ML17276A034: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 01/26/2018 | | issue date = 01/26/2018 | ||
| title = Memo for Transmittal to ACRS the Phase 4 Chapter 19.5, Aircraft Impact Assessment Safety Evacuation Report for the APR1400 Design Certification | | title = Memo for Transmittal to ACRS the Phase 4 Chapter 19.5, Aircraft Impact Assessment Safety Evacuation Report for the APR1400 Design Certification | ||
| author name = Bradford A | | author name = Bradford A | ||
| author affiliation = NRC/NRO/DNRL | | author affiliation = NRC/NRO/DNRL | ||
| addressee name = Veil A | | addressee name = Veil A | ||
| addressee affiliation = NRC/ACRS | | addressee affiliation = NRC/ACRS | ||
| docket = 05200046 | | docket = 05200046 | ||
| license number = | | license number = | ||
| contact person = Steckel J | | contact person = Steckel J | ||
| package number = ML17276A032 | | package number = ML17276A032 | ||
| document type = Memoranda | | document type = Memoranda | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:January 26, 2018 | {{#Wiki_filter:January 26, 2018 MEMORANDUM TO: Andrea D. Veil, Executive Director Advisory Committee on Reactor Safeguards FROM: Anna H. Bradford, Deputy Director | ||
/RA Frank Akstulewicz Acting for// | |||
MEMORANDUM TO: | Division of New Reactor Licensing Office of New Reactors | ||
FROM: | |||
Division of New Reactor Licensing | |||
==SUBJECT:== | ==SUBJECT:== | ||
ADVANCED POWER REACTOR 1400 DESIGN CERTIFICATION APPLICATION - SAFETY EVALUATION WITH NO OPEN ITEMS FOR CHAPTER 19.5, | ADVANCED POWER REACTOR 1400 DESIGN CERTIFICATION APPLICATION - SAFETY EVALUATION WITH NO OPEN ITEMS FOR CHAPTER 19.5, AIRCRAFT IMPACT ASSESSMENT By letter dated December 23, 2014, Korea Electric Power Corporation (KEPCO) and Korea Hydro & Nuclear Power Co (KHNP), Ltd. submitted an application for a design certification of the Advanced Power Reactor 1400 (APR1400) Standard Design. | ||
Based on our review of the application, the staff is providing the Advisory Committee on Reactor Safeguards (ACRS) its Safety Evaluation (SE) with no Open Items for Chapter 19.5, Aircraft Impact Assessment (ML17276A082). Unless otherwise stated in the SE, the staffs review was based on Revision 1 of the application. The SE is being provided to support a meeting of the subcommittee of the ACRS scheduled for February 21, 2018. The ACRS full committee meeting will be held after the subcommittee meeting. | |||
By letter dated December 23, 2014, Korea Electric Power Corporation (KEPCO) and Korea Hydro & Nuclear Power Co (KHNP), Ltd. submitted an application for a design certification of the Advanced Power Reactor 1400 (APR1400) Standard Design. | The staff concludes that the SE does contain information exempt from public disclosure. The NRC will withhold the SE from public disclosure for ten business days to allow KHNP the opportunity to verify the staffs conclusion that the SE contains such exempt information. | ||
Based on our review of the application, the staff is providing the Advisory Committee on Reactor Safeguards (ACRS) its Safety Evaluation (SE) with no Open Items for Chapter 19.5, | Therefore, the staff requests that the ACRS withhold the SE from public disclosure until the information has been released publicly in the Agencywide Documents Access and Management System. | ||
CONTACTS: James A. Steckel, NRO/DNRL/LB2 301-415-1026 William R. Ward, NRO/DNRL/LB2 301-415-7038 | |||
The staff concludes that the SE does contain information exempt from public disclosure. The NRC will withhold the SE from public disclosure for ten business days to allow KHNP the opportunity to verify the | |||
Therefore, the staff requests that the ACRS withhold the SE from public disclosure until the information has been released publicly in the Agencywide Documents Access and Management System. | |||
CONTACTS: James A. Steckel, NRO/DNRL/LB2 301-415-1026 | |||
William R. Ward, NRO/DNRL/LB2 | |||
A. Veil The staff will inform the ACRS immediately when KHNP responds to the | A. Veil The staff will inform the ACRS immediately when KHNP responds to the staffs request for verification that any of the information in the SE should be withheld from public disclosure. | ||
Docket No.: | Docket No.: 52-046 | ||
PKG: | PKG: ML17276A032 MEMO: ML17276A034 SER: ML17276A082 *via email NRO-002 OFFICE DNRL/LB2: PM DNRL/ LB2: LA* DNRL/ LB2: PM DNRL/LB2 BC DNRL: D NAME JSteckel CSmith WWard MMcCoppin FAkstulewicz DATE 12/8/2017 12/12/2017 1/25/2018 12/14/2017 1/26/2018}} |
Latest revision as of 16:31, 29 October 2019
ML17276A034 | |
Person / Time | |
---|---|
Site: | 05200046 |
Issue date: | 01/26/2018 |
From: | Anna Bradford NRC/NRO/DNRL |
To: | Andrea Veil Advisory Committee on Reactor Safeguards |
Steckel J | |
Shared Package | |
ML17276A032 | List: |
References | |
Download: ML17276A034 (3) | |
Text
January 26, 2018 MEMORANDUM TO: Andrea D. Veil, Executive Director Advisory Committee on Reactor Safeguards FROM: Anna H. Bradford, Deputy Director
/RA Frank Akstulewicz Acting for//
Division of New Reactor Licensing Office of New Reactors
SUBJECT:
ADVANCED POWER REACTOR 1400 DESIGN CERTIFICATION APPLICATION - SAFETY EVALUATION WITH NO OPEN ITEMS FOR CHAPTER 19.5, AIRCRAFT IMPACT ASSESSMENT By letter dated December 23, 2014, Korea Electric Power Corporation (KEPCO) and Korea Hydro & Nuclear Power Co (KHNP), Ltd. submitted an application for a design certification of the Advanced Power Reactor 1400 (APR1400) Standard Design.
Based on our review of the application, the staff is providing the Advisory Committee on Reactor Safeguards (ACRS) its Safety Evaluation (SE) with no Open Items for Chapter 19.5, Aircraft Impact Assessment (ML17276A082). Unless otherwise stated in the SE, the staffs review was based on Revision 1 of the application. The SE is being provided to support a meeting of the subcommittee of the ACRS scheduled for February 21, 2018. The ACRS full committee meeting will be held after the subcommittee meeting.
The staff concludes that the SE does contain information exempt from public disclosure. The NRC will withhold the SE from public disclosure for ten business days to allow KHNP the opportunity to verify the staffs conclusion that the SE contains such exempt information.
Therefore, the staff requests that the ACRS withhold the SE from public disclosure until the information has been released publicly in the Agencywide Documents Access and Management System.
CONTACTS: James A. Steckel, NRO/DNRL/LB2 301-415-1026 William R. Ward, NRO/DNRL/LB2 301-415-7038
A. Veil The staff will inform the ACRS immediately when KHNP responds to the staffs request for verification that any of the information in the SE should be withheld from public disclosure.
Docket No.: 52-046
PKG: ML17276A032 MEMO: ML17276A034 SER: ML17276A082 *via email NRO-002 OFFICE DNRL/LB2: PM DNRL/ LB2: LA* DNRL/ LB2: PM DNRL/LB2 BC DNRL: D NAME JSteckel CSmith WWard MMcCoppin FAkstulewicz DATE 12/8/2017 12/12/2017 1/25/2018 12/14/2017 1/26/2018