|
|
(One intermediate revision by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 01/11/2011 | | | issue date = 01/11/2011 |
| | title = Emergency Response Data System (ERDS) Changes | | | title = Emergency Response Data System (ERDS) Changes |
| | author name = Weber T N | | | author name = Weber T |
| | author affiliation = Arizona Public Service Co | | | author affiliation = Arizona Public Service Co |
| | addressee name = | | | addressee name = |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:10 CFR 50, Appendix E LAFIA subsidiary of Pinnacle West Capital Corporation. | | {{#Wiki_filter:10 CFR 50, Appendix E LAFIA subsidiaryof Pinnacle West CapitalCorporation. |
| Thomas N. Weber Department Leader Regulatory Affairs Tel, 623-393-5764 Mail Station 7636 Palo Verde Nuclear Fax 023-393-8442 PO Box 52034 Generating Station eo-mall Thomas.Weber2LWg gap§cm Phoenix, Arizona 06072-2034 102-06304-TNW/DFS January 11,2011 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 | | Thomas N.Weber Department Leader Regulatory Affairs Tel, 623-393-5764 Mail Station 7636 Palo Verde Nuclear Fax 023-393-8442 PO Box 52034 Generating Station eo-mall Thomas.Weber2LWg gap§cm Phoenix, Arizona 06072-2034 102-06304-TNW/DFS January 11,2011 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 |
|
| |
|
| ==Dear Sirs:== | | ==Dear Sirs:== |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2 and 3 Docket Nos. STN 50-528, 50-529, and 50-530 Emergency Response Data System (ERDS) Changes Pursuant to the requirements of 10 CFR 50, Appendix E, Section VI.3, "Maintaining the Emergency Response Data System," Arizona Public Service Company (APS) is submitting this letter to inform the NRC of changes to the PVNGS Emergency Response Data System (ERDS) link software scheduled to be implemented in February 2011.These changes will involve a conversion from a dial-up modem based system to a more reliable internet based system using a plant information server and NRC supplied Virtual Private Network (VPN) appliance. | | Palo Verde Nuclear Generating Station (PVNGS) |
| The NRC ERDS Resource desk was notified of this change via email dated April 2, 2010.During implementation of this change, the existing ERDS link will remain available and will not affect the plant's ability to activate the existing ERDS link if required.This information is being provided for compliance with 10 CFR 50, Appendix E, Section VI.3.b, which requires notification 30 days prior to any hardware or software changes that could affect the transmission format or computer communication protocol to the ERDS.No commitments are being made to the NRC by this letter. Should you need further information regarding this notification, please contact Russell A. Stroud, Licensing Section Leader, at (623) 393-5111.Sincerely, A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway *Comanche Peak *Diablo Canyon | | Units 1, 2 and 3 Docket Nos. STN 50-528, 50-529, and 50-530 Emergency Response Data System (ERDS) Changes Pursuant to the requirements of 10 CFR 50, Appendix E, Section VI.3, "Maintaining the Emergency Response Data System," Arizona Public Service Company (APS) is submitting this letter to inform the NRC of changes to the PVNGS Emergency Response Data System (ERDS) link software scheduled to be implemented in February 2011. |
| | These changes will involve a conversion from a dial-up modem based system to a more reliable internet based system using a plant information server and NRC supplied Virtual Private Network (VPN) appliance. The NRC ERDS Resource desk was notified of this change via email dated April 2, 2010. |
| | During implementation of this change, the existing ERDS link will remain available and will not affect the plant's ability to activate the existing ERDS link if required. |
| | This information is being provided for compliance with 10 CFR 50, Appendix E, Section VI.3.b, which requires notification 30 days prior to any hardware or software changes that could affect the transmission format or computer communication protocol to the ERDS. |
| | No commitments are being made to the NRC by this letter. Should you need further information regarding this notification, please contact Russell A. Stroud, Licensing Section Leader, at (623) 393-5111. |
| | Sincerely, A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway *Comanche Peak *Diablo Canyon |
| * Palo Verde o San Onofre | | * Palo Verde o San Onofre |
| * South Texas 0 Wolf Creek ,0 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Emergency Response Data System (ERDS) Changes Page 2 TNW/RAS/DFS/gat cc: E. E. Collins Jr.J. R. Hall L. K. Gibson M. A. Brown NRC Region IV Regional Administrator NRC NRR Senior Project Manager NRC NRR Project Manager NRC Senior Resident Inspector for PVNGS}} | | * South Texas 0 Wolf Creek ,0 |
| | |
| | ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Emergency Response Data System (ERDS) Changes Page 2 TNW/RAS/DFS/gat cc: E. E. Collins Jr. NRC Region IV Regional Administrator J. R. Hall NRC NRR Senior Project Manager L. K. Gibson NRC NRR Project Manager M. A. Brown NRC Senior Resident Inspector for PVNGS}} |
|
---|
Category:Letter
MONTHYEARML24295A0362024-10-23023 October 2024 Regulatory Audit Plan in Support of Relief Request No. 71; Resubmittal of Relief Request-30 ML24296B2152024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 03: Alternative Request Allowing Removal of the Lower Acceptance Criteria Threshold from Solenoid-Operated Valves ML24296B2142024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 02: Alternative Request Allowing Normally Closed Valves with a Safety Function to Close to Be Exercise Tested Once Per Refueling Cycle IR 05000528/20244022024-10-22022 October 2024 Security Baseline Inspection Report 05000528/2024402 and 05000529/2024402 and 05000530/2024402 ML24296B2172024-10-18018 October 2024 Submittal of Unit 1 Core Operating Limits Report, Revision 34, Unit 2 Core Operating Limits Report, Revision 26, and Unit 3 Core Operating Limits Report, Revision 3 ML24292A2192024-10-18018 October 2024 Core Operating Limits Report Revision 34, 26 and 33 ML24292A0322024-10-17017 October 2024 Th Refueling Outage Steam Generator Tube Inspection Report ML24285A2562024-10-11011 October 2024 License Renewal - Alloy 600 Management Program Plan Response to Request for Additional Information IR 07200044/20244012024-10-0808 October 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200044/2024401 ML24269A1542024-09-27027 September 2024 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Life-of-Plant Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 1 ML24262A0972024-09-23023 September 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000529/2024011) ML24241A2542024-08-28028 August 2024 Inservice Inspection Request for Information ML24241A2782024-08-28028 August 2024 License Amendment Request to Revise the Technical Specifications 3.5.1 and 3.5.2 Safety Injection Tank Pressure Bands, and to Use GOTHIC Code ML24240A2682024-08-27027 August 2024 Transmittal of Technical Specification Bases Revision 79 IR 05000528/20240052024-08-22022 August 2024 Updated Inspection Plan for Palo Verde Nuclear Generating Station - Units 1, 2, and 3 (Report 05000528/2024005, 05000529/2024005, 05000530/2024005) 05000530/LER-2024-001-01, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-08-21021 August 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24208A0612024-08-20020 August 2024 Issuance of Amendment Nos. 224, 224, and 224 Regarding Revision to Technical Specifications 3.5.1, 3.5.2 and 3.6.5 IR 05000528/20244042024-08-0808 August 2024 Cybersecurity Inspection Report 05000528/2024404, 05000529/2024404 and 05000530/2024404 ML24213A3232024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 71: Re-Submittal of RR-30 ML24213A3292024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 72: Re-Submittal of RR-39 IR 05000528/20240022024-07-29029 July 2024 Integrated Inspection Report 05000528/2024002 and 05000529/2024002 and 05000530/2024002 ML24173A3302024-07-24024 July 2024 Pressurizer Surge Line Inspection Program ML24159A4702024-07-17017 July 2024 Issuance of Amendment Nos. 223, 223, and 223 Revision to Technical Specifications 3.5.1 and 3.5.2 Using Risk Informed Process for Evaluations ML24198A0662024-07-16016 July 2024 Program Review - Simulator Testing Methodology ML24193A3442024-07-11011 July 2024 Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R24 ML24129A0522024-07-0303 July 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report ML24177A3212024-06-25025 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX180, AMZDFX181, AMZDFX182 Vertical Concrete Cask Identification Nu 05000530/LER-2024-002, Invalid Specified System Actuation of Train B Emergency Diesel Generator2024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator IR 05000528/20240042024-06-25025 June 2024 Notification of Inspection (NRC Inspection Report 05000528/2024004, 05000529/2024004, 05000530/2024004) ML24177A3222024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24170A9962024-06-18018 June 2024 Response to Second Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown a IR 05000528/20243012024-06-17017 June 2024 NRC Examination Report 05000528/2024301; 05000529/2024301; 05000530/2024301 ML24129A2062024-06-14014 June 2024 Issuance of Amendment Nos. 222, 222, and 222 Revision to Technical Specifications to Adopt TSTF-266-A 05000530/LER-2024-001, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-06-0505 June 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24159A0262024-06-0303 June 2024 Annual Report of Guarantee of Payment of Deferred Premium 05000529/LER-2024-001, Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater2024-05-23023 May 2024 Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater ML24135A2482024-05-14014 May 2024 Response to Second Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24164A2582024-05-0909 May 2024 10-PV-2024-04 Post-Exam Comments ML24128A2702024-05-0707 May 2024 Docket Nos. Stn 50-528/529/530 - Response to NRC Regulatory Issue Summary (RIS) 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24129A1482024-05-0707 May 2024 And Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Casks with Applied Changes IR 05000528/20240012024-05-0202 May 2024 Independent Spent Fuel Storage Installation, Integrated Inspection Report 05000528/2024001, 05000529/2024001, 05000530/2024001, 07200044/2024001, and Exercise of Enforcement Discretion ML24119A0022024-04-26026 April 2024 2023 Annual Environmental Operating Report ML24116A2082024-04-24024 April 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2023 IR 05000528/20244012024-04-22022 April 2024 Security Baseline Inspection Report 05000528/2024401 and 05000529/2024401 and 05000530/2024401 (Cover Letter) ML24109A0712024-04-22022 April 2024 NRC Initial Operator Licensing Examination Approval 05000528/2024301, 05000529/2024301, and 05000530/2024301 ML24112A0012024-04-19019 April 2024 Core Operating Limits Report, Revision 32 ML24108A1982024-04-16016 April 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Casks with Applied Changes Authorized by an Amended Certificate of Compliance ML24103A2482024-04-12012 April 2024 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2023 ML24131A0972024-04-10010 April 2024 Annual Radiological Environmental Operating Report 2023 ML24096A2202024-04-0505 April 2024 Transmittal of Technical Specification Bases Revision 78 2024-09-27
[Table view] Category:Emergency Preparedness-Emergency Plan
MONTHYEARML22173A0872022-06-21021 June 2022 Generation Station (Pvngs), Units 1, 2, and 3 and Independent Spent Fuel Storage Installation - PVNGS Emergency Plan, Revision 73 ML22091A3072022-04-0101 April 2022 Independent Spent Fuel Storage Installation (Isfsi), Evacuation Time Estimate Study ML21203A1382021-07-22022 July 2021 Generation Station (Pvngs), Units 1, 2, and 3 and Independent Spent Fuel Storage Installation - PVNGS Emergency Plan, Revision 70 ML21203A1522021-07-22022 July 2021 Generation Station (Pvngs), Units 1, 2, and 3 and Independent Spent Fuel Storage Installation - PVNGS Emergency Plan, Revision 71 ML21099A2722021-04-0909 April 2021 Generation Station, Units 1, 2, 3 and Independent Spent Fuel Storage Installation - Emergency Plan, Revision 69 ML21007A3842021-01-0707 January 2021 Generation Station (PVNGS) Units 1, 2, and 3, and Independent Spent Fuel Storage Installation - PVNGS Emergency Plan, Revision 68 ML20010F6062020-01-10010 January 2020 Independent Spent Fuel Storage, Emergency Plan, Revision 66 ML19346H6352019-12-12012 December 2019 PVNGS Emergency Plan, Revision 65 ML18341A1592018-12-0606 December 2018 Emergency Plan, Revision 63 ML18269A3622018-09-25025 September 2018 ISFSI - Emergency Plan, Revision 62 ML18172A0072018-06-12012 June 2018 Independent Spent Fuel Storage Installation - PVNGS Emergency Plan, Revision 61 ML18164A4032018-06-12012 June 2018 Independent Spent Fuel Storage Installation - Submittal of PVNGS Emergency Plan, Revision 61 ML17269A2642017-09-21021 September 2017 Enclosure 1: Palo Verde, Units 1, 2, and 3, and ISFSI - Emergency Plan, Revision 60 ML17264A6632017-09-21021 September 2017 ISFSI - Submittal of PVNGS Emergency Plan, Revision 60 ML17263B2482017-09-15015 September 2017 Independent Spent Fuel Storage Installation, Submittal of Emergency Plan, Revision 59 ML17263B2492017-09-15015 September 2017 Emergency Plan, Rev. 59. Part 2 of 2 ML17269A3342017-09-15015 September 2017 Emergency Plan, Rev. 59. Part 1 of 2 ML1102100242011-01-11011 January 2011 Emergency Response Data System (ERDS) Changes 2022-06-21
[Table view] |
Text
10 CFR 50, Appendix E LAFIA subsidiaryof Pinnacle West CapitalCorporation.
Thomas N.Weber Department Leader Regulatory Affairs Tel, 623-393-5764 Mail Station 7636 Palo Verde Nuclear Fax 023-393-8442 PO Box 52034 Generating Station eo-mall Thomas.Weber2LWg gap§cm Phoenix, Arizona 06072-2034 102-06304-TNW/DFS January 11,2011 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2 and 3 Docket Nos. STN 50-528, 50-529, and 50-530 Emergency Response Data System (ERDS) Changes Pursuant to the requirements of 10 CFR 50, Appendix E, Section VI.3, "Maintaining the Emergency Response Data System," Arizona Public Service Company (APS) is submitting this letter to inform the NRC of changes to the PVNGS Emergency Response Data System (ERDS) link software scheduled to be implemented in February 2011.
These changes will involve a conversion from a dial-up modem based system to a more reliable internet based system using a plant information server and NRC supplied Virtual Private Network (VPN) appliance. The NRC ERDS Resource desk was notified of this change via email dated April 2, 2010.
During implementation of this change, the existing ERDS link will remain available and will not affect the plant's ability to activate the existing ERDS link if required.
This information is being provided for compliance with 10 CFR 50, Appendix E, Section VI.3.b, which requires notification 30 days prior to any hardware or software changes that could affect the transmission format or computer communication protocol to the ERDS.
No commitments are being made to the NRC by this letter. Should you need further information regarding this notification, please contact Russell A. Stroud, Licensing Section Leader, at (623) 393-5111.
Sincerely, A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway *Comanche Peak *Diablo Canyon
- South Texas 0 Wolf Creek ,0
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Emergency Response Data System (ERDS) Changes Page 2 TNW/RAS/DFS/gat cc: E. E. Collins Jr. NRC Region IV Regional Administrator J. R. Hall NRC NRR Senior Project Manager L. K. Gibson NRC NRR Project Manager M. A. Brown NRC Senior Resident Inspector for PVNGS