ML062930268: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML062930268
| number = ML062930268
| issue date = 09/11/2006
| issue date = 09/11/2006
| title = Limerick Oct. 2006 Exam - Draft - Section a Operating Exam (Folder 2)
| title = Oct. 2006 Exam - Draft - Section a Operating Exam (Folder 2)
| author name = Fish T H
| author name = Fish T
| author affiliation = NRC/RGN-I/DRS/OB
| author affiliation = NRC/RGN-I/DRS/OB
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Limerick Generating Station Job Performance Measure CALCULATE STAY TIME JPM Number: 0703 EXELON NUCLEAR LLOJPM0703 REVOOI.DOC I Job Performance Measure (JPM)
{{#Wiki_filter:Limerick Generating Station Job Performance Measure CALCULATE STAY TIME JPM Number: 0703
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 1 I below. I. Task description and number, JPM description and number are identified.  
 
: 2. Knowledge and Abilities (WA) references are included.  
EXELON NUCLEAR LLOJPM0703 REVOOI.DOCI Job Performance Measure (JPM)
: 3. Performance location specified. (in-plant, control room, or simulator)  
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 1Ibelow.
: 4. initial setup conditions are identified.  
I.Task description and number, JPM description and number are identified.
: 5. Initiating and terminating cues are properly identified.  
: 2. Knowledge and Abilities (WA) references are included.
: 6. Task standards identified and verified by SME review. 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
: 3. Performance location specified. (in-plant, control room, or simulator)
Procedure Rev. Date a. verify cues both verbal and visual are free of conflict, and  
: 4. initial setup conditions are identified.
: 5. Initiating and terminating cues are properly identified.
: 6. Task standards identified and verified by SME review.
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev.           Date
: 9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
: b. ensure performance time is accurate.
then revise the JPM. cover page.
: 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 9. Pilot test the JPM: 10. If the JPM cannot be performed as written with proper responses, I 1. When JPM is revalidated, SME or Instructor sign and date JPM LLOJPM0703 RevOO1,doc Page2of9 I I EXELON NUCLEAR LLOJPM0703 REVOO7.DOC I Job Performance Measure (JPM) REVISION RECORD (
I1. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
LLOJPM0703 RevOO1,doc                                                                   Page2of9 I
 
I                                     EXELON NUCLEAR LLOJPM0703 REVOO7.DOC       I Job Performance Measure (JPM)
REVISION RECORD (


==SUMMARY==
==SUMMARY==
)
)
0 Old PKocedure RP-LG-460-2000 superceded by Current Procedure RP-AA-460-1001, Added Check Boxes SIMULATOR SETUP INSTRUCTIONS:
0   Old PKocedure RP-LG-460-2000 superceded by Current Procedure RP-AA-460-1001, Added Check Boxes SIMULATOR SETUP INSTRUCTIONS:
None INITIAL CON D IT10 N S: - Unit I is in OPCON 1 Work is being performed in the Unit 1 Main Steam Chase Additional high radiation exposure controls are required Two workers are perfohing the work - - - - Job conditions and information are as follows: Dose Rate Alarms on their Electronic Dosimeter for both workers: 600 mrem/hr Accumulated Dose Alarms on their Electronic Dosimeter for both workers: 1200 mrem RWP Approval Dose Alarm for both workers: 1200 mrem Stop Work Dose Rate for both workers: 600 mrem/hr Worker I has 600 mrem accumulated dose on his Electronic Dosimeter from his first entry Worker 2 has 800 mrem accumulated dose on his Electronic Dosimeter from his first entry 3 man-hrs are required to finish the work Time required to enter: 5 minutes Time required to exit: 5 minutes Work is to be performed in the Unit 1 Main Steam Chase against the Containment Wall INITIATING CUES: Use RP-AA-460-1001, "Additional High Radiation Exposure Controls" attachment 3 and I survey map to determine:
None INITIAL CONDIT10NS:
I. 2. Maximum Stay Times (Worst Case) to reach the Electronic Dosimeter accumulated dose alarms for worker I and worker 2 If the workers can finish the work without receiving accumulated dose alarms L L OJPMO703 Re v00 I. doc Page3of9 I I EXELON NUCLEAR LLOJPM0703 REvOO'I.DOC 1 Job Performance Measure (JPM1 TASK STANDARD:
      -     Unit Iis in OPCON 1
Calculate stay time for workers I and 2 until dose alarms reached and if work can be finished in the allotted time. .........  
      -    Work is being performed in the Unit 1 Main Steam Chase
.......................................  
      -    Additional high radiation exposure controls are required
-_...........-.._... " .....................
      -    Two workers are perfohing the work
"." .... " ........,....._  
      -     Job conditions and information are as follows:
"" ... ^.. """....."......"." ................................
Dose Rate Alarms on their Electronic Dosimeter for both workers: 600 mrem/hr Accumulated Dose Alarms on their Electronic Dosimeter for both workers:
.........................
1200 mrem RWP Approval Dose Alarm for both workers: 1200 mrem Stop Work Dose Rate for both workers: 600 mrem/hr Worker Ihas 600 mrem accumulated dose on his Electronic Dosimeter from his first entry Worker 2 has 800 mrem accumulated dose on his Electronic Dosimeter from his first entry 3 man-hrs are required to finish the work Time required to enter: 5 minutes Time required to exit: 5 minutes Work is to be performed in the Unit 1 Main Steam Chase against the Containment Wall INITIATING CUES:
....... "..".. I...........
Use RP-AA-460-1001, "Additional High Radiation Exposure Controls" attachment 3 and         I survey map to determine:
............  
I. Maximum Stay Times (Worst Case) to reach the Electronic Dosimeter accumulated dose alarms for worker Iand worker 2
............"".............  
: 2. If the workers can finish the work without receiving accumulated dose alarms LL OJPMO703 Rev00I.doc                                                               Page3of9   I
.............  
 
....."...".....
I                                                                                             EXELON NUCLEAR LLOJPM0703 REvOO'I.DOC                                                                             1 Job Performance Measure (JPM1 TASK STANDARD:
Information For Evaluator's Use: UNSAT requires written comments on respective step.
Calculate stay time for workers Iand 2 until dose alarms reached and if work can be finished in the allotted time.
................................................ -_...........-.._.............. "."...."........,....._""...^.."""....."......"."
I ...........................""..............................."...".....
Information For Evaluator's Use:
UNSAT requires written comments on respective step.
* Denotes CRITICAL steps.
* Denotes CRITICAL steps.
Number any comments in the "Comment Number" column. Then annotate that comment in the "Comments" section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the "Comment Number" column. Then annotate that comment in the "Comments" section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps.
The timeclock starts when the candidate acknowledaes the initiating cue. LLOJPM0703 RevOOl. doc ~age4of9 I I EXEL ON NUCLEAR LLOJPM0703 REVOO~.DOC Job Performance Measure (JPM)
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Operator's Name: Job Title: 0 NLO 0 RO 0 SRO 0 STA 0 SRO Cert JPM Title: Calculate Stay Time JPM Number: LLOJPM0703 Revision Number:
The timeclock starts when the candidate acknowledaes the initiating cue.
000 WA Number and Importance:
LLOJPM0703 RevOOl.doc                                                                                                                                                                                                                     ~age4of9                                     I
Generic 2.3.10 Suggested Testing Environment:
 
Simulator Actual Testing Environment:
I                                     EXELON NUCLEAR LLOJPM0703 REVOO~.DOC Job Performance Measure (JPM)
Simulator Testing Method: Simulate Fa u I ted : No Alternate Path:
Operator's Name:
No Time Critical:
Job
No Estimated Time to Complete: 30 minutes Actual Time Used: minutes  
 
==Title:==
0 NLO         0RO            0 SRO       0 STA     0 SRO Cert JPM
 
==Title:==
Calculate Stay Time JPM Number: LLOJPM0703                               Revision Number: 000 WA Number and Importance: Generic 2.3.10 Suggested Testing Environment:         Simulator Actual Testing Environment:       Simulator Testing Method:       Simulate           Fau I ted :   No Alternate Path:       No Time Critical:     No Estimated Time to Complete: 30 minutes Actual Time Used:             minutes


==References:==
==References:==


EVALUATION SUM MARY: Were all the Critical Elements performed satisfactorily?
EVALUATION  
0 Yes 0 No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be: 0 Satisfactory 0 Unsatisfactory .Comments:
 
Evaluator's Name: (Print) Evaluator's Signature:
==SUMMARY==
Date: L L OJPMO703 Rev00 I. doc Page 5 of 9 1 EXELON NUCLEAR JPM Start Time: ELEMENT (Cue: Provide copy of RP-AA-460-1001 and survey map)  
Were all the Critical Elements performed satisfactorily?           0Yes      0 No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:           0Satisfactory          0 Unsatisfactory
: 1. Determine Maximum Stay Time for the required entry  
.Comments:
: 2. For worker 1 : *2.a Subtract accumulated dose of 600 mr from accumulated dose alarm of 1200 mr to get remaining dose until alarm "2.b Divide Allowable Work Dose by the Maximum Whole Body Dose Rate in work area to get Maximum Stay Time (Worst Case) 2.c Subtract entry and exit time of 10 minutes (5 minutes+5 minutes) from the Maximum Stay Time  
Evaluator's Name:                                         (Print)
: 3. For worker 2: *3.a Subtract accumulated dose of 800 mr from accumulated dose alarm of 1200 mr to get remaining dose until alarm *3.b Divide Allowable Work Dose by the Maximum Whole Body Dose Rate in work area to get Maximum Stay Time (Worst Case) STANDARD NIA Maximum Stay Time Determined to be: Accum - Accum = Remain Dose Dose Dose Alarm Alarm 1200 mr - 600 mr = 600 mr Remain! Max = Max Dose Dose Stay Alarm Rate Time 600mr / 400 mr/hr = 1.5 hr Max - Entry = Max Stay Exit Allow Time Time Time 90 min - 10 min = 80 min Accum - Accum = Remain Dose Dose Dose Alarm Alarm 1200 mr - 800 mr = 400 mr Remain/ Max = Max Dose Dose Stay Alarm Rate Time 400mr / 400 mr/hr = 1 hr Comment Number LLOJPM0703 RevOOl. doc Page6of9 1 EXELON NUCLEAR I ELEMENT 3.c Subtract entry and exit time of IO minutes (5 minutes+5 minutes) from the Maximum Stay Time  
Evaluator's Signature:                                             Date:
LL OJPMO703 Rev00I.doc                                                             Page 5 of 9
 
1                                     EXELON NUCLEAR JPM Start Time:
ELEMENT                         STANDARD              Comment Number (Cue: Provide copy of RP-AA-460-1001 and               NIA survey map)
: 1. Determine Maximum Stay Time for the     Maximum Stay Time required entry                         Determined to be:
: 2. For worker 1:
  *2.a Subtract accumulated dose of 600 mr Accum - Accum = Remain from accumulated dose alarm of       Dose      Dose      Dose 1200 mr to get remaining dose until Alarm              Alarm alarm 1200 mr - 600 mr = 600 mr "2.b Divide Allowable Work Dose by the   Remain! Max =          Max Maximum Whole Body Dose Rate in     Dose      Dose        Stay work area to get Maximum Stay Time  Alarm    Rate        Time (Worst Case) 600mr / 400 mr/hr = 1.5 hr 2.c Subtract entry and exit time of 10   Max    - Entry =    Max minutes (5 minutes+5 minutes) from   Stay      Exit    Allow the Maximum Stay Time               Time    Time      Time 90 min - 10 min = 80 min
: 3. For worker 2:
  *3.a Subtract accumulated dose of 800 mr Accum - Accum = Remain from accumulated dose alarm of       Dose      Dose      Dose 1200 mr to get remaining dose until Alarm              Alarm alarm 1200 mr - 800 mr = 400 mr
  *3.b Divide Allowable Work Dose by the   Remain/ Max =          Max Maximum Whole Body Dose Rate in     Dose      Dose        Stay work area to get Maximum Stay Time  Alarm    Rate        Time (Worst Case) 400mr / 400 mr/hr = 1 hr LLOJPM0703 RevOOl.doc                                                   Page6of9 1
 
EXELON NUCLEAR I                 ELEMENT                           STANDARD 3.c Subtract entry and exit time of I O  Max    -  Entry =  Max minutes (5 minutes+5 minutes) from   Stay      Exit    Allow the Maximum Stay Time                 Time      Time    Time 60 min I O rnin = 50 rnin I                    -
: 4. Calculate if man-hrs are exceeded:
: 4. Calculate if man-hrs are exceeded:
I- 4.a Add worker 1 Maximum Stay Time of 80 minutes to worker 2 Maximum Stay Time of 50 minutes I *4.b Determine work can not be competed due to combined stay time less than required 3 man-hrs (1 80 minutes) i re ma in i ng (CUE: "You may stop here, you have met the termination criteria for this JPM") JPM Stop Time: STANDARD Max - Entry = Max Stay Exit Allow Time Time Time 60 min - IO rnin = 50 rnin Worker + Worker = Total 1 Stay 2Stay Stay Time Time Time 80 min + 50 min = 130 rnin Determine work can not be completed NIA LLOJPM0703 RevO0l.doc Page7of9 I INITIAL CONDITIONS: - Unit 1 is in OPCON 1 - Work is being performed in the Unit 1 Main Steam Chase Additional high radiation exposure controls are required Two workers are performing the work Job conditions and information are as follows: - - Dose Rate Alarms on their Electronic Dosimeter for both workers: 600 mremlhr Accumulated Dose Alanns on their Electronic Dosimeter for both workers: 1200 mrem RWP Approval Dose Alarm for both workers: 1200 mrem Stop Work Dose Rate for both workers: 600 mrem/hr Worker 1 has 600 mrem accumulated dose on his Electronic Dosimeter from his first entry Worker 2 has 800 mrem accumulated dose on his Electronic Dosimeter from his first entry 3 man-hrs are required to finish the work Time required to enter: 5 minutes Time required to exit: 5 minutes Work is to be performed in the Unit 1 Main Steam Chase against the Containment Wall INITIATING CUES: Use RP-AA-460-1001, "Additional High Radiation Exposure Controls" attachment 3 and I survey map to determine:  
4.a Add worker 1 Maximum Stay Time of     Worker + Worker = Total 80 minutes to worker 2 Maximum       1 Stay    2Stay    Stay Stay Time of 50 minutes               Time      Time    Time I                                             80 min + 50 min = 130 rnin i
: 1. 2. Maximum Stay Times (Worst Case) to reach the Electronic Dosimeter accumulated dose alarms for worker I and worker 2. If the workers can finish the work without receiving accumulated dose alarms.
    *4.b Determine work can not be competed Determine work can not be due to combined stay time less than   completed required 3 man-hrs (1 80 minutes) remaining (CUE: You may stop here, you have met                   NIA the termination criteria for this JPM)
ARW SURVEY FORM ~ v? No. _" 04-52 _ DATE: 12/24/04 ............
JPM Stop Time:
__ ... .. _. .... __ TIME: ........ _ 0900 . _ sum No: .. ....................
LLOJPM0703 RevO0l.doc                                                  Page7of9 I
_. __I_, __"" -ll"".l_"l" _.l._l._.ll" "" r. .... PBAPS <e$ OTHER [circle one) koa 1. ..........
 
01 .. I ...... " p11_7,p1 :.y-~:zr-T-===zcc-~
INITIAL CONDITIONS:
=_.- -&1_1-1-1-=
      -     Unit 1 is in OPCON 1
-=~~~~=--~.~---~.~-~____
      -     Work is being performed in the Unit 1 Main Steam Chase
04-258 L 1 3Lm. RX REV. _ 279 ..... mm: "MI ..........
      -    Additional high radiation exposure controls are required Two workers are performing the work
waxm: .Va!ve..work.in.
      -     Job conditions and information are as follows:
Mah. Steam C.hase. ........................................................................................................... , ,TW taw wialned, '& 3nlw #. ere.! Art Star Phil Head lWl?nKEl Joe Tech J BT mMD FI: ~~-'sx i ~ .... l%?xdm-W4 Pm [Rhl Eare/ldkW uv Ix5'fAlID INSTRUMENT SEW i i No. I c.4. WE vmID i SEW No. ................ . ...... ... ..... 'e ! ...... - ... .... ..... ??- ..... - .... I-. ............  
Dose Rate Alarms on their Electronic Dosimeter for both workers: 600 mremlhr Accumulated Dose Alanns on their Electronic Dosimeter for both workers:
.9. --- 1 __ ............
1200 mrem RWP Approval Dose Alarm for both workers: 1200 mrem Stop Work Dose Rate for both workers: 600 mrem/hr Worker 1 has 600 mrem accumulated dose on his Electronic Dosimeter from his first entry Worker 2 has 800 mrem accumulated dose on his Electronic Dosimeter from his first entry 3 man-hrs are required to finish the work Time required to enter: 5 minutes Time required to exit: 5 minutes Work is to be performed in the Unit 1 Main Steam Chase against the Containment Wall INITIATING CUES:
R02A ....... 33-3333 1. ....... ..z:.::.:.:
Use RP-AA-460-1001, Additional High Radiation Exposure Controls attachment 3 and         I survey map to determine:
....... ... 4.. .............................. - ... ...... ..... .... .- ............................
: 1. Maximum Stay Times (Worst Case) to reach the Electronic Dosimeter accumulated dose alarms for worker Iand worker 2.
+ j m RM 14 I 33-4444 ' x INSTRUMEM
: 2. If the workers can finish the work without receiving accumulated dose alarms.
.- T-? /Joan/ OA . j ~LImCmlw . ~, i i ccm.:mon/G4  
 
! --- i __ -- ... ,I .................  
l"_
._ ........ ............
l.""
2.. ...... .................  
l ARW_._l._l"l.SURVEY FORM                                  ""
...........
                                                                                                                                                                                                                                                                                                        ~
_._ .....___----.
                                              <e$
~ ...........
: __I_,
Contarnlnation 1 Floor 2 1 Floor WI , lrEM%~mN .... .f . 'r i .& .. i , Floor
L r.
* ___- I
PBAPS              OTHER[circleone)                                                                                                                                                                koa            1........... 01  .. I......
* 1 Floor , 6 I Floor 7 I Floor -_I___-_-
  "                p 1
7-- I2 13 Floor Floor ___ ____ - -. _._ __-. -- Floor Floor ___ __ __ -. -- elk <lk <lk <lk <lk <lk <lk <lk <lk clk .........
1 p
12/24/04 Joe Joo IUE . 
_1 7
, I Limerick Generating Station Job Performance Measure ERP CLASSIFICATION AND REPORTING (TIME CRITICAL)
                      ,                                                                      :.y-~:zr-T-===zcc-~                  =_-      .-&1_1-1-1-=                                                                        - = ~ ~ ~ ~ = - - ~ . ~ - - - ~ . ~ - ~ _ _ _ _
JPM Number: 0127 JCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPM0127 Rev 001 JOB PERFORMANCE MEASURE (JPM) JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
v?No.                _"      04-52 _                          DATE:                  12/24/04
Prior to JPM usage, revalidate JPM using steps 8 through 11 below. I. Task description and number, JPM description and number are identified.
                                                                                          ............ __ ... .. _.....__                TIME: ........              _ 0900                    ._                        s u m No:                          04-258..              ....................             _.
: 2. Knowledge and Abilities (WA) references are included.  
mm:                     "MI       1                  3Lm.      RX .....                 REV.      _ 279  .....
: 3. Performance location specified. (in-plant, control room, or simulator)
waxm:                             .Va!ve..work.in.               M a h . Steam C.hase............................................................................................................                                                                                                       ,
: 4. Initial setup conditions are identified.
                                                                                                            ,TW   taw wialned,           '&       3nlw #. ere.!
: 5. Initiating and terminating cues are properly identified.  
mMD FI:                           Joe Tech                                          JBT              ~ ~ - ' s x Art Star                                                                                    Phil Head i .. ~
: 6. Task standards identified and verified by SME review.
lWl?nKEl
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk 8. Verify the procedure referenced by this JPM matches the most current revision of (*I- that procedure:
[Rhl Eare/ldkW                                                                                                             l%?xdm-W4                                                                                              P    m c.4. WE vmID                         i                               INSTRUMENT                                                SEW                     i                  uv Ix5'fAlID S E W INSTRUMEM                                                              i                                      'e            I!......                                                                                                                                         I-.
Procedure Rev. Date 9. Pilot test the JPM: a. verify cues both verbal and visual are free of conflict, and b. ensure performance time is accurate.
                              .                                                                                                                                                       RM 14 -.                                 No.
JPM. 10. If the JPM cannot be performed as written with proper responses, then revise the 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page. LLOJPM0127 Rev001 .doc Page 2 of 7 JCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPM0727 Rev 007 JOB PERFORMANCE MEASURE (JPM) REVISION RECORD (Summary)
__ ............ R02A
: 1. Revision 001, Delete revision numbers from EP procedure numbers. SIMULATOR SETUP INSTRUCTIONS:
                                          .- .           No.
I. Reset simulator to any IC in which Unit I is at power in OPCON I 2. Enter the following MET conditions
33-3333 j
: a. Wind Speed 4.0 MPH b. Wind Direction 132" INITIAL CONDITIONS:
1.....   ..z:.::.:.:1
0 Unit 1 and 2 are operating at full power 0 A call from security indicates that a small plane has crashed into and damaged the spray pond network. INITIATING CUES: 0 This JPM will start after you have reviewed the task conditions and tell the evaluator that you are ready to begin 0 You are required to make the ERP classification and subsequent call outs. All communications should be made as if a drill is in progress Information For Evaluator's Use: UNSAT requires written comments on respective step.
                                                                                      ... m          ...
* Denotes CRITICAL steps. Number any comments in the "Comment Number" column.
                                                                                                    .......         ...           4...............................                       -.     .. .....             33-4444 ....
Then annotate that comment in the "Comments" section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
                                                                                                                                                                                                                                                        '        .....??- .....- .... I ............ .9. ---
x.-
                                                                                                                                                                                                                                                                                      +  ............................
WI          ,  Contarnlnation lrEM%~mN
                                                                                                                                                                                                                                      .. .f 1 Floor                          .
2        1      Floor                                          elk
                                                                                                                                                                                                                              'r          i                                                      <lk i
Floor
                                                                                                                                                                                                                                                                                                    <lk T-?                                                        I i
                                                                                                      !                                                                                        /Joan/ OA
* 1                                                      <lk I,
                                                                                                                                                                                                                ---                               Floor
                                                                                                                                                                                                                              -_I___-_-
j ~LImCmlw
__                --                                                                          <lk
                                                                                                                                  .                                             i 6                  Floor
  ,I
    ~
                                                                                                                                  ~,                                               i ccm.:mon/G4                             7-
                                                                                                                                                                      ............ 2.. ......           .................
7          I      Floor                                          <lk Floor                                          <lk Floor                                          <lk Floor                                          <lk Floor                                          clk I2 13 Joe Joo                                                                                                            IUE                      .               12/24/04
 
I Limerick Generating Station Job Performance Measure ERP CLASSIFICATION AND REPORTING (TIME CRITICAL)
JPM Number:  0127
 
JCLEAR GENERATION        GROUP                                              EXELON NUCLEAR I LLOJPM0127 Rev 001 JOB PERFORMANCE MEASURE (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
I.Task description and number, JPM description and number are identified.
: 2. Knowledge and Abilities (WA) references are included.
: 3. Performance location specified. (in-plant, control room, or simulator)
: 4. Initial setup conditions are identified.
: 5. Initiating and terminating cues are properly identified.
: 6. Task standards identified and verified by SME review.
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk
(*I-
: 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev.           Date
: 9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
: 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
LLOJPM0127 Rev001.doc                                                                      Page 2 of 7
 
JCLEAR   GENERATION       GROUP                                                   EXELON NUCLEAR I LLOJPM0727 Rev 007 JOB PERFORMANCE MEASURE (JPM)
REVISION RECORD (Summary)
: 1. Revision 001, Delete revision numbers from EP procedure numbers.
SIMULATOR SETUP INSTRUCTIONS:
I.Reset simulator to any IC in which Unit Iis at power in OPCON I
: 2. Enter the following MET conditions
: a. Wind Speed 4.0 MPH
: b. Wind Direction 132" INITIAL CONDITIONS:
0  Unit 1 and 2 are operating at full power 0  A call from security indicates that a small plane has crashed into and damaged the spray pond network.
INITIATING CUES:
0  This JPM will start after you have reviewed the task conditions and tell the evaluator that you are ready to begin 0  You are required to make the ERP classification and subsequent call outs. All communications should be made as if a drill is in progress Information For Evaluator's Use:
UNSAT requires written comments on respective step.
* Denotes CRITICAL steps.
Number any comments in the "Comment Number" column. Then annotate that comment in the "Comments" section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledaes the initiatina cue. LLOJPM0127 Rev001 .doc Page 3 of 7 JCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPM0727 Rev 007 JOB PERFORMANCE MEASURE (JPM) TITLE: ERP CLASSIFICATION AND REPORTING (TIME CRITICAL)
The timeclock starts when the candidate acknowledaes the initiatina cue.
Operator's Name: Job Title: 0 NLO 0 RO 0 SRO STA DSRO Cert JPM Title: JPM Number: LLOJPM 0127 Revision Number: 001 ERP CLASSIFICATION AND REPORTING (TIME CRITICAL)
LLOJPM0127 Rev001 .doc                                                                           Page 3 of 7
KIA Number and Importance:
 
Generic 2.4.41 2.314.1 Suggested Testing Environment:
JCLEAR GENERATION GROUP                                                 EXELON NUCLEAR     I LLOJPM0727 Rev 007 JOB PERFORMANCE MEASURE (JPM)
Simulator Actual Testing Environment:
TITLE:     ERP CLASSIFICATION AND REPORTING (TIME CRITICAL)
Simulator Testing Method: Perform Faulted: No Alternate Path:
Operator's Name:
No Time Critical:
Job
Yes Estimated Time to Complete:
 
I5 minutes Actual Time Used: Minutes eferences:
==Title:==
EP-AA-I 008, LGS EMERGENCY ACTION LEVEL (EAL) MATRIX EP-MA-114-IOO-F-OI , State/Local Event Notification Form EVALUATION  
0NLO          0RO          0SRO            STA     D S R O Cert JPM
 
==Title:==
ERP CLASSIFICATION AND REPORTING (TIME CRITICAL)
JPM Number:               LLOJPM 0127           Revision Number:     001 KIA Number and Importance:           Generic 2.4.41     2.314.1 Suggested Testing Environment:       Simulator Actual Testing Environment:           Simulator Testing Method:       Perform                             Faulted:         No Alternate Path:       No                                 Time Critical: Yes Estimated Time to Complete:             I 5 minutes       Actual Time Used:       Minutes eferences:     EP-AA-I 008, LGS EMERGENCY ACTION LEVEL (EAL) MATRIX EP-MA-114-IOO-F-OI , State/Local Event Notification Form EVALUATION  


==SUMMARY==
==SUMMARY==
: Were all the Critical Elements performed satisfactorily7 UYes UNO The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be: 0 Satisfactory Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily7                 UYes U N O The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:             0Satisfactory                  Unsatisfactory Comments:
Eva I u ato r's Name: (Print) Evaluator's Signature: Date:
EvaIuator's Name:                                             (Print)
LLOJPM0127 Rev001 .doc Page 4 of 7 JCLEAR GENERATION GROUP EXELON NUCLEAR 1 STANDARD LLOJPMOl27 Rev 001 JOB PERFORMANCE MEASURE (JPM) SAT UNSAT Comment Number START TIME: PERFORMANCE CHECKLIST:
Evaluator's Signature:                                         Date:
ELEMENT b ~ I. Evaluator note time candidate begins reviewing EALs 2. When an abnormal condition is being evaluated, REFER to the appropriate Station EAL Matrix and PERFORM the following: IDENTIFY the Unit Mode for the state of the plant prior to  
LLOJPM0127 Rev001.doc                                                             Page 4 of 7
: 3. I EP-AA-I 1 I, Section 4.1 N/A NIA ~ ~ Use EAL Matrix to classify event Determine Alert initiating conditions have been exceeded NOTE the EAL number I associated with the IC "HA3 " identified 7". DECLARE the event 8. RETURN to the appropriate EP-AA-112 ERO position checklist and immediately begin notifications Declare an Alert within -l5 minutes of the START TIME in Step 1 DECLARATION TIME: N/A ~ ~ EP-AA-112-1 OO-F-01 , SHIFT EMERGENCY DIRECTOR CHECKLIST LLOJPMOl27 Rev001 .doc Page 5 of 7 JCLEAR GENERATION GROUP EXELON NUCLEAR I ~ ~~ Contact Shift Communicator to initiate callout per Attachment 2 LLOJPM0127 Rev 007 Direct Shift Communicator to 1 perform notification within 12 minutes of DECLARATION TIME. (15 minutes minus time for Communicator to receive form and make roll call) Note: This step is graded after I the next section. JOB PERFORMANCE MEASURE (JPM) 13. Message number - ENTER a sequential number starting with 1 14. APPROVED BY 15*. STATUS BLOCK 16". CLASSIFICATION 17". AFFECTED UNIT 18*. DECLARED AT 19. CLASSIFICATION STATUS I ELEMENT 661'J or equivalent entered Signature entered THIS IS A DRILL marked "ALERT" checked "ONE and TWO" checked Time and Date entered.
 
"HA3 entered as EAL# "INITIAL DECLARATION" checked 9. ANNOUNCE the event classification to the Control Room Staff, and over the plant Public Address (PA) system based on pre-scripted message guidelines in EP-AA- 112, Attachment 6 IO. PERFORM Attachment 2, ERO Augmentation  
JCLEAR GENERATION GROUP                                                   EXELON NUCLEAR 1 LLOJPMOl27 Rev 001 JOB PERFORMANCE MEASURE (JPM)
: 11. DETERMINE the correct plant-based PAR per the appropriate site-specific PAR flowchart in EP-AA-111, Attachments 8 12*. INITIATE required State/Local notifications within 15 minutes of the event classification as required EP-MA-I 14-1 00 for instructions on completion and transmittal of State/County notifications STANDARD Make announcement per scripted message N/A - No PAR for Alert SAT UNSAT Comment Number LLOJPM0127 Rev001 .doc Page 6 of 7 JCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPM0127 Rev 001 JOB PERFORMANCE MEASURE (JPM) ELEMENT 4 DESCRIPTION NON-ROUTINE RADIOLOGICAL RELEASE i;' STATUS 22. PAR 23*. METEOROLOGY 24*. STATUS CUE: (When State and Local Notification Form is given to Shift Communicator)
START TIME:
You have met the termination criteria for the JPM. JPM Stop Time STANDARD "An Event has occurred that threatens vital equipment. Current Plant Conditions Do not Threaten public safety." "NO checked Left blank or "NOT APPLICABLE" checked Values match displayed Tower I 175' or Tower 2 159' PMS data (1 32"/ 4 MPH) "This is a drill" checked (Critical that at least one of the two status blocks on the page is marked correctly and no contradictory info is marked. If contradictory info is marked, then the incorrect step is UNSAT. If one block is blank and the other is correct, then the blank block is N/A) N/A LLOJPM0127 Rev001 .doc Page 7 of 7 INITIAL CONDITIONS:
PERFORMANCE CHECKLIST:
Unit 1 and 2 are operating at full power 0 A call from security indicates that a small plane has crashed into and damaged the spray pond network. INITIATING CUES: 0 This JPM will start after you have reviewed the task conditions and tell the evaluator that you are ready to begin 0 You are required to make the ERP classification and subsequent call outs. All communications should be made as if a drill is in progress Limerick Generating Station Job Performance Measure FIRE ALARM IN INVERTOR ROOM JPM Number: LLOJPM0715 L
ELEMENT                       STANDARD              SAT  UNSAT  Comment Number b
1dUCLEAR GENERATION GROUP EXELON NUCLEAR1 - LLOJPM0715 Rev000 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
I
Prior to JPM usage, revalidate JPM using steps 8 through I1 below. 1. Task description and number, JPM description and number are identified.  
~
: 2. Knowledge and Abilities (WA) references are included.  
EP-AA-I 1I,Section 4.1 I. Evaluator note time candidate begins reviewing EALs
: 3. Performance location specified. (in-plant, control room, or simulator)  
: 2. When an abnormal condition is being evaluated, REFER to the appropriate Station EAL                     N/A Matrix and PERFORM the following:
: 4. Initial setup conditions are identified.  
: 3. IDENTIFY the Unit Mode for                     NIA the state of the plant prior to
: 5. Initiating and terminating cues are properly identified.  
                                              ~       ~
: 6. Task standards identified and verified by SME review. 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Use EAL Matrix to classify event Determine Alert initiating conditions have been exceeded I        NOTE the EAL number associated with the IC HA3 identified
Procedure Rev. Date a. verify cues both verbal and visual are free of conflict, and  
: 7. DECLARE the event               Declare an Alert within -l5 minutes of the START TIME in Step 1 DECLARATION TIME:
: 8. RETURN to the appropriate EP-AA-112 ERO position checklist and immediately          N/A begin notifications
                                            ~       ~
EP-AA-112-1OO-F-01, SHIFT EMERGENCY DIRECTOR CHECKLIST LLOJPMOl27 Rev001.doc                                                             Page 5 of 7
 
JCLEAR GENERATION       GROUP                                           EXELON NUCLEAR     I LLOJPM0127 Rev 007 JOB PERFORMANCE MEASURE (JPM)
ELEMENT                           STANDARD            SAT  UNSAT  Comment Number
: 9. ANNOUNCE the event               Make announcement per classification to the Control     scripted message Room Staff, and over the plant Public Address (PA) system based on pre-scripted message guidelines in EP-AA-112, Attachment 6               ~    ~~
IO. PERFORM Attachment 2,             Contact Shift Communicator to ERO Augmentation                 initiate callout per Attachment 2
: 11. DETERMINE the correct             N/A - No PAR for Alert plant-based PAR per the appropriate site-specific PAR flowchart in EP-AA-111, Attachments 8 12*. INITIATE required State/Local     Direct Shift Communicator to notifications within 15 minutes 1 perform notification within 12 of the event classification as   minutes of DECLARATION required EP-MA-I 14-100 for       TIME. (15 minutes minus time instructions on completion and   for Communicator to receive transmittal of State/County       form and make roll call) notifications Note: This step is graded after I the next section.
: 13. Message number - ENTER a          661J  or equivalent entered sequential number starting with 1
: 14. APPROVED BY                      Signature entered 15*. STATUS BLOCK                    THIS IS A DRILL marked
: 16. CLASSIFICATION                  ALERT checked
: 17. AFFECTED UNIT                    ONE and TWO checked 18*. DECLARED AT                      Time and Date entered. H A 3 entered as EAL#
: 19. CLASSIFICATION STATUS            INITIAL DECLARATION checked I
LLOJPM0127 Rev001 .doc                                                             Page 6 of 7
 
JCLEAR GENERATION GROUP                                                   EXELON NUCLEAR I LLOJPM0127 Rev 001 JOB PERFORMANCE MEASURE (JPM) 4                    ELEMENT DESCRIPTION STANDARD An Event has occurred that threatens vital equipment.
Current Plant Conditions Do not Threaten public safety.
NON-ROUTINE                    N O checked i; 22.
RADIOLOGICAL RELEASE STATUS PAR                            Left blank or NOT APPLICABLE checked 23*. METEOROLOGY                  Values match displayed Tower I175or Tower 2 159 PMS data (132/ 4 MPH) 24*. STATUS                            This is a drill checked (Critical that at least one of the two status blocks on the page is marked correctly and no contradictory info is marked. If contradictory info is marked, then the incorrect step is UNSAT. If one block is blank and the other is correct, then the blank block is N/A)
CUE: (When State and Local            N/A Notification Form is given to Shift Communicator)
You have met the termination criteria for the JPM.
JPM Stop Time LLOJPM0127 Rev001.doc                                                               Page 7 of 7
 
INITIAL CONDITIONS:
Unit 1 and 2 are operating at full power 0 A call from security indicates that a small plane has crashed into and damaged the spray pond network.
INITIATING CUES:
0 This JPM will start after you have reviewed the task conditions and tell the evaluator that you are ready to begin 0 You are required to make the ERP classification and subsequent call outs. All communications should be made as if a drill is in progress
 
Limerick Generating Station Job Performance Measure FIRE ALARM IN INVERTOR ROOM JPM Number: LLOJPM0715 L
 
1dUCLEAR GENERATION GROUP                   -
EXELON NUCLEAR1 LLOJPM0715 Rev000 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through I 1 below.
: 1. Task description and number, JPM description and number are identified.
: 2. Knowledge and Abilities (WA) references are included.
: 3. Performance location specified. (in-plant, control room, or simulator)
: 4. Initial setup conditions are identified.
: 5. Initiating and terminating cues are properly identified.
: 6. Task standards identified and verified by SME review.
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev.           Date
: 9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
: b. ensure performance time is accurate.
then revise the JPM. cover page. 9. Pilot test the JPM: IO. If the JPM cannot be performed as written with proper responses, 1 I. When JPM is revalidated, SME or Instructor sign and date JPM L LOJPM077 5 Rev000. doc Page 2 of 7 LL OJPM0715 Rev000 REVISION RECORD (Summary):  
I O . If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 1. New JPM. SIMULATOR SETUP INSTRUCTIONS:
1 I.When JPM is revalidated, SME or Instructor sign and date JPM cover page.
None TASK STANDARD:  
LLOJPM077 5 Rev000.doc                                                               Page 2 of 7
: 1. Dispatch the Fire Brigade 2. Evacuate the #I Inverter Room  
 
: 3. Identify 1 FSSG-3020 as the correct Fire Safe Shutdown Guide TASK CONDITIONS:
LL OJPM0715 Rev000 REVISION RECORD (Summary):
Unit 1 is at 100% power. INITIATING CUE: This JPM is to be conducted as a "DRILL". The following is observed in the MCR: Audible Fire Alarm Code 5-2-4 is alarming CONT EL 254 INVERT RM I (006 FIRE I-3-L) Annunciator is in alarm You are directed by Shift Supervision to respond to the above alarm as the PRO Information For Evaluator's Use:
: 1. New JPM.
SIMULATOR SETUP INSTRUCTIONS:
None TASK STANDARD:
: 1. Dispatch the Fire Brigade
: 2. Evacuate the #Inverter I       Room
: 3. Identify 1FSSG-3020 as the correct Fire Safe Shutdown Guide TASK CONDITIONS:
Unit 1 is at 100% power.
INITIATING CUE:
This JPM is to be conducted as a DRILL.
The following is observed in the MCR:
Audible Fire Alarm Code 5-2-4 is alarming CONT EL 254 INVERT RM I (006 FIRE I-3-L) Annunciator is in alarm You are directed by Shift Supervision to respond to the above alarm as the PRO Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes CRITICAL steps.
* Denotes CRITICAL steps.
Number any comments in the "Comment Number" column. Then annotate that comment in the "Comments" section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column. Then annotate that comment in the Comments section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multipfe steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multipfe steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue. L LOJPMO715 Rev000. doc Page 3 of 7
The timeclock starts when the candidate acknowledges the initiating cue.
,\lUCLEAR GENERATION GROUP EXELO N NUCLEAR I LLOJPM0715 Rev000 Operator's Name: Job Title: 0 NLO CI RO 0 SRO 0 STA 0 SRO Cert JPM Title: FIRE ALARM IN INVERTOR ROOM JPM Number:
LLOJPMO715 Rev000.doc                                                                       Page 3 of 7
LLOJPM0715 Revision Number:
 
000 K/A Number and Importance:
,\lUCLEAR GENERATION GROUP                                                   EXELON NUCLEAR I LLOJPM0715 Rev000 Operators Name:
Generic 2.4.27 3.0 13.5 Suggested Testing Environment:
Job
Classroom Actual Testing Environment:
 
Classroom Testing Method: Simulate Faulted: No Alternate Path:
==Title:==
No Time Critical:
0 NLO         CI RO         0 SRO         0STA            0SRO Cert JPM
No Estimated Time to Complete:
 
15 minutes Actual Time Used: minutes  
==Title:==
FIRE ALARM IN INVERTOR ROOM JPM Number: LLOJPM0715                       Revision Number: 000 K/A Number and Importance:       Generic 2.4.27         3.0 13.5 Suggested Testing Environment:           Classroom Actual Testing Environment:       Classroom Testing Method: Simulate                     Faulted: No Alternate Path:     No         Time Critical:     No Estimated Time to Complete: 15 minutes         Actual Time Used:               minutes


==References:==
==References:==
CONT EL 254 INVERT RM I (006 FIRE I-3-L)
SE-8 Fire SE-24 E Crew Day Shift People Paper FSSA-3000 Sheets 1 through 10 EVALUATION


CONT EL 254 INVERT RM I (006 FIRE I-3-L)
==SUMMARY==
SE-8 Fire E" Crew Day Shift People Paper FSSA-3000 Sheets 1 through 10 SE-24 EVALUATION SUM MARY: Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?       0Yes            0 No The operators performance was evaluated against the standards contained in this JPM,and has been determined to be:             0Satisfactory            0 Unsatisfactory Comments:
0 Yes 0 No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be: 0 Satisfactory 0 Unsatisfactory Comments:
Note: Any grade of UNSAT requires a comment.
Note: Any grade of UNSAT requires a comment. Evaluator's Name: (Print) Eva1 uator' s Sign at u re: Date: LLOJPMO715 Rev000.doc Page 4 of 7 r\lUCL*AR G*N*RAT/ON GROUP EXELON NUCLEAR I ELEMENT STANDARD SAT LLOJPM0715 Rev000 UNSAT Comment Number SE-24 SE-24,APP 1 "E" Crew Day Shift People Paper FSSA-3000 Sheets I through 10 If the JPM is conducted in Simulator setting, student should obtain copies of required documents without assistance.  
Evaluators Name:                                           (Print)
: 1. OBTAIN copy of ARC 006 FIRE SUE: When requested, provide copy of I-3-L ARC 006 FIRE I-3-L 2. OBTAIN a copy of the most recent revision of SE-8, FIRE NE: When requested, provide copy of SE-8, FIRE 3. OBTAIN a copy of the most recent revision of: SE-24 SE-24,APP 1 NE: When requested, provide copy of SE-24 INPLANT EVACUATIONS COPY Of ARC 006 FIRE 1-34 obtained.
Eva1uators Signature:                                               Date:
Copy of the most recent revision of SE-8 obtained.
LLOJPMO715 Rev000.doc                                                                 Page 4 of 7
Copy of the most recent revision of SE-24, including Appendix 1, obtained.
 
LLOJPM0715 Rev000. doc Page 5 of 7 rVUCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPM0715 Rev000 JOB PERFORMANCE MEASURE (JPM) ELEMENT "4. DISPATCH Fire Brigade Leader to investigate the fire alarm. CUE: After Fire Brigade leader is dispatched:
r\lUCLAR GNRAT/ON GROUP                                                       EXELON NUCLEAR I LLOJPM0715 Rev000 ELEMENT                           STANDARD                 SAT   UNSAT     Comment Number SE-24 SE-24,APP 1 "E" Crew Day Shift People Paper FSSA-3000 Sheets Ithrough 10 If the JPM is conducted in Simulator setting, student should obtain copies of required documents without assistance.
REPORT: This is Mark Coleman, Fire Brigade Leader. I am responding to the fire alarm code 5-24., Elev. 254 Control Enclosure Inverter Room
: 1. OBTAIN copy of ARC 006 FIRE             COPYOf ARC 006 FIRE 1-34 I-3-L                                obtained.
#I. "5. EVACUATE local area per SE-24 XJE: If candidate requests determination of assembly area: "The CRS directs use of the HP field office." 3UE: After the candidate makes the local area evacuation, report back as Mark Coleman, fire brigade leader, "There is a fire in Inverter Room
SUE: When requested, provide copy of ARC 006 FIRE I-3-L
#I. Smoke is coming out from under the door and the door is hot to the touch." '6. ACTIVATE the Fire Brigade. SUE: If the Fire Brigade Leader is requested to make a recommendation on activation of the Fire Brigade respond, "Recommend activating the Fire Brigade".
: 2. OBTAIN a copy of the most recent        Copy of the most recent revision of SE-8, FIRE               revision of SE-8 obtained.
STANDARD The Fire Brigade leader is dispatched to investigate the fire alarm. NOTE: SE-8 gives specific direction to dispatch only the Fire Brigade Leader when the sole indication of the fire is the area fire alarm. The candidate may dispatch the Fire Brigade Leader by radio or plant page separately or as part of the local area evacuation below. The candidate may also dispatch the entire Fire Brigade because this is directed in the ARC. This would also satisfy the standard. Simulate using plant PA and plant radio to make announcement including the following general information "This is a drill. Fire alarm code 5-2-4 has been annunciated in Elev. 254 Control Enclosure Inverter Room I. Fire Brigade Leader respond. All personnel evacuate the Elev. 254 Control Enclosure Inverter Room I and assemble at the HP field office. This is a drill" (SE-24 App I): The Fire Brigade is activated.
N E : When requested, provide copy of SE-8, FIRE
SAT - UNSAT Comment Number LLOJPM0715 Rev000.doc Page 6 of 7 r\/UCL*AR GENERATION GROUP EXELON NUCLEAR 1 LLOJPM0715 Rev000 JOB PERFORMANCE MEASURE (JPM) ELEMENT 7. ACKKNOWLEDGE fire brigade member reports of response AND location.
: 3. OBTAIN a copy of the most recent        Copy of the most recent revision of:                         revision of SE-24, including Appendix 1, obtained.
CUE: Call in to the candidate as each of the Fire Brigade members (Mark Coleman - Fire Brigade Leader, Kevin Buckley, Scott Miller, Brian Stratton, and Shawn McAnulty) with the following communication: "This is (Insert Name) responding to the Fire Alarm code. I am on route to the Fire Brigade Locker." 8. ADVISE Fire Brigade Leader of the appropriate Pre Fire Plan to use from information contained in the Annunciator Response Card for the fire alarm. CUE: Respond as Mark Coleman, Fire Brigade Leader, "I understand I am to refer to Pre-Fire Plan F-A- 452. ~ ~~~~~~ *9. REFER to Fire Safe Shutdown Area Map FSSA-3000 to determine appropriate Fire Safe Shutdown Guide (FSSG) for both units. CUE: When requested provide copies of FSSA-3000 Sheets 1 through IO. CUE: You may stop here, you have met the termination criteria for this JPM JPM Stop Time STANDARD Each Fire Brigade member's report of response and location is acknowledged. ADVISE Fire Brigade Leader to use Pre-Fire Plan F-A-452.
SE-24 SE-24,APP 1 N E : When requested, provide copy of SE-24 INPLANT EVACUATIONS LLOJPM0715 Rev000.doc                                                                     Page 5 of 7
~~ Identify 1 FSSG-3020 FIRE AREA 020 FIRE GUIDE Unit 1 Static Inverter Compartment (El. 254'-0") as the appropriate FSSG. SAT UNSAT Comment Number L L 0 JPMO 7 I 5 Re v000. doc Page 7 of 7
 
,\lUCLEAR GENERATiON GROUP EXELON NUCLEAR I TASK CONDITIONS:
rVUCLEAR GENERATION           GROUP                                             EXELON NUCLEAR I LLOJPM0715 Rev000 JOB PERFORMANCE MEASURE (JPM)
Unit 1 is at 100% power. INITIATING CUE: This JPM is to be conducted as a "DRILL". The following is observed in the MCR: 0 Audible Fire Alarm Code 5-2-4 is alarming 0 CONT EL 254 INVERT RM I (006 FIRE I-3-L) Annunciator is in alarm You are directed by Shift Supervision to respond to the above alarm as the PRO Limerick Job Generating Station Performance Measure REVIEW / CONTINUE PERFORMANCE OF MAIN TURBINE BYPASS VALVE EXERCISING SURVEILLANCE TEST JPM Number: LLOJPM0713 EXELON NUCLEAR JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
ELEMENT                             STANDARD                SAT  UNSAT    Comment
Prior to JPM usage, revalidate JPM using steps 8 through 1 I below. 1. Task description and number, JPM description and number are identified.  
: 4. DISPATCH Fire Brigade Leader to       The Fire Brigade leader is
: 2. Knowledge and Abilities (WA) references are included.  
                                                                              -              Number investigate the fire alarm.           dispatched to investigate the fire alarm.
: 3. Performance location specified. (in-plant, control room, or simulator)  
NOTE: SE-8 gives specific direction to dispatch only the Fire Brigade Leader when the sole indication of the fire is the area fire alarm. The candidate may dispatch the Fire Brigade Leader by radio or plant page CUE: After Fire Brigade leader is          separately or as part of the dispatched:                        local area evacuation below.
: 4. Initial setup conditions are identified.  
REPORT: This is Mark Coleman,      The candidate may also Fire Brigade Leader. I am          dispatch the entire Fire responding to the fire alarm code  Brigade because this is 5-24., Elev. 254 Control            directed in the ARC. This Enclosure Inverter Room #I.        would also satisfy the standard.
: 5. Initiating and terminating cues are properly identified.  
: 5. EVACUATE local area per SE-24          Simulate using plant PA and plant radio to make announcement including the XJE: If candidate requests                following general information determination of assembly area:    (SE-24 App I):
: 6. Task standards identified and verified by SME review. 7. Critical steps meet the criteria for critical steps and are .dentifie( with an asterisk (*). 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
The CRS directs use of the HP      This is a drill. Fire alarm code field office.                      5-2-4 has been annunciated in 3UE: After the candidate makes the        Elev. 254 Control Enclosure local area evacuation, report      Inverter Room I. Fire Brigade back as Mark Coleman, fire          Leader respond. All personnel brigade leader, There is a fire in evacuate the Elev. 254 Control Inverter Room #I. Smoke is      Enclosure Inverter Room I and coming out from under the door      assemble at the HP field and the door is hot to the touch. office. This is a drill 6.ACTIVATE the Fire Brigade.              The Fire Brigade is activated.
Procedure Rev. Date a. verify cues both verbal and visual are free of conflict, and b. ensure performance time is accurate. then revise the JPM. cover page. 9. Pilot test the JPM: IO. If the JPM cannot be performed as written with proper responses, 11. When JPM is revalidated, SME or Instructor sign and date JPM L L OJPMO77 3 RevOOO. doc Page 2 of 7 EXELON NUCLEAR LLOJPM0773Rev000 Revision Record (Summary):
SUE: If the Fire Brigade Leader is requested to make a recommendation on activation of the Fire Brigade respond, Recommend activating the Fire Brigade.
I. New JPM. SIMULATOR SETUP INSTRUCTIONS:
LLOJPM0715 Rev000.doc                                                                 Page 6 of 7
 
r\/UCLAR      GENERATION       GROUP                                             EXELON NUCLEAR 1 LLOJPM0715 Rev000 JOB PERFORMANCE MEASURE (JPM)
ELEMENT                                 STANDARD              SAT  UNSAT    Comment Number
: 7. ACKKNOWLEDGE fire brigade                     Each Fire Brigade member's member reports of response         AND     report of response and location.                                  location is acknowledged.
CUE: Call in to the candidate as each of the Fire Brigade members (Mark Coleman - Fire Brigade Leader, Kevin Buckley, Scott Miller, Brian Stratton, and Shawn McAnulty) with the following communication: "This is (Insert Name) responding to the Fire Alarm code. I am on route to the Fire Brigade Locker."
: 8. ADVISE Fire Brigade Leader of the           ADVISE Fire Brigade Leader appropriate Pre Fire Plan to use from       to use Pre-Fire Plan F-A-452.
information contained in the Annunciator Response Card for the fire alarm.
CUE: Respond as Mark Coleman, Fire Brigade Leader, "I understand I am to refer to Pre-Fire Plan F-A-452.
                              ~ ~~~~~~         ~~
*9. REFER to Fire Safe Shutdown Area           Identify 1FSSG-3020 FIRE Map FSSA-3000 to determine                 AREA 020 FIRE GUIDE Unit 1 appropriate Fire Safe Shutdown             Static Inverter Compartment Guide (FSSG) for both units.                 (El. 254'-0")as the appropriate FSSG.
CUE: When requested provide copies of FSSA-3000 Sheets 1 through IO.
CUE: You may stop here, you have met the termination criteria for this JPM JPM Stop Time LL0JPMO 7I 5 Rev000.doc                                                                 Page 7 of 7
 
  ,\lUCLEAR GENERATiON GROUP                                             EXELON NUCLEAR I TASK CONDITIONS:
Unit 1 is at 100% power.
INITIATING CUE:
This JPM is to be conducted as a "DRILL".
The following is observed in the MCR:
0   Audible Fire Alarm Code 5-2-4 is alarming 0   CONT EL 254 INVERT RM I (006 FIRE I-3-L) Annunciator is in alarm You are directed by Shift Supervision to respond to the above alarm as the PRO
 
Limerick Generating Station Job Performance Measure REVIEW / CONTINUE PERFORMANCE OF MAIN TURBINE BYPASS VALVE EXERCISING SURVEILLANCE TEST JPM Number: LLOJPM0713
 
EXELON NUCLEAR JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 1Ibelow.
: 1. Task description and number, JPM description and number are identified.
: 2. Knowledge and Abilities (WA) references are included.
: 3. Performance location specified. (in-plant, control room, or simulator)
: 4. Initial setup conditions are identified.
: 5. Initiating and terminating cues are properly identified.
: 6. Task standards identified and verified by SME review.
: 7. Critical steps meet the criteria for critical steps and are .dentifie(
with an asterisk (*).
: 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev.           Date
: 9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
I O . If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
LL OJPMO773 RevOOO.doc                                                               Page 2 of 7
 
EXELON NUCLEAR LLOJPM0773Rev000 Revision Record (Summary):
I.New JPM.
SIMULATOR SETUP INSTRUCTIONS:
None TASK STANDARD:
None TASK STANDARD:
I. Determine that Reactor power must be reduced to raise MCPR above the limit with Main 2. SRO's determine that operation may continue at reduced power per the action of Tech Turbine BPV's inoperable.
I.Determine that Reactor power must be reduced to raise MCPR above the limit with Main Turbine BPVs inoperable.
Spec 3.2.3.b. TASK CONDITIONS:  
: 2. SROs determine that operation may continue at reduced power per the action of Tech Spec 3.2.3.b.
: 1. 2. 3. 4. Unit I has started up from a refuel outage and is at 100% power. All required equipment is OPERABLE.
TASK CONDITIONS:
Due to difficulties performing ST-6-001-761  
: 1. Unit Ihas started up from a refuel outage and is at 100% power.
-1, the ST could not be completed on the previous shift. ST-6-001-761-1 is partially complete to step 4.3.4 and is to be completed on the current shift. INITIATING CUE: You are directed to review and continue with the performance of ST-6-001-761-1 at step 4.3.5. Information For Evaluator's Use: UNSAT requires written comments on respective step.
: 2. All required equipment is OPERABLE.
: 3. Due to difficulties performing ST-6-001-761-1, the ST could not be completed on the previous shift.
: 4. ST-6-001-761-1 is partially complete to step 4.3.4 and is to be completed on the current shift.
INITIATING CUE:
You are directed to review and continue with the performance of ST-6-001-761-1 at step 4.3.5.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
* Denotes CRITICAL steps.
* Denotes CRITICAL steps.
Number any comments in the "Comment Number" column. Then annotate that comment in the "Comments" section.
Number any comments in the Comment Number column. Then annotate that comment in the Comments section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue. L L OJPMO77 3 Rev000. doc Page 3 of 7 EXEL ON NUCLEAR LLOJPM0713Rev000 Operator's Name: Job Title:
The timeclock starts when the candidate acknowledges the initiating cue.
0 NLO 0 RO 0 SRO 0 STA 0 SRO Cert JPM Title: REVIEW / CONTINUE PERFORMANCE OF MAIN TURBINE BYPASS VALVE EXERCISING SURVEILLANCE TEST JPM Number: LLOJPM0713 Revision Number: 000 WA Number and Importance:
LL OJPMO773 Rev000.doc                                                                     Page 3 of 7
Generic 2.2.12 3.0 13.4 Suggested Testing Environment:
 
Classroom Actual Testing Environment:
EXEL ON NUCLEAR LLOJPM0713Rev000 Operators Name:
Classroom Testing Method: Simulate Faulted: No Alternate Path:
Job
No Time Critical:
 
No Estimated Time to Complete:
==Title:==
20 minutes Actual Time Used: minutes  
0 NLO         0 RO           0 SRO         0 STA           0 SRO Cert JPM
 
==Title:==
REVIEW / CONTINUE PERFORMANCE OF MAIN TURBINE BYPASS VALVE EXERCISING SURVEILLANCE TEST JPM Number: LLOJPM0713                       Revision Number: 000 WA Number and Importance:         Generic 2.2.12         3.0 13.4 Suggested Testing Environment:           Classroom Actual Testing Environment:       Classroom Testing Method: Simulate                     Faulted: No Alternate Path: No Time Critical: No Estimated Time to Complete: 20 minutes         Actual Time Used:               minutes


==References:==
==References:==
ST-6-001-761-1, MAIN TURBINE BYPASS VALVE EXERCISING EVALUAT1ON SU M MARY:
Were all the Critical Elements performed satisfactorily?        CJ Yes          No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:              0Satisfactory              Unsatisfactory Comments:
Note: Any grade of UNSAT requires a comment.
Evaluators Name:                                            (Print)
Eva1uators Signature:                                                Date:
LL 0JPMO713 Rev000.doc                                                                Page 4 of 7


ST-6-001-761-1, MAIN TURBINE BYPASS VALVE EXERCISING EVAL U AT1 ON SU M MARY: Were all the Critical Elements performed satisfactorily?
I                                         EXELON NUCLEAR LLOJPM0713Rev000 JOB PERFORMANCE MEASURE (JPM)
CJ Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be: 0 Satisfactory Unsatisfactory Comments:
Note: Any grade of UNSAT requires a comment. Evaluator's Name: (Print) Eva1 u a tor's Signatu re: Date: LL 0 JPMO713 Rev000. doc Page 4 of 7 I EXELON NUCLEAR 6. REQUEST a P-I. CUE: If asked, provide a copy of a P-I printout to the candidate LLOJPM0713Rev000 P-1 is requested.
JOB PERFORMANCE MEASURE (JPM)  
"7. RECORD current value of "CORRECTION FACTOR:
MFLCPR from P-I requested.
NOTE: Critical Element(s) indicated by
NOTE: Critical Element(s) indicated by
* in Performance Checklist.
* in Performance Checklist.
PERFORMANCE CHECKLIST:
PERFORMANCE CHECKLIST:
Current value of "CORRECT ION FACTOR: MFLCPR from P-1 is JPM Start Time 1 ELEMENT /I *8. RECORD current value of MCPR from P-I requested.
JPM Start Time
STANDARD 1. PROVIDE candidate a marked UP COPY of ST-6-001-761-1.
  /I 1.
NIA 2. ELVALUATE number of BPV's that are inoperable.
ELEMENT PROVIDE candidate a marked STANDARD NIA UP COPY of ST-6-001-761-1.
3 of the BPV's did not open fully and are determined to be inoperable.  
: 2. ELVALUATE number of BPVs            3 of the BPVs did not open that are inoperable.                  fully and are determined to be inoperable.
*3. DETERMINE that the number of OPERABLE BPV's is less than the number required by COLR Table 7-2. CUE: If asked, action statement C of Tech Spec 3.2.3 has not already been satisfied.
    *3. DETERMINE that the number of          It was determined that the OPERABLE BPVs is less than          number of OPERABLE BPVs the number required by COLR          is less than the number Table 7-2.                            required by COLR Table 7-2.
It was determined that the number of OPERABLE BPV's is less than the number required by COLR Table 7-2. *4. COMPLETE Attachment 2 to determine the applicable OLMCPR. *5. RECORD the applicable OLMCPR limit as determined in step I .e of Attachment  
CUE: If asked, action statement C of Tech Spec 3.2.3 has not already been satisfied.
: 2. The applicable OLMCPR is determined to be 1.47. The OLMCPR limit of 1.47 is recorded.
    *4. COMPLETE Attachment 2 to             The applicable OLMCPR is determine the applicable             determined to be 1.47.
II I recorded.
OLMCPR.
    *5. RECORD the applicable                 The OLMCPR limit of 1.47 is OLMCPR limit as determined in         recorded.
step I.e of Attachment 2.
: 6. REQUEST a P-I.                       P-1 is requested.
CUE: If asked, provide a copy of a P-I printout to the candidate
: 7. RECORD current value of              Current value of CORRECTION FACTOR:                  CORRECTION FACTOR:
MFLCPR from P-I requested.           MFLCPR from P-1 is I                                            I recorded.
1    *8. RECORD current value of MCPR from P-I requested.
Current value of MCPR from P-I requested is recorded.
Current value of MCPR from P-I requested is recorded.
L LOJPM0713 Rev000.doc Page 5 of 7 I EXEL ON NUCLEAR ' L L OJPMO7l3RevOOO NOTE: This is the termination point for RO's. The remaining portion of this JPM is "SRO ONLY". JOB PERFORMANCE MEASURE (JPM) ELEMENT I/ DETERMINE current value of MCPR LIMIT per step 4.3.5.6 /I '' *lo. MCPR recorded in step 4.3.5.5 is less than or equal to MCPR LIMIT recorded in step 4.3.5.6,THEN REDUCE Rx power in accordance with RMSl  
LLOJPM0713 Rev000.doc                                                           Page 5 of 7
&lJ GP-5 Appendix 2, Section 3.1 to achieve a MCPR greater than the MCPR LIMIT. 11. Immediately NOTIFY Reactor Engineering to change the MCPR limit in the process computer based on inoperable main turbine bypass valves. STANDARD Current value of MCPR LIMIT per step 4.3.5.6 is determined.
 
A determination is made to reduce Rx power until MCPR is greater than the MCPR LIMIT. Reactor Engineering is notified.
I                                         EXELON NUCLEAR LL OJPMO7l3RevOOO JOB PERFORMANCE MEASURE (JPM)
6 BPV's are determined to be OPERABLE.
I/              ELEMENT                             STANDARD              SAT  UNSAT    Commenl Number
N/A is entered. SAT UNSAT Commenl Number LLOJPM0713 Rev000. doc Page 6 of 7 I EXELON NUCLEAR L L OJPMO 71 3Rev000 STANDARD The EOC-RPT trip system is OPERABLE. N/A is entered. Operation may continue at a reduced power level. JOB PERFORMANCE MEASURE (JPM)
  /I
SAT ELEMENT *13. IF the EOC-RPT trip system is inoperable per Tech Spec 3.3.4.2 AND the main turbine bypass system is inoperable per Tech Spec 3.7.8 reactor power is 225%. THEN MCPR is UNANALYZED AND the Tech Spec actions required by Tech Spec 3.2.3.b must be followed.
    *lo.
Otherwise ENTER N/A for this step. point for the JPM. CUE: You have reached the termination JPM Stop Time UNSAT I Comment LLOJPM0773 Rev000,doc Page 7 of 7 EXELON NUCLEAR TASK CONDITIONS:
DETERMINE current value of MCPR LIMIT per step 4.3.5.6 MCPR recorded in step Current value of MCPR LIMIT per step 4.3.5.6 is determined.
I. Unit 1 has started up from a refuel outage and is at 100% power. 2. All required equipment is OPERABLE.  
A determination is made to 4.3.5.5 is less than or equal to   reduce Rx power until MCPR MCPR LIMIT recorded in step       is greater than the MCPR 4.3.5.6,THEN REDUCE Rx             LIMIT.
: 3. Due to difficulties performing ST-6-001-761-1, the ST could not be completed on the previous shift.  
power in accordance with RMSl
: 4. ST-6-001-761-1 is partially complete to step 4.3.4 and is to be completed on the current shift. INITIATING CUE: You are directed to review and continue with the performance of ST-6-001-761-1 at step 4.3.5.
          &     GP-5 lJ  Appendix 2, Section 3.1 to achieve a MCPR greater than the MCPR LIMIT.
Limerick Generating Station Job Performance Measure Administrative Actions on a Thermal Limit Violation JPM Number: LLOJPM0714
: 11. Immediately NOTIFY Reactor        Reactor Engineering is Engineering to change the         notified.
.UCLEAR GENERATION GROUP EXELON NUCLEAR I L LOJPM0714 Rev000 4\ JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
MCPR limit in the process computer based on inoperable main turbine bypass valves.
Prior to JPM usage, revalidate JPM using steps 8 through 11 below. 1. Task description and number, JPM description and number are identified.  
NOTE: This is the termination point for ROs. The remaining portion of this JPM is SRO ONLY.
: 2. Knowledge and Abilities (WA) references are included.  
6 BPVs are determined to be OPERABLE. N/A is entered.
: 3. Performance location specified. (in-plant, control room, or simulator)  
LLOJPM0713 Rev000.doc                                                             Page 6 of 7
: 4. Initial setup conditions are identified.  
 
: 5. Initiating and terminating cues are properly identified.  
I EXELON NUCLEAR LL OJPMO713Rev000 JOB PERFORMANCE MEASURE (JPM)
: 6. Task standards identified and verified by SME review. 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
ELEMENT                          STANDARD            SAT         I UNSAT Comment
Procedure Rev. Date 9. Pilot test the JPM: a. verify cues both verbal and visual are free of conflict, and b. ensure performance time is accurate. then revise the JPM. cover page. IO. If the JPM cannot be performed as written with proper responses, 11. When JPM is revalidated, SME or Instructor sign and date JPM LLOJPMU714 Rev000.doc Page 2 of 8   
  *13. IF the EOC-RPT trip system is    The EOC-RPT trip system is inoperable per Tech Spec         OPERABLE. N/A is entered.
,(/CLEAR GENERAT~ON GROUP EXELON NUCLEAR( L L OJ PM0714 Re v000 REVISION RECORD (Summary):
3.3.4.2 AND   the main turbine bypass system is inoperable per Tech Spec 3.7.8         reactor   Operation may continue at a power is 225%. THEN MCPR is       reduced power level.
UNANALYZEDAND the Tech Spec actions required by Tech Spec 3.2.3.b must be followed.
Otherwise ENTER N/A for this step.
CUE: You have reached the termination point for the JPM.
JPM Stop Time LLOJPM0773 Rev000,doc                                                       Page 7 of 7
 
EXELON NUCLEAR TASK CONDITIONS:
I.Unit 1 has started up from a refuel outage and is at 100% power.
: 2. All required equipment is OPERABLE.
: 3. Due to difficulties performing ST-6-001-761-1, the ST could not be completed on the previous shift.
: 4. ST-6-001-761-1 is partially complete to step 4.3.4 and is to be completed on the current shift.
INITIATING CUE:
You are directed to review and continue with the performance of ST-6-001-761-1 at step 4.3.5.
 
Limerick Generating Station Job Performance Measure Administrative Actions on a Thermal Limit Violation JPM Number: LLOJPM0714
 
    .UCLEAR GENERATION       GROUP                                             EXELON NUCLEAR I 4\
LLOJPM0714Rev000 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
: 1. Task description and number, JPM description and number are identified.
: 2. Knowledge and Abilities (WA) references are included.
: 3. Performance location specified. (in-plant, control room, or simulator)
: 4. Initial setup conditions are identified.
: 5. Initiating and terminating cues are properly identified.
: 6. Task standards identified and verified by SME review.
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev.           Date
: 9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
I O . If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
LLOJPMU714 Rev000.doc                                                                 Page 2 of 8
 
  ,(/CLEAR GENERAT~ON     GROUP                                           EXELON NUCLEAR(
LL OJPM0714Rev000 REVISION RECORD (Summary):
None SIMULATOR SETUP INSTRUCTIONS:
None SIMULATOR SETUP INSTRUCTIONS:
None. TASK STANDARD:
None.
Satisfactory task completion is indicated:  
TASK STANDARD:
= The candidate identifies the need for a power reduction using control rods only, in accordance with the approved procedure, until FLLLP is less than 1 .O. FLLLP must be restored within two hours or power must be reduced to less than 25%. TASK CONDITIONS:  
Satisfactory task completion is indicated:
: 1. Reactor power is currently stable at 99.7%. 2. During the previous shift, Reactor Engineering and Ops Management had authorized a Reactor power ascension using control rods and recirc flow. 3. Reactor power was raised from 90% following a slight rod pattern adjustment.  
    = The candidate identifies the need for a power reduction using control rods only, in accordance with the approved procedure, until FLLLP is less than 1.O. FLLLP must be restored within two hours or power must be reduced to less than 25%.
: 4. Shift turnover has been completed, all required log entries have been completed and you have assumed shift duties.  
TASK CONDITIONS:
: 5. The official 3D Monicore Periodic Log (PI) is being run at this time to assess the recently completed Reactor power ascension.  
: 1.     Reactor power is currently stable at 99.7%.
: a. The Plant Monitoring System (PMS) is operable.  
: 2.     During the previous shift, Reactor Engineering and Ops Management had authorized a Reactor power ascension using control rods and recirc flow.
: b. 3D Monicore (3DM) is OPERABLE.  
: 3. Reactor power was raised from 90% following a slight rod pattern adjustment.
: c. No PMS software testing is in progress.  
: 4. Shift turnover has been completed, all required log entries have been completed and you have assumed shift duties.
: d. The P-1 edit is not known to be invalid. INITIATING CUE You are directed to review the official 3D Monicore Periodic Log (PI) to ensure Reactor core limits have been controlled during the recent power ascension.
: 5. The official 3D Monicore Periodic Log (PI) is being run at this time to assess the recently completed Reactor power ascension.
L L OJP MO714 Re v000. doc Page 3 of 8
: a.     The Plant Monitoring System (PMS) is operable.
,cICL*AR GENERATION GROUP EXELON NUCLEAR1 L LOJPMO 7I4RevOOO Information For Evaluator's Use: UNSAT requires written comments on respective step.
: b.     3D Monicore (3DM) is OPERABLE.
* Denotes CRITICAL steps. Number any comments in the "Comment Number" column. Then annotate that comment in the "Comments" section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
: c.     No PMS       software testing is in progress.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. The timeclock starts when the candidate acknowledges the initiating cue. L LOJPM0714 Re v000. doc Page 4 of 8   
: d.     The P-1 edit is not known to be invalid.
.cICLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPM0714Rev000 Operator's Name:
INITIATING CUE You are directed to review the official 3D Monicore Periodic Log (PI) to ensure Reactor core limits have been controlled during the recent power ascension.
Job Title: 0 NLO 0 RO 0 SRO 0 STA 0 SRO Cert JPM Title: Administrative Actions on a Thermal Limit Violation JPM Number: LLOJPM0714 Revision Number: 000 KIA Number and Importance:
LL OJPMO714 Re v000.doc                                                             Page 3 of 8
Suggested Testing Environment:
 
Classroom Actual Testing Environment:
  ,cICLAR GENERATION GROUP                                               EXELON NUCLEAR1 LLOJPMO7I4RevOOO Information For Evaluators Use:
Classroom Testing Method: Simulate Faulted: No Alternate Path:
UNSAT requires written comments on respective step.
No 295014 AA2.04 4.1 / 4.4 Time Critical:
* Denotes CRITICAL steps.
No Estimated Time to Complete:
Number any comments in the Comment Number column. Then annotate that comment in the Comments section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
10 minutes Actual Time Used: m in Utes
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
LLOJPM0714 Re v000.doc                                                             Page 4 of 8
 
  .cICLEAR GENERATION     GROUP                                         EXELON NUCLEAR       I LLOJPM0714Rev000 Operators Name:
Job
 
==Title:==
0NLO          0 RO         0SRO        0STA      0SRO Cert JPM
 
==Title:==
Administrative Actions on a Thermal Limit Violation JPM Number: LLOJPM0714         Revision Number: 000 KIA Number and Importance:       295014 AA2.04 4.1 / 4.4 Suggested Testing Environment:         Classroom Actual Testing Environment:       Classroom Testing Method: Simulate                   Faulted: No Alternate Path: No Time Critical: No Estimated Time to Complete: 10 minutes       Actual Time Used:           minUtes


==References:==
==References:==
Line 276: Line 532:


==SUMMARY==
==SUMMARY==
: Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?     0Yes        0 No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:         0Satisfactory          0Unsatisfactory Comments:
0 Yes 0 No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be: 0 Satisfactory 0 Unsatisfactory Comments:
Note: Any grade of UNSAT requires a comment.
Note: Any grade of UNSAT requires a comment. Evaluator's Name: (Print) Evaluator's Signature: Date:
Evaluators Name:                                         (Print)
LLOJPM0714 RevOO0.doc Page 5 of 8   
Evaluators Signature:                                           Date:
,UCLEAR GENERATION GROUP EXELON NUCLEAR^
LLOJPM0714 RevOO0.doc                                                         Page 5 of 8
ELEMENT STANDARD SAT UNSAT CUE: Provide the student with a 3D N/A Monicore Periodic Log (PI). LLOJPM0714Rev000 JOB PERFORMANCE MEASURE (JPM)
 
Comment Number NOTE: Critical Element(s) indicated by
  ,UCLEAR GENERATION   GROUP                                         EXELON   NUCLEAR^
* in Performance Checklist.
LLOJPM0714Rev000 JOB PERFORMANCE MEASURE (JPM)
*I. Review the official 3D Monicore Periodic Log (PI) to ensure core Thermal Limits and FLLLP are acceptable.
NOTE: Critical Element(s) indicated by
* in Performance Checklist.
PERFORMANCE CHECKLIST:
PERFORMANCE CHECKLIST:
JPM Start Time Observe core FLLLP has exceeded the specified limit, and all other core parameters are within their specified limits. L LOJPM0774 Rev000.
JPM Start Time ELEMENT                            STANDARD            SAT  UNSAT Comment Number CUE: Provide the student with a 3D                  N/A Monicore Periodic Log (PI).
doc Page 6 of 8 rUCLEAR GENERATION GROUP EXELON NUCLEAR I ~~ ~ LLOJPM0714Rev000 JOB PERFORMANCE MEASURE (JPM)
*I. Review the official 3D          Observe core FLLLP has Monicore Periodic Log (PI) to  exceeded the specified limit, ensure core Thermal Limits      and all other core and FLLLP are acceptable.      parameters are within their specified limits.
ELEMENT *2. Communicate the condition of the core as indicated on the 3D Monicore Periodic Log (PI 1- CUE: Role play as necessary.  
LLOJPM0774 Rev000.doc                                                       Page 6 of 8
*3. Determine GP-14 must be entered and obtain a copy and enter GP-14. 4. Make immediate notification of core conditions.
 
CUE: Role play as necessary.  
rUCLEAR GENERATION GROUP
*5. Determine a Reactor power reduction using control only AND RMSl is required until FLLLP is less than 1 .OOO CUE: You have met the termination point for this JPM. JPM Stop Time STANDARD States the following concerning the condition of the core: The core FLLLP has exceeded the specified limit. All other core parameters are within their specified limits. Reviews GP-I4 prerequisites.
                  ~~                  ~
Reviews procedure . "NOTE" prior to step 3.1 of GP-14. Immediately inform the following of the FLLLP violation
EXELON NUCLEAR     I LLOJPM0714Rev000 JOB PERFORMANCE MEASURE (JPM)
: Shift Management
ELEMENT                             STANDARD              SAT  UNSAT  Comment Number
* Reactor Engineers Inform Shift Management:
*2. Communicate the condition of       States the following the core as indicated on the     concerning the condition of 3D Monicore Periodic Log         the core:
e Reactor power reduction using control rods only AND RMSl is required until FLLLP is less than 1 .OOO SAT UNSAT Comment Number LLOJPM0714 Rev000.doc Page 7 of 8 KLEAR GENERATION GROUP EXELON NUCLEAR I rSK CONDITIONS:
(PI 1-                                   The core FLLLP has exceeded the specified limit.
I. Reactor power is currently stable at 99.7%. 2. During the previous shift, Reactor Engineering and Ops Management had authorized a Reactor power ascension using control rods and recirc flow. 3. Reactor power was raised from 90% following a slight rod pattern adjustment.  
All other core parameters are within their specified limits.
: 4. Shift turnover has been completed, all required log entries have been completed and you have assumed shift duties.  
CUE: Role play as necessary.
: 6. The official 3D Monicore Periodic Log (PI) is being run at this time to assess the recently completed Reactor power ascension.  
*3. Determine GP-14 must be         Reviews GP-I4 entered and obtain a copy and     prerequisites.
: a. The Plant Monitoring System (PMS) is operable.  
enter GP-14.
: b. 3D Monicore (3DM) is OPERABLE.  
Reviews procedure .
: c. No PMS OR software testing is in progress.  
                                        "NOTE" prior to step 3.1 of GP-14.
: d. The P-1 edit is not known to be invalid. INITIATING CUE You are directed to review the official 3D Monicore Periodic Log (PI) to ensure Reactor core limits have been controlled during the recent power ascension.
: 4. Make immediate notification of     Immediately inform the core conditions.                 following of the FLLLP violation:
Limerick Generating Station Job Performance Measure DETERMINATION OF ADEQUATE SHIFT STAFFING JPM Number: 0712 EXELON NUCLEAR Job Performance Measure (JPM) JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Shift Management CUE: Role play as necessary.
Prior to JPM usage, revalidate JPM using steps 8 through 11 below. I. Task description and number, JPM description and number are identified.  
* Reactor Engineers
: 2. Knowledge and Abilities (WA) references are included.  
*5. Determine a Reactor power       Inform Shift Management:
: 3. Performance location specified. (in-plant, control room, or simulator)  
reduction using control only AND RMSl is required       e      Reactor power until FLLLP is less than 1.OOO           reduction using control rods only AND RMSl is required until FLLLP is less than 1.OOO CUE: You have met the termination point for this JPM.
: 4. Initial setup conditions are identified.  
JPM Stop Time LLOJPM0714 Rev000.doc                                                         Page 7 of 8
: 5. Initiating and terminating cues are properly identified.  
 
: 6. Task standards identified and verified by SME review. 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
K L E A R GENERATION     GROUP                                           EXELON NUCLEAR       I rSK CONDITIONS:
Procedure Rev. Date a. verify cues both verbal and visual are free of conflict, and b. ensure performance time is accurate.
I.     Reactor power is currently stable at 99.7%.
then revise the JPM. cover page. 9. Pilot test the JPM: IO. If the JPM cannot be performed as written with proper responses, I I. When JPM is revalidated, SME or Instructor sign and date JPM LLOJPM0712 Rev000.doc Page 2 of 7 I EXELON NUCLEAR LLOJPM0712 REVOOO.DOC Job Performance Measure (JPM) REVlS ION RECORD (
: 2.     During the previous shift, Reactor Engineering and Ops Management had authorized a Reactor power ascension using control rods and recirc flow.
: 3.     Reactor power was raised from 90% following a slight rod pattern adjustment.
: 4.     Shift turnover has been completed, all required log entries have been completed and you have assumed shift duties.
: 6.     The official 3D Monicore Periodic Log (PI) is being run at this time to assess the recently completed Reactor power ascension.
: a.     The Plant Monitoring System (PMS) is operable.
: b.     3D Monicore (3DM) is OPERABLE.
: c.     No PMS OR software testing is in progress.
: d.     The P-1 edit is not known to be invalid.
INITIATING CUE You are directed to review the official 3D Monicore Periodic Log (PI) to ensure Reactor core limits have been controlled during the recent power ascension.
 
Limerick Generating Station Job Performance Measure DETERMINATION OF ADEQUATE SHIFT STAFFING JPM Number: 0712
 
EXELON NUCLEAR Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
I.Task description and number, JPM description and number are identified.
: 2. Knowledge and Abilities (WA) references are included.
: 3. Performance location specified. (in-plant, control room, or simulator)
: 4. Initial setup conditions are identified.
: 5. Initiating and terminating cues are properly identified.
: 6. Task standards identified and verified by SME review.
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev.           Date
: 9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
I O . If the JPM cannot be performed as written with proper responses, then revise the JPM.
II.When JPM is revalidated, SME or Instructor sign and date JPM cover page.
LLOJPM0712 Rev000.doc                                                                   Page 2 of 7
 
I                                         EXELON NUCLEAR LLOJPM0712 REVOOO.DOC Job Performance Measure (JPM)
REVlSION RECORD (


==SUMMARY==
==SUMMARY==
)
)
New JPM SIMULATOR SETUP INSTRUCTIONS:
New JPM SIMULATOR SETUP INSTRUCTIONS:
None INITIAL CONDITIONS: - Both units are in OPCON I Today's date is 12/25 - It is night shift 18:30 - 06:30 The entire shift has participated in a Christmas meal at @ 0000 Initial shift staffing (attached) consists of 1 Shift Manager, 2 Control Room - - Supervisors, 3 Reactor Operators, and 11 Equipment Operators INITIATING CUES: At 0130, 1 Reactor Operator complains of severe stomach pain/headache and is unable to perform duties as Reactor Operator.
None INITIAL CONDITIONS:
      -       Both units are in OPCON I Todays date is 12/25
      -       It is night shift 18:30 - 06:30
      -      The entire shift has participated in a Christmas meal at @ 0000
      -      Initial shift staffing (attached) consists of 1 Shift Manager, 2 Control Room Supervisors, 3 Reactor Operators, and 11 Equipment Operators INITIATING CUES:
At 0130, 1 Reactor Operator complains of severe stomach pain/headache and is unable to perform duties as Reactor Operator.
TASK STANDARD:
TASK STANDARD:
Determine that shift is below minimum staffing requirements and take appropriate corrective action Information For Evaluator's Use:
Determine that shift is below minimum staffing requirements and take appropriate corrective action Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes CRITICAL steps. Number any comments in the "Comment Number" column.
* Denotes CRITICAL steps.
Then annotate that comment in the "Comments" section.
Number any comments in the Comment Number column. Then annotate that comment in the Comments section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct Page 3 of 7 LLOJPM0712 RevOOO. doc EXELON NUCLEAR I L L 0 JPM0712 REvOOO. DOC Job Performance Measure (JPMI the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct LLOJPM0712 RevOOO.doc                                                                      Page 3 of 7
The timeclock starts when the candidate acknowledges the initiating cue.  
 
......................................................
EXELON NUCLEAR                                                                                                                                                         I LL 0JPM0712 REvOOO.DOC Job Performance Measure (JPMI the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
.............................................................  
The timeclock .............................................................
-........  
...................................................... starts when the candidate
"..... ........ " .................  
                                                                            -........ ".............acknowledges
* .... " ....... " ...--."......., ".,"....."^^  
                                                                                                    "................. .... ..........--.".......,the initiating
...-. I ....-..... " ......... " ..........
                                                                                                                                                    ".,"....."^^...-. ....-..... .........cue.
I.. I ... I.. ..... ".." ...........---.-.-.-. " .....................  
I          "          ".......... ... ...".."...........---.-.-.-. ........... .. ".."..."
.... ".."..." LLOJPM0712 Rev000.doc Page 4 of 7 LLOJPM0712 REVOOO.DOC Job Performance Measure (JPM)
I..
Operator's Name: Job Title: 0 NLO 0 RO 0 SRO 0 STA 0 SRO Cert JPM Title: Determination of Adequate Shift Staffing JPM Number: LLOJPM0712 Revision Number: 000 WA Number and Importance:
I I . .                         "
Generic 2.1 .IO 2.7 / 3.9 Suggested Testing Environment:
LLOJPM0712 Rev000.doc                                                                                                                                                                                                                 Page 4 of 7
Classroom Actual Testing Environment:
 
Classroom Testing Method: Simulate Faulted: No Alternate Path: No Time Critical:
LLOJPM0712 REVOOO.DOC Job Performance Measure (JPM)
No Estimated Time to Complete:
Operators Name:
15 minutes Actual Time Used: minutes  
Job
 
==Title:==
0 NLO       0 RO         0SRO          0STA      0 SRO Cert JPM
 
==Title:==
Determination of Adequate Shift Staffing JPM Number: LLOJPM0712 Revision Number: 000 WA Number and Importance:           Generic 2.1 . I O  2.7 / 3.9 Suggested Testing Environment:         Classroom Actual Testing Environment:       Classroom Testing Method:       Simulate           Faulted:       No Alternate Path:       No Time Critical:     No Estimated Time to Complete: 15 minutes Actual Time Used:                     minutes


==References:==
==References:==
OP-LG-101-1II,SHIFT STAFFING REQUIREMENTS TECHNICAL SPECIFICATIONS EVALUATION


OP-LG-101-1 I I, SHIFT STAFFING REQUIREMENTS TECHNICAL SPECIFICATIONS EVALUATION
==SUMMARY==
Were all the Critical Elements performed satisfactorily?        OYes    UNO The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:            0Satisfactory          0 Unsatisfactory Comments:
Evaluators Name:                                          (Print)
EvaIuators Signature:                                              Date:
LLOJPM0712 Rev000.doc                                                                Page 5 of 7


==SUMMARY==
EXELON NUCLEAR JPM Start Time:
: Were all the Critical Elements performed satisfactorily?
ELEMENT                               STANDARD            SAT I.Obtain OP-LG-101-1II,       or Tech Specs     OP-LG-I 01-1I1 or to determine shift staffing requirements     Tech Specs are obtained (Cue: If requested, provide copy of OP-LG-I 01-1 1IOR candidate may use Tech Specs to determine minimum shift staffing requirements)
OYes UNO The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be: 0 Satisfactory 0 Unsatisfactory Comments:
*2, Determine that shift staffing is in violation Reactor Operator of minimum shift staffing requirements       staffing is in violation per OP-LG-I 01-1I1 and Tech Specs.           Of OP-LG-101-111 (Shift staffing requires 17 shift positions (Minimum required staffing is 2 Reactor filled including 2 Reactor Operators in OPCON 1)                                     Operators    with both units in OPCON 1)
Evaluator's Name: (Print) Date: Eva I ua t or's S ig nat u re : L LOJPM0712 Rev000. doc Page 5 of 7 EXELON NUCLEAR JPM Start Time:
*3. Determine action necessary IAW current       OP-LG-101-1 I1 step shift manning.                               4.1 .I .4 states that shift (Except for Shift Manager, shift crew        crew composition may composition may be one less than             be one less than the minimum requirements for up to 2 hours.       minimum requirements With IRO unable to perform duties, the       of Attachment 1 for a shift is 1 position below minimum             period not to exceed requirements.)                               two hours
ELEMENT I. Obtain OP-LG-101-1 I I, or Tech Specs to determine shift staffing requirements (Cue: If requested, provide copy of OP- LG-I 01 -1 1 I OR candidate may use Tech Specs to determine minimum shift staffing requirements)  
*4. Take action to restore minimum shift         Perform operator call-staffing                                     in to get RO position manned within 2 hours
*2, Determine that shift staffing is in violation of minimum shift staffing requirements per OP-LG-I 01 -1 I 1 and Tech Specs. (Shift staffing requires 17 shift positions filled including 2 Reactor Operators in OPCON 1) *3. Determine action necessary IAW current shift manning. (Except for Shift Manager, shift crew composition may be one less than minimum requirements for up to 2 hours. With I RO unable to perform duties, the shift is 1 position below minimum requirements.)  
: 5. Record shift staffing position changes in     Changes in shift Operator Log, per OP-AA-I 11-101             staffing recorded in Operator Logs
*4. Take action to restore minimum shift staffing 5. Record shift staffing position changes in Operator Log, per OP-AA-I 11-101 6. Deviations from Administrative Controls per Tech Specs, for shift staffing must be reported to Shift Manager (CUE: "You may stop here, you have met the termination criteria for this JPM") JPM Stop Time: STANDARD OP-LG-I 01-1 I 1 or Tech Specs are obtained Reactor Operator staffing is in violation (Minimum required staffing is 2 Reactor Operators with both units in OPCON 1) Of OP-LG-101-111 OP-LG-101-1 I 1 step 4.1 .I .4 states that shift crew composition may be one less than the minimum requirements of Attachment 1 for a period not to exceed two hours Perform operator call-in to get RO position manned within 2 hours Changes in shift staffing recorded in Operator Logs Shift Manager or higher notified that shift is below minimum shift staffing level N/A SAT LLOJPM0712 Rev000.doc Page 6 of 7 I EXELON NUCLEAR -\ INITIAL CONDITIONS: - Both units are in OPCON 1 It is night shift 18:30 - 06:30 The entire shift has participated in a Christmas meal at @ 0000 Initial shift staffing (attached) consists of 1 Shift Manager, 2 Control Room Supervisors, 3 Reactor Operators, and 11 Equipment Operators - Today's date is 12/25 - - - . INITIATING CUES: At 01 30, 1 Reactor Operator complains of severe stomach painlheadache and is unable to perform duties as Reactor Operator. Determine whether Tech Spec and Operations shift staffing requirements are adequate, and if required, any actions needed.}}
: 6. Deviations from Administrative Controls       Shift Manager or per Tech Specs, for shift staffing must be higher notified that reported to Shift Manager                     shift is below minimum shift staffing level (CUE: "You may stop here, you have met                       N/A the termination criteria for this JPM")
JPM Stop Time:
LLOJPM0712 Rev000.doc                                                             Page 6 of 7
 
I                                           EXELON NUCLEAR
  -\
INITIAL CONDITIONS:
            -       Both units are in OPCON 1
            -      Today's date is 12/25
            -      It is night shift 18:30- 06:30
            -      The entire shift has participated in a Christmas meal at @ 0000
            -      Initial shift staffing (attached) consists of 1 Shift Manager, 2 Control Room Supervisors, 3 Reactor Operators, and 11 Equipment Operators
. INITIATING CUES:
At 0130, 1 Reactor Operator complains of severe stomach painlheadache and is unable to perform duties as Reactor Operator.
Determine whether Tech Spec and Operations shift staffing requirements are adequate, and if required, any actions needed.}}

Latest revision as of 00:27, 14 March 2020

Oct. 2006 Exam - Draft - Section a Operating Exam (Folder 2)
ML062930268
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 09/11/2006
From: Todd Fish
Operations Branch I
To:
Exelon Generation Co
Sykes, Marvin D.
References
Download: ML062930268 (48)


Text

Limerick Generating Station Job Performance Measure CALCULATE STAY TIME JPM Number: 0703

EXELON NUCLEAR LLOJPM0703 REVOOI.DOCI Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 1Ibelow.

I.Task description and number, JPM description and number are identified.

2. Knowledge and Abilities (WA) references are included.
3. Performance location specified. (in-plant, control room, or simulator)
4. initial setup conditions are identified.
5. Initiating and terminating cues are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. Date

9. Pilot test the JPM:
a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.
10. If the JPM cannot be performed as written with proper responses, then revise the JPM.

I1. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

LLOJPM0703 RevOO1,doc Page2of9 I

I EXELON NUCLEAR LLOJPM0703 REVOO7.DOC I Job Performance Measure (JPM)

REVISION RECORD (

SUMMARY

)

0 Old PKocedure RP-LG-460-2000 superceded by Current Procedure RP-AA-460-1001, Added Check Boxes SIMULATOR SETUP INSTRUCTIONS:

None INITIAL CONDIT10NS:

- Unit Iis in OPCON 1

- Work is being performed in the Unit 1 Main Steam Chase

- Additional high radiation exposure controls are required

- Two workers are perfohing the work

- Job conditions and information are as follows:

Dose Rate Alarms on their Electronic Dosimeter for both workers: 600 mrem/hr Accumulated Dose Alarms on their Electronic Dosimeter for both workers:

1200 mrem RWP Approval Dose Alarm for both workers: 1200 mrem Stop Work Dose Rate for both workers: 600 mrem/hr Worker Ihas 600 mrem accumulated dose on his Electronic Dosimeter from his first entry Worker 2 has 800 mrem accumulated dose on his Electronic Dosimeter from his first entry 3 man-hrs are required to finish the work Time required to enter: 5 minutes Time required to exit: 5 minutes Work is to be performed in the Unit 1 Main Steam Chase against the Containment Wall INITIATING CUES:

Use RP-AA-460-1001, "Additional High Radiation Exposure Controls" attachment 3 and I survey map to determine:

I. Maximum Stay Times (Worst Case) to reach the Electronic Dosimeter accumulated dose alarms for worker Iand worker 2

2. If the workers can finish the work without receiving accumulated dose alarms LL OJPMO703 Rev00I.doc Page3of9 I

I EXELON NUCLEAR LLOJPM0703 REvOO'I.DOC 1 Job Performance Measure (JPM1 TASK STANDARD:

Calculate stay time for workers Iand 2 until dose alarms reached and if work can be finished in the allotted time.

................................................ -_...........-.._.............. "."...."........,....._""...^.."""....."......"."

I ...........................""..............................."...".....

Information For Evaluator's Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

Number any comments in the "Comment Number" column. Then annotate that comment in the "Comments" section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledaes the initiating cue.

LLOJPM0703 RevOOl.doc ~age4of9 I

I EXELON NUCLEAR LLOJPM0703 REVOO~.DOC Job Performance Measure (JPM)

Operator's Name:

Job

Title:

0 NLO 0RO 0 SRO 0 STA 0 SRO Cert JPM

Title:

Calculate Stay Time JPM Number: LLOJPM0703 Revision Number: 000 WA Number and Importance: Generic 2.3.10 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Testing Method: Simulate Fau I ted : No Alternate Path: No Time Critical: No Estimated Time to Complete: 30 minutes Actual Time Used: minutes

References:

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? 0Yes 0 No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be: 0Satisfactory 0 Unsatisfactory

.Comments:

Evaluator's Name: (Print)

Evaluator's Signature: Date:

LL OJPMO703 Rev00I.doc Page 5 of 9

1 EXELON NUCLEAR JPM Start Time:

ELEMENT STANDARD Comment Number (Cue: Provide copy of RP-AA-460-1001 and NIA survey map)

1. Determine Maximum Stay Time for the Maximum Stay Time required entry Determined to be:
2. For worker 1:
  • 2.a Subtract accumulated dose of 600 mr Accum - Accum = Remain from accumulated dose alarm of Dose Dose Dose 1200 mr to get remaining dose until Alarm Alarm alarm 1200 mr - 600 mr = 600 mr "2.b Divide Allowable Work Dose by the Remain! Max = Max Maximum Whole Body Dose Rate in Dose Dose Stay work area to get Maximum Stay Time Alarm Rate Time (Worst Case) 600mr / 400 mr/hr = 1.5 hr 2.c Subtract entry and exit time of 10 Max - Entry = Max minutes (5 minutes+5 minutes) from Stay Exit Allow the Maximum Stay Time Time Time Time 90 min - 10 min = 80 min
3. For worker 2:
  • 3.a Subtract accumulated dose of 800 mr Accum - Accum = Remain from accumulated dose alarm of Dose Dose Dose 1200 mr to get remaining dose until Alarm Alarm alarm 1200 mr - 800 mr = 400 mr
  • 3.b Divide Allowable Work Dose by the Remain/ Max = Max Maximum Whole Body Dose Rate in Dose Dose Stay work area to get Maximum Stay Time Alarm Rate Time (Worst Case) 400mr / 400 mr/hr = 1 hr LLOJPM0703 RevOOl.doc Page6of9 1

EXELON NUCLEAR I ELEMENT STANDARD 3.c Subtract entry and exit time of I O Max - Entry = Max minutes (5 minutes+5 minutes) from Stay Exit Allow the Maximum Stay Time Time Time Time 60 min I O rnin = 50 rnin I -

4. Calculate if man-hrs are exceeded:

4.a Add worker 1 Maximum Stay Time of Worker + Worker = Total 80 minutes to worker 2 Maximum 1 Stay 2Stay Stay Stay Time of 50 minutes Time Time Time I 80 min + 50 min = 130 rnin i

  • 4.b Determine work can not be competed Determine work can not be due to combined stay time less than completed required 3 man-hrs (1 80 minutes) remaining (CUE: You may stop here, you have met NIA the termination criteria for this JPM)

JPM Stop Time:

LLOJPM0703 RevO0l.doc Page7of9 I

INITIAL CONDITIONS:

- Unit 1 is in OPCON 1

- Work is being performed in the Unit 1 Main Steam Chase

- Additional high radiation exposure controls are required Two workers are performing the work

- Job conditions and information are as follows:

Dose Rate Alarms on their Electronic Dosimeter for both workers: 600 mremlhr Accumulated Dose Alanns on their Electronic Dosimeter for both workers:

1200 mrem RWP Approval Dose Alarm for both workers: 1200 mrem Stop Work Dose Rate for both workers: 600 mrem/hr Worker 1 has 600 mrem accumulated dose on his Electronic Dosimeter from his first entry Worker 2 has 800 mrem accumulated dose on his Electronic Dosimeter from his first entry 3 man-hrs are required to finish the work Time required to enter: 5 minutes Time required to exit: 5 minutes Work is to be performed in the Unit 1 Main Steam Chase against the Containment Wall INITIATING CUES:

Use RP-AA-460-1001, Additional High Radiation Exposure Controls attachment 3 and I survey map to determine:

1. Maximum Stay Times (Worst Case) to reach the Electronic Dosimeter accumulated dose alarms for worker Iand worker 2.
2. If the workers can finish the work without receiving accumulated dose alarms.

l"_

l.""

l ARW_._l._l"l.SURVEY FORM ""

~

<e$

__I_,

L r.

PBAPS OTHER[circleone) koa 1........... 01 .. I......

" p 1

1 p

_1 7

,  :.y-~:zr-T-===zcc-~ =_- .-&1_1-1-1-= - = ~ ~ ~ ~ = - - ~ . ~ - - - ~ . ~ - ~ _ _ _ _

v?No. _" 04-52 _ DATE: 12/24/04

............ __ ... .. _.....__ TIME: ........ _ 0900 ._ s u m No: 04-258.. .................... _.

mm: "MI 1 3Lm. RX ..... REV. _ 279 .....

waxm: .Va!ve..work.in. M a h . Steam C.hase............................................................................................................ ,

,TW taw wialned, '& 3nlw #. ere.!

mMD FI: Joe Tech JBT ~ ~ - ' s x Art Star Phil Head i .. ~

lWl?nKEl

[Rhl Eare/ldkW l%?xdm-W4 P m c.4. WE vmID i INSTRUMENT SEW i uv Ix5'fAlID S E W INSTRUMEM i 'e I!...... I-.

. RM 14 -. No.

__ ............ R02A

.- . No.

33-3333 j

1..... ..z:.::.:.:1

... m ...

....... ... 4.. .............................. -. .. ..... 33-4444 ....

' .....??- .....- .... I ............ .9. ---

x.-

+ ............................

WI , Contarnlnation lrEM%~mN

.. .f 1 Floor .

2 1 Floor elk

'r i <lk i

Floor

<lk T-? I i

! /Joan/ OA

  • 1 <lk I,

--- Floor

-_I___-_-

j ~LImCmlw

__ -- <lk

. i 6 Floor

,I

~

~, i ccm.:mon/G4 7-

............ 2.. ...... .................

7 I Floor <lk Floor <lk Floor <lk Floor <lk Floor clk I2 13 Joe Joo IUE . 12/24/04

I Limerick Generating Station Job Performance Measure ERP CLASSIFICATION AND REPORTING (TIME CRITICAL)

JPM Number: 0127

JCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPM0127 Rev 001 JOB PERFORMANCE MEASURE (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.

I.Task description and number, JPM description and number are identified.

2. Knowledge and Abilities (WA) references are included.
3. Performance location specified. (in-plant, control room, or simulator)
4. Initial setup conditions are identified.
5. Initiating and terminating cues are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*I-

8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. Date

9. Pilot test the JPM:
a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.
10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

LLOJPM0127 Rev001.doc Page 2 of 7

JCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPM0727 Rev 007 JOB PERFORMANCE MEASURE (JPM)

REVISION RECORD (Summary)

1. Revision 001, Delete revision numbers from EP procedure numbers.

SIMULATOR SETUP INSTRUCTIONS:

I.Reset simulator to any IC in which Unit Iis at power in OPCON I

2. Enter the following MET conditions
a. Wind Speed 4.0 MPH
b. Wind Direction 132" INITIAL CONDITIONS:

0 Unit 1 and 2 are operating at full power 0 A call from security indicates that a small plane has crashed into and damaged the spray pond network.

INITIATING CUES:

0 This JPM will start after you have reviewed the task conditions and tell the evaluator that you are ready to begin 0 You are required to make the ERP classification and subsequent call outs. All communications should be made as if a drill is in progress Information For Evaluator's Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

Number any comments in the "Comment Number" column. Then annotate that comment in the "Comments" section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledaes the initiatina cue.

LLOJPM0127 Rev001 .doc Page 3 of 7

JCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPM0727 Rev 007 JOB PERFORMANCE MEASURE (JPM)

TITLE: ERP CLASSIFICATION AND REPORTING (TIME CRITICAL)

Operator's Name:

Job

Title:

0NLO 0RO 0SRO STA D S R O Cert JPM

Title:

ERP CLASSIFICATION AND REPORTING (TIME CRITICAL)

JPM Number: LLOJPM 0127 Revision Number: 001 KIA Number and Importance: Generic 2.4.41 2.314.1 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Testing Method: Perform Faulted: No Alternate Path: No Time Critical: Yes Estimated Time to Complete: I 5 minutes Actual Time Used: Minutes eferences: EP-AA-I 008, LGS EMERGENCY ACTION LEVEL (EAL) MATRIX EP-MA-114-IOO-F-OI , State/Local Event Notification Form EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily7 UYes U N O The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be: 0Satisfactory Unsatisfactory Comments:

EvaIuator's Name: (Print)

Evaluator's Signature: Date:

LLOJPM0127 Rev001.doc Page 4 of 7

JCLEAR GENERATION GROUP EXELON NUCLEAR 1 LLOJPMOl27 Rev 001 JOB PERFORMANCE MEASURE (JPM)

START TIME:

PERFORMANCE CHECKLIST:

ELEMENT STANDARD SAT UNSAT Comment Number b

I

~

EP-AA-I 1I,Section 4.1 I. Evaluator note time candidate begins reviewing EALs

2. When an abnormal condition is being evaluated, REFER to the appropriate Station EAL N/A Matrix and PERFORM the following:
3. IDENTIFY the Unit Mode for NIA the state of the plant prior to

~ ~

Use EAL Matrix to classify event Determine Alert initiating conditions have been exceeded I NOTE the EAL number associated with the IC HA3 identified

7. DECLARE the event Declare an Alert within -l5 minutes of the START TIME in Step 1 DECLARATION TIME:
8. RETURN to the appropriate EP-AA-112 ERO position checklist and immediately N/A begin notifications

~ ~

EP-AA-112-1OO-F-01, SHIFT EMERGENCY DIRECTOR CHECKLIST LLOJPMOl27 Rev001.doc Page 5 of 7

JCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPM0127 Rev 007 JOB PERFORMANCE MEASURE (JPM)

ELEMENT STANDARD SAT UNSAT Comment Number

9. ANNOUNCE the event Make announcement per classification to the Control scripted message Room Staff, and over the plant Public Address (PA) system based on pre-scripted message guidelines in EP-AA-112, Attachment 6 ~ ~~

IO. PERFORM Attachment 2, Contact Shift Communicator to ERO Augmentation initiate callout per Attachment 2

11. DETERMINE the correct N/A - No PAR for Alert plant-based PAR per the appropriate site-specific PAR flowchart in EP-AA-111, Attachments 8 12*. INITIATE required State/Local Direct Shift Communicator to notifications within 15 minutes 1 perform notification within 12 of the event classification as minutes of DECLARATION required EP-MA-I 14-100 for TIME. (15 minutes minus time instructions on completion and for Communicator to receive transmittal of State/County form and make roll call) notifications Note: This step is graded after I the next section.
13. Message number - ENTER a 661J or equivalent entered sequential number starting with 1
14. APPROVED BY Signature entered 15*. STATUS BLOCK THIS IS A DRILL marked
16. CLASSIFICATION ALERT checked
17. AFFECTED UNIT ONE and TWO checked 18*. DECLARED AT Time and Date entered. H A 3 entered as EAL#
19. CLASSIFICATION STATUS INITIAL DECLARATION checked I

LLOJPM0127 Rev001 .doc Page 6 of 7

JCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPM0127 Rev 001 JOB PERFORMANCE MEASURE (JPM) 4 ELEMENT DESCRIPTION STANDARD An Event has occurred that threatens vital equipment.

Current Plant Conditions Do not Threaten public safety.

NON-ROUTINE N O checked i; 22.

RADIOLOGICAL RELEASE STATUS PAR Left blank or NOT APPLICABLE checked 23*. METEOROLOGY Values match displayed Tower I175or Tower 2 159 PMS data (132/ 4 MPH) 24*. STATUS This is a drill checked (Critical that at least one of the two status blocks on the page is marked correctly and no contradictory info is marked. If contradictory info is marked, then the incorrect step is UNSAT. If one block is blank and the other is correct, then the blank block is N/A)

CUE: (When State and Local N/A Notification Form is given to Shift Communicator)

You have met the termination criteria for the JPM.

JPM Stop Time LLOJPM0127 Rev001.doc Page 7 of 7

INITIAL CONDITIONS:

Unit 1 and 2 are operating at full power 0 A call from security indicates that a small plane has crashed into and damaged the spray pond network.

INITIATING CUES:

0 This JPM will start after you have reviewed the task conditions and tell the evaluator that you are ready to begin 0 You are required to make the ERP classification and subsequent call outs. All communications should be made as if a drill is in progress

Limerick Generating Station Job Performance Measure FIRE ALARM IN INVERTOR ROOM JPM Number: LLOJPM0715 L

1dUCLEAR GENERATION GROUP -

EXELON NUCLEAR1 LLOJPM0715 Rev000 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through I 1 below.

1. Task description and number, JPM description and number are identified.
2. Knowledge and Abilities (WA) references are included.
3. Performance location specified. (in-plant, control room, or simulator)
4. Initial setup conditions are identified.
5. Initiating and terminating cues are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. Date

9. Pilot test the JPM:
a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

I O . If the JPM cannot be performed as written with proper responses, then revise the JPM.

1 I.When JPM is revalidated, SME or Instructor sign and date JPM cover page.

LLOJPM077 5 Rev000.doc Page 2 of 7

LL OJPM0715 Rev000 REVISION RECORD (Summary):

1. New JPM.

SIMULATOR SETUP INSTRUCTIONS:

None TASK STANDARD:

1. Dispatch the Fire Brigade
2. Evacuate the #Inverter I Room
3. Identify 1FSSG-3020 as the correct Fire Safe Shutdown Guide TASK CONDITIONS:

Unit 1 is at 100% power.

INITIATING CUE:

This JPM is to be conducted as a DRILL.

The following is observed in the MCR:

Audible Fire Alarm Code 5-2-4 is alarming CONT EL 254 INVERT RM I (006 FIRE I-3-L) Annunciator is in alarm You are directed by Shift Supervision to respond to the above alarm as the PRO Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

Number any comments in the Comment Number column. Then annotate that comment in the Comments section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multipfe steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

LLOJPMO715 Rev000.doc Page 3 of 7

,\lUCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPM0715 Rev000 Operators Name:

Job

Title:

0 NLO CI RO 0 SRO 0STA 0SRO Cert JPM

Title:

FIRE ALARM IN INVERTOR ROOM JPM Number: LLOJPM0715 Revision Number: 000 K/A Number and Importance: Generic 2.4.27 3.0 13.5 Suggested Testing Environment: Classroom Actual Testing Environment: Classroom Testing Method: Simulate Faulted: No Alternate Path: No Time Critical: No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

CONT EL 254 INVERT RM I (006 FIRE I-3-L)

SE-8 Fire SE-24 E Crew Day Shift People Paper FSSA-3000 Sheets 1 through 10 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? 0Yes 0 No The operators performance was evaluated against the standards contained in this JPM,and has been determined to be: 0Satisfactory 0 Unsatisfactory Comments:

Note: Any grade of UNSAT requires a comment.

Evaluators Name: (Print)

Eva1uators Signature: Date:

LLOJPMO715 Rev000.doc Page 4 of 7

r\lUCLAR GNRAT/ON GROUP EXELON NUCLEAR I LLOJPM0715 Rev000 ELEMENT STANDARD SAT UNSAT Comment Number SE-24 SE-24,APP 1 "E" Crew Day Shift People Paper FSSA-3000 Sheets Ithrough 10 If the JPM is conducted in Simulator setting, student should obtain copies of required documents without assistance.

1. OBTAIN copy of ARC 006 FIRE COPYOf ARC 006 FIRE 1-34 I-3-L obtained.

SUE: When requested, provide copy of ARC 006 FIRE I-3-L

2. OBTAIN a copy of the most recent Copy of the most recent revision of SE-8, FIRE revision of SE-8 obtained.

N E : When requested, provide copy of SE-8, FIRE

3. OBTAIN a copy of the most recent Copy of the most recent revision of: revision of SE-24, including Appendix 1, obtained.

SE-24 SE-24,APP 1 N E : When requested, provide copy of SE-24 INPLANT EVACUATIONS LLOJPM0715 Rev000.doc Page 5 of 7

rVUCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPM0715 Rev000 JOB PERFORMANCE MEASURE (JPM)

ELEMENT STANDARD SAT UNSAT Comment

4. DISPATCH Fire Brigade Leader to The Fire Brigade leader is

- Number investigate the fire alarm. dispatched to investigate the fire alarm.

NOTE: SE-8 gives specific direction to dispatch only the Fire Brigade Leader when the sole indication of the fire is the area fire alarm. The candidate may dispatch the Fire Brigade Leader by radio or plant page CUE: After Fire Brigade leader is separately or as part of the dispatched: local area evacuation below.

REPORT: This is Mark Coleman, The candidate may also Fire Brigade Leader. I am dispatch the entire Fire responding to the fire alarm code Brigade because this is 5-24., Elev. 254 Control directed in the ARC. This Enclosure Inverter Room #I. would also satisfy the standard.

5. EVACUATE local area per SE-24 Simulate using plant PA and plant radio to make announcement including the XJE: If candidate requests following general information determination of assembly area: (SE-24 App I):

The CRS directs use of the HP This is a drill. Fire alarm code field office. 5-2-4 has been annunciated in 3UE: After the candidate makes the Elev. 254 Control Enclosure local area evacuation, report Inverter Room I. Fire Brigade back as Mark Coleman, fire Leader respond. All personnel brigade leader, There is a fire in evacuate the Elev. 254 Control Inverter Room #I. Smoke is Enclosure Inverter Room I and coming out from under the door assemble at the HP field and the door is hot to the touch. office. This is a drill 6.ACTIVATE the Fire Brigade. The Fire Brigade is activated.

SUE: If the Fire Brigade Leader is requested to make a recommendation on activation of the Fire Brigade respond, Recommend activating the Fire Brigade.

LLOJPM0715 Rev000.doc Page 6 of 7

r\/UCLAR GENERATION GROUP EXELON NUCLEAR 1 LLOJPM0715 Rev000 JOB PERFORMANCE MEASURE (JPM)

ELEMENT STANDARD SAT UNSAT Comment Number

7. ACKKNOWLEDGE fire brigade Each Fire Brigade member's member reports of response AND report of response and location. location is acknowledged.

CUE: Call in to the candidate as each of the Fire Brigade members (Mark Coleman - Fire Brigade Leader, Kevin Buckley, Scott Miller, Brian Stratton, and Shawn McAnulty) with the following communication: "This is (Insert Name) responding to the Fire Alarm code. I am on route to the Fire Brigade Locker."

8. ADVISE Fire Brigade Leader of the ADVISE Fire Brigade Leader appropriate Pre Fire Plan to use from to use Pre-Fire Plan F-A-452.

information contained in the Annunciator Response Card for the fire alarm.

CUE: Respond as Mark Coleman, Fire Brigade Leader, "I understand I am to refer to Pre-Fire Plan F-A-452.

~ ~~~~~~ ~~

  • 9. REFER to Fire Safe Shutdown Area Identify 1FSSG-3020 FIRE Map FSSA-3000 to determine AREA 020 FIRE GUIDE Unit 1 appropriate Fire Safe Shutdown Static Inverter Compartment Guide (FSSG) for both units. (El. 254'-0")as the appropriate FSSG.

CUE: When requested provide copies of FSSA-3000 Sheets 1 through IO.

CUE: You may stop here, you have met the termination criteria for this JPM JPM Stop Time LL0JPMO 7I 5 Rev000.doc Page 7 of 7

,\lUCLEAR GENERATiON GROUP EXELON NUCLEAR I TASK CONDITIONS:

Unit 1 is at 100% power.

INITIATING CUE:

This JPM is to be conducted as a "DRILL".

The following is observed in the MCR:

0 Audible Fire Alarm Code 5-2-4 is alarming 0 CONT EL 254 INVERT RM I (006 FIRE I-3-L) Annunciator is in alarm You are directed by Shift Supervision to respond to the above alarm as the PRO

Limerick Generating Station Job Performance Measure REVIEW / CONTINUE PERFORMANCE OF MAIN TURBINE BYPASS VALVE EXERCISING SURVEILLANCE TEST JPM Number: LLOJPM0713

EXELON NUCLEAR JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 1Ibelow.

1. Task description and number, JPM description and number are identified.
2. Knowledge and Abilities (WA) references are included.
3. Performance location specified. (in-plant, control room, or simulator)
4. Initial setup conditions are identified.
5. Initiating and terminating cues are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are .dentifie(

with an asterisk (*).

8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. Date

9. Pilot test the JPM:
a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

I O . If the JPM cannot be performed as written with proper responses, then revise the JPM.

11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

LL OJPMO773 RevOOO.doc Page 2 of 7

EXELON NUCLEAR LLOJPM0773Rev000 Revision Record (Summary):

I.New JPM.

SIMULATOR SETUP INSTRUCTIONS:

None TASK STANDARD:

I.Determine that Reactor power must be reduced to raise MCPR above the limit with Main Turbine BPVs inoperable.

2. SROs determine that operation may continue at reduced power per the action of Tech Spec 3.2.3.b.

TASK CONDITIONS:

1. Unit Ihas started up from a refuel outage and is at 100% power.
2. All required equipment is OPERABLE.
3. Due to difficulties performing ST-6-001-761-1, the ST could not be completed on the previous shift.
4. ST-6-001-761-1 is partially complete to step 4.3.4 and is to be completed on the current shift.

INITIATING CUE:

You are directed to review and continue with the performance of ST-6-001-761-1 at step 4.3.5.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

Number any comments in the Comment Number column. Then annotate that comment in the Comments section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

LL OJPMO773 Rev000.doc Page 3 of 7

EXEL ON NUCLEAR LLOJPM0713Rev000 Operators Name:

Job

Title:

0 NLO 0 RO 0 SRO 0 STA 0 SRO Cert JPM

Title:

REVIEW / CONTINUE PERFORMANCE OF MAIN TURBINE BYPASS VALVE EXERCISING SURVEILLANCE TEST JPM Number: LLOJPM0713 Revision Number: 000 WA Number and Importance: Generic 2.2.12 3.0 13.4 Suggested Testing Environment: Classroom Actual Testing Environment: Classroom Testing Method: Simulate Faulted: No Alternate Path: No Time Critical: No Estimated Time to Complete: 20 minutes Actual Time Used: minutes

References:

ST-6-001-761-1, MAIN TURBINE BYPASS VALVE EXERCISING EVALUAT1ON SU M MARY:

Were all the Critical Elements performed satisfactorily? CJ Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: 0Satisfactory Unsatisfactory Comments:

Note: Any grade of UNSAT requires a comment.

Evaluators Name: (Print)

Eva1uators Signature: Date:

LL 0JPMO713 Rev000.doc Page 4 of 7

I EXELON NUCLEAR LLOJPM0713Rev000 JOB PERFORMANCE MEASURE (JPM)

NOTE: Critical Element(s) indicated by

  • in Performance Checklist.

PERFORMANCE CHECKLIST:

JPM Start Time

/I 1.

ELEMENT PROVIDE candidate a marked STANDARD NIA UP COPY of ST-6-001-761-1.

2. ELVALUATE number of BPVs 3 of the BPVs did not open that are inoperable. fully and are determined to be inoperable.
  • 3. DETERMINE that the number of It was determined that the OPERABLE BPVs is less than number of OPERABLE BPVs the number required by COLR is less than the number Table 7-2. required by COLR Table 7-2.

CUE: If asked, action statement C of Tech Spec 3.2.3 has not already been satisfied.

  • 4. COMPLETE Attachment 2 to The applicable OLMCPR is determine the applicable determined to be 1.47.

OLMCPR.

  • 5. RECORD the applicable The OLMCPR limit of 1.47 is OLMCPR limit as determined in recorded.

step I.e of Attachment 2.

6. REQUEST a P-I. P-1 is requested.

CUE: If asked, provide a copy of a P-I printout to the candidate

7. RECORD current value of Current value of CORRECTION FACTOR: CORRECTION FACTOR:

MFLCPR from P-I requested. MFLCPR from P-1 is I I recorded.

1 *8. RECORD current value of MCPR from P-I requested.

Current value of MCPR from P-I requested is recorded.

LLOJPM0713 Rev000.doc Page 5 of 7

I EXELON NUCLEAR LL OJPMO7l3RevOOO JOB PERFORMANCE MEASURE (JPM)

I/ ELEMENT STANDARD SAT UNSAT Commenl Number

/I

  • lo.

DETERMINE current value of MCPR LIMIT per step 4.3.5.6 MCPR recorded in step Current value of MCPR LIMIT per step 4.3.5.6 is determined.

A determination is made to 4.3.5.5 is less than or equal to reduce Rx power until MCPR MCPR LIMIT recorded in step is greater than the MCPR 4.3.5.6,THEN REDUCE Rx LIMIT.

power in accordance with RMSl

& GP-5 lJ Appendix 2, Section 3.1 to achieve a MCPR greater than the MCPR LIMIT.

11. Immediately NOTIFY Reactor Reactor Engineering is Engineering to change the notified.

MCPR limit in the process computer based on inoperable main turbine bypass valves.

NOTE: This is the termination point for ROs. The remaining portion of this JPM is SRO ONLY.

6 BPVs are determined to be OPERABLE. N/A is entered.

LLOJPM0713 Rev000.doc Page 6 of 7

I EXELON NUCLEAR LL OJPMO713Rev000 JOB PERFORMANCE MEASURE (JPM)

ELEMENT STANDARD SAT I UNSAT Comment

3.3.4.2 AND the main turbine bypass system is inoperable per Tech Spec 3.7.8 reactor Operation may continue at a power is 225%. THEN MCPR is reduced power level.

UNANALYZEDAND the Tech Spec actions required by Tech Spec 3.2.3.b must be followed.

Otherwise ENTER N/A for this step.

CUE: You have reached the termination point for the JPM.

JPM Stop Time LLOJPM0773 Rev000,doc Page 7 of 7

EXELON NUCLEAR TASK CONDITIONS:

I.Unit 1 has started up from a refuel outage and is at 100% power.

2. All required equipment is OPERABLE.
3. Due to difficulties performing ST-6-001-761-1, the ST could not be completed on the previous shift.
4. ST-6-001-761-1 is partially complete to step 4.3.4 and is to be completed on the current shift.

INITIATING CUE:

You are directed to review and continue with the performance of ST-6-001-761-1 at step 4.3.5.

Limerick Generating Station Job Performance Measure Administrative Actions on a Thermal Limit Violation JPM Number: LLOJPM0714

.UCLEAR GENERATION GROUP EXELON NUCLEAR I 4\

LLOJPM0714Rev000 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.

1. Task description and number, JPM description and number are identified.
2. Knowledge and Abilities (WA) references are included.
3. Performance location specified. (in-plant, control room, or simulator)
4. Initial setup conditions are identified.
5. Initiating and terminating cues are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. Date

9. Pilot test the JPM:
a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

I O . If the JPM cannot be performed as written with proper responses, then revise the JPM.

11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

LLOJPMU714 Rev000.doc Page 2 of 8

,(/CLEAR GENERAT~ON GROUP EXELON NUCLEAR(

LL OJPM0714Rev000 REVISION RECORD (Summary):

None SIMULATOR SETUP INSTRUCTIONS:

None.

TASK STANDARD:

Satisfactory task completion is indicated:

= The candidate identifies the need for a power reduction using control rods only, in accordance with the approved procedure, until FLLLP is less than 1.O. FLLLP must be restored within two hours or power must be reduced to less than 25%.

TASK CONDITIONS:

1. Reactor power is currently stable at 99.7%.
2. During the previous shift, Reactor Engineering and Ops Management had authorized a Reactor power ascension using control rods and recirc flow.
3. Reactor power was raised from 90% following a slight rod pattern adjustment.
4. Shift turnover has been completed, all required log entries have been completed and you have assumed shift duties.
5. The official 3D Monicore Periodic Log (PI) is being run at this time to assess the recently completed Reactor power ascension.
a. The Plant Monitoring System (PMS) is operable.
b. 3D Monicore (3DM) is OPERABLE.
c. No PMS software testing is in progress.
d. The P-1 edit is not known to be invalid.

INITIATING CUE You are directed to review the official 3D Monicore Periodic Log (PI) to ensure Reactor core limits have been controlled during the recent power ascension.

LL OJPMO714 Re v000.doc Page 3 of 8

,cICLAR GENERATION GROUP EXELON NUCLEAR1 LLOJPMO7I4RevOOO Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

Number any comments in the Comment Number column. Then annotate that comment in the Comments section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

LLOJPM0714 Re v000.doc Page 4 of 8

.cICLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPM0714Rev000 Operators Name:

Job

Title:

0NLO 0 RO 0SRO 0STA 0SRO Cert JPM

Title:

Administrative Actions on a Thermal Limit Violation JPM Number: LLOJPM0714 Revision Number: 000 KIA Number and Importance: 295014 AA2.04 4.1 / 4.4 Suggested Testing Environment: Classroom Actual Testing Environment: Classroom Testing Method: Simulate Faulted: No Alternate Path: No Time Critical: No Estimated Time to Complete: 10 minutes Actual Time Used: minUtes

References:

GP-5, STEADY STATE OPERATIONS GP-14, RESOLUTION OF THERMAL LIMITS VIOLATION EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? 0Yes 0 No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: 0Satisfactory 0Unsatisfactory Comments:

Note: Any grade of UNSAT requires a comment.

Evaluators Name: (Print)

Evaluators Signature: Date:

LLOJPM0714 RevOO0.doc Page 5 of 8

,UCLEAR GENERATION GROUP EXELON NUCLEAR^

LLOJPM0714Rev000 JOB PERFORMANCE MEASURE (JPM)

NOTE: Critical Element(s) indicated by

  • in Performance Checklist.

PERFORMANCE CHECKLIST:

JPM Start Time ELEMENT STANDARD SAT UNSAT Comment Number CUE: Provide the student with a 3D N/A Monicore Periodic Log (PI).

  • I. Review the official 3D Observe core FLLLP has Monicore Periodic Log (PI) to exceeded the specified limit, ensure core Thermal Limits and all other core and FLLLP are acceptable. parameters are within their specified limits.

LLOJPM0774 Rev000.doc Page 6 of 8

rUCLEAR GENERATION GROUP

~~ ~

EXELON NUCLEAR I LLOJPM0714Rev000 JOB PERFORMANCE MEASURE (JPM)

ELEMENT STANDARD SAT UNSAT Comment Number

  • 2. Communicate the condition of States the following the core as indicated on the concerning the condition of 3D Monicore Periodic Log the core:

(PI 1- The core FLLLP has exceeded the specified limit.

All other core parameters are within their specified limits.

CUE: Role play as necessary.

  • 3. Determine GP-14 must be Reviews GP-I4 entered and obtain a copy and prerequisites.

enter GP-14.

Reviews procedure .

"NOTE" prior to step 3.1 of GP-14.

4. Make immediate notification of Immediately inform the core conditions. following of the FLLLP violation:

Shift Management CUE: Role play as necessary.

  • Reactor Engineers
  • 5. Determine a Reactor power Inform Shift Management:

reduction using control only AND RMSl is required e Reactor power until FLLLP is less than 1.OOO reduction using control rods only AND RMSl is required until FLLLP is less than 1.OOO CUE: You have met the termination point for this JPM.

JPM Stop Time LLOJPM0714 Rev000.doc Page 7 of 8

K L E A R GENERATION GROUP EXELON NUCLEAR I rSK CONDITIONS:

I. Reactor power is currently stable at 99.7%.

2. During the previous shift, Reactor Engineering and Ops Management had authorized a Reactor power ascension using control rods and recirc flow.
3. Reactor power was raised from 90% following a slight rod pattern adjustment.
4. Shift turnover has been completed, all required log entries have been completed and you have assumed shift duties.
6. The official 3D Monicore Periodic Log (PI) is being run at this time to assess the recently completed Reactor power ascension.
a. The Plant Monitoring System (PMS) is operable.
b. 3D Monicore (3DM) is OPERABLE.
c. No PMS OR software testing is in progress.
d. The P-1 edit is not known to be invalid.

INITIATING CUE You are directed to review the official 3D Monicore Periodic Log (PI) to ensure Reactor core limits have been controlled during the recent power ascension.

Limerick Generating Station Job Performance Measure DETERMINATION OF ADEQUATE SHIFT STAFFING JPM Number: 0712

EXELON NUCLEAR Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.

I.Task description and number, JPM description and number are identified.

2. Knowledge and Abilities (WA) references are included.
3. Performance location specified. (in-plant, control room, or simulator)
4. Initial setup conditions are identified.
5. Initiating and terminating cues are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. Date

9. Pilot test the JPM:
a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

I O . If the JPM cannot be performed as written with proper responses, then revise the JPM.

II.When JPM is revalidated, SME or Instructor sign and date JPM cover page.

LLOJPM0712 Rev000.doc Page 2 of 7

I EXELON NUCLEAR LLOJPM0712 REVOOO.DOC Job Performance Measure (JPM)

REVlSION RECORD (

SUMMARY

)

New JPM SIMULATOR SETUP INSTRUCTIONS:

None INITIAL CONDITIONS:

- Both units are in OPCON I Todays date is 12/25

- It is night shift 18:30 - 06:30

- The entire shift has participated in a Christmas meal at @ 0000

- Initial shift staffing (attached) consists of 1 Shift Manager, 2 Control Room Supervisors, 3 Reactor Operators, and 11 Equipment Operators INITIATING CUES:

At 0130, 1 Reactor Operator complains of severe stomach pain/headache and is unable to perform duties as Reactor Operator.

TASK STANDARD:

Determine that shift is below minimum staffing requirements and take appropriate corrective action Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

Number any comments in the Comment Number column. Then annotate that comment in the Comments section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct LLOJPM0712 RevOOO.doc Page 3 of 7

EXELON NUCLEAR I LL 0JPM0712 REvOOO.DOC Job Performance Measure (JPMI the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock .............................................................

...................................................... starts when the candidate

-........ ".............acknowledges

"................. .... ..........--.".......,the initiating

".,"....."^^...-. ....-..... .........cue.

I " ".......... ... ...".."...........---.-.-.-. ........... .. ".."..."

I..

I I . . "

LLOJPM0712 Rev000.doc Page 4 of 7

LLOJPM0712 REVOOO.DOC Job Performance Measure (JPM)

Operators Name:

Job

Title:

0 NLO 0 RO 0SRO 0STA 0 SRO Cert JPM

Title:

Determination of Adequate Shift Staffing JPM Number: LLOJPM0712 Revision Number: 000 WA Number and Importance: Generic 2.1 . I O 2.7 / 3.9 Suggested Testing Environment: Classroom Actual Testing Environment: Classroom Testing Method: Simulate Faulted: No Alternate Path: No Time Critical: No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

OP-LG-101-1II,SHIFT STAFFING REQUIREMENTS TECHNICAL SPECIFICATIONS EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? OYes UNO The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: 0Satisfactory 0 Unsatisfactory Comments:

Evaluators Name: (Print)

EvaIuators Signature: Date:

LLOJPM0712 Rev000.doc Page 5 of 7

EXELON NUCLEAR JPM Start Time:

ELEMENT STANDARD SAT I.Obtain OP-LG-101-1II, or Tech Specs OP-LG-I 01-1I1 or to determine shift staffing requirements Tech Specs are obtained (Cue: If requested, provide copy of OP-LG-I 01-1 1IOR candidate may use Tech Specs to determine minimum shift staffing requirements)

  • 2, Determine that shift staffing is in violation Reactor Operator of minimum shift staffing requirements staffing is in violation per OP-LG-I 01-1I1 and Tech Specs. Of OP-LG-101-111 (Shift staffing requires 17 shift positions (Minimum required staffing is 2 Reactor filled including 2 Reactor Operators in OPCON 1) Operators with both units in OPCON 1)
  • 3. Determine action necessary IAW current OP-LG-101-1 I1 step shift manning. 4.1 .I .4 states that shift (Except for Shift Manager, shift crew crew composition may composition may be one less than be one less than the minimum requirements for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. minimum requirements With IRO unable to perform duties, the of Attachment 1 for a shift is 1 position below minimum period not to exceed requirements.) two hours
  • 4. Take action to restore minimum shift Perform operator call-staffing in to get RO position manned within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />
5. Record shift staffing position changes in Changes in shift Operator Log, per OP-AA-I 11-101 staffing recorded in Operator Logs
6. Deviations from Administrative Controls Shift Manager or per Tech Specs, for shift staffing must be higher notified that reported to Shift Manager shift is below minimum shift staffing level (CUE: "You may stop here, you have met N/A the termination criteria for this JPM")

JPM Stop Time:

LLOJPM0712 Rev000.doc Page 6 of 7

I EXELON NUCLEAR

-\

INITIAL CONDITIONS:

- Both units are in OPCON 1

- Today's date is 12/25

- It is night shift 18:30- 06:30

- The entire shift has participated in a Christmas meal at @ 0000

- Initial shift staffing (attached) consists of 1 Shift Manager, 2 Control Room Supervisors, 3 Reactor Operators, and 11 Equipment Operators

. INITIATING CUES:

At 0130, 1 Reactor Operator complains of severe stomach painlheadache and is unable to perform duties as Reactor Operator.

Determine whether Tech Spec and Operations shift staffing requirements are adequate, and if required, any actions needed.