{{#Wiki_filter:CENG.a joint venture ofConstellation M neM,4gyqD NINE MILE POINTNUCLEAR STATIONAugust 7, 2013U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION:
{{#Wiki_filter:CENG.a joint venture of Constellation M neM,4gyqD NINE MILE POINT NUCLEAR STATION August 7, 2013 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION:


==SUBJECT:==
==SUBJECT:==
Document Control DeskDirector, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards Nine Mile Point Nuclear Station, Units 1 and 2Renewed Facility Operating License Nos. DPR-63 and NPF-69Docket Nos. 5 0-220 and 50-410Nine Mile Point Nuclear Station Independent Spent Fuel Storage Installation General LicenseDocket No. 72-1036General License 30-day Cask Registration Notification and First SystemThermal Performance Assessment Pursuant to the requirements of 10 CFR 72.212(b)(2),
Document Control Desk Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards Nine Mile Point Nuclear Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-63 and NPF-69 Docket Nos. 5 0-220 and 50-410 Nine Mile Point Nuclear Station Independent Spent Fuel Storage Installation General License Docket No. 72-1036 General License 30-day Cask Registration Notification and First System Thermal Performance Assessment Pursuant to the requirements of 10 CFR 72.212(b)(2), this letter provides the information to register the use of two approved spent fuel storage casks at the Nine Mile Point Nuclear Station (NMPNS)Independent Spent Fuel Storage Installation (ISFSI).Licensee's Name: Nine Mile Point Nuclear Station, LLC Address: PO Box 63 Lycoming, NY 13093 DPR-63 and NPF-69 Reactor License Numbers: Docket Numbers: Person Responsible for Providing additional information:
this letter provides the information to register theuse of two approved spent fuel storage casks at the Nine Mile Point Nuclear Station (NMPNS)Independent Spent Fuel Storage Installation (ISFSI).Licensee's Name:Nine Mile Point Nuclear Station, LLCAddress:PO Box 63Lycoming, NY 13093DPR-63 and NPF-69Reactor License Numbers:Docket Numbers:Person Responsible forProviding additional information:
Cask Certificate Number: Certificate Amendment Number: Cask Model Number: Cask Identification Numbers: 50-220, 50-4 10 and 72-1036 Ms. Theresa H. Darling 315-349-2221 1004 10 NUHOMSO-61BT NMP6 1 B-007-A, loaded July 11, 2013 NMP61B-008-A, loaded July 23, 2013 Nine Mile Point Nuclear Station, LLC P.O. Box 63, Lycoming, NY 13093 Document Control Desk August 7, 2013 Page 2 The Technical Specifications (TS) for Certificate of Compliance (CoC) No. 1004, Amendment No. 10,§1.1.7 "Special Requirements for First System in Place", requires the results of the temperature measurements of the first Dry Shielded Canister (DSC) placed in service be submitted to the NRC for evaluation and assessment.
Cask Certificate Number:Certificate Amendment Number:Cask Model Number:Cask Identification Numbers:50-220, 50-4 10 and 72-1036Ms. Theresa H. Darling315-349-2221 100410NUHOMSO-61BT NMP6 1 B-007-A, loaded July 11, 2013NMP61B-008-A, loaded July 23, 2013Nine Mile Point Nuclear Station, LLCP.O. Box 63, Lycoming, NY 13093 Document Control DeskAugust 7, 2013Page 2The Technical Specifications (TS) for Certificate of Compliance (CoC) No. 1004, Amendment No. 10,§1.1.7 "Special Requirements for First System in Place", requires the results of the temperature measurements of the first Dry Shielded Canister (DSC) placed in service be submitted to the NRC forevaluation and assessment.
Additionally, this section of TS requires subsequent users of the system to report heat loads higher than the first user. The first user of the NUHOMS CoC No. 1004, Duke Energy, submitted the heat transfer characteristics for an 18.95 kilowatt (kW) Dry Shielded Canister (DSC) in a letter to the NRC, from Duke Energy, "Cask Certificate of Compliance, Docket No.: 72-1004, 30-day Report for Higher Canister Heat Loading per General Requirement Section 1.1.7," dated August 8, 2007 (ML072340622).
Additionally, this section of TS requires subsequent users of the system toreport heat loads higher than the first user. The first user of the NUHOMS CoC No. 1004, DukeEnergy, submitted the heat transfer characteristics for an 18.95 kilowatt (kW) Dry Shielded Canister(DSC) in a letter to the NRC, from Duke Energy, "Cask Certificate of Compliance, Docket No.: 72-1004,30-day Report for Higher Canister Heat Loading per General Requirement Section 1.1.7," dated August8, 2007 (ML072340622).
The first DSC loaded at NMPNS had a heat load of 7.30 kW, as reported in our letter dated October 17, 2012.A summary of the thermal performance of the seventh and eighth DSCs in place at the NMPNS ISFSI is submitted for your information.
The first DSC loaded at NMPNS had a heat load of 7.30 kW, as reported inour letter dated October 17, 2012.A summary of the thermal performance of the seventh and eighth DSCs in place at the NMPNS ISFSI issubmitted for your information.
Horizontal Storage Module (HSM) Model: NUHOMS Model 102 HSM Identification Number: 7DFS-HSM004G Cask: NMP61B-007-A Calculated Heat Load: 9 kW Calculated AT: 49 degrees F Actual AT (Note 1): 47.5 degrees F HSM Identification Number: 7DFS-HSM004H Cask: NMP61B-008-A Calculated Heat Load: 8.98 kW Calculated AT: 48.1 degrees F Actual AT (Note 1): 32.7 degrees F Note 1: The actual AT represents the measured AT obtained during equilibrium conditions.
Horizontal Storage Module (HSM) Model: NUHOMS Model 102HSM Identification Number: 7DFS-HSM004G Cask: NMP61B-007-A Calculated Heat Load: 9 kWCalculated AT: 49 degrees FActual AT (Note 1): 47.5 degrees FHSM Identification Number: 7DFS-HSM004H Cask: NMP61B-008-A Calculated Heat Load: 8.98 kWCalculated AT: 48.1 degrees FActual AT (Note 1): 32.7 degrees FNote 1: The actual AT represents the measured AT obtained during equilibrium conditions.
Equilibrium conditions were achieved when the daily temperature change observed was less than 6 degrees F over three consecutive days.This letter contains no NRC commitments.
Equilibrium conditions were achieved when the daily temperature change observed was less than 6 degrees F overthree consecutive days.This letter contains no NRC commitments.
Should you have any questions regarding the information in this submittal, please contact me at (315) 349-2221.Sincerely, Theresa H. Darling Acting Director Licensing cc: NRC Regional Administrator, Region I NRC Resident Inspector NRR Project Manager}}
Should you have any questions regarding the information inthis submittal, please contact me at (315) 349-2221.
Sincerely, Theresa H. DarlingActing Director Licensing cc: NRC Regional Administrator, Region INRC Resident Inspector NRR Project Manager}}

Revision as of 02:11, 14 July 2018

Nine Mile Point, Units 1 and 2 & Nine Mile Point Nuclear Station Independent Spent Fuel Storage Installation - General License 30-day Cask Registration Notification and First System Thermal Performance Assessment
ML13227A015
Person / Time
Site: Nine Mile Point, 07201004  Constellation icon.png
Issue date: 08/07/2013
From: Darling T H
Constellation Energy Nuclear Group, EDF Group, Nine Mile Point
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML13227A015 (2)


Text

CENG.a joint venture of Constellation M neM,4gyqD NINE MILE POINT NUCLEAR STATION August 7, 2013 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION:

SUBJECT:

Document Control Desk Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards Nine Mile Point Nuclear Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-63 and NPF-69 Docket Nos. 5 0-220 and 50-410 Nine Mile Point Nuclear Station Independent Spent Fuel Storage Installation General License Docket No. 72-1036 General License 30-day Cask Registration Notification and First System Thermal Performance Assessment Pursuant to the requirements of 10 CFR 72.212(b)(2), this letter provides the information to register the use of two approved spent fuel storage casks at the Nine Mile Point Nuclear Station (NMPNS)Independent Spent Fuel Storage Installation (ISFSI).Licensee's Name: Nine Mile Point Nuclear Station, LLC Address: PO Box 63 Lycoming, NY 13093 DPR-63 and NPF-69 Reactor License Numbers: Docket Numbers: Person Responsible for Providing additional information:

Cask Certificate Number: Certificate Amendment Number: Cask Model Number: Cask Identification Numbers: 50-220, 50-4 10 and 72-1036 Ms. Theresa H. Darling 315-349-2221 1004 10 NUHOMSO-61BT NMP6 1 B-007-A, loaded July 11, 2013 NMP61B-008-A, loaded July 23, 2013 Nine Mile Point Nuclear Station, LLC P.O. Box 63, Lycoming, NY 13093 Document Control Desk August 7, 2013 Page 2 The Technical Specifications (TS) for Certificate of Compliance (CoC) No. 1004, Amendment No. 10,§1.1.7 "Special Requirements for First System in Place", requires the results of the temperature measurements of the first Dry Shielded Canister (DSC) placed in service be submitted to the NRC for evaluation and assessment.

Additionally, this section of TS requires subsequent users of the system to report heat loads higher than the first user. The first user of the NUHOMS CoC No. 1004, Duke Energy, submitted the heat transfer characteristics for an 18.95 kilowatt (kW) Dry Shielded Canister (DSC) in a letter to the NRC, from Duke Energy, "Cask Certificate of Compliance, Docket No.: 72-1004, 30-day Report for Higher Canister Heat Loading per General Requirement Section 1.1.7," dated August 8, 2007 (ML072340622).

The first DSC loaded at NMPNS had a heat load of 7.30 kW, as reported in our letter dated October 17, 2012.A summary of the thermal performance of the seventh and eighth DSCs in place at the NMPNS ISFSI is submitted for your information.

Horizontal Storage Module (HSM) Model: NUHOMS Model 102 HSM Identification Number: 7DFS-HSM004G Cask: NMP61B-007-A Calculated Heat Load: 9 kW Calculated AT: 49 degrees F Actual AT (Note 1): 47.5 degrees F HSM Identification Number: 7DFS-HSM004H Cask: NMP61B-008-A Calculated Heat Load: 8.98 kW Calculated AT: 48.1 degrees F Actual AT (Note 1): 32.7 degrees F Note 1: The actual AT represents the measured AT obtained during equilibrium conditions.

Equilibrium conditions were achieved when the daily temperature change observed was less than 6 degrees F over three consecutive days.This letter contains no NRC commitments.

Should you have any questions regarding the information in this submittal, please contact me at (315) 349-2221.Sincerely, Theresa H. Darling Acting Director Licensing cc: NRC Regional Administrator, Region I NRC Resident Inspector NRR Project Manager