, CLI-09-7, 69 N.R.C. at 287 (citing Louisiana Power & Light Co. (Waterford Steam Electric Station, Unit 3), CLI-86-1, 23 N.R.C. 1, 5 (1986)). [P]roponents of a reopening motion bear the burden of meeting all of [these]

requirements. Id. (citing Public Service Co. of New Hampshire (Seabrook Station, Units 1 and 2), CLI-90-10, 32 N.R.C. 218, 221 (1990)). Bare assertions and speculation . . . do not supply the requisite support. Id. (citing AmerGen Energy Co., LLC (Oyster Creek Nuclear Generating Station), CLI-08-28, 68 N.R.C. 658, 674 (2008)). Evidence contained in the Section 2.326(b) affidavits must meet the admissibility standards in 10 C.F.R. § 2.337. Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-12-06, 75 N.R.C. __, slip op. at 18 (Mar.

8, 2012) (CLI-12-06). In other words, the evidence must be relevant, material, and reliable.

Id.

13

In addition, where a motion to reopen relates to a contention not previously in controversy, as is the case here, a motion to reopen must also satisfy the standards for non-timely contentions in 10 C.F.R. § 2.309(c). 10 C.F.R. § 2.326(d); Pilgrim, CLI-12-03 at 9.16 Section 2.309(c) provides that non-timely contentions will not be entertained, absent a determination by the Board that the contentions should be admitted based upon a balancing of the following factors:

(i) Good cause, if any, for the failure to file on time; (ii) The nature of the requestor's/petitioner's right under the Act to be made a party to the proceeding; (iii) The nature and extent of the requestor's/petitioner's property, financial or other interest in the proceeding; (iv) The possible effect of any order that may be entered in the proceeding on the requestor's/petitioner's interest; (v) The availability of other means whereby the requestor's/petitioner's interest will be protected; (vi) The extent to which the requestor's/petitioner's interests will be represented by existing parties; (vii) The extent to which the requestor's/petitioner's participation will broaden the issues or delay the proceeding; and (viii) The extent to which the requestor's/petitioner's participation may reasonably be expected to assist in developing a sound record.

10 C.F.R. § 2.309(c)(1).

In keeping with the Commissions disfavor of contentions after the initial filing, these factors are stringent. Oyster Creek, CLI-09-7, 69 N.R.C. at 260, citing Florida Power & Light Co. (Calvert Cliffs Nuclear Power Plant, Units 1 and 2, et al.), CLI-06-21, 64 N.R.C. 30, 33 16 See also Dominion Nuclear Connecticut, Inc. (Millstone Nuclear Power Station, Unit 3), CLI-09-5, 69 N.R.C.

115, 125 (2009); Oyster Creek, CLI-08-28, 68 N.R.C. at 668.

14

(2006). Late petitioners properly have a substantial burden in justifying their tardiness.

Nuclear Fuel Services, Inc. (West Valley Reprocessing Plant), CLI-75-4, 1 N.R.C. 273, 275 (1975).

Commission case law places most importance on whether the petitioner has demonstrated sufficient good cause for the untimely filing. Tennessee Valley Authority (Watts Bar Nuclear Plant, Unit 2), CLI-10-12, 71 N.R.C. 319, 323 (2010); Private Fuel Storage, L.L.C. (Independent Spent Fuel Storage Installation), CLI-00-02, 51 N.R.C. 77, 79 (2000); Millstone, CLI-09-5, 69 N.R.C. at 125. Indeed, failure to demonstrate good cause requires the petitioner to make a compelling showing with respect to the other factors. Texas Utilities Electric Co. (Comanche Peak Steam Electric Station, Unit 2), CLI-93-4, 37 N.R.C. 156, 165 (1993). In other words, A petitioners showing must be highly persuasive; it would be a rare case where

[the Commission] would excuse a non-timely petition absent good cause.

Watts Bar, CLI-10-12, 71 N.R.C. at 323 (footnote omitted).

Finally, any new contention must also satisfy the strict standards for admissibility in 10 C.F.R. § 2.309(f)(1). These standards also are enforced rigorously. If any one . . . is not met, a contention must be rejected. Arizona Public Service Co. (Palo Verde Nuclear Generating Station, Unit Nos. 1, 2, and 3), CLI-91-12, 34 N.R.C. 149, 155 (1991) (citation omitted); USEC, Inc. (American Centrifuge Plant), CLI-06-9, 63 N.R.C. 433, 437 (2006) (These requirements are deliberately strict, and we will reject any contention that does not satisfy the requirements.

(footnotes omitted)). A licensing board is not to overlook a deficiency in a contention or assume the existence of missing information. Palo Verde, CLI-91-12, 34 N.R.C. at 155; Oyster Creek, CLI-09-7, 69 N.R.C. at 260 (the contention admissibility rules require the petitioner (not the board) to supply all of the required elements for a valid intervention petition (emphasis added)

(footnote omitted)).

15

B. The JRWA/PW Motion Fails to Meet the Reopening Standards The JRWA/PW Motion fails to satisfy all of the standards for reopening a closed record in 10 C.F.R. § 2.326. As a threshold matter, the JRWA/PW Motion should be rejected out of hand because its supporting affidavits fail to meet the Section 2.326(b) requirement that such affidavits specifically address why each one of the Section 2.326(a) reopening standards has been met. Despite Petitioners assertion that their affiants have addressed the relevant criteria, JRWA/PW Motion at 36, the affiants fail to do so. The affidavit from E. Pine duBois nowhere addresses the Section 2.326(a) criteria. Indeed, Ms. DuBois affidavit never mentions the roseate tern. While the affidavit from Dr. Nisbet pays lip service to two of the Section 2.326(a) criteria, he fails to separately address each criterion and provide a specific explanation of why [each]

has been met or specif[ies] the factual and/or technical bases why each of the Section 2.326 criteria has been met for each of the multiple allegations raised in the JRWA/PW Motion. 10 C.F.R. § 2.326(b). Dr. Nisbet nowhere asserts that the issues raised in the Contention are timely under Section 2.326(a)(1). With respect to the other two reopening criteria, Dr. Nisbet provides a conclusory assertion that the Contention raises significant environmental issues and that a materially different result would have been likely if those issues had been considered initially.

Nisbet Aff. at ¶ 21. Such bare assertions and speculation are insufficient to meet the requirements of Section 2.326. Oyster Creek, CLI-09-7, 69 N.R.C. at 287. The JRWA/PW Motions failure to meet the requirements of Section 2.326(b) alone is sufficient grounds to reject the Motion. Texas Utilities Electric Co. (Comanche Peak Steam Electric Station, Units 1 16

and 2), CLI-92-12, 36 N.R.C. 62, 76 (1992), citing Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), CLI-89-1, 29 N.R.C. 89, 93-94 (1989).17

1. JRWA/PWs Claims Are Untimely Neither JRWA/PW nor their affiants demonstrate that the issues raised in the JRWA/PW Motion are timely, nor could they. The bases for JRWA/PWs challenges are not new information and could have been raised long ago.

Except in certain circumstances inapplicable here, the NRC rules allow new contentions to be filed only with the leave of the presiding officer upon a showing that:

(i) The information upon which the amended or new contention is based was not previously available; (ii) The information upon which the amended or new contention is based is materially different than information previously available; and (iii) The amended or new contention has been submitted in a timely fashion based on the availability of the subsequent information.

10 C.F.R. § 2.309(f)(2)(i)-(iii). In essence, a proponent of a new contention must show that it could not have raised its contention earlier. [T]he unavailability of [a] document does not constitute a showing of good cause for admitting a late-filed contention when the factual predicate for that contention is available from other sources in a timely manner. Duke Power Co. (Catawba Nuclear Station, Units 1 and 2), CLI-83-19, 17 N.R.C.1041, 1043 (1983).

Consequently, an intervenor cannot establish good cause for filing a late contention when the information on which the contention is based was publicly available for some time prior to the filing of the contention. Philadelphia Electric Co. (Limerick Generating Station, Units 1 and 2),

ALAB-828, 23 N.R.C. 13, 21 (1986). The NRC typically applies a 30-day clock to the filing 17 See also Pilgrim, CLI-12-03 at 16 (ruling that Pilgrim Watch failed to meet the Section 2.326 reopening standards because it did not demonstrate, with the level of support required under section 2.326(b), that a materially different result would have been likely) (emphasis added).

17

of a new contention based on new information,18 and this has been the standard established in this proceeding.19 JRWA/PWs claim that the NRC Staff was required to prepare a BA on the roseate tern, e.g., JRWA/PW Motion at 5, could have been brought as early as December 2006 when the Staff issued the DSEIS. Likewise, the claim that FWS inappropriately acquiesced to the NRCs conclusions with respect to the roseate tern, e.g., id., could have been brought at that same time, if not in July 2007 with the Staffs publication of the FSEIS. The NRC Staff made public its determination that a BA was not required with the publication of the DSEIS in December 2006.

DSEIS at 4-59. The FWS May 2006 Letter to NRC transmitting FWSs determination from the year prior that license renewal for PNPS is not likely to adversely affect federally-listed species subject to the jurisdiction of the [FWS], and that formal consultation . . . is not required was both referenced and included in the December 2006 DSEIS (at 2-92, 2-140, E-11). In addition, the FSEIS expressly states that the Staff concluded that impacts on [ESA-listed species within the jurisdiction of FWS] during the license renewal period would be small, and that FWS concurred with that conclusion on May 23, 2006. FSEIS at A-105. Thus, any challenge to the NRC Staffs determination not to prepare a BA, or FWSs concurrence with the NRC Staffs conclusions with respect to the lack of significant impacts on the roseate tern, could have been brought years ago.

None of the claims made by JRWA/PW attempting to challenge the sufficiency of the Entergy, NRC Staff, and FWS determinations with respect to impacts on the roseate tern is timely raised. Indeed, the untimeliness of these claims is evident on the face of the JRWA/PW 18 Southern Nuclear Operating Co. (Vogtle Electric Generating Plant, Units 3 and 4), CLI-11-08, 74 N.R.C. __, slip op. at 3 n.8 (Sept. 27, 2011).

19 See Order (Establishing Schedule for Proceeding and Addressing Related Matters) (Dec. 20, 2006) at 6-7.

18

Motion. JRWA/PW purport to rely on information that predates or is contained in the DSEIS and FSEIS, or otherwise could have been raised many months if not years ago. For example, JRWA/PW and their witness purport to rely on (1) widely available scientific data available in 2006 and 2007, JRWA/PW Motion at 7; (2) a paper published in 1999 and information dating back to 1988 on the existence the roseate tern at Long Point Beach (LPB), id. at 16, 18, 19, 29, citing Nisbet Aff. at ¶¶ 4, 14, 16; (3) information contained in the July 2007 FSEIS concerning the location of Pilgrim, the impingement and entrainment of small fish prey for the roseate tern, and cooling water discharges, id. at 20-21; (4) a September 2010 FWS Study, id. at 21 n.15; (5) a September 2008 EPA publication on guidance for renewing nuclear power plant environmental impact statements, id. at 22 n.19; (6) Pilgrim NPDES permit limit violations occurring in 2010-2011, id. at 21-23 & n. 20; and (7) a 2007-2009 Massachusetts Audubon Society study, id. at 33, citing Nisbet Aff. at ¶ 11. Obviously none of this information is new. In some cases, the information is more than a decade old.

Further, none of Petitioners claims are made timely by their receipt of the year 2000 ENSR report in mid-April 2012. JRWA/PW Motion at 23, 31, 34, 45-46. As JRWA/PW acknowledge, the ENSR 2000 report was referenced in Entergys ER and the NRC Staffs FSEIS. Id. at 23; see ER at 2-36, 3-20, 4-54; see, e.g., FSEIS at 2-137. Further, the NRC Staffs Environmental Audit Summary identified ENSR 2000 as one of the documents that the NRC had obtained during the audit and provided an ADAMS accession number.20 While JRWA/PW apparently had to ask the NRCs public document room for a copy, the reality is that JRWA/PW simply made no attempt to do so until recently. Their failure to request this document does not make their present claims timely.

19

Moreover, JRWA/PW do not in fact rely on the ENSR 2000 document to support their claims, but instead disavow its sweeping no adverse impact and no [adverse] effect conclusion. JRWA/PW Motion at 23, 23 nn.21-22, 34. Thus, JRWA/PW cannot claim that this document provides timely support for their allegations. Finally, JRWA/PW fail to show that the information contained in the document is any different, let alone materially different, than information previously available under Section 2.309(f)(2)(ii). As summarized by JRWA/PW, the ENSR 2000 document discusses impingement and entrainment of aquatic species at Pilgrim, the temperature of Pilgrims water discharges, and the impact of Pilgrims cooling water system.

JRWA/PW Motion at 23. All of this information is discussed in Entergys ER and the Staffs DSEIS and FSEIS, see, e.g., ER §§ 4.2-4.4, FSEIS § 4.1. In fact, the ENSR 2000 report is often referenced to support the information contained in the ER and FSEIS.

Because Petitioners claims are untimely, in order to reopen the record Petitioners must demonstrate that their issues are exceptionally grave. 10 C.F.R. § 2.326(a)(1).21 When promulgating the exceptionally grave standard to consider untimely claims, the Commission made clear that exceptionally grave means that an in issue presents a sufficiently grave threat to public safety.22 None of the allegations in the JRWA/PW Motion or its supporting affidavits raises any issue that could be characterized as a sufficiently grave threat to public safety.

JRWA/PW present no evidence that continued operation of Pilgrim during the license renewal term will endanger any roseate tern. JRWA/PW claim that they have raised an exceptionally grave issue only by speculating that a significant potential for adverse impacts on the roseate 20 Summary of Environmental Site Audit Related to the Review of the License Renewal Application for Pilgrim Nuclear Power Station (July 25, 2006), Encl. 2 at 3 (available at ADAMS Accession No. ML062070305).

21 Vogtle, CLI-11-08 at 14 n.44 (when a motion to reopen is untimely, the § 2.326(a)(1) exceptionally grave test supplants the § 2.326(a)(2) significant safety or environmental issue test) (citation omitted).

20

tern exists, and that they have proffered evidence of potential effects on the roseate tern.

JRWA/PW Motion at 5, 33, 34 (emphasis added), citing Nisbet Aff. at ¶ 19. These allegations simply cannot be characterized as presenting any threat, let alone a sufficiently grave threat, to public safety. Furthermore, such speculation is insufficient to meet the stringent Section 2.326 reopening requirements. Oyster Creek, CLI-09-7, 69 N.R.C. at 287. Consequently, JRWA/PW have failed to raise any exceptionally grave issue.

2. JRWA/PWs Claims Do Not Address any Significant Environmental or Safety Issue In addition to being untimely, JRWA/PWs claims fail to demonstrate the existence of a significant environmental or safety issue. The Commission has directly held that bare assertions and speculation . . . do not supply the requisite support to satisfy the Section 2.326 standards.23 Merely asserting that something might turn up to support an intervenors concerns does not raise a significant issue sufficient to restart the hearing process.24 In order to demonstrate the existence of a significant environmental issue, the information Petitioners present must paint a seriously different picture of the environmental landscape.25 None of JRWA/PWs claims (or their affiants assertions) raises any significant environmental issue. JRWA/PW have come forward with no credible evidence that the roseate tern will be adversely affected by Pilgrims continued operation. Nor have they provided any 22 Final Rule, Criteria for Reopening Records in Formal Licensing Proceedings, 51 Fed. Reg. 19,535, 19,536 (May 30, 1986), quoting Vermont Yankee Nuclear Power Corp. (Vermont Yankee Nuclear Power Station), ALAB-124, 6 A.E.C. 358, 365 n.10 (1973).

23 Oyster Creek, CLI-09-7, 69 N.R.C. at 287 (citing Oyster Creek, CLI-08-28, 68 N.R.C. at 674).

24 Oyster Creek, CLI-08-23, 68 N.R.C. 461, 486 (2008) (rejecting a motion to reopen where movants provided only mere speculation that the contention might materially alter conclusions in the final safety evaluation report)

(emphasis in original).

25 See Private Fuel Storage, L.L.C. (Independent Spent Fuel Storage Installation), CLI-06-03, 63 N.R.C. 19, 28-29 (2006) (PFS) (holding that claimed additional environmental impacts were not so significant or central to the FEISs discussion of environmental impacts that an FEIS supplement (and the consequent reopening of our adjudicatory record) is reasonable or necessary).

21

evidence disputing the NRC Staffs conclusion that the roseate tern is unlikely to be adversely affected during the renewal period. FSEIS at 4 4-65. Indeed, JRWA/PW never assert that there will be any adverse impact to the roseate tern, and their expert, Dr. Nisbet, never provides any expert opinion that there will be any adverse impact.

Rather, JRWA/PW and Dr. Nisbet erroneously suggest that Entergy, the NRC Staff, and FWS have overlooked information concerning the existence of the roseate tern near Pilgrim.

JRWA/PW Motion at 16-20, 35; Nisbet Aff. at ¶¶ 7-9, 14, 17, 18. As a result, JRWA/PW claim that the Entergy, Staff, and FWS environmental documents addressing impacts to the roseate tern are materially incomplete, inaccurate, or inadequate. JRWA/PW Motion at 5-6. These manufactured claims are both unseemly and baseless. For example, JRWA/PW assert that Entergy, the NRC Staff, and FWS ignored the existence of the roseate tern at specified locations within two to four miles of the Pilgrim site, and considered only that roseate tern appeared in the area exclusively during migration. JRWA/PW Motion at 16-18. These assertions mischaracterize information plainly stated by Entergy, the NRC Staff, and FWS. Entergys February 2005 letter to FWS stated that [s]everal listed terrestrial species are known to occur in the general vicinity of the PNPS site, including the roseate tern, and that those species cannot be ruled out as occasional visitors to the PNPS site. Entergy Feb. 2005 Letter to FWS at 1, 2.

The March 2005 FWS response to Entergy stated that the federally-endangered roseate tern . . .

[is] known to occur along Plymouth Beach, just north of the PNPS, but that none . . . are known to frequent the immediate vicinity of PNPS and, therefore, the presence of [this] species near the power station is probably transient in nature. FWS Mar. 2005 Letter to Entergy at 1 (emphasis added). The NRC Staff stated that the roseate tern is known to occur along Plymouth Beach just north of PNPS and may pass through the PNPS site during northward migration in 22

late spring or southward migration in early fall. DSEIS at 2-96 (emphasis added). JRWA/PWs mischaracterizations of clear statements in the record cannot raise a significant environmental issue. Pilgrim Watch nowhere explains (nor can it explain) how information concerning the existence of the roseate tern on LPB 2-4 miles away from the Pilgrim site is any different, let alone seriously different, than the information presented by Entergy, the NRC Staff, and FWS.

JRWA/PW speculate about the significant potential for adverse effects on the roseate terns food sources that might result from entrainment, impingement, and cooling water discharges. JRWA/PW Motion at 20-23, 22 n.20, 34 (emphasis added). JRWA/PW also raise potential adverse impacts from a limited number of incidents where Pilgrim has exceeded the chlorine-related discharge limits in its NPDES permit. Id. at 22 & n.20. Notably absent from Dr. Nisbets Affidavit is any discussion of the potential impacts on the roseate tern from operation of the Pilgrim cooling water system, including chlorination exceedance incidents.

Rather, Dr. Nisbet claims only that Entergy has failed to consider the potential for adverse effects on roseate tern, or its fish prey, resulting from impingement, entrainment, and alleged pollutant discharges. Nisbet Aff. at ¶ 19. As previously noted, such speculation is not sufficient to meet the very high standards for reopening a closed record. Pilgrim, CLI-12-03 at 23-24.

The attached Affidavits from Drs. Scherer and Barnum of Normandeau Associates,26 and Mr. Scheffer from Pilgrim27 demonstrate that JRWA/PWs claims raise no significant issue:

  • 95% of the roseate tern breeding population in Massachusetts can be found on Bird Island and Ram Island in Buzzards bay, which are in a geographically 26 Affidavit of Michael D. Scherer, Ph.D. and Sarah A. Barnum, Ph.D., in Support of Entergys Answer Opposing Jones River Watershed Associations and Pilgrim Watchs Motion to Reopen, Request for Hearing and Permission to File New Contention (May 16, 2012) (Scherer & Barnum Aff.).

23

distinct subgroup with little connection to any roseate terns that might be present near PNPS. Scherer & Barnum Aff. at ¶ 8.

  • The bulk of the roseate tern diet in Massachusetts is comprised of American sand lance, hake, and Atlantic herring. At times, sand lance make up 95 % of the roseate terns fish prey. Scherer & Barnum Aff. at ¶¶ 12, 18.
  • There is no indication that any lack of prey fish availability during the summer months - if any such lack of prey fish availability exists - when roseate tern are present in Massachusetts has caused or contributed to the decrease in roseate tern nesting sites or the decline in the northeastern roseate tern population. Scherer &

Barnum Aff. at ¶ 14.

  • Impingement and entrainment of the roseate terns main fish prey species will have no discernible impact in on the availability of these fish species as prey for the roseate tern. Scherer & Barnum Aff. at ¶¶ 17-28.
  • In an average year, approximately 1,648 pounds of age 1 equivalent sand lance are impinged and entrained at Pilgrim each year. Conservatively assuming 100 %

mortality of impinged and entrained individual sand lance, this is less than the amount that two humpback whales concentrating their foraging efforts on sand lance would consume in one day. In addition, annual consumption of sand lance by North American seals, approximately 831 million pounds per year, dwarfs impingement and entrainment losses at PNPS. Thus, it is not scientifically 27 Affidavit of Jacob J. Scheffer in Support of Entergys Answer Opposing Jones River Watershed Associations and Pilgrim Watchs Motion to Reopen and Hearing Request on Contention Related to the Roseate Tern (May 16, 2012) (Scheffer Aff.).

24

credible to suggest that the annual magnitude of impingement and entrainment mortality at PNPS could potentially affect the availability of sand lance as prey for the roseate tern. Scherer & Barnum Aff. at ¶¶ 19-23.

  • Atlantic herring and hake may also make up a portion of the roseate terns diet.

On average, again conservatively assuming 100 % impingement and entrainment mortality, Atlantic herring losses at PNPS average 296 pounds per year. This is a minute fraction of the estimated hundreds of millions of pounds of Atlantic herring available for predation by the roseate tern. The annual combined estimate of age 1 hake impingement and entrainment losses at PNPS, assuming 100 %

mortality, is approximately 14,070 pounds, which is a minute fraction of the more than 50 million of pounds of hake estimated in the Cape Cod area. Thus, impingement and entrainment losses of Atlantic herring and hake at PNPS cannot reasonably be expected to affect the availability of such prey for the roseate tern.

Scherer & Barnum Aff. at ¶¶ 24-28.

  • The asserted turbulence associated with PNPSs cooling water discharge is not expected to bring an abundance of sand lance to the surface where they can be captured, and thus the area near the cooling water discharge is unlikely to provide desirable foraging conditions for the roseate tern. Moreover, to the extent any roseate terns might be attracted to the turbulence created by PNPSs cooling water discharge, if prey fish are absent from the water, any such attractiveness would likely be short lived, as the roseate terns flexible foraging strategy would allow it to either move or concentrate its feeding efforts where prey are abundant. Scherer

& Barnum Aff. at ¶¶ 29-30.

25

  • Contrary to Petitioners assertion (JRWA/PW Motion at 21), the Pilgrim NPDES permit has been administratively continued during the pendency of permit renewal proceedings, and, as a result, the conditions and limitations of the most recent NPDES permit remain valid and in full force and effect. Scheffer Aff. at ¶ 7.

Chlorination of the CWS is limited to a maximum of two hours per day, with the frequency of chlorination ranging from once a day to once a week, and to a Total Residual Oxidant (TRO) concentration of 0.1 mg/L, stricter than the federal effluent limitation guideline of 0.2 mg/L. The NPDES permit allows constant chlorination of the SWS system, with an average monthly limit of 0.5 mg/L and an instantaneous maximum limit of 1.0 mg/L. Scheffer Aff. at ¶¶ 8-9.

  • Pilgrim samples CWS and SWS water to ensure compliance with their respective TRO concentration limits. Water discharged from the CWS is sampled in the discharge canal at least 8 times during each chlorination period, assuming a 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> run. Pilgrim samples SWS water (downstream of the heat exchanges and prior to entering the discharge canal) for chlorine twice daily when chlorination is in service. These sampling results are documented in Pilgrims Discharge Monitoring Reports (DMRs). Scheffer Aff. at ¶¶ 10-12.
  • Chlorination permit exceedances are extraordinarily rare. Over the past ten years, PNPS has documented only two instances in which the chlorine concentration exceeded the CWSs maximum permitted level of 0.1 mg/L, each resulting from 26

minor and unanticipated equipment malfunctions, and each lasting less than 20 minutes in duration. Both exceedances, while over the NPDES permit limit, were less than the 0.2 mg/L federal effluent limitation guideline, and the amount of residual chlorine discharged into Cap Cod Bay is expected to have been minimal.

Scheffer Aff. at ¶¶ 12-13.

  • Similarly, over the past ten years, PNPS has documented only 6 instances (out of thousands of sampling events) in which the chlorine concentration of SWS water (measured prior to entering the discharge canal) exceeded the daily maximum permitted limit of 1.0 mg/L. Because SWS water is substantially diluted when mixed with the CWS stream prior to the point of discharge into Cape Cod Bay, and chlorine demand further reduces TRO concentration, even where an SWS exceedance has occurred, the concentration is typically undetectable prior, and is always at or below the 0.1 mg/L limit for CWS discharges set in the stations NPDES permit. Scheffer Aff. at ¶ 14.
  • Heavy metals such as zinc, copper, and chromium are believed to be absent from the Pilgrim Stations regularly discharged effluent. The use of the corrosion inhibitor Tolyltriazole in Pilgrim systems has been authorized by the U.S. EPA.

When Tolyltriazole has been discharged, it has been in diluted concentrations well below EPA approved limits and reported in the Stations DMRs. Scheffer Aff. at

¶¶ 18-19.

  • The chlorine discharge limitations set forth in Pilgrims NPDES permit are considered protective of marine organisms in Cape Cod Bay. Although PNPS has, on rare occasion experienced exceedances of its chlorine discharge limits at 27

certain outfall locations, it is highly unlikely that those exceedances would affect the environment, or have any impact on the biota in Cape Cod Bay. Thus, there is no credible scientific evidence that discharges from PNPS have any adverse effect on roseate tern. Scherer & Barnum Aff. at ¶¶ 15, 31.

For all of the reasons set forth above, JRWA/PWs claims fail to raise a significant environmental or safety issue as required under Section 2.326(a)(2).

3. JRWA/PW Have Failed to Demonstrate That a Materially Different Result Would Be Likely JRWA/PW and their affiants fail to demonstrate that a materially different result would have been likely had their newly proffered evidence been considered initially, as required by 10 C.F.R. § 2.326(a)(3) (emphasis added). Petitioners have a deliberately heavy burden to demonstrate that a materially different result would be likely. Oyster Creek, CLI-08-28, 68 N.R.C. at 674; see also Pilgrim, CLI-12-03 at 8; Oyster Creek, CLI-09-7, 69 N.R.C. at 287. At this late stage of the proceeding, is it not sufficient simply to raise an issue. The level of support required for a motion to reopen is greater than that required for a contention under the general admissibility requirements of 10 C.F.R. § 2.309(f)(1). Pilgrim, CLI-12-06 at 18.

[N]o reopening of the evidentiary hearing will be required if the [documents] submitted in response to the motion demonstrate that there is no genuine unresolved issue of fact. PFS, CLI-05-12, 61 N.R.C. 345, 350 (2005), citing Vermont Yankee Nuclear Power Corp. (Vermont Yankee Nuclear Power Station), ALAB-138, 6 A.E.C. 520, 523-24 (1973). A petitioner will fail to demonstrate that a materially different result will be likely where the petitioner seeks to litigate issues outside the scope of a proceeding, or fails to challenge pertinent information contained in the existing licensing documents. See Pilgrim, CLI-12-06 at 26-27.

28

The sole claim that JRWA/PW make with respect to this criterion is that, had their information been considered initially, a materially different result would have been likely because there would be a biological assessment as to whether PNPS relicensing would be likely to effect [sic] the roseate tern, which would include information cited in the Nisbet Affidavit and Petitioners documents and this information would be taken into account in the balance of alternatives under NEPA. JRWA/PW Motion at 36. Dr. Nisbet merely asserts his opinion that a materially different result would have been likely if the information in his affidavit had been considered previously, Nisbet Aff. at ¶ 21, but nowhere explains what would be different, and why that difference would be material. JRWA/PW and Dr. Nisbet are incorrect.

As previously discussed, no BA is required where, as here, the Federal action does not involve any major construction activities. 16 U.S.C. § 1536; 50 C.F.R. § 402.12(b); 51 Fed.

Reg. at 19,936; Water Keeper Alliance, 271 F.3d at 31. As FWS explained, The Service will not require [BAs] for actions that do not involve construction or activities having physical impacts similar to construction, such as dredging, blasting, etc. This limitation derives support from the 1979 Conference Report reference to actions designed primarily to result in the building or erection of various projects.

51 Fed. Reg. at 19,936 (some emphasis added). Renewal of Pilgrims operating license involves no such building or erection of various projects. Entergy Feb. 2005 Letter to FWS at 3. ([n]o expansion of existing facilities is planned and no additional land disturbance is anticipated).

See also FWS Mar. 2005 Letter to Entergy at 2; DSEIS at 4-58; FSEIS at 4-64.

Further, even if a BA were required, the NRC Staffs existing NEPA analysis satisfies the requirement. 16 U.S.C. 1536(c)(1) (permitting that a BA may be undertaken as part of the NRCs preparation of an environmental impact statement). In addition, as discussed supra, FWS regulations provide that the contents of a BA are discretionary, and the Staffs analysis already 29

contains discussion on multiple items recommended for inclusion in a BA. 50 C.F.R. § 402.12(f); see FSEIS at 4-64, 4-66, 4-70. Petitioners claim (JRWA/PW Motion at 18-19) that the NRC has overlooked certain studies developed since 2006/2007, i.e., after the time period when NRC and FWS made their determinations, does not violate the ESAs procedural requirements. Water Keeper Alliance, 271 F.3d at 33. Consequently, Petitioners can not demonstrate that their claims are likely to succeed on the merits.

Finally, the attached Affidavits from Drs. Scherer and Barnum and Mr. Scheffer demonstrate that JRWA/PWs claims do not demonstrate that a materially different outcome would be likely because continued operation of Pilgrim is not likely to result in any discernible impacts on the roseate tern. As previously summarized, Petitioners have failed in their obligation to raise any significant environmental issue warranting supplementation of the FSEIS, or otherwise undermining the FWS determination that no consultation was required, and the Staff determination that it would not prepare a BA. There is no evidence suggesting that PNPS will have any credible indirect impact on the roseate tern through impacts on the availability of fish prey due to impingement and entrainment mortality, or the impacts of pollution. Scherer &

Barnum Aff. at ¶¶ 15, 31. Average annual estimates of the annual impact to sand lance, the roseate terns main fish prey, from impingement and entrainment are comparable to one days consumption by just two whales. Id. at ¶ 22. The estimates of impingement and entrainment impacts to the roseate terns other significant prey species, Atlantic herring and hake, are miniscule when compared to the total available stocks for those fish species. Id. at ¶¶ 25-28.

Over the past ten years, there are only two documented instances where chlorinated water discharges into Cape Cod Bay from the CWS exceeded the 0.1 mg/L limit prescribed in Pilgrims (currently valid) NPDES permit. Scheffer Aff. at ¶ 13. Those exceedances will have 30

little, if any, potential for adverse impact on roseate tern fish prey. Scherer & Barnum Aff. at ¶¶ 15, 31.

For all of the reasons set forth above, JRWA/PWs claims fail to demonstrate that a materially different outcome would be likely under Section 2.326(a)(3).

C. The Contention fails to meet 10 C.F.R. § 2.309(c) standards for considering a late-filed contention JRWA/PWs belated contention should not be admitted because Petitioners have shown no good cause for their extreme tardiness, and a balancing of the remaining factors in 10 C.F.R.

§ 2.309(c) does not outweigh this failure to timely file the Contention.

To demonstrate good cause, the first and most important late-filed factor, JRWA/PW must establish that the information on which their Contention is based is new information not already in the public domain that could not have been presented earlier. Comanche Peak, CLI-92-12, 36 N.R.C. at 69-73; Millstone, CLI-09-5, 69 N.R.C. at 126. Petitioners have failed to demonstrate good cause under Section 2.309(c)(1) for the same reasons that their Contention is untimely under Section 2.326(a) and 2.309(f)(2), discussed supra. All of Petitioners claims (such as sitings and observations of the roseate tern on LPB dating back to 1988) could have been raised years ago. JRWA/PWs reliance on a document they received a few weeks ago, JRWA/PW Motion at 45-46, does not show good cause. The ENSR 2000 report was referenced numerous times in the ER, the DSEIS, and the FSEIS. Thus, JRWA/PW could have requested it years ago. Moreover, JRWA/PW do not rely on any information contained in that document, but instead disavow its contents. And they nowhere show that the ENSR 2000 reports discussion of impingement, entrainment and cooling water impacts is any different than information already available.

31

Having failed to show good cause, the demonstration regarding the other factors must be compelling in order to justify admitting the Contentions. Dominion Nuclear Connecticut, Inc.

(Millstone Nuclear Power Station, Units 2 and 3), CLI-05-24, 62 N.R.C. 551, 565 (2005);

Comanche Peak, CLI-92-12, 36 N.R.C. at 73. In balancing the remaining late-filed contention factors, the Commission grants considerable weight to factors seven and eight.

We regard as highly important the intervenor's ability to contribute to the development of a sound record on a particular contention. We also are giving significant weight to the potential delay, if any, which might ensue from admitting a particular contention.

Consumers Power Co. (Midland Plant, Units 1 and 2) LBP-82-63, 16 N.R.C. 571, 577 (1982)

(citations omitted), citing South Carolina Electric & Gas Co. (Virgil C. Summer Nuclear Station, Unit 1), ALAB-642, 13 N.R.C. 881, 895 (1981); see also Commonwealth Edison Co.

(Braidwood Nuclear Power Station, Units 1 and 2), CLI-86-8, 23 N.R.C. 241, 246-47 (1986).

JRWA/PW cannot make a compelling showing on the remaining factors because factors seven and eight heavily weigh against admitting the Contention.

Factor seven, the extent to which admission of the Contention will broaden the issues or delay the proceeding, weighs heavily against admitting the Contention. All admitted contentions have been resolved, and the proposed Contention pending before the Board concerns ESA-listed aquatic species and thus has little, if any, relation to the roseate tern Contention. The Commission has made clear that the introduction of a new contention, well after the contested proceeding closed, would broaden the issues and delay the proceeding. Vogtle, CLI-11-08 at

18. Where, as here, the proceeding has been ongoing for over six years, the NRCs Staffs view has long since been complete, all admitted contentions have been resolved, and there is less than one month before the expiration of the Pilgrim license, there can be no question that admission of the Contention would broaden the issues and delay the proceeding.

32

Factor eight, the ability to contribute to a sound record, also weighs heavily against admitting the Contention. As explained throughout this Answer, JRWA and their affiants provide no information, let alone significant information, demonstrating the existence of any significant environmental issue calling into question the conclusions reached by Entergy, the NRC Staff, and FWS concerning impacts to the roseate tern. Further, Entergy has demonstrated that no materially different result would be likely were JRWA/PWs claims considered.

Petitioners have thus failed to demonstrate any ability to contribute to a sound record.

Thus, factors one (good cause), seven (broaden and delay proceeding), and eight (contribution to a sound record) - the three most significant factors - count heavily against Petitioners. The other factors in 10 C.F.R. § 2.309(c)(1) are less important (see, e.g., Pacific Gas

& Electric Co. (Diablo Canyon Power Plant Independent Spent Fuel Storage Installation), CLI-08-1, 67 N.R.C. 1, 6 (2008); Comanche Peak, CLI-93-4, 37 N.R.C. at 165), and therefore cannot outweigh Petitioners failure to demonstrate good cause or meet the criteria in factors seven and eight.

V. The Roseate Tern Contention is Inadmissible Even if JRWA/PW had met the standards for reopening a closed record and the standards for a late contention (which they have not), their contention would still be inadmissible because it does not satisfy the pleading requirements in 10 C.F.R. § 2.309(f)(1). Petitioners are still required to demonstrate that their contention satisfies the admissibility standards in 10 C.F.R. § 2.309(f)(1)(i)-(vi). Sacramento Municipal Utility District (Rancho Seco Nuclear Generating Station), CLI-93-12, 37 N.R.C. 355, 362-63 (1993). Petitioners Contention does not meet these standards.

33

JRWA/PWs claim that the NRC failed to prepare a BA on the roseate tern is not material to the findings the NRC must make, and fails to raise a genuine dispute on any material issue. 10 C.F.R. §§ 2.309(f)(1)(iv), (vi). As previously discussed, the NRC Staff was not required to prepare a BA because renewal of Pilgrims operating license involves no major construction activities.

Also immaterial, as well as beyond the scope of this proceeding, is JRWA/PWs claim that FWS unlawfully ignored the requirement for a biological assessment and without a scientific basis declared the roseate tern to be probably transient. 10 C.F.R. §§ 2.309(f)(1)(iii), (iv). The Commission has long held that the scope of a licensing proceeding does not include litigating issues that are the primary responsibility of other agencies. The Commission has made clear that licensing boards should narrowly construe their scope to avoid where possible the litigation of issues that are the primary responsibility of other agencies and whose regulation is not necessary to meet [the Commissions] statutory responsibilities.28 Congress gave the Commission no roving mandate to determine other agencies permit authority. Id. Thus, any claim that FWS failed to adequately perform its functions is beyond the purview of the Licensing Board.

The Contention is also inadmissible because it is not supported by sufficient information to show that a genuine dispute exists on a material issue of law or fact, as required by 10 C.F.R.

§ 2.309(f)(1)(v), (vi). Under the NRCs Rules of Practice, a protestant does not become entitled to an evidentiary hearing merely on request, or on a bald or conclusory allegation that such a dispute exists. The protestant must make a minimal showing that material facts are in dispute, thereby demonstrating that an inquiry in depth is appropriate. Rules of Practice for Domestic 34

Licensing Proceedings - Procedural Changes in the Hearing Process, 54 Fed. Reg. 33,168, 33,171 (Aug. 11, 1989) (quoting Conn. Bankers Assn v. Bd. of Governors, 627 F.2d 245, 251 (D.C. Cir. 1980)). JRWA/PW make multiple assertions that fall far short of this strict standard.

First, JRWA/PW mischaracterize the information on which Entergy, the NRC Staff, and FWS relied when concluding that continued operation of Pilgrim would likely result in no adverse impact to the roseate tern. Despite the claim to the contrary, JRWA/PW Motion at 15-17, Entergy did not describe the roseate tern as being near Pilgrim exclusively during its migration. Entergy stated that, although no suitable nesting habitat for the roseate tern had been identified at the Pilgrim site, it was known to occur in the general vicinity of the PNPS site

. . . and cannot be ruled out as [an] occasional visitor[] to the PNPS site and environs. Entergy Feb. 2005 Letter to FWS at 1, 2; ER at 2-9. Likewise, both FWS and the NRC acknowledged the existence of the roseate tern on Plymouth Beach, just north of the PNPS. FWS Mar. 2005 Letter to Entergy at 1; DSEIS at 2-96. JRWA/PW nowhere show any material difference between these statements and the information they raise in the Contention, i.e., the existence of the roseate tern on LPB. Petitioners mischaracterizations of information plainly evident in the Entergy, Staff, and FWS documents cannot create a genuine dispute.

In addition, Petitioners provide no expert support for their claims that continued operation of Pilgrim will result in adverse impacts to the roseate terns food sources by impingement, entrainment, and waste water discharges. Dr. Nisbet merely suggests that such impacts ought to be further investigated, e.g., Nisbet Aff. at ¶ 19, without providing any information indicating that the roseate terns food sources would be adversely impacted. Neither 28 Hydro Resources, Inc. (2929 Coors Road, Suite 101, Albuquerque, NM 87120), CLI-98-16, 48 N.R.C. 119, 121-22 (1998) (footnote omitted).

35

Petitioners nor their expert challenge the fact that the roseate tern population near Pilgrim has been increasing during its operation, and provide no evidence disputing the NRC Staffs determination that there is no evidence that these species have been adversely affected by previous operation of the PNPS facility FSEIS at 4-64. Petitioners and Dr. Nisbets bare assertions are insufficient to demonstrate a genuine dispute on a material issue of law or fact under . . . section 2.309(f)(1)(vi). Pilgrim, CLI-12-03 at 23-24.

VI. Conclusion For the reasons set forth above, JRWA/PWs Motion should be denied.

Respectfully Submitted,

/signed electronically by David R. Lewis/

David R. Lewis Timothy J.V. Walsh PILLSBURY WINTHROP SHAW PITTMAN LLP 2300 N Street, NW Washington, DC 20037-1128 Tel. (202) 663-8000 E-mail: david.lewis@pillsburylaw.com Counsel for Entergy Dated: May 16, 2012 36

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of Entergy Nuclear Generation Docket No. 50-293-LR Company Entergy Nuclear Operations, Inc.

(Pilgrim Nuclear Power Station)

AFFIDAVIT OF MICHAEL D. SCHERER, Ph.D. AND SARAH A. BARNUM, PH.D. IN SUPPORT OF ENTERGYS ANSWER OPPOSING JONES RIVER WATERSHED ASSOCIATIONS AND PILGRIM WATCHS MOTION TO REOPEN, REQUEST FOR HEARING AND PERMISSION TO FILE NEW CONTENTION We, Michael D. Scherer, Ph.D. and Sarah A. Barnum, Ph.D., do hereby depose and say on the basis of personal knowledge and our professional opinion, and under penalties of perjury, that:

BACKGROUND AND QUALIFICATIONS

1. My name is Dr. Michael D. Scherer. I am a Vice President and Senior Marine Scientist with Normandeau Associates, Inc. (Normandeau), a professional consulting firm that specializes in ecological, environmental and natural resources management services. I hold a Ph.D. degree with a Fisheries Biology major and Biometrics minor from the University of Massachusetts, a Master of Science degree in Fisheries Biology from the University of Massachusetts, and a Bachelor of Science degree in Fisheries Biology from Cornell University.

My most recent curriculum vitae, and additional detail regarding my qualifications, are described in and attached to my March 19, 2012 Declaration, also submitted in this proceeding and hereby incorporated by reference as if set forth fully herein. See Affidavit of Michael D. Scherer, Ph.D.

1

in Support of Entergys Answer Opposing Jones River Watershed Associations and Pilgrim Watchs Motion to Reopen and Hearing Request.

2. My name is Dr. Sarah A. Barnum. I am a Senior Wildlife Ecologist with Normandeau. I hold a Ph.D. degree from the School of Architecture and Planning with a concentration in Conservation Planning from the University of Colorado, a Master of Science degree in Wildlife Ecology from Utah State University, and a Bachelor of Science degree in Wildlife Biology from the University of Vermont. My most recent curriculum vitae is attached hereto as Exhibit 1. I have over 15 years experience as a wildlife ecologist, with a focus on avian ecology, and I have significant experience in assessing the potential impacts of energy facilities and technologies on birds, including the roseate tern and other seabirds that may occur in portions of Cape Cod Bay and, more generally, the Gulf of Maine. In particular, I have worked as an avian biologist and project manager assessing potential impacts of proposed wind turbine projects in Massachusetts (e.g., the Madaket Wind Turbine Project and the Saugus Community Wind Project) on avian resources, including terns and other shorebirds. In addition, from 2005-2007, I was a Conservation Program Manager for New Hampshire Audubon, where I oversaw multiple on-going research and conservation programs, including the Tern Restoration Project.

PURPOSE AND METHODOLOGY

3. This Declaration is made in response to the Jones River Watershed Associations and Pilgrim Watchs Motion to Reopen, Request for Hearing and Permission to File New Contention (collectively, the Petition), dated May 2, 2012. The Petition alleges certain deficiencies in the NRCs evaluation of the potential impacts of continued operation of Pilgrim Nuclear Power Station (PNPS) on the roseate tern (Sterna dougallii) which is listed as 2

endangered under the federal Endangered Species Act (ESA). 16 U.S.C. § 1531 et seq. In this Declaration, we will offer our expert opinion that the continued operation of PNPS will have no discernible effects on the northeast population of roseate tern, its habitat or recovery goals.

4. The opinions expressed in this Declaration are in part based on our review of the sources identified in Exhibit 2. To the best of our knowledge, the factual statements in this Declaration are true and accurate, and the opinions expressed therein are based on our best professional judgment.

DISCUSSION Description of PNPS and its Environment

5. A description of PNPS and its location and environment is provided in paragraphs 7 through 16 of Dr. Scherers previous Declaration submitted in this proceeding. Additional information on the operation of PNPS is provided in the Declaration of Mr. Jacob J. Scheffer, which we have reviewed and understand is being submitted contemporaneously with this Declaration.

Relevant Biology and Ecology of the Roseate Tern

6. The roseate tern, a medium sized, fish eating, shore bird, is a migratory species that spends at least half the year in tropical latitudes with a scattered distribution primarily in the tropical and sub-tropical Atlantic, Indian, and Pacific Oceans. Gochfeld et al., 1998. During the summer, a subpopulation of roseate terns breeds in the northeast region of North America, from New York to Nova Scotia. Id.
7. Roseate terns arrive in Massachusetts from late-April to mid-May to nest at several coastal locations, typically on islands (as discussed below). Mostello 2007. These birds then abandon their breeding locations in late-July and August, although they temporarily may 3

congregate in staging areas around Cape Cod and the Islands of Nantucket and Marthas Vineyard, before departing by mid- to late-September for wintering grounds in the West Indies and off the northern and eastern coasts of South America, where they will remain for upwards of six months out of the year. See US FWS. 1998 (Hereinafter, Recovery Plan). Roseate terns appear to disperse throughout the breeding range in July and August, re-aggregating at staging areas primarily on outer Cape Cod in late August and early September prior to southward migration. US FWS 2010 (Hereinafter, 5-Year Review); Trull et al., 1999; Blake 2010.

Staging areas are transitory relative to breeding colonies, and individuals may remain in one place foraging for as little as a few hours or overnight (i.e., roosting) before moving on to the next spot. See e.g., Trull et al. 1999. In short, because staging roseate terns are not anchored to a single area by the presence of a nest, they are free to move to alternative staging areas if the fishing or other ambient conditions are not advantageous in a particular area.

8. Roseate terns typically nest in colonies on sandy, gravelly, or rocky islands (which are less likely than the mainland to have mammalian and certain avian predators) and, less commonly, in small numbers at the ends of long barrier beaches. Recovery Plan; Mostello 2007. In Massachusetts, the roseate tern invariably nests in association with common terns, forming clusters or sub-colonies within larger common tern colonies. Mostello 2007. Compared to the common tern, the roseate tern selects nest sites with denser vegetation, such as seaside goldenrod and beach pea, which provide cover for eggs and chicks. Id. In Massachusetts, significant nesting colonies of roseate terns are found at Bird Island and Ram Island, in Buzzards Bay, with 735 and 584 breeding pairs in 2010, respectively, which accounts for 95% of the Massachusetts breeding population. MADEP 2011. Birds in these two colonies are not expected to be influenced by PNPS, as they belong to a subgroup of the northeast population that is 4

separate from birds near PNPS. Specifically, a long-term banding study of roseate terns indicates that the northeast population is split into two separate subgroups: a cold water subgroup nesting north and east of Cape Cod, which would include any birds nesting near Plymouth, Massachusetts; and a warm water subgroup nesting south and west of Cape Cod, which includes the major colonies in Buzzards Bay. 5-Year review. The interchange of individual birds between these two groups is thought to be limited. Id.

9. Long Beach, in Plymouth, Massachusetts has historically been a minor nesting site. Recovery Plan Appendix B; 5-Year Review). From 1999 through 2009, only a single nesting pair was recorded, in 2008. 5-Year Review. Dr. Nisbet states in his Affidavit that three pairs of roseate tern nested at Long Beach in 2011, though the source of this information is not stated and does not appear to have been published. Nisbet Aff. ¶ 8.
10. Roseate terns are highly mobile foragers, flying much faster than common terns (Recovery Plan), which allows them to forage over large areas. In Massachusetts, roseate terns may forage 25-30 km (about 15 to 18 miles) away from the breeding colony. Mostello 2007; Recovery Plan. Published data on the roseate terns foraging range from staging areas are not available, due to the difficulty in monitoring the movements of individuals that are not anchored to a single location for a significant period of time, as is the case for nesting birds. However, there is nothing that would indicate that roseate terns foraging range from staging areas is smaller than from breeding colonies. In fact, because they are not anchored to a nest, they may be able to forage over a larger range.
11. Roseate terns also exhibit a flexible foraging strategy, adapting to foraging conditions within their range by concentrating their feeding efforts in areas where prey are more abundant. See Heinemann 1992. For example, Heinemann (1992) observed over the course of a 5

summer the foraging behaviors of individuals nesting in the breeding colony located at Bird Island, Massachusetts. He reported significant variation in foraging intensity over the course of the summer at different locations around Buzzards Bay, separated by distances of more than 20 km (12.5 miles). See id. The flexible foraging strategy exhibited by this colony demonstrates the ability of roseate terns to adapt to local conditions and to concentrate their feeding efforts in areas within their relatively large foraging range where prey are more plentiful.

12. The roseate tern is a fairly specialized forager, usually feeding over shallow sandbars, shoals, inlets, tide rips, which bring prey fish close to the surface, making them easier to catch. Recovery Plan; 5-yr Review. They feed almost exclusively on small, schooling marine fish, though occasionally they include crustaceans in their diet. See Gochfeld et al., 1998.

Although the composition of their diet varies from year to year and with location, the bulk of the roseate tern diet in Massachusetts is comprised of sand lance (Ammodytes spp.), hake (Urophycis spp.), and Atlantic herring (Clupea harengus). 5-Year Review. The roseate tern captures prey fish mainly by plunge-diving from heights of up to 20 m and often submerging 50 cm or more, but also by surface-dipping and contact-dipping. Mostello 2007; Recovery Plan.

13. The northeastern population of the roseate tern was listed as endangered under the federal ESA in 1987, principally due to contraction of the population into a small number of breeding sites and secondarily because of its declining numbers. Recovery Plan; see also DOI 1987. From the 1920s through the 1970s, roseate terns were displaced from at least 30 nesting colonies, due primarily to occupation of those sites by herring gulls and great black-backed gulls, and secondarily to animal predation (which may have intensified as terns were displaced by gulls to sites closer to the mainland), and erosion of the shoreline. Recovery Plan. By 1979, the northeast population (i.e., from New York to Nova Scotia) was estimated to be approximately 6

2,500 pairs. Mostello 2007. Following two decades of fairly steady increase, the northeast population peaked at 4,310 pairs in 2000 (id.) and is currently estimated at approximately 3,000 nesting pairs. 5-Year Review. The cause of this more recent population decline has not been identified, but data suggest that this decline is likely related to mortality at the wintering grounds in South America. Mostello 2007.

14. The primary range-wide threats to the northeastern roseate tern population include habitat displacement by gulls, predation of eggs and chicks by a number of birds and mammals, including owls, black crowned night herons, great black-backed gulls, peregrine falcons, mink, raccoon, rats and other rodents and fox, as well as physical human disturbance of, and activities in, staging areas (i.e., habitat loss). 5-Year Review. There is no indication that a lack of prey fish availability in Massachusetts during the summer months (even assuming any such lack of availability exists) has caused or contributed to the decrease in nesting sites or the decline in the northeastern roseate tern population.

Absence of Potential Impacts of PNPS on the Roseate Tern No Credible Evidence of Direct Impacts

15. Based on available information, PNPS is not expected to have any direct impact on the roseate tern. There clearly is no risk to the roseate tern of impingement or entrainment in PNPSs cooling water intake system (CWIS). Furthermore, although JRWA does allege and infer that discharges of chlorine, corrosion inhibitors, and heavy metals from PNPS to Cape Cod Bay could directly affect the roseate tern, as explained in the Declaration of Mr. Scheffer: (i) heavy metals (such as chromium, zinc, and copper) are believed to be absent from the Stations regularly discharged effluent (Scheffer Aff. at ¶ 18); (ii) periodic discharges of corrosion inhibitors are subject to and well below EPA-authorized effluent limitations (Scheffer Aff. at ¶ 7

19); and (iii) chlorination of PNPSs CWS and SWS is conducted subject to and with the benefit of a NPDES permit (Scheffer Aff. at ¶ 9), the federal chlorine effluent limitations for which are considered protective of marine organisms in Cape Cod Bay. While PNPS has, on rare occasion, experienced exceedances of its chlorine discharge limits at certain outfall locations, it is well-established that chlorine decays rapidly in sea water following a predictable relationship (see e.g., Wang et al., 2008; Høstgaard-Jensen, et al., 1977) such that, irrespective of dilution, it is highly unlikely that chlorine discharges from even occasional exceedances would affect the environment. In short, the chlorine discharges from PNPS are small, infrequent, and decay quickly and there is no expectation they will have any impact on the biota in Cape Cod Bay.

Consequently, there is no credible scientific evidence that discharges from PNPS have any adverse effect on roseate terns. Indeed, because PNPS is not expected to directly (or, as discussed below, indirectly) impact the roseate tern, the PNPS property in fact may provide especially suitable nesting or staging habitat, as human entry is restricted and the birds would likely be protected from human disturbance.

No Credible Evidence of Indirect Impacts

16. Based on available information, PNPS is not expected to have any indirect impact on the roseate tern. Although JRWA also alleges that PNPSs operation has potential indirect impacts on the roseate tern through: 1) impacts on the availability of fish prey due to impingement and entrainment (I&E) mortality; and 2) impacts of pollution on their fish prey, there is no technical evidence to suggest that either alleged impact is scientifically credible (or even plausible).

8

No Impacts on Roseate Tern Prey Species

17. In its Petition, JRWA refers to statements in the PNPS Final Supplemental Environmental Impact Statement (FSEIS) regarding historical I&E of the roseate terns main fish prey species by PNPSs CWIS (see Petition at 20-21) and, based on these statements, suggests that PNPS may adversely impact the roseate terns food supply. Petition at 34. While PNPS does result in some I&E of the roseate terns main fish prey species, as explained below, the evidence indicates that PNPS I&E will have no discernable impact on the availability of these fish species as prey for the roseate tern.

Sand Lance

18. As discussed above, roseate terns eat almost exclusively small marine fish that they capture by plunge diving, feeding primarily on sand lance, which at times represents 95% of the birds diet. See Uttley et al., 1989, Safina 1990, Heinemann 1992, Shealer and Kress 1994, Goyert 2010. Sand lance typically occur in dense schools, with individual fish reportedly numbering from 500 to tens of thousands. Meyer et al., 1979. Because they do not support a commercial or recreational fishery, estimates of sand lance populations in the Gulf of Maine, such as the spawning stock assessments conducted by the National Marine Fisheries Service (NMFS) for many other species, are not available. However, a thorough review of the available literature reveals no indication that the abundance of sand lance in the Gulf of Maine is low or declining, and they remain a significant proportion of the diet of a number of marine predators, including piscivorous fish, various shorebirds, and several species of seals and whales.

Robards, et al., 1999. Moreover, PNPS monitoring indicates that the number of sand lance has been relatively stable over the past decade. Entergy 2012.

9

19. Sand lance are known to be impinged at PNPS, though in low numbers, and primarily during November and December, well after roseate terns have migrated to their southern winter habitat. Setting aside a single year reflecting an aberrational event, the annual average number of sand lance impinged is only 147 individuals. Even including the aberrational year (2003, in which a three-day impingement of 13,758 sand lance resulted an anomalous annual estimate of 30,765 fish that year), the annual average over the last decade is only 3,209 sand lance per year impinged at PNPS. Although the age of impinged sand lance is not known, the size range of those impinged corresponds to age 1 and age 2 fish. If impinged sand lance are assumed to be age 1 fish, which weigh on average 0.00384 pounds (EPA 2004), the annual average of 147 fish would weigh a total of 0.56 pounds. Indeed, even if one includes the anomalous year (2003) in these calculations, the annual average weight of 3,209 fish is only 12.3 pounds.
20. Sand lance eggs are demersal and adhere to the ocean bottom, and are therefore rarely subject to entrainment at PNPS, as evidenced by eggs being found in entrainment samples in only one year - 1979 - over the last three decades. Entergy 2012. Sand lance larvae do appear in PNPS entrainment samples during their winter spawning season. Over the last decade, the number of sand lance larvae entrained, expressed in terms of age 1 fish, averaged approximately 426,000 individuals each year, which, applying the same per fish weight of 0.00384 pounds, converts to an estimated total weight of 1,636 pounds of fish annually. Thus, absent a declining population, entrainment of sand lance at PNPS cannot reasonably be considered to have a potential impact, even indirectly, on roseate tern.
21. Moreover, the I&E losses reported above (and below) are conservative because they assume 100% mortality. In a review of entrainment mortality studies conducted at 21 10

power plants, the Electric Power Research Institute (EPRI) concluded it is clear that for most species survival can be quite high. The available data do not support the assumption that all entrained organisms are killed. EPRI (2000). Considering an array of species, EPRI found that entrainment survival rates ranged from approximately 25% for sensitive species to greater than 50% for hardier ones. Id. Likewise, impingement studies conducted at PNPS indicate that latent survival rates (56 hours6.481481e-4 days <br />0.0156 hours <br />9.259259e-5 weeks <br />2.1308e-5 months <br /> after being impinged) ranged from 0 to 25% depending on species (MRI 1983). Accordingly, the I&E losses reported in this Declaration likely overstate actual losses.

22. As a reference point, humpback whales, which are known to feed on sand lance in New England waters (Weinrich et al., 1992; Overholtz and Nicolas 1979; Payne et al., 1990; Weinrich et al., 1997; Friedlaender et al., 2009), are estimated to consume food at the rate of approximately 471 kg/day (1,036 lbs/day). Roman and McCarthy 2010. In addition, humpback whales in Cape Cod Bay are known to employ specialized feeding behaviors, known as bubble net feeding or the similar lobtail feeding, that allow the whales to increase their foraging efficiency by concentrating schooling fish near the surface. Weinrich et al., 1992; Hain et al.,

1982; Hazen et al., 2009. When employing these behaviors, humpbacks may target schools of sand lance. Id. Indeed, in some areas of the Gulf of Maine, humpback whales are known to specialize in feeding on sand lance, and their spatial distribution is highly correlated with sand lance density. Payne et al., 1986. Based on their daily consumption, when humpback whales are concentrating on sand lance, two whales would eat more sand lance in one day than would be impinged and entrained at PNPS in an average year. It is, therefore, simply not scientifically credible to suggest that the annual magnitude of I&E mortality at PNPS could potentially affect the availability of sand lance as prey for the roseate tern.

11

23. Another reference point for appreciating the miniscule scale of I&E losses at PNPS, as well as the general abundance of sand lance in the North Atlantic is provided by Hammill and Stenson (2000), who estimated the number of fish of various species that are consumed by the seal population in Atlantic waters of Canada. Over a seven-year period (1990-1996), an average of 5.4 million seals consumed 831 million pounds of sand lance annually, which would be equivalent to 216.5 billion age 1 sand lance. Thus, the consumption of sand lance by seals in the North Atlantic dwarfs I&E losses at PNPS. Further, where seals presumably consume only a fraction of the sand lance present in their foraging area, these data illustrate the overall abundance of sand lance.

Atlantic Herring and Hake

24. In addition to sand lance, Atlantic herring (Clupea harengus) as well as three species of hake in the genus Urophycis may make up a portion of the roseate terns diet.

Heinemann 1992.

Atlantic Herring

25. Young-of-the-year Atlantic herring are impinged in minimal numbers at PNPS, with an annual average (again, expressed in terms of age 1 fish) of 140 individuals per year over the last decade. Atlantic herring eggs are not entrained at PNPS because they are spawned on offshore banks and, like the sand lance, are demersal and adhesive. Larval Atlantic herring are subject to entrainment at PNPS, with annual losses (expressed in terms of age 1 fish) of 9,294 individuals per year over the last decade. Entergy 2012. Conservatively assuming 100% I&E mortality, annual mortality of Atlantic herring at PNPS averages 9,434 fish. Where an age 1 Atlantic herring weighs on average 0.0314 pounds, this represents an annual loss of 296 pounds of fish. EPA 2004.

12

26. By comparison, the Atlantic herring spawning stock biomass of the Gulf of Maine-Georges Bank herring complex was estimated to be 400,000 metric tons, or 900 million pounds, of adult fish in 2008. TRAC 2009. Spawning stock biomass consists of fish age 3 and older. Based on these estimates and accounting for the additional mortality experienced between age 1 and age 3 (to adult), the number of Atlantic herring entrained and impinged at PNPS is a minute fraction of the northeast population available for predation by roseate terns, and cannot reasonably be expected to impact the availability of these fish or the feeding success of the roseate tern.

Hake

27. Three species of hake - red hake (Urophycis chuss), white hake (U. tenuis), and spotted hake (U. regia) - are impinged and entrained at PNPS. Early life stage hake are impinged at PNPS in minimal numbers, with an annual average over the last decade for all three species combined of 150 fish (Entergy 2012), which is the equivalent of 35 pounds, per year.

Eggs and larvae of the three species cannot readily be distinguished from one another, and so their entrainment numbers are combined. The average annual entrainment rate for hake over the last decade, expressed as age 1 fish, is 60,759 per year, which represents an annual total of 14,035 pounds. Thus, the annual combined estimate of hake entrainment and impingement losses at PNPS, again conservatively assuming 100% I&E mortality, is approximately 14,070 pounds.

28. Stock assessments are completed periodically by NMFS for both red and white hake. The latest stock assessment in 2010 for red hake alone provided a stock estimate of 4,706 metric tons or 10,374,000 pounds (spring and fall estimates averaged) for the northern stock defined as the Gulf of Maine to Northern Georges Bank region. NEFSC 2011. The most recent 13

spawning stock biomass assessment for white hake was completed in 2007, at which time the Gulf of Maine to Northern Georges Bank population was estimated to be 19,800 metric tons or 43,651,100 pounds. NEFSC 2008. Based on these data, which do not include the spotted hake, losses due to I&E at PNPS are a minute fraction of the hake population in the Cape Cod area, and the continued operation of PNPS cannot reasonably be expected to affect the availability of hake prey to roseate terns.

Miscellaneous Responses

29. The Petition also asserts that turbulent water around [PNPSs] two breakwaters, and turbulence created by regular and periodic cooling water discharges are expected to be prime locations for foraging roseate terns and goes so far as to state that PNPS is thus an attractive nuisance for the roseate tern. Petition at 20. These assertions are erroneous. First, the currents flowing past PNPSs two intake embayment breakwaters are relatively slow, even during thermal backwashing, and do not result in any additional turbulence that is not already associated with the shoreline generally (i.e., during storms). Second, as discussed above, while roseate terns often forage over turbulent waters, such turbulence is associated with shoreline hydrodynamic features, such as tide rips, that act to bring fish in these areas to the surface, making them more easily preyed upon by diving birds. Although roseate tern prey such as sand lance do occur in the vicinity of PNPS, as evidenced by their appearing in I&E samples, the sea floor in the vicinity of Rocky Point, where PNPS is located, is rocky, and therefore is not suitable habitat for sand lance, which prefer substrates into which they can burrow such as clean sand, sand and shell, and fine gravel. Meyer 1979. Thus, the asserted turbulence associated with PNPSs cooling water discharge is not expected to bring an abundance of sand lance to the 14

surface where they can be captured, and should therefore not provide desirable foraging conditions for the roseate tern.

30. Moreover, to the extent any roseate terns might be attracted to the turbulence created by PNPSs cooling water discharge, if prey fish are absent from the water, any such attractiveness would likely be short lived, as the roseate terns flexible foraging strategy, as described above, would allow it to either move or concentrate its feeding efforts where prey are abundant. See Heinemann 1992. Consequently, even if PNPS did adversely affect local prey fish abundance (which there is no evidence that it does) there is no credible evidence that, were significant numbers of roseate terns to nest or stage in areas near PNPS in the future, their ability to forage adequately would be impaired by continued operation of PNPS.
31. JRWA also alleges that discharges of pollution from PNPS potentially affect the roseate tern through their fish prey. For the reasons discussed above in ¶ 15, and as explained in Mr. Scheffers Declaration, there is no credible scientific evidence such discharges have any adverse effect on roseate tern fish prey.
32. Finally, JRWA alleges that thermal releases from PNPS, including backwash operations, may adversely affect the roseate terns prey fish. See Petition at 21. First, there is no evidence that the thermal plume created by PNPSs CWIS, as authorized by its NPDES permit, adversely affects roseate tern prey fish in Cape Cod Bay. Moreover, as explained in Mr.

Scheffers Declaration, backwash operations are performed infrequently - 3 to 5 times per year -

and, due to the low volume of water discharged, the temporal and spatial extent of the thermal plume associated with backwashing is very limited - occurring for only a few hours in 3 to 5 feet of water at the surface of the intake embayment. Scheffer Aff. ¶ 16. Consequently, there is no 15

credible scientific evidence that thermal discharges from PNPS have any adverse effect on roseate tern prey fish.

I declare under penalty of perjury that the foregoing is true and correct.

Executed in Accord with 10 C.F.R. § 2.304(d)

Michael D. Scherer Vice President and Senior Marine Scientist Normandeau Associates, Inc.

141 Falmouth Heights Rd.

Falmouth, Massachusetts 02540 Phone: 508.548.0700 Email: mscherer@normandeau.com I declare under penalty of perjury that the foregoing is true and correct.

Executed in Accord with 10 C.F.R. § 2.304(d)

Sarah A. Barnum Senior Wildlife Ecologist Normandeau Associates, Inc.

Bedford, New Hampshire 25 Nashua Road Bedford, New Hampshire 03110-5500 Phone: 603.472.5191 Email: sbarnum@normandeau.com LIBA/2303188.4 16

EXHIBIT ONE SARAH A. BARNUM, Ph.D.

Senior Wildlife Ecologist EDUCATION Dr.BarnumisaSeniorWildlifeEcologistatNormandeauwithover Ph.D. 2003, Conservation Planning, 15yearsofprofessionalexperience.Herbackgroundincludes University of Colorado providingexpertisetothetransportationandenergysectors,aswell M.S. 1993, Wildlife Biology, Utah State University asavarietyofgeneraldevelopmentprojects.Shehashandson B.S. 1988, (cum laude) Wildlife Biology, experiencewithawithawiderangeofspeciesincludingforestbirds, University of Vermont waterfowl,raptors,smallmammals,largemammals,amphibians,and

reptiles.Dr.Barnumsprojectshaveemphasizedexamininghabitat PROFESSIONAL EXPERIENCE 2007-Present Normandeau Associates relationships,impactassessmentforthreatenedandendangered

2005-2007 New Hampshire species,mitigationplanning,andFederalESAcompliance.Dr. Audubon, Concord, NH Barnumalsohasextensiveexperienceinprojectplanning,project 2004-2005 Baystate Environmental management,experimentaldesign,anddataanalysis. Consultants, East Longmeadow, MA 2001-2003 Environmental Planning SELECTED PROJECT EXPERIENCE and Policy Unit, Colorado DOT, Denver, CO Confidential(2011present)-WindDevelopment,NorthernMA. 1998-2000 Office of Environmental Avianandacousticbatsurveystosupportenvironmentalpermitting Services, Colorado DOT, foraproposedsixturbineproject.Aviansurveysincluderaptor Denver, CO 1996-1998 Dames & Moore, Denver, surveysandbreedingbirdsurveys.ProjectManagerandAvian CO Biologist. 1993-1994 Bio-Resources, Inc.,

Logan, UT Confidential(2011present)-WindDevelopment,DownEastME.

Avianandacousticbatsurveystosupportenvironmentalpermitting

foraproposed20plusturbineproject.Aviansurveysincluderaptorsurveysandeaglesurveys.WildlifeTaskManager

andAvianBiologist.

Confidential(2011)-WindDevelopment,NorthernME.Avianandacousticbatsurveystosupportenvironmental

permittingforaproposedsixturbineproject.Aviansurveysincluderaptorsurveys,eaglesurveys,andbreedingbird

surveys.WildlifeTaskManagerandAvianBiologist.

FirstWind(20102011)PostConstructionMortalityMonitoring,StetsonWindPowerFacility,WashingtonCounty,

Maine.ManagedpersonneltosearchallturbinesonsiteforbirdandbatfatalitiesfromAprilOctober,2010,and

conductsearcherefficiencytrialsandscavengertrialstoestimatetruenumberoffatalities;reportwriting.Project

Manager.

NorthernPass(2010Present)HVDCPowerLineUpgrade.Conductwildlifeassessmentsinsupportofstateand

federalpermittingforinstallationofanew,200milelongHVDClineinNewHampshire.Tasksincludeconsultationwith

stateandfederalagencies(ESA,NEPA),desktopanalysis,anddesignandcoordinationoffieldsurveys.Speciesof

interestincludeforestcarnivores,bats,raptors,songbirds,turtles,snakes,andlepidopterons.TaskManager.

TownofNantucket(20102011)-MadaketWind.AssessmentofavianandT&Eresourcesintheprojectareato

determinepotentialimpactsandpermittingrequirements.Specieofinterestincludedlongtailedduck,northern

harrier,andnightmigrants.Workincludesbothdesktopandfieldassessment.ProjectManager

MACleanEnergyCenter(20092010)-AvianImpactAssessmentforMadaketWind.Desktopanalysisofbiological

andpermittingissuesassociatedwithaproposedwinddevelopmentinNantucket,MA.ProjectManagerandAvian

Biologist.

1

Normandeau Associates, Inc. Sarah A. Barnum, PH.D.

FirstWind(20092010)-BrimfieldWind.Avianandacousticbatsurveystosupportenvironmentalpermittingfora

proposed20MWprojectinsouthwesternMA.Aviansurveysincluderaptorsurveysandbreedingbirdsurveys.Project

ManagerandAvianBiologist.

FederalHighwayAdministration(20092011)-AnalysisofMethodstoIdentifyDeerVehicleCollisionHotspots.

QualitativeandquantitativemethodstoidentifyDVChotspotswillbecomparedbasedondataneeds,easeof

implementation,expertiserequired,andrelevancytosolvingsafetyandecologicalissues.Projectresponsibilities

includereviewofmethodsthroughliteraturereviewandinterviewswithDOTstaff,creatingandimplementing

comparisonprotocols,staffmanagementandreportwriting.ProjectManager.

Confidential(2007Present)MaineWindEnergyDeveloper.Wildlifesurveystosupportenvironmentalpermitting

foraproposed50MWprojectinwesternMaine.PermitcurrentlyinpreparationincludeaSiteLocationof

DevelopmentActpermit,aNaturalResourcesProtectionActpermit,andlikelyaCorpsSection404individualpermit.

TaskManager.

FederalHighwayAdministration(20082010)-MitigationWetlandFunctionalAssessment.Wetlandsconstructed

tomitigateforhighwayprojectrelatedimpactsweresurveyedandcompared,andlevelsofinvasivecoverandwildlife

functionswerecomparedtonaturalwetlands.Projectresponsibilitiesincludedidentifyingandselectingstudysites,

conductingsurveys,semiquantitativeanalysis,reportwriting,andmanagingstaff.ProjectManager.

FloridaPowerandLight(20082010)SeabrookNuclearFacilityRelicensing.Reviewandsummarizeallterrestrial

ecologyissuesassociateswithfacilityconstructionandoperationswithafocusonthreatenedandendangeredspecies,

andimpactassessment;resultspresentedinanEnvironmentalReporttosupportrelicensing.TaskManager.

TheMountWashingtonResort(20072008)-DartmouthBrookHabitatAssessment.Providedexpertopinion

regardingthesuitabilityoftheresortspropertyforCanadalynxandAmericanmarten.Tasksincludedfield

assessmentoftheproperty,reviewofcurrentliterature,producingawrittenreportdetailinganalysisapproachand

findings,andongoingconsultationwithregulatingagencies.SeniorWildlifeEcologist.

U.S.Navy(2008)CascoBayFuelLineRemoval.WildlifestudiestosupportCorps404andMaineNRPApermitting

inBrunswickandHarpswell,ME.Conductedhabitatsurveyofprojectarea,wildlifehabitatmapping,fieldreviewand

impactassessment,withafocusofidentifyingsuitablehabitatforandpresenceofspecieslistedbytheStateofMaine

and/orUSFWS.Compiledresultsinareporttosupportalllocalandfederalpermittingefforts.SeniorWildlife

Ecologist.

MountSnowResort(2008)-Reviewallthreatenedandendangeredspeciesissuesassociatedwithasnowmaking

upgrade;analyzeimpactsandsummarizeresultsinaForestServiceBiologicalAssessmentandaNEPAEnvironmental

Assessment.SeniorWildlifeEcologist.

WasteManagement(2008)-CrossroadsLandfillDeerWinteringHabitatAssessment.Surveyofdeerwintering

areasassociatedwiththeCrossroadslandfilltodeterminevalueofhabitat.Compileresultsinletterreportsuitablefor

referenceinfutureexpansionplanningandpermitting.SeniorWildlifeEcologist.

Noble(2007)-GraniteReliableWindBreedingBirdSurveys.Oversawdesignandimplementationofbreedingbird

surveysatprojectarea.Managedstaffandconductedqualityassurancetasksforfieldactivitiesandreportwriting.

ManagingPrincipal.

NewHampshireAudubon(20052007)-NHRoute2WildlifeCrossingInvestigation.Designed,implementand

managedatrackingstudytoindentifythelocationswherewildlifecrossedthehighway,andtodeterminethe

characteristicsofpreferredcrossinglocations.TasksincludedextensivequantitativeandqualitativeanalysisofGIS

baseddatasets.PrincipleInvestigatorandProjectManager.



2

EXHIBIT TWO Sources Reviewed

1. Blake, K. 2010. Roseate (Sterna dougallii) and common tern (Sterna hirundo) use of staging sites during the post-breeding period in coastal Massachusetts. M.Sc. thesis, Antioch University, Keene, New Hampshire. 87 pp.
2. DOI (Department of the Interior). 1987. Endangered and Threatened Wildlife and Plants; Determination of Endangered and Threatened Status for Two Populations of the Roseate Tern, Final Rule. 52 Fed. Reg. 42064.
3. Entergy. 2012. Marine Ecology Studies Pilgrim Nuclear Power Station. Report No. 79.

Report Period: January 2011 - December 2011. Chemistry Dept. -Environmental Group, Entergy Nuclear-Pilgrim Station, Plymouth, MA.

4. EPA (Environmental Protection Agency). 2004. Technical Development Document for the Final Section 316(b) Phase II Existing Facilities Rule. Attachment A to Chapter 4:

Cooling Water Intake Structure Technology Fact Sheets. EPA Document Number 821R04007.

5. EPRI. 2000. Review of entrainment survival studies: 1970 - 2000. Electric Power Research Institute, Palo Alto, CA. Technical Report 1000757.
6. Friedlaender, A.S., E.L. Hazen, D.P. Nowacek, P.N. Halpin, C. Ware, M.T. Weinrich, T.

Hurst, D. Wiley. 2009. Diel changes in humpback whale Megaptera novaeangliae feeding behavior in response to sand lance Ammodytes spp. behavior and distribution.

Marine Ecology Progress Series 395:91-100.

7. Gochfeld, M., J. Burger, and I.C. Nisbet. 1998. Roseate Tern (Sterna dougallii), The Birds of North America Online (A. Poole, Ed.). Ithaca, Cornell Lab of Ornithology.

Retrieved from the Birds of North America Online:

http://bna.birds.cornell.edu/bna/species/370. Accessed on May 10, 2012.

8. Goyert, Holly. 2010. Offshore foraging behavior and ecology of roseate (Sterna dougallii) and common terns (S. hirundo). 37th Annual Meeting of the Pacific Seabird Group February 17, 2010.
9. Hain, J.H.W., G.R. Carter, S.D. Kraus, C.A. Mayo, and H.E. Winn. 1982. Feeding behavior of the humpback whale, Megaptera novaeangliae, in the western North Atlantic. Fish. Bull., 80(2):259-268.
10. Hammill, M.O. and G.B. Stenson. 2000. Estimated prey consumption by harp seals (Phoca groenlandica), hooded seals (Cystophora cristata), grey seals (Halichoerus grypus) and harbour seals (Phoca vitulina) in Atlantic Canada. J. Northwest Atlantic Fisheries Science 26:1-23.

2

11. Hazen, E.L., A.S. Friedlaender, M.A. Thompson, C.R. Ware, M.T. Weinrich, P.N.

Halpin, D.N. Wiley. 2009. Fine-scale prey aggregations and foraging ecology of humpback whales, Megaptera novaeangliae. Marine Ecology Progress Series 395:75-89.

12. Heinemann, D. 1992. Foraging ecology of Roseate terns breeding on Bird Island, Buzzards bay, Massachusetts. Final report. 55 pp.
13. Høstgaard-Jensen, P., Klitgaard, J., Pedersen, K.M. 1977. Chlorine Decay in Cooling Water and Discharge into Seawater. Journal Water Pollution Control Federation, 49:1832-1841.
14. MADFW (Massachusetts Division of Fisheries and Wildlife). 2011. Buzzards Bay Tern Restoration Project, available at:

http://www.mass.gov/dfwele/dfw/nhesp/conservation/birds/tern_restoration.htm (Updated Feb. 16, 2011).

15. Meyer, Thomas L., Richard A. Cooper, and Richard W. Langton. 1979. Relative abundance, behavior, and food habits of the American sand lance, Ammodytes americanus, from the Gulf of Maine. Fishery Bulletin 77(1):243-253.
16. Mostello, C.S. 2007. Roseate Tern (Sterna dougallii) Fact Sheet. Massachusetts Division of Fisheries and Wildlife, Natural Heritage Endangered Species Program. 4pp.
17. MRI (Marine Research, Inc.). 1983. Assessment of finfish survival at Pilgrim Nuclear Power Station, 1982. Submitted to Boston Edison Company, Boston, MA. 38 pp.
18. NEFSC (Northeast Fisheries Science Center). 2008. Assessment of 19 Northeast Groundfish Stocks through 2007. Report of the 3rd Groundfish Assessment Review Meeting (GARM III), Northeast Fisheries Science Center, Woods Hole, Massachusetts, August 4-8, 2008. Northeast Fisheries Science Center Reference Document, 08-15 ; 884 p + xvii.
19. NEFSC. 2011. 51st Northeast Regional Stock Assessment Workshop (51st SAW)

Assessment Report. US Dept Commer, Northeast Fish Sci Cent Ref Doc. 11-01; 70 p.

20. Overholtz W.J. and Nicholas J.R. (1979). "Apparent feeding by the fin whale, Balaenoptera physalus, and humpback whale, Megaptera novaeangliae, on the American sand lance, Ammodytes americanus, in the Northwest Atlantic". Fish. Bull., 77: 285-287.
21. Payne, P. M., J. R. Nicolas, L. OBrien, and K. D. Powers. 1986. The distribution of the humpback whales Megaptera novaeangliae on Georges Bank and in the Gulf of Maine in relation to densities of the sand eel Ammodytes americanus. Fish. Bull. 84:271í277.
22. Payne, P.M., D.N. Wiley, S.B. Young, S. Pittman, P.J. Clapham, J.W. Jossi. 1990.

Recent fluctuations in the abundance of baleen whales in the southern Gulf of Maine in relation to changes in selected prey. Fish. Bull., 88(4):687-696.

3

23. Robbards, M.D, Willson, M.F., Armstrong, R.H, and Piatt, J.F. 1999. Sand Lance: A Review of Biology and Predator Relations and Annotated Bibliography. Res. Pap. PNW-RP-521. Portland, OR: U.S. Department of Agriculture, Forest Service, Pacific Northwest Research Station.
24. Roman, J. and McCarthy, J.J. 2010. The Whale Pump: Marine Mammals Enhance Primary Productivity in a Coastal Basin. PLoS ONE 5(10):e13255. Doi:10.1371.
25. Safina, C. 1990. Foraging habitat partitioning between roseate and common terns. Auk 107:351 to 358.
26. Shealer, D.A. and S.W. Kress. 1994. Post-breeding movements and prey selection of roseate terns at Stratton Island, Maine. Journal of Field Ornithology 65(3):349-362.
27. TRAC (Transboundary Resources Assessment Committee). 2009. Status Report: Gulf Of Maine-Georges Bank Herring Stock Complex.
28. Trull, P., S. Hecker, M.J. Watson, and I.C.T. Nisbet. 1999. Staging of roseate terns Sterna dougallii in the post-breeding period around Cape Cod, Massachusetts, United States. Atlantic Seabirds 1: 145 to 158.
29. Wang, J., Chen M., Lee H., Chen, C., Pai, S., and Meng, P. 2008. A Model to Predict Total Chlorine Residue in the Cooling Seawater of a Power Plant Using Iodine Colorimetric Method. Int J Mol Sci., 9(4): 542-553.
30. Weinrich, M.T., Schilling, M.R. and Belt, C.R. 1992. Evidence for acquisition of a novel feeding behaviour: lobtail feeding in humpbackwhales, Megaptera novaeangliae, Animal Behaviour, 44(6): 1059-1072.
31. Weinrich, Martin T., R. Griffiths, J. Bove, M. Schilling. 1997. A shift in distribution of humpback whales, Megaptera novaeangliae, in response to prey in the southern Gulf of Maine. Fish. Bull., 95:826-836.
32. US FWS (U.S. Fish and Wildlife Service). 1998. Roseate Tern (Sterna dougalii)

Northeastern Population Recovery Plan.

33. US FWS. 2010. Caribbean Roseate Tern and North Atlantic Roseate Tern (Sterna dougallii dougallii). 5-Year Review: Summary and Evaluation. 148 pp.
34. Uttley, J., P. Monaghan, and S. White. 1989. Differential effects of reduced sand eel availability on two sympatrically breeding species of tern. Ornis Scandinavica 20(4):273-277.



4

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of Docket No. 50-293-LR ASLBP No. 06-848-02-LR Entergy Nuclear Generation Company Entergy Nuclear Operations, Inc.

(Pilgrim Nuclear Power Station)

AFFIDAVIT OF JACOB J. SCHEFFER IN SUPPORT OF ENTERGYS ANSWER OPPOSING JONES RIVER WATERSHED ASSOCIATIONS AND PILGRIM WATCHS MOTION TO REOPEN HEARING REQUEST ON CONTENTION RELATED TO THE ROSEATE TERN I, Jacob J. Scheffer, do hereby depose and state, on the basis of personal knowledge, and under penalties of perjury, that:

1. I am Chemistry Supervisor for Entergy Nuclear Operations, Inc., the operating entity for the Pilgrim Nuclear Power Station (PNPS or the Station), which is located in Plymouth, Massachusetts and is owned by Entergy Nuclear Generation Company (collectively, Entergy). I have held this position since June 2008. Prior to that time, I served as Superintendent of Environmental Protection for PNPS (October 1999-June 2007), a position in which I held substantially the same responsibilities as my current role. From 1970 until October 1999, when Entergy acquired PNPS, I was employed by Boston Edison Company (BECO),

where, for close to three decades, I served in a variety of environmental and engineering roles at various BECO facilities, including at PNPS.

2. As Chemistry Supervisor, I oversee PNPSs compliance with local, state and federal environmental regulations, including, without limitation, all environmental monitoring performed in accordance with the Federal Clean Water Act, 33 U.S.C. § 1251 et seq., the

Massachusetts Clean Water Act, M.G.L. ch. 21, 26-53, and the Stations National Pollution Discharge Elimination System permit (the NPDES Permit or the Permit), as well as all reporting provided to the United States Environmental Protection Agency (USEPA), the Massachusetts Department of Environmental Protection (MADEP), and any other local, state and federal regulators in connection with same. As such, I have personal knowledge regarding the Stations operations, its NPDES Permit, the effluent limitations, monitoring requirements, and other conditions authorized or required under that Permit, and any relevant discharge monitoring reports that may be submitted in connection with same.

3. I have reviewed the Motion to Reopen, Request for Hearing and Permission to File New Contention in Above-Captioned License Renewal Proceeding on Violations of the Endangered Species Act with Regard to the Roseate Tern (the Motion), which was filed by Jones River Watershed Association and Pilgrim Watch (collectively, JRWA) on May 2, 2012, and which alleges certain deficiencies in the Nuclear Regulatory Commissions (NRC) evaluation of the potential impact (assuming any) of continued PNPS operations on the roseate tern, an ESA-listed species, during the relicensing period. In support of this Motion, JRWA makes certain incomplete and/or erroneous statements concerning the Stations operations, its NPDES-regulated discharges, and the NPDES Permit itself. I am providing this Affidavit to correct and clarify those statements, including those concerning the incidence and perceived magnitude of any chlorine discharges by PNPS into Cape Cod Bay (alternatively, the Bay).

Description of PNPS and Its Cooling Water Intake System

4. PNPS is a nuclear power generating facility consisting of a single boiling water reactor and associated steam-electric and auxiliary systems. PNPS continuously generates power at a rated capacity of approximately 680 net MWe (711 gross MWe), which is enough electricity for approximately 550,000 homes in Massachusetts.

2

5. PNPS was designed for and actually utilizes once-through cooling This means that sea water is drawn from an intake embayment created by two large breakwaters, the walls of which effectively separate the embayment from the open waters of Cape Cod Bay at all points except an approximate 800 foot opening to the inlet. Once water is drawn into the Station through an intake structure, a series of pumps direct the water to either the Stations Circulating Water System (CWS) or its (Salt) Service Water System (SWS).1 As its name suggests, the purpose of the CWS is to remove heat from the Stations condenser; the primary purpose of the SWS, on the other hand, is to provide cooling water for the Stations heat exchangers, which act as the Stations safety-related ultimate heat sink (though the SWS is also one of the two water sources for PNPSs marine screen wash system). Once it has passed through the SWS or CWS, effluent from both systems flows to a 900-foot long discharge canal located northwest of the intake structure. Like the intake embayment, the discharge canal is created by two man-made breakwaters (one of which is shared with the intake embayment).

Upon entry into the discharge canal, effluent from the CWS and SWS systems merge and become fully mixed prior to discharge into the Bay, though the CWS is the larger of the two systems, and therefore typically discharges approximately thirty (30) to sixty (60) times the water volume discharged by the much smaller SWS, depending on the number of circulating and service water pumps in service at any given time.2 The temperature of the effluent upon discharge to Cape Cod Bay is typically between 85-95 degrees Fahrenheit in the summer, but in any event below the 102 degrees Fahrenheit limit authorized by the Stations NPDES Permit.

NPDES Permit at Part A.2.a (NRC ADAMS Accession No. ML061420166).

1 The intake structure houses two circulating water pumps and five service water pumps, though the number of service water pumps in operation at any given time is dictated by operational needs and ambient environmental conditions.

2 Indeed, even under those infrequent circumstances when CWS flow is at its lowest (e.g., during an outage, when only one circulating water pump and five service water pumps might be in service), the discharge volume from the CWS still outpaces SWS discharge volume by a full 12.5 to 1.

3

The NPDES Permit and Relevant NPDES-Regulated Discharges

6. Since at least 1975, PNPS continuously has conducted its operations subject to an NPDES Permit jointly issued (and repeatedly renewed) by USEPA and MADEP. The current NPDES Permit (Permit No. MA0003557), like its predecessors, sets out a variety of operational, monitoring, and reporting requirements that, consistent with the federal Clean Water Act (33 U.S.C. § 1251 et seq.) and applicable Massachusetts law, regulate the Stations discharge of effluent into Cape Cod Bay, satisfy Massachusetts water quality standards, and safeguard the aquatic ecosystem and biota of the Bay. See NPDES Permit at 1. In furtherance of those goals, PNPSs NPDES Permit sets forth, among other things, maximum daily and average monthly concentration limits for any residual chlorine which may be discharged from the CWS (referenced in the NPDES Permit as Outfall # 001) and/or the SWS (referenced in same as Outfall # 010). NPDES Permit at Parts A.2.a and A.5.a. The Permit further regulates the Stations thermal backwashes (as discussed more fully below). Id. at Part A.3.
7. JRWA alleges in its Motion that the Stations Clean Water Act NPDES permit expired 16 years ago. Motion at 21. This statement - which implies, either purposefully or inadvertently, that PNPS has been operating in violation of the Clean Water Act - is incomplete and misleading. To the contrary, and as confirmed by USEPA via written correspondence on multiple occasions, the Stations NPDES Permit has been administratively continued during the pendency of permit renewal proceedings, which USEPA acknowledges have been delayed through no fault of the Stations despite having filed a timely renewal application. See Correspondence from Jane Downing, USEPA to E.T. Boulette, Boston Edison (Mar. 1, 1996)

(attached hereto as Exhibit 1); Correspondence from Olga Vergara, USEPA to Jacob Scheffer, Entergy (Dec. 2 1999) (attached hereto as Exhibit 2); Correspondence from David M. Webster, USEPA to Jacob Scheffer, Entergy (Oct. 25, 2004) (attached hereto as Exhibit 3); see also 5 4

U.S.C. § 558(c) (When the licensee has made timely and sufficient application for a renewal or a new license in accordance with agency rules, a license with reference to an activity of a continuing nature does not expire until the application has been finally determined by the agency.). As such, the conditions and limitations of the most recent NPDES Permit remain valid and in full force and effect.

a. NPDES-Regulated Chlorination of the CWS and SWS
8. In order to control biofouling, PNPS utilizes chlorine (sodium hypochlorite) as a biocide for its CWS and SWS. No other biocide is used in the operating systems at PNPS.

Sodium hypochlorite is intended to and actually rapidly dissipates during its use, with dissipation accelerated through heat and sunlight. Nonetheless, the use, and subsequent discharge, of any residual chlorine concentration in PNPSs effluent is conducted subject to and with the benefit of its NPDES Permit.

9. Specifically, pursuant to the Stations NPDES Permit, chlorination of the CWS is limited to a maximum of two hours per day (although the chlorination schedule is variable and dependent on environmental and operational conditions, ranging from once a day to once a week). Chlorination is further limited to a Total Residual Oxidant (TRO) concentration of 0.10 mg/L in the Station discharge prior to release into Cape Cod Bay, and is stricter than the federal effluent limitation guideline of 0.20 mg/L set by USEPA. See 40 C.F.R. § 423.13(b)(1).

While continuous chlorination of the SWS is permitted in accordance with the NPDES Permit, the Station is limited to a monthly average TRO of 0.50 mg/L, as well as a maximum daily concentration of 1.0 mg/L.

10. In compliance with its NPDES monitoring and reporting requirements, PNPS carefully monitors TRO concentrations in the CWS and SWS. For example, during CWS chlorination, personnel at the Station take baseline measurements both before and after 5

chlorination in order to ensure the TRO concentration is undetectable (i.e., <0.02 mg/L) except during the period of chlorine injection. They also take grab samples at the discharge canal every ten (10) to fifteen (15) minutes during chlorination, to monitor compliance with NPDES Permit limits. As such, the Station takes no less than eight (8) analytical chlorine readings during a typical CWS chlorination period (assuming a maximum two-hour run).

11. Similarly, Station personnel monitor chlorine levels in the SWS closely. In fact, the water used in that system is tested no less than twice daily when chlorination is in service, with sampling performed downstream of the heat exchangers (i.e., before the service cooling water has left the auxiliary building or mixed with cooling water from the CWS in the discharge canal) in compliance with the NPDES Permit. See Correspondence from Jane Downing, USEPA to E.T. Boulette, Boston Edison re: Pilgrim Nuclear Power Station, NPDES Permit No.

MA0003557, Sampling of Service Salt Water System (Aug. 26, 1998) (attached hereto as Exhibit 4) (authorizing twice daily sampling during chlorination at the SWS).

12. Pursuant to its NPDES Permit, Entergy documents the results of all chlorine discharge monitoring performed at PNPS in its Discharge Monitoring Reports (DMRs), which are submitted to USEPA and MADEP on a monthly basis.3 These DMRs are organized by discharge/outfall point, and also contain a written summary of the Stations discharge data. As such, these reports provide a reliable snapshot of the sampling performed at PNPS on a daily and monthly basis. A review of those reports confirms, contrary to JRWAs assertions (Motion at 22

& n. 20), that NPDES Permit exceedances of chlorine concentrations discharged from the CWS and SWS are exceedingly rare.

3 For ease of reference, a representative example of a DMR for PNPS is attached hereto as Exhibit 5. Copies of additional DMRs, as discussed in this Affidavit, will be provided upon request.

6

13. Indeed, in the last ten years (2002-2011),4 and as summarized in the attached Exhibit 6, PNPS has documented only two (2) instances in which the chlorine concentration in the CWS exceeded the instantaneous maximum permitted level of 0.1 mg/L. Those two exceedances, which occurred on February 3, 2005 (peak TRO of 0.14 mg/L) and December 14, 2011 (peak TRO of 0.18 mg/L), were each the result of minor and unanticipated equipment malfunctions, and each was less than twenty (20) minutes in duration. See Exhibit 6.

Furthermore, it is worth noting that both exceedances, while over the NPDES Permit limit, were well under the 0.2 mg/L federal effluent limitation guidelines set by USEPA. See 40 C.F.R. § 423.13(b)(1) (providing the federal standard for total residual chlorine). Given the brief duration and low concentrations involved with these two exceedances, the amount of residual chlorine discharged into the Bay is expected to have been minimal.

14. In that same ten year period, and as summarized in Exhibit 6, PNPS has documented only six (6) individual instances (out of literally thousands of sampling events) in which the chlorine concentration, as measured at the SWS, exceeded the daily maximum authorized limit of 1.0 mg/L. However, while those measurements reflect the chlorine concentration at the time of testing inside the SWS (i.e., an internal stream), they do not correlate to actual discharge levels into the Bay, which were in compliance with end point TRO limits during each of these occurrences. First, as mentioned above, prior to emptying into the Bay, water from the SWS (outfall # 010) must first travel to and through the main discharge canal, where it mixes with - and is substantially diluted by - the much more voluminous flow from the CWS (outfall # 001). As such, even assuming the Station were operating under maximum SWS and minimum CWS flow conditions, any residual chlorine concentration in the SWS would be 4

As evidenced by the Stations DMRs, there have been no chlorine concentration exceedances from the SWS or CWS outfalls in 2012.

7

reduced by a minimum factor of 12.5 to 1 prior to the point of discharge into Cape Cod Bay. In actual operations, and as a function of the variability of the Stations service pump needs (which can further reduce the volume of water circulating through the SWS), however, the dilution factor is typically much greater, ranging from 30:1 to 60:1. Furthermore, upon mixing with water from the CWS, any residual chlorine concentration in the service water is subject to chlorine decay or chlorine demand, whereby chlorinated water reacts with substances in unchlorinated water and spontaneously accelerates the TRO concentration reductions. As a result of these two factors, any residual chlorine in the SWS water stream is effectively reduced or eliminated before the point of discharge into Cape Cod Bay, such that the concentration prior to entering the Bay is typically undetectable, and is always at or below the stricter 0.1 mg/L ceiling set for circulating water in the Stations NPDES Permit. This is equally true for each of the six (6) chlorination Permit exceedances reported from the SWS outfall in the past decade. 5 See e.g., Exhibit 5; supra Footnote 3.

b. Thermal Backwashes
15. JRWA also implies in its Motion, without precise citation, that the Stations backwash operations may pose a significant threat to roseate terns. Motion at 21. But, in fact, this is incorrect. As an initial matter, thermal backwashes are performed as a further prophylactic measure to control biofouling in the intake structure, and thereby reduce the Stations chlorination needs. During a thermal backwash, the flow of water through the CWS is re-routed such that water is taken in on one side and discharged through the other side of the intake structure. All thermal backwashes are conducted in accordance with PNPSs NPDES 5

It is worth noting that the Station has also occasionally experienced non-conformances with the NPDES requirement to dechlorinate the fish sluice water (outfall #003) as discussed in its DMRs and the Supplemental Final Environmental Impact Statement (FSEIS). NRC, Generic Environmental Impact Statement for License Renewal of Nuclear Power Plants, Supplement 29 Regarding Pilgrim Nuclear Power Station, Final Report, Docket 5-293, at p. 4-5 (2007); see Exhibit 6.

8

Permit, which provides limitations on frequency, effluent temperature and flow (NPDES Permit MA 0003557 at Part A.3).

16. Furthermore, the conditions created by a thermal backwash are not only environmentally limited, but actually represent a net reduction in thermal discharges. Thermal backwashes are a relatively infrequent occurrence at PNPS, conducted only three to five times per year. They are also relatively short in duration, typically lasting only two hours each from start to finish. Importantly, while effluent temperatures are elevated to approximately 110 degrees (and always less than 120 degrees) Fahrenheit during a thermal backwash, the flow is reduced by half, such that it results in an overall reduction in the total thermal effluent load released from the Station. Studies further indicate that the thermal plume created by the Stations backwashing operations is highly localized and surface-oriented in nature.

Specifically, a thermal survey performed in 1977 to determine the effects of thermal backwashes at PNPS found that the procedure produced a relatively thin thermal plume at the surface, averaging three (3) to five (5) feet in depth, that spread from the intake structure across the western end of the intake embayment and along the breakwater, and completely dissipated within a few hours. Normandeau Associates, Inc. (1977) Thermal Surveys of Backwashing Operations at Pilgrim Station During July 1977.

c. Allegations Concerning Other Pollutants
17. JRWA also raises allegations in its Motion concerning the discharge of metals and corrosion inhibitor by PNPS. Motion at 21. More specifically, JRWA asserts, without citation to a source document, that [s]ince PNPS uses a corrosion inhibitor, and had to almost entirely replace corroded pipes in about 1984, corrosion of metal piping is obviously an issue at the facility. Id. at 21-22. The metals about which JRWA purports to raise concern are copper, zinc and chromium. Id.

9

18. As an initial matter, the tubing in PNPSs cooling water condenser system is comprised entirely of elemental titanium, and has been since 1977, when the entire tubing configuration in the condenser was replaced. Titanium is highly resistant to sea water corrosion, and in any event, does not contain copper, zinc, or chromium. Furthermore, JRWAs reference to the replacement of certain other metal piping in 1984 is wholly inapposite, as the piping in question was used for internal water recirculation only, and as such did not make contact with or discharge into Cape Cod Bay or any other surface water in or around PNPS. Entergy also is not aware of any corrosion issues relative to its SWS system. Indeed, as stated in the Stations NPDES Permit Renewal Application, zinc, copper, and chromium are all believed to be absent from the Stations regularly discharged effluent. See Correspondence from J.F. Alexander, Entergy to Kevin McSweeney, USEPA, re: NPDES Permit Renewal Application - Pilgrim (Dec.

1, 1999) (NRC ADAMS Accession No. ML993430072); Correspondence from E.T. Boulette, Boston Edison to Kevin McSweeney, USEPA re: NPDES Permit Renewal Application (Oct. 25, 1995) (cover letter for which is attached hereto as Exhibit 7). There have been no substantive changes or modifications to PNPS operations that would alter this conclusion since the time of that submission.

19. Pursuant to and as authorized by the USEPA, see Correspondence from Edward K. McSweeny, USEPA to E.T. Boulette, Boston Edison re: Pilgrim Nuclear Power Station, NPDES Permit No. MA0003557, Use of Tolytriazole [sic] as a Corrosion Inhibitor (June 30, 1995) (attached hereto as Exhibit 8), the Station does utilize Tolyltriazole (a corrosion inhibitor) in the facilitys heating system, however that is largely an internal, processed water system which does not circulate to the discharge canal, save for once annually during planned, routine maintenance. In the past, and as reported in the DMRs, Tolyltriazole was occasionally discharged in diluted concentrations well below USEPA approved limits through either outfall 10

011 (the neutralizing sump) or outfall 010 (the SWS) as a result of minor, erosion-related leaks from the Stations Turbine Building Closed Cooling Water (TBCCW) and Reactor Building Closed Cooling Water (RBCCW) systems, each of which has been corrected.

I declare under penalty of perjury that the foregoing is true and correct.

Executed in Accord with 10 C.F.R. § 2.304(d)

Jacob J. Scheffer Chemistry Supervisor Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Phone: 508-830-8323 E-mail: jscheff@entergy.com 11

EXHIBIT ONE

EXHIBIT TWO

EXHIBIT THREE

EXHIBIT FOUR

EXHIBIT FIVE

EXHIBIT SIX Pilgrim Nuclear Power Station:

Circulating Water System (CWS) and (Salt) Service Water System (SWS), and Fish Sluice Water (FSW) Chlorination Exceedances for 2002-20111 Date System Maximum Concentration 05/25/2002 FSW <0.1 mg/l*

11/11/2002 FSW 0.12 mg/l 2/3/2005 CWS 0.18 mg/l 1/5/2006 FSW 0.08 mg/l 2/2/2006 FSW 1.1 mg/l 7/19/2006 FSW <0.5 mg/l*

8/16/2006 FSW <0.5 mg/l*

8/16/2006 SWS 1.05 mg/l 9/20/2006 FSW <0.4 mg/l*

10/15/2006 FSW <0.5 mg/l*

2/19/2008 SWS 1.25 mg/l 1/27/2009 FSW 0.38 mg/l 2/10/2010 FSW 0.74 mg/l 1

Exceedances are based on a review of Discharge Monitoring Reports (DMRs) submitted monthly to the United States Environmental Protection Agency (USEPA) and Massachusetts Department of Environmental Protection (MADEP) between 2002-2011.

2

3/31/2010 SWS 1.03 mg/l 10/29/2010 FSW 0.22 mg/l 11/27/2010 SWS 2.4 mg/l 4/5/2011 SWS 1.3 mg/l 7/20/2011 SWS 1.15 mg/l 12/14/2011 CWS 0.14 mg/l

  • Estimated concentrations.

3

EXHIBIT SEVEN

EXHIBIT EIGHT

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of )

)

Entergy Nuclear Generation Company and ) Docket No. 50-293-LR Entergy Nuclear Operations, Inc. ) ASLBP No. 06-848-02-LR

)

(Pilgrim Nuclear Power Station) )

CERTIFICATE OF SERVICE I hereby certify that copies of Entergys Answer Opposing Jones River Watershed Associations and Pilgrim Watchs Motion to Reopen and Hearing Request on Contention Related to the Roseate Tern, dated May 16, 2012, was provided to the Electronic Information Exchange for service on the individuals below, this 16th day of May, 2012.

Secretary Office of Commission Appellate Adjudication Attn: Rulemakings and Adjudications Staff Mail Stop O-16 C1 Mail Stop O-16 C1 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 OCAAmail@nrc.gov hearingdocket@nrc.gov Administrative Judge Atomic Safety and Licensing Board Ann Marshall Young, Esq., Chair Mail Stop T-3 F23 Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Mail Stop T-3 F23 Washington, DC 20555-0001 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Ann.Young@nrc.gov Administrative Judge Administrative Judge Dr. Richard F. Cole Dr. Paul B. Abramson Atomic Safety and Licensing Board Atomic Safety and Licensing Board Mail Stop T-3 F23 Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Richard.Cole@nrc.gov Paul.Abramson@nrc.gov 403470655v6

Susan L. Uttal, Esq. Matthew Brock, Assistant Attorney General Maxwell C. Smith, Esq. Commonwealth of Massachusetts Joseph A. Lindell, Esq. Office of the Attorney General Office of the General Counsel One Ashburton Place Mail Stop O-15 D21 Boston, MA 02108 U.S. Nuclear Regulatory Commission Martha.Coakley@state.ma.us Washington, DC 20555-0001 Matthew.Brock@state.ma.us Susan.Uttal@nrc.gov; Maxwell.Smith@nrc.gov; Joseph.Lindell@nrc.gov Ms. Mary Lampert Margaret Sheehan, Esq.

148 Washington Street 61 Grozier Road Duxbury, MA 02332 Cambridge, MA 02138 mary.lampert@comcast.net meg@ecolaw.biz Sheila Slocum Hollis, Esq. Mr. Mark D. Sylvia Duane Morris LLP Town Manager 505 9th Street, NW Town of Plymouth Suite 1000 11 Lincoln St.

Washington, DC 20006 Plymouth, MA 02360 sshollis@duanemorris.com msylvia@townhall.plymouth.ma.us Chief Kevin M. Nord Richard R. MacDonald Fire Chief and Director, Duxbury Emergency Town Manager Management Agency 878 Tremont Street 688 Tremont Street Duxbury, MA 02332 P.O. Box 2824 macdonald@town.duxbury.ma.us Duxbury, MA 02331 nord@town.duxbury.ma.us

/signed electronically by Timothy J. V. Walsh/

Timothy J. V. Walsh 2

403470655v6