(2 intermediate revisions by the same user not shown) |
Line 5: |
Line 5: |
| | author name = | | | author name = |
| | author affiliation = Exelon Generation Co, LLC | | | author affiliation = Exelon Generation Co, LLC |
| | addressee name = Fish T H, Fuller B | | | addressee name = Fish T, Fuller B |
| | addressee affiliation = NRC/RGN-I/DRS/OB | | | addressee affiliation = NRC/RGN-I/DRS/OB |
| | docket = 05000410 | | | docket = 05000410 |
| | license number = NMP-069 | | | license number = NMP-069 |
| | contact person = Jackson D E | | | contact person = Jackson D |
| | case reference number = TAC U01875 | | | case reference number = TAC U01875 |
| | package number = ML13295a030 | | | package number = ML13295a030 |
Line 19: |
Line 19: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:Title: NMP NRC Exam March 2014 Operating Exam Changes Purpose: A memo documenting changes and comments from the Operating Exam based on NRC Prep Week and Chief Examiner Draft Operating Exam Submittal review. Operating Exam Changes: JPM S-1 JPM S-2 Simulator JPM S-2 Type Codes changed from D, S to A, M, S, based on revision to Simulator JPM S-2. Step 12 was changed from PASS/FAIL to SAT/UNSAT. | | {{#Wiki_filter:Title: NMP NRC Exam March 2014 Operating Exam Changes |
| Modified to incorporate an alternate path requiring the operators to manually scram the reactor after 3 control rods scrammed. | | |
| JPM P-lA/18 JPM P-2 RO C0-2 RO EC SROC0-2 SROEC .SRORC SROEP Revised Step 16 from SAT/UNSAT to PASS/FAIL. | | ==Purpose:== |
| For P-1A, removed all references to the Division 2 EDG. For P-1B, removed all references to the Division 1 EDG. Added a SAT/UNSAT step for Applicants to sign and initial Attachment 1, "Test Personnel Signature and Initial Log". Reference Precaution and Limitation 6.4 for this step. Step 7, Changed cue from 240 psig to 245 psig. Step 12, added cue for Diesel Air Start Pressure after start. Steps 5, 6, 13, changed "Directs" to "Contacts" Changed validation time to 20 minutes Step 2, changed Section 8.0 to Section 8.2. Changed Initial Conditions to remove reference to Section 8.2 (i.e. drain line installed | | A memo documenting changes and comments from the Operating Exam based on NRC Prep Week and Chief Examiner Draft Operating Exam Submittal review. |
| @ 2RDS*V107 vice referencing the exact procedure section). | | Operating Exam Changes: |
| Revised validation time to 20 minutes. No changes to this JPM Revise provided log to show only two instances of constant RPV flow with no change in Primary Containment Water Level. Currently there are four instances. | | Simulator JPM S-2 Type Codes changed from D, S to A, M, S, based on revision to Simulator JPM S-2. |
| Revise JPM initiating cue to make it clear that the Applicant is to get Shift Manager Signature approval, not just the Shift Manager approval. | | JPM S-1 Step 12 was changed from PASS/FAIL to SAT/UNSAT. |
| Revise JPM to limit the scope of the JPM. Originally had Applicant describe all Division 1 components. | | JPM S-2 Modified to incorporate an alternate path requiring the operators to manually scram the reactor after 3 control rods scrammed. |
| Revised JPM to just describe one Division 1 component. | | |
| | JPM P-lA/18 Revised Step 16 from SAT/UNSAT to PASS/FAIL. |
| | For P-1A, removed all references to the Division 2 EDG. For P-1B, removed all references to the Division 1 EDG. |
| | Added a SAT/UNSAT step for Applicants to sign and initial Attachment 1, "Test Personnel Signature and Initial Log". |
| | Reference Precaution and Limitation 6.4 for this step. |
| | Step 7, Changed cue from 240 psig to 245 psig. |
| | Step 12, added cue for Diesel Air Start Pressure after start. |
| | Steps 5, 6, 13, changed "Directs" to "Contacts" Changed validation time to 20 minutes JPM P-2 Step 2, changed Section 8.0 to Section 8.2. |
| | Changed Initial Conditions to remove reference to Section 8.2 (i.e. drain line installed @ 2RDS*V107 vice referencing the exact procedure section). |
| | Revised validation time to 20 minutes. |
| | No changes to this JPM Revise provided log to show only two instances of constant RPV flow with no change in Primary Containment Water Level. Currently there are four instances. |
| | RO C0-2 Revise JPM initiating cue to make it clear that the Applicant is to get Shift Manager Signature approval, not just the Shift Manager approval. |
| | RO EC Revise JPM to limit the scope of the JPM. Originally had Applicant describe all Division 1 components. Revised JPM to just describe one Division 1 component. |
| Changed JPM to two worksheets vice just one worksheet. | | Changed JPM to two worksheets vice just one worksheet. |
| Nq changes to.thisJPM Revise initiating cue from "Document all required actions .... " to "Document all required communications and actions .... " Step 7, add cue for CR being initiated No changes to this JPM Step 11, 12, and 14 fix breaker and electric bus nomenclature (typos) No changes to this JPM Fix typos in front matter and on page 6 Add "This is Time Critical" to JPM initiating cue.}} | | Nq changes to.thisJPM Revise initiating cue from "Document all required actions .... " |
| | to "Document all required communications and actions .... " |
| | Step 7, add cue for CR being initiated SROC0-2 No changes to this JPM SROEC Step 11, 12, and 14 fix breaker and electric bus nomenclature (typos) |
| | .SRORC No changes to this JPM SROEP Fix typos in front matter and on page 6 Add "This is Time Critical" to JPM initiating cue.}} |
Letter Sequence Draft Other |
---|
|
|
|
|
---|
Category:License-Operator
MONTHYEARML24213A1412024-07-31031 July 2024 Requalification Program Inspection ML24263A1162024-01-0808 January 2024 Final Qa/Related Forms ML24002B0852024-01-0202 January 2024 FY24 NMP2 Final QA Forms ML23347A0632023-12-13013 December 2023 NMP1 Retake FY23 Examination Files ML23257A1732023-09-14014 September 2023 Requalification Program Inspection ML23220A0262023-08-0808 August 2023 Licensed Operator Positive Fitness-for-Duty Test ML23186A1642023-07-0606 July 2023 Operator Licensing Retake Examination Approval RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23135A1562023-05-15015 May 2023 Final Qa/Related Forms IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 ML23123A0582023-05-0303 May 2023 Final Qa/Related Forms ML23109A0332023-04-19019 April 2023 Senior Reactor and Reactor Operator Initial License Examinations RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21258A3552021-09-16016 September 2021 Requalification Program Inspection ML21137A1602021-05-17017 May 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21137A2402021-05-17017 May 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21137A1692021-05-17017 May 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21133A2422021-05-13013 May 2021 Handouts to Applicants (Folder 3) ML21133A1472021-05-13013 May 2021 Final Qa/Related Forms (Folder 1) ML21131A1892021-05-11011 May 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21123A1892021-05-0303 May 2021 Draft Written Examination (Folder 2) ML21123A1982021-05-0303 May 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21123A2412021-04-19019 April 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21123A2242021-04-19019 April 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21034A4742021-02-0303 February 2021 Handouts to Applicants (Folder 3) ML21034A4762021-02-0303 February 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21033A7962021-02-0202 February 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21033A5382021-02-0202 February 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21032A3232021-02-0101 February 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21032A2812021-02-0101 February 2021 Final Qa/Related Forms (Folder 1) ML21027A2592021-01-27027 January 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML21008A3542021-01-0808 January 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21008A3322021-01-0808 January 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20350B7852020-12-11011 December 2020 Modified Question Source Information (Post 2020 Audit) (Folder 3) ML20120A5582020-04-30030 April 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20105A1762020-04-15015 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Nine Mile Point Nuclear Station, Unit 1 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20055E0092020-01-15015 January 2020 Final Q/A Related Form - Form ES-401-6 (Folder 1) ML20055D8832020-01-15015 January 2020 Final Qa/Related Forms (Folder 1) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19337A5342019-11-29029 November 2019 Operator Licensing Examination Approval ML20055E0172019-10-28028 October 2019 Nile Mile Point Unit 2 - Draft Written Examination (Folder 2) ML20055E0122019-10-28028 October 2019 NRC Comments on Draft Licensee-Developed Operating Test ML20055E0152019-10-28028 October 2019 Draft Written Examination and Operating Test Outlines (Folder 2) ML19289D0132019-10-15015 October 2019 September 4, 2019, NRC Generic Fundamentals Examination Results for Nine Mile Point Nuclear Station, Unit 1 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20055E0132019-10-15015 October 2019 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) NMP1L3288, Fitness-for-Duty Response to Request for Information2019-07-0101 July 2019 Fitness-for-Duty Response to Request for Information ML19154A5672019-06-0303 June 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19151A8132019-05-31031 May 2019 Licensed Operator Positive Fitness-For-Duty Test RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations 2024-07-31
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24263A1162024-01-0808 January 2024 Final Qa/Related Forms ML24002B0852024-01-0202 January 2024 FY24 NMP2 Final QA Forms ML23347A0632023-12-13013 December 2023 NMP1 Retake FY23 Examination Files ML23186A1642023-07-0606 July 2023 Operator Licensing Retake Examination Approval RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23135A1562023-05-15015 May 2023 Final Qa/Related Forms IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 ML23123A0582023-05-0303 May 2023 Final Qa/Related Forms ML23109A0332023-04-19019 April 2023 Senior Reactor and Reactor Operator Initial License Examinations RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21137A1692021-05-17017 May 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21137A2402021-05-17017 May 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21137A1602021-05-17017 May 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21133A2422021-05-13013 May 2021 Handouts to Applicants (Folder 3) ML21133A1472021-05-13013 May 2021 Final Qa/Related Forms (Folder 1) ML21131A1892021-05-11011 May 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21123A1892021-05-0303 May 2021 Draft Written Examination (Folder 2) ML21123A1982021-05-0303 May 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21123A2412021-04-19019 April 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21123A2242021-04-19019 April 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21034A4762021-02-0303 February 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21034A4742021-02-0303 February 2021 Handouts to Applicants (Folder 3) ML21033A7962021-02-0202 February 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21033A5382021-02-0202 February 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21032A3232021-02-0101 February 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21032A2812021-02-0101 February 2021 Final Qa/Related Forms (Folder 1) ML21027A2592021-01-27027 January 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML21008A3322021-01-0808 January 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21008A3542021-01-0808 January 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML20350B7852020-12-11011 December 2020 Modified Question Source Information (Post 2020 Audit) (Folder 3) ML20120A5582020-04-30030 April 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20105A1762020-04-15015 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Nine Mile Point Nuclear Station, Unit 1 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20055E0092020-01-15015 January 2020 Final Q/A Related Form - Form ES-401-6 (Folder 1) ML20055D8832020-01-15015 January 2020 Final Qa/Related Forms (Folder 1) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19337A5342019-11-29029 November 2019 Operator Licensing Examination Approval ML20055E0122019-10-28028 October 2019 NRC Comments on Draft Licensee-Developed Operating Test ML20055E0152019-10-28028 October 2019 Draft Written Examination and Operating Test Outlines (Folder 2) ML20055E0172019-10-28028 October 2019 Nile Mile Point Unit 2 - Draft Written Examination (Folder 2) ML20055E0132019-10-15015 October 2019 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML19151A8132019-05-31031 May 2019 Licensed Operator Positive Fitness-For-Duty Test RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML20055E0202019-04-22022 April 2019 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML18333A0182018-11-25025 November 2018 Initial Operator Licensing Operating Test Approval ML18088A7262018-05-21021 May 2018 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML18117A2102018-04-26026 April 2018 Senior Reactor and Reactor Operator Initial License Examinations RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18088A7172018-03-29029 March 2018 Final Outlines (Folder 3) ML18088A7282018-03-29029 March 2018 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) 2024-01-08
[Table view] |
Text
Title: NMP NRC Exam March 2014 Operating Exam Changes
Purpose:
A memo documenting changes and comments from the Operating Exam based on NRC Prep Week and Chief Examiner Draft Operating Exam Submittal review.
Operating Exam Changes:
Simulator JPM S-2 Type Codes changed from D, S to A, M, S, based on revision to Simulator JPM S-2.
JPM S-1 Step 12 was changed from PASS/FAIL to SAT/UNSAT.
JPM S-2 Modified to incorporate an alternate path requiring the operators to manually scram the reactor after 3 control rods scrammed.
JPM P-lA/18 Revised Step 16 from SAT/UNSAT to PASS/FAIL.
For P-1A, removed all references to the Division 2 EDG. For P-1B, removed all references to the Division 1 EDG.
Added a SAT/UNSAT step for Applicants to sign and initial Attachment 1, "Test Personnel Signature and Initial Log".
Reference Precaution and Limitation 6.4 for this step.
Step 7, Changed cue from 240 psig to 245 psig.
Step 12, added cue for Diesel Air Start Pressure after start.
Steps 5, 6, 13, changed "Directs" to "Contacts" Changed validation time to 20 minutes JPM P-2 Step 2, changed Section 8.0 to Section 8.2.
Changed Initial Conditions to remove reference to Section 8.2 (i.e. drain line installed @ 2RDS*V107 vice referencing the exact procedure section).
Revised validation time to 20 minutes.
No changes to this JPM Revise provided log to show only two instances of constant RPV flow with no change in Primary Containment Water Level. Currently there are four instances.
RO C0-2 Revise JPM initiating cue to make it clear that the Applicant is to get Shift Manager Signature approval, not just the Shift Manager approval.
RO EC Revise JPM to limit the scope of the JPM. Originally had Applicant describe all Division 1 components. Revised JPM to just describe one Division 1 component.
Changed JPM to two worksheets vice just one worksheet.
Nq changes to.thisJPM Revise initiating cue from "Document all required actions .... "
to "Document all required communications and actions .... "
Step 7, add cue for CR being initiated SROC0-2 No changes to this JPM SROEC Step 11, 12, and 14 fix breaker and electric bus nomenclature (typos)
.SRORC No changes to this JPM SROEP Fix typos in front matter and on page 6 Add "This is Time Critical" to JPM initiating cue.