Line 12: | Line 12: | ||
| identified by = NRC | | identified by = NRC | ||
| Inspection procedure = IP 71111.08 | | Inspection procedure = IP 71111.08 | ||
| Inspector = L Wertb, | | Inspector = L Wertb, Collinsd Hardage, D Retterer, J Panfel, R Carrion, R Kellner, S Sandal, W Pursley, A Patzb, Collinss Walker | ||
| CCA = N/A for ROP | | CCA = N/A for ROP | ||
| INPO aspect = | | INPO aspect = | ||
| description = The NRC identified an AV of 10 CFR 50.9, Completeness and Accuracy of Information, for the licensees failure to provide data to the NRC that was accurate in all material aspects. Specifically, on two occasions (October 1995, May 2000), the licensee stated that weld 1B31-1RC-12BR-E-5 had been modified with a full-structural weld overlay (FSWOL), when in fact it had only been modified with a less robust design overlay (leak barrier). The NRC approved the licensees requests/proposed alternatives in part based on the inaccurate characterization of the welds. The licensee has since installed the FSWOL and entered the issue into the corrective action program as CR 10197850. The NRC is considering escalated enforcement on the basis that had the licensee provided accurate information, it would likely have caused the NRC to reconsider a regulatory position. | | description = The NRC identified an AV of 10 CFR 50.9, Completeness and Accuracy of Information, for the licensees failure to provide data to the NRC that was accurate in all material aspects. Specifically, on two occasions (October 1995, May 2000), the licensee stated that weld 1B31-1RC-12BR-E-5 had been modified with a full-structural weld overlay (FSWOL), when in fact it had only been modified with a less robust design overlay (leak barrier). The NRC approved the licensees requests/proposed alternatives in part based on the inaccurate characterization of the welds. The licensee has since installed the FSWOL and entered the issue into the corrective action program as CR 10197850. The NRC is considering escalated enforcement on the basis that had the licensee provided accurate information, it would likely have caused the NRC to reconsider a regulatory position. | ||
}} | }} |
Latest revision as of 19:56, 20 February 2018
Site: | Hatch |
---|---|
Report | IR 05000321/2016010 Section 1R08 |
Date counted | Jun 30, 2016 (2016Q2) |
Type: | TEV: Severity level III |
cornerstone | Initiating Events |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.08 |
Inspectors (proximate) | L Wertb Collinsd Hardage D Retterer J Panfel R Carrion R Kellner S Sandal W Pursley A Patzb Collinss Walker |
Violation of: | 10 CFR 50.9 |