CNS-15-048, Transmittal of 2014 Annual Radiological Environmental Operating Report: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:DUKE ENERGY, Kelvin Henderson Vice President Catawba Nuclear Station Duke Energy CNO1VP I 4800 Concord Road York, SC 29745 CNS-15-048 o:803.701.4251 f:803.701.3221 May 14, 2015 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001
{{#Wiki_filter:Kelvin Henderson DUKE ENERGY,                                                                                         Vice President Catawba Nuclear Station Duke Energy CNO1VP I 4800 Concord Road York, SC 29745 CNS-15-048                                                                                 o:803.701.4251 f:803.701.3221 May 14, 2015 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001


==Subject:==
==Subject:==
Duke Energy Carolinas, LLC Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413 and 50-414 2014 Annual Radiological Environmental Operating Report Pursuant to Catawba Nuclear Station Technical Specification 5.6.2 and Selected Licensee Commitment 16.11-16, please find enclosed the 2014 Annual Radiological Environmental Operating Report. This report covers operation of Catawba Units 1 and 2 during the 2014 calendar year.Any questions concerning this report should be directed to Cecil A. Fletcher II at (803) 701-3622.Sincerely, Kelvin Henderson Vice President, Catawba Nuclear Station Enclosure www.duke-energy.com U.S. Nuclear Regulatory Commission 2014 Annual Radiological Environmental Operating Report May 14, 2015 Page 2 xc (with enclosure):
Duke Energy Carolinas, LLC Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413 and 50-414 2014 Annual Radiological Environmental Operating Report Pursuant to Catawba Nuclear Station Technical Specification 5.6.2 and Selected Licensee Commitment 16.11-16, please find enclosed the 2014 Annual Radiological Environmental Operating Report. This report covers operation of Catawba Units 1 and 2 during the 2014 calendar year.
V. M. McCree Regional Administrator U.S. Nuclear Regulatory Commission  
Any questions concerning this report should be directed to Cecil A. Fletcher II at (803) 701-3622.
-Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 G. Edward Miller NRC Project Manager (CNS)U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 8 G9A Rockville, MD 20852 G. A. Hutto, IlI, Senior Resident Inspector U.S. Nuclear Regulatory Commission Catawba Nuclear Station}}
Sincerely, Kelvin Henderson Vice President, Catawba Nuclear Station Enclosure www.duke-energy.com
 
U.S. Nuclear Regulatory Commission 2014 Annual Radiological Environmental Operating Report May 14, 2015 Page 2 xc (with enclosure):
V. M. McCree Regional Administrator U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 G. Edward Miller NRC Project Manager (CNS)
U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 8 G9A Rockville, MD 20852 G. A. Hutto, IlI, Senior Resident Inspector U.S. Nuclear Regulatory Commission Catawba Nuclear Station}}

Latest revision as of 12:03, 31 October 2019

Transmittal of 2014 Annual Radiological Environmental Operating Report
ML15141A152
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 05/14/2015
From: Henderson K
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML15141A154 List:
References
CNS-15-048
Download: ML15141A152 (2)


Text

Kelvin Henderson DUKE ENERGY, Vice President Catawba Nuclear Station Duke Energy CNO1VP I 4800 Concord Road York, SC 29745 CNS-15-048 o:803.701.4251 f:803.701.3221 May 14, 2015 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001

Subject:

Duke Energy Carolinas, LLC Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413 and 50-414 2014 Annual Radiological Environmental Operating Report Pursuant to Catawba Nuclear Station Technical Specification 5.6.2 and Selected Licensee Commitment 16.11-16, please find enclosed the 2014 Annual Radiological Environmental Operating Report. This report covers operation of Catawba Units 1 and 2 during the 2014 calendar year.

Any questions concerning this report should be directed to Cecil A. Fletcher II at (803) 701-3622.

Sincerely, Kelvin Henderson Vice President, Catawba Nuclear Station Enclosure www.duke-energy.com

U.S. Nuclear Regulatory Commission 2014 Annual Radiological Environmental Operating Report May 14, 2015 Page 2 xc (with enclosure):

V. M. McCree Regional Administrator U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 G. Edward Miller NRC Project Manager (CNS)

U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 8 G9A Rockville, MD 20852 G. A. Hutto, IlI, Senior Resident Inspector U.S. Nuclear Regulatory Commission Catawba Nuclear Station