| issue date = 08/06/2010 | | issue date = 08/06/2010 | ||
| title = Response to Regulatory Issue Summary 2010-08, Preparation and Scheduling of Operator Licensing Examinations. | | title = Response to Regulatory Issue Summary 2010-08, Preparation and Scheduling of Operator Licensing Examinations. | ||
| author name = Allen B | | author name = Allen B | ||
| author affiliation = FirstEnergy Nuclear Operating Co | | author affiliation = FirstEnergy Nuclear Operating Co | ||
| addressee name = | | addressee name = | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:FENOC | {{#Wiki_filter:FENOC 5501 North State Route 2 FirstEnergyNuclear OperatingCompany Oak Harbor,Ohio 43449 Barry S. Allen 419-321-7676 Vice President- Nuclear Fax: 419-321-7582 August `6, 20 10 L-1 0-213 United States Nuclear Regulatory Commission Document Control Desk Washington,' D.C. 20555-0001 | ||
-Nuclear Fax: 419-321-7582 August `6, 20 10 L-1 0-213 United States Nuclear Regulatory Commission Document Control Desk Washington,' | |||
D.C. 20555-0001 | |||
==SUBJECT:== | ==SUBJECT:== | ||
Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Response to Regulatory Issue Summary 2010-08, "Preparation and Scheduling of Operator Licensing Examinations" The Davis-Besse Nuclear Power Station (DBNPS) is providing information in response to NRC Regulatory Issue Summary (RIS) 2010-08, "Preparation and Scheduling of Operator Licensing Examinations." The RIS requested licensees to voluntarily submit a response using NRC Form 536, "Operator Licensing Examination Data," to provide data for scheduling and preparation of operator licensing examinations. | |||
Attached is the completed NRC Form 536, which provides information through calendar year 2015 for Initial Operator License Examinations and through calendar year 2013 for Generic Fundamentals Examinations. | Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Response to Regulatory Issue Summary 2010-08, "Preparation and Scheduling of Operator Licensing Examinations" The Davis-Besse Nuclear Power Station (DBNPS) is providing information in response to NRC Regulatory Issue Summary (RIS) 2010-08, "Preparation and Scheduling of Operator Licensing Examinations." The RIS requested licensees to voluntarily submit a response using NRC Form 536, "Operator Licensing Examination Data," to provide data for scheduling and preparation of operator licensing examinations. Attached is the completed NRC Form 536, which provides information through calendar year 2015 for Initial Operator License Examinations and through calendar year 2013 for Generic Fundamentals Examinations. | ||
There are no regulatory commitments included in this letter. If there are any questions or if additional information is required, please contact Mr. Robert C. Hovland, Site Training Manager, at (4,19) 321-8406.Sincerely, Barry S.Allen GMW | There are no regulatory commitments included in this letter. If there are any questions or if additional information is required, please contact Mr. Robert C. Hovland, Site Training Manager, at (4,19) 321-8406. | ||
Sincerely, Barry S.Allen GMW | |||
==Attachment:== | ==Attachment:== | ||
NRC Form 536, "Operator Licensing Examination Data" cc: Regional Administrator, NRC Region III DB-1 NRC/NRR Project Manager DB-1 NRC Senior Resident Inspector Chief, Operations Branch, NRC Region III Utility Radiological Safety Board | |||
Attachment L-1 0-213 NRC Form NRC 536 Operator Licensing Examination Data (One page follows) | |||
.1 1 ý _A NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008) Estimated burden per response to comply with this voluntary information collection request: 1 hour. This information collection is used to plan budgets OPERATOR LICENSING and resources estimate to the for operator Records andexaminations. | |||
.1 1 ý _A NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008) | FOIA/PrivacySend comments Services Branchregardin burden (T-5 F53), U.S. | ||
Estimated burden per response to comply with this voluntary information collection request: 1 hour. This information collection is used to plan budgets and resources for operator | Nuclear Regulatory Commission, Washington, DC 20555-000, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection. | ||
FACILITY NRC REGION Davis-Besse Nuclear Power Station, Unit 1 (DBNPS) | |||
FACILITY NRC REGION Davis-Besse Nuclear Power Station, Unit 1 (DBNPS)III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 2012 Cy 2013 Cy 2014 Cy 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 CY | III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 2012 Cy 2013 Cy 2014 Cy 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 CY 2013 CY 2014 Cy 2 0 15 NUMBER OF REACTOR 0 6 0 6 OPERATORS NUMBER OF SENIOR REACTOR 0 8 0 8 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 0 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 12/02/2013 12/07/2015 ALTERNATE DATE 01/06/2014 01/11/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 14 CANDIDATES NRccE AE NRC~~~FOME1020)PINE NRC* FORM 536 (10-2008) PRINTED ON RECYCLED PAPER}} | ||
-INSTANT NUMBER OF SENIOR REACTOR 0 OPERATORS | |||
-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS | |||
-LIMITED PROPOSED DATES PRIMARY DATE 12/02/2013 12/07/2015 ALTERNATE DATE 01/06/2014 01/11/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 14 CANDIDATES NRC~~~ FOME1020)PINE |
Latest revision as of 15:23, 13 November 2019
ML102300502 | |
Person / Time | |
---|---|
Site: | Davis Besse ![]() |
Issue date: | 08/06/2010 |
From: | Allen B FirstEnergy Nuclear Operating Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
L-10-213, RIS-10-008 | |
Download: ML102300502 (3) | |
Text
FENOC 5501 North State Route 2 FirstEnergyNuclear OperatingCompany Oak Harbor,Ohio 43449 Barry S. Allen 419-321-7676 Vice President- Nuclear Fax: 419-321-7582 August `6, 20 10 L-1 0-213 United States Nuclear Regulatory Commission Document Control Desk Washington,' D.C. 20555-0001
SUBJECT:
Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Response to Regulatory Issue Summary 2010-08, "Preparation and Scheduling of Operator Licensing Examinations" The Davis-Besse Nuclear Power Station (DBNPS) is providing information in response to NRC Regulatory Issue Summary (RIS) 2010-08, "Preparation and Scheduling of Operator Licensing Examinations." The RIS requested licensees to voluntarily submit a response using NRC Form 536, "Operator Licensing Examination Data," to provide data for scheduling and preparation of operator licensing examinations. Attached is the completed NRC Form 536, which provides information through calendar year 2015 for Initial Operator License Examinations and through calendar year 2013 for Generic Fundamentals Examinations.
There are no regulatory commitments included in this letter. If there are any questions or if additional information is required, please contact Mr. Robert C. Hovland, Site Training Manager, at (4,19) 321-8406.
Sincerely, Barry S.Allen GMW
Attachment:
NRC Form 536, "Operator Licensing Examination Data" cc: Regional Administrator, NRC Region III DB-1 NRC/NRR Project Manager DB-1 NRC Senior Resident Inspector Chief, Operations Branch, NRC Region III Utility Radiological Safety Board
Attachment L-1 0-213 NRC Form NRC 536 Operator Licensing Examination Data (One page follows)
.1 1 ý _A NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets OPERATOR LICENSING and resources estimate to the for operator Records andexaminations.
FOIA/PrivacySend comments Services Branchregardin burden (T-5 F53), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-000, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Davis-Besse Nuclear Power Station, Unit 1 (DBNPS)
III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 2012 Cy 2013 Cy 2014 Cy 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 CY 2013 CY 2014 Cy 2 0 15 NUMBER OF REACTOR 0 6 0 6 OPERATORS NUMBER OF SENIOR REACTOR 0 8 0 8 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 0 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 12/02/2013 12/07/2015 ALTERNATE DATE 01/06/2014 01/11/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 14 CANDIDATES NRccE AE NRC~~~FOME1020)PINE NRC* FORM 536 (10-2008) PRINTED ON RECYCLED PAPER