ML15083A428: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 03/23/2015 | | issue date = 03/23/2015 | ||
| title = March 2015 - North Anna Generic Fundamentals Examination Results | | title = March 2015 - North Anna Generic Fundamentals Examination Results | ||
| author name = Guthrie E | | author name = Guthrie E | ||
| author affiliation = NRC/RGN-II/DRS/OLHPB | | author affiliation = NRC/RGN-II/DRS/OLHPB | ||
| addressee name = Standley B | | addressee name = Standley B | ||
| addressee affiliation = Virginia Electric & Power Co (VEPCO) | | addressee affiliation = Virginia Electric & Power Co (VEPCO) | ||
| docket = 05000338, 05000339 | | docket = 05000338, 05000339 | ||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 23, 2015 Virginia Electric and Power Company ATTN: Mr. Billy E. Standley Manager Nuclear Training North Anna Power Station 1022 Haley Drive Mineral, VA 23117 | ||
North Anna Power Station 1022 Haley Drive Mineral, VA 23117 | |||
==SUBJECT:== | ==SUBJECT:== | ||
NORTH ANNA - NRC GENERIC FUNDAMENTALS EXAMINATION RESULTS | NORTH ANNA - NRC GENERIC FUNDAMENTALS EXAMINATION RESULTS | ||
==Dear Mr. Standley:== | ==Dear Mr. Standley:== | ||
On March 4, 2015, the U.S. Nuclear Regulatory Commission (NRC) administered the generic fundamentals examination (GFE) of the written operator licensing examination to employees of your facility. Enclosed with this letter are copies of the final answer key, the grading results for your facility, and copies of individual answer sheets for each of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets. A | On March 4, 2015, the U.S. Nuclear Regulatory Commission (NRC) administered the generic fundamentals examination (GFE) of the written operator licensing examination to employees of your facility. Enclosed with this letter are copies of the final answer key, the grading results for your facility, and copies of individual answer sheets for each of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets. A PASS in the RESULTS column indicates that the individual achieved a passing grade of 80 percent or better on the GFE, while a FAIL indicates that the individual failed the examination. | ||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter without its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. | |||
In accordance with 10 CFR 2.390 of the | If you have any questions concerning this examination, please contact me at (404) 997-4662. | ||
Sincerely, | |||
Sincerely, | /RA/ | ||
Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos.: 50-338, 50-339 License Nos.: NPF-4, NPF-7 | |||
Eugene F. Guthrie, Chief | |||
Docket Nos.: | |||
==Enclosures:== | ==Enclosures:== | ||
(See Page 2) | (See Page 2) | ||
B. Standley | |||
B. Standley 2 | |||
==Enclosures:== | ==Enclosures:== | ||
: 1. Final Answer Key | : 1. Final Answer Key | ||
: 3. Individual Answer Sheets | : 2. Examination Results Summary | ||
: 3. Individual Answer Sheets cc w/o encls.: | |||
cc w/o encls.: | Virginia Electric and Power Company ATTN: Mr. Gerald T. Bischof Site Vice President North Anna Power Station 1022 Haley Drive Mineral, VA 23117 Virginia Electric and Power Company ATTN: Mr. Fred Mladen Plant Manager North Anna Power Station 1022 Haley Drive Mineral, VA 23117 | ||
Virginia Electric and Power Company ATTN: | |||
North Anna Power Station 1022 Haley Drive | |||
Mineral, VA 23117 Virginia Electric and Power Company ATTN: | |||
North Anna Power Station 1022 Haley Drive Mineral, VA 23117 | |||
ML15083A428 | ML15083A428 X SUNSI REVIEW COMPLETE OFFICE RII:DRS SIGNATURE EG NAME EGUTHRIE DATE 3/23/2015 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO}} |
Latest revision as of 14:00, 31 October 2019
ML15083A428 | |
Person / Time | |
---|---|
Site: | North Anna |
Issue date: | 03/23/2015 |
From: | Eugene Guthrie Operator Licensing and Human Performance Branch |
To: | Standley B Virginia Electric & Power Co (VEPCO) |
References | |
Download: ML15083A428 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 23, 2015 Virginia Electric and Power Company ATTN: Mr. Billy E. Standley Manager Nuclear Training North Anna Power Station 1022 Haley Drive Mineral, VA 23117
SUBJECT:
NORTH ANNA - NRC GENERIC FUNDAMENTALS EXAMINATION RESULTS
Dear Mr. Standley:
On March 4, 2015, the U.S. Nuclear Regulatory Commission (NRC) administered the generic fundamentals examination (GFE) of the written operator licensing examination to employees of your facility. Enclosed with this letter are copies of the final answer key, the grading results for your facility, and copies of individual answer sheets for each of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets. A PASS in the RESULTS column indicates that the individual achieved a passing grade of 80 percent or better on the GFE, while a FAIL indicates that the individual failed the examination.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter without its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
If you have any questions concerning this examination, please contact me at (404) 997-4662.
Sincerely,
/RA/
Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos.: 50-338, 50-339 License Nos.: NPF-4, NPF-7
Enclosures:
(See Page 2)
B. Standley 2
Enclosures:
- 1. Final Answer Key
- 2. Examination Results Summary
- 3. Individual Answer Sheets cc w/o encls.:
Virginia Electric and Power Company ATTN: Mr. Gerald T. Bischof Site Vice President North Anna Power Station 1022 Haley Drive Mineral, VA 23117 Virginia Electric and Power Company ATTN: Mr. Fred Mladen Plant Manager North Anna Power Station 1022 Haley Drive Mineral, VA 23117
ML15083A428 X SUNSI REVIEW COMPLETE OFFICE RII:DRS SIGNATURE EG NAME EGUTHRIE DATE 3/23/2015 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO