| number = ML080350396
| number = ML080350396
| issue date = 02/12/2008
| issue date = 02/12/2008
| title = Byron, Units 1 and 2, Technical Specification, Amendment Nos. 154 and 154, Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program
| title = Technical Specification, Amendment Nos. 154 and 154, Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program
| author name =  
| author name =  
| author affiliation = NRC/NRR/ADRO/DORL/LPLIII-2
| author affiliation = NRC/NRR/ADRO/DORL/LPLIII-2
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Programs and Manuals 5.5BYRON  UNITS 1 & 2 5.5  20 Amendment 5.5 Programs and Manuals 5.5.15 Safety Function Determination Program (SFDP)
{{#Wiki_filter:Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.15     Safety Function Determination Program (SFDP) (continued)
  (continued)
The SFDP identifies where a loss of safety function exists. If a loss of safety function is determined to exist by this program, the appropriate Conditions and Required Actions of the LCO in which the loss of safety function exists are required to be entered.
The SFDP identifies where a loss of safety function exists. If a loss of safety function is determined to exist by this program, the appropriate Conditions and Required Actions of the LCO in which the loss of safety function exists are required to be entered.5.5.16 Containment Leakage Rate Testing Program A program shall be established to implement the leakage rate  
5.5.16     Containment Leakage Rate Testing Program A program shall be established to implement the leakage rate testing of the containment as required by 10 CFR 50.54(o) and 10 CFR 50, Appendix J, Option B, as modified by approved exemptions. This program shall be in accordance with the guidelines contained in Regulatory Guide 1.163, September 1995 and NEI 94-01, Revision 0, as modified by the following exceptions:
 
: 1. NEI 94 1995, Section 9.2.3: The first Unit 1 Type A test performed after the February 19, 1998 Type A test shall be performed no later than February 19, 2013.
testing of the containment as required by 10 CFR 50.54(o) and 10 CFR 50, Appendix J, Option B, as modified by approved exemptions. This program shall be in accordance with the guidelines contained in Regulatory Guide 1.163, September 1995 and NEI 94-01, Revision 0, as modified by the following exceptions:1. NEI 94 1995, Section 9.2.3: The first Unit 1 Type A test performed after the February 19, 1998 Type A test shall be performed no later than February 19, 2013. 2. NEI 94 1995, Section 9.2.3: The first Unit 2 Type A test performed after the November 2, 1999 Type A test shall be performed no later than November 2, 2014.
: 2. NEI 94 1995, Section 9.2.3: The first Unit 2 Type A test performed after the November 2, 1999 Type A test shall be performed no later than November 2, 2014.
The peak calculated containment internal pressure for the design  
The peak calculated containment internal pressure for the design basis loss of coolant accident, Pa, is 42.8 psig for Unit 1 and 38.4 psig for Unit 2 The maximum allowable containment leakage rate, La, at Pa, shall be 0.20% of containment air weight per day.
 
Leakage Rate acceptance criteria are:
basis loss of coolant accident, P a , is 42.8 psig for Unit 1 and 38.4 psig for Unit 2 The maximum allowable containment leakage rate, L a , at P a , shall be 0.20% of containment air weight per day.
: a. Containment leakage rate acceptance criterion is d 1.0 La.
Leakage Rate acceptance criteria are: a. Containment leakage rate acceptance criterion is 1.0 L a.During the first unit startup following testing in accordance with this program, the leakage rate acceptance criteria are < 0.60 L a for the Type B and C tests and < 0.75 L a for Type A tests; and 154}}
During the first unit startup following testing in accordance with this program, the leakage rate acceptance criteria are < 0.60 La for the Type B and C tests and < 0.75 La for Type A tests; and BYRON  UNITS 1 & 2                5.5  20                        Amendment 154}}

Latest revision as of 20:56, 14 November 2019

Technical Specification, Amendment Nos. 154 and 154, Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program
ML080350396
Person / Time
Site: Byron  Constellation icon.png
Issue date: 02/12/2008
From:
NRC/NRR/ADRO/DORL/LPLIII-2
To:
Thorpe-Kavanaugh Meghan, LP3-2, 415-5735
References
TAC MD5151, TAC MD5152
Download: ML080350396 (1)


Text

Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.15 Safety Function Determination Program (SFDP) (continued)

The SFDP identifies where a loss of safety function exists. If a loss of safety function is determined to exist by this program, the appropriate Conditions and Required Actions of the LCO in which the loss of safety function exists are required to be entered.

5.5.16 Containment Leakage Rate Testing Program A program shall be established to implement the leakage rate testing of the containment as required by 10 CFR 50.54(o) and 10 CFR 50, Appendix J, Option B, as modified by approved exemptions. This program shall be in accordance with the guidelines contained in Regulatory Guide 1.163, September 1995 and NEI 94-01, Revision 0, as modified by the following exceptions:

1. NEI 94 1995, Section 9.2.3: The first Unit 1 Type A test performed after the February 19, 1998 Type A test shall be performed no later than February 19, 2013.
2. NEI 94 1995, Section 9.2.3: The first Unit 2 Type A test performed after the November 2, 1999 Type A test shall be performed no later than November 2, 2014.

The peak calculated containment internal pressure for the design basis loss of coolant accident, Pa, is 42.8 psig for Unit 1 and 38.4 psig for Unit 2 The maximum allowable containment leakage rate, La, at Pa, shall be 0.20% of containment air weight per day.

Leakage Rate acceptance criteria are:

a. Containment leakage rate acceptance criterion is d 1.0 La.