ML13346A018: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:A ~DEPARTMENT OF MECHANICAL, Rensselaer AEROSPACE, AND NUCLEAR ENGINEERING RCF-1 3-04December 3, 2013U.S. Nuclear Regulatory Commission ATTN: Document Control DeskWashington, DC 20555Re: Change in Level 2 personnel at RPI Reactor critical Facility:
{{#Wiki_filter:A ~DEPARTMENT OF MECHANICAL, Rensselaer AEROSPACE, AND NUCLEAR ENGINEERING RCF-1 3-04 December 3, 2013 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Re: Change in Level 2 personnel at RPI Reactor critical Facility:
License CX -22
License CX -22  


==Dear Sir,==
==Dear Sir,==
This letter notifies you, in accordance with our Technical Specifications of license CX -22,change in Level 2 personnel (Director, Reactor Critical Facility).
This letter notifies you, in accordance with our Technical Specifications of license CX -22, change in Level 2 personnel (Director, Reactor Critical Facility).
Effective January 1, 2014Dr. Peter Caracappa is appointed as Director of Walthousen Reactor Critical  
Effective January 1, 2014 Dr. Peter Caracappa is appointed as Director of Walthousen Reactor Critical Facility, by the Dean, School of Engineering.
: Facility, by theDean, School of Engineering.
A copy of the letter of Appointment is attached herewith.
A copy of the letter of Appointment is attached herewith.
Effective January Ist 2014 Dr.Caracappa will replace Dr. Sreepada as the Director, Reactor Critical Facility.j.Prof Sastry R. SreepadaDirector, Walthousen Reactor Critical FacilityProfessor of Practice, Rensselaer Polytechnic Institute, 110 8th Street, Troy NY 12180cc:Dr. Joe Chow,Dean of School of Engineering Dr. Suvranu De, Chairman, MANEDr. Yaron Danon, Chairman NSRBDr. Peter Caracappa, RPI, MANEMs. Annette Chism, Director EHSDr. George Xu, Head, Nuclear Engineering ProgramMr. Glenn Winters, Reactor Operations Supervisor Sgt. Marcie DelVecchio Ms. Leslie A NortonRensselaer Polytechnic Institute 110 8th Street I Troy, NY 12180-3590 1 Jonsson Engineering CenterPhone (518) 276-6351 1 Fax (518) 276-6025 1 email: mane@rpi.edu (I~A)1 SCHOOL OF ENGINEERING OFFICE OF THE DEANJune 10, 2013Dr. Peter Caracappa Department of Mechanical, Aerospace, andNuclear Engineering Rensselaer Polytechnic Institute Troy, NY 12180-3590
Effective January Ist 2014 Dr.Caracappa will replace Dr. Sreepada as the Director, Reactor Critical Facility.j.Prof Sastry R. Sreepada Director, Walthousen Reactor Critical Facility Professor of Practice, Rensselaer Polytechnic Institute, 110 8th Street, Troy NY 12180 cc: Dr. Joe Chow, Dean of School of Engineering Dr. Suvranu De, Chairman, MANE Dr. Yaron Danon, Chairman NSRB Dr. Peter Caracappa, RPI, MANE Ms. Annette Chism, Director EHS Dr. George Xu, Head, Nuclear Engineering Program Mr. Glenn Winters, Reactor Operations Supervisor Sgt. Marcie DelVecchio Ms. Leslie A Norton Rensselaer Polytechnic Institute 110 8th Street I Troy, NY 12180-3590 1 Jonsson Engineering Center Phone (518) 276-6351 1 Fax (518) 276-6025 1 email: mane@rpi.edu (I~A)1 SCHOOL OF ENGINEERING OFFICE OF THE DEAN June 10, 2013 Dr. Peter Caracappa Department of Mechanical, Aerospace, and Nuclear Engineering Rensselaer Polytechnic Institute Troy, NY 12180-3590


==Dear Dr. Caracappa:==
==Dear Dr. Caracappa:==


Based on the recommendation of Dr. Suvranu De, Head of the Department ofMechanical, Aerospace, and Nuclear Engineering, it is a pleasure to offer you anappointment as Director of the Reactor Critical  
Based on the recommendation of Dr. Suvranu De, Head of the Department of Mechanical, Aerospace, and Nuclear Engineering, it is a pleasure to offer you an appointment as Director of the Reactor Critical Facility, part time, at Rensselaer Polytechnic Institute, effective January 1, 2014. There is no salary associated with this responsibility.
: Facility, part time, at Rensselaer Polytechnic Institute, effective January 1, 2014. There is no salary associated with thisresponsibility.
Your acceptance of this appointment should be made by signing the enclosed copy of this letter and returning to this office.I appreciate your willingness to serve in this capacity and stand ready to assist you in this role.Sincerely, David V. Rosowsky, Ph.D., P.E., F.ASCE Dean, School of Engineering ACCEPTED:
Your acceptance of this appointment should be made by signing the enclosed copy ofthis letter and returning to this office.I appreciate your willingness to serve in this capacity and stand ready to assist you inthis role.Sincerely, David V. Rosowsky, Ph.D., P.E., F.ASCEDean, School of Engineering ACCEPTED:
DATE: 2-11 Rensselaer Polytechnic Institute 110 8th Street I Troy, NY 12180-3590 USA I 3004 Jonsson Engineering Center Phone (518) 276-6203 I Fax (518) 276-8788}}
DATE: 2-11Rensselaer Polytechnic Institute 110 8th Street I Troy, NY 12180-3590 USA I 3004 Jonsson Engineering CenterPhone (518) 276-6203 I Fax (518) 276-8788}}

Revision as of 19:41, 13 July 2018

Change Update in Level 2 Pesonnel at Rpi Reactor Critical Facility
ML13346A018
Person / Time
Site: Rensselaer Polytechnic Institute
Issue date: 12/03/2013
From: Sreepada S R
Rensselaer Polytechnic Institute
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RCF-13-04
Download: ML13346A018 (2)


Text

A ~DEPARTMENT OF MECHANICAL, Rensselaer AEROSPACE, AND NUCLEAR ENGINEERING RCF-1 3-04 December 3, 2013 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Re: Change in Level 2 personnel at RPI Reactor critical Facility:

License CX -22

Dear Sir,

This letter notifies you, in accordance with our Technical Specifications of license CX -22, change in Level 2 personnel (Director, Reactor Critical Facility).

Effective January 1, 2014 Dr. Peter Caracappa is appointed as Director of Walthousen Reactor Critical Facility, by the Dean, School of Engineering.

A copy of the letter of Appointment is attached herewith.

Effective January Ist 2014 Dr.Caracappa will replace Dr. Sreepada as the Director, Reactor Critical Facility.j.Prof Sastry R. Sreepada Director, Walthousen Reactor Critical Facility Professor of Practice, Rensselaer Polytechnic Institute, 110 8th Street, Troy NY 12180 cc: Dr. Joe Chow, Dean of School of Engineering Dr. Suvranu De, Chairman, MANE Dr. Yaron Danon, Chairman NSRB Dr. Peter Caracappa, RPI, MANE Ms. Annette Chism, Director EHS Dr. George Xu, Head, Nuclear Engineering Program Mr. Glenn Winters, Reactor Operations Supervisor Sgt. Marcie DelVecchio Ms. Leslie A Norton Rensselaer Polytechnic Institute 110 8th Street I Troy, NY 12180-3590 1 Jonsson Engineering Center Phone (518) 276-6351 1 Fax (518) 276-6025 1 email: mane@rpi.edu (I~A)1 SCHOOL OF ENGINEERING OFFICE OF THE DEAN June 10, 2013 Dr. Peter Caracappa Department of Mechanical, Aerospace, and Nuclear Engineering Rensselaer Polytechnic Institute Troy, NY 12180-3590

Dear Dr. Caracappa:

Based on the recommendation of Dr. Suvranu De, Head of the Department of Mechanical, Aerospace, and Nuclear Engineering, it is a pleasure to offer you an appointment as Director of the Reactor Critical Facility, part time, at Rensselaer Polytechnic Institute, effective January 1, 2014. There is no salary associated with this responsibility.

Your acceptance of this appointment should be made by signing the enclosed copy of this letter and returning to this office.I appreciate your willingness to serve in this capacity and stand ready to assist you in this role.Sincerely, David V. Rosowsky, Ph.D., P.E., F.ASCE Dean, School of Engineering ACCEPTED:

DATE: 2-11 Rensselaer Polytechnic Institute 110 8th Street I Troy, NY 12180-3590 USA I 3004 Jonsson Engineering Center Phone (518) 276-6203 I Fax (518) 276-8788