ML15107A022: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 72: Line 72:
contact me at 404-997-4607.  
contact me at 404-997-4607.  
       Sincerely,  
       Sincerely,  
   
   
       /RA/   
       /RA/   
Line 89: Line 88:
   ML15107A022                 
   ML15107A022                 
x SUNSI REVIEW COMPLETE        FORM 665 ATTACHED OFFICE RII:DRS RII:DRS      SIGNATURE GKO JHB1      NAME G. Ottenberg J. Bartley      DATE 4/16/2015 4/16/2015      E-MAIL COPY? YES NO YES NO       
x SUNSI REVIEW COMPLETE        FORM 665 ATTACHED OFFICE RII:DRS RII:DRS      SIGNATURE GKO JHB1      NAME G. Ottenberg J. Bartley      DATE 4/16/2015 4/16/2015      E-MAIL COPY? YES NO YES NO       
     Enclosure
     Enclosure INFORMATION REQUEST FOR NORTH ANNA POWER STATION  COMPONENT DESIGN BASES INSPECTION  
INFORMATION REQUEST FOR NORTH ANNA POWER STATION  COMPONENT DESIGN BASES INSPECTION  
  Please provide the information electronically in ".pdf" files, Excel, or other searchable format on CDROM (or FTP site, Sharepoint, etc.).  The CDROM (or website) should be indexed and  
  Please provide the information electronically in ".pdf" files, Excel, or other searchable format on CDROM (or FTP site, Sharepoint, etc.).  The CDROM (or website) should be indexed and  
hyperlinked to facilitate ease of use.   
hyperlinked to facilitate ease of use.   

Revision as of 05:44, 9 July 2018

Notification of North Anna Power Station - Component Design Bases Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000338/2015007 and 05000339/2015007
ML15107A022
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 04/16/2015
From: Bartley J H
NRC/RGN-II/DRS/EB1
To: Heacock D A
Virginia Electric & Power Co (VEPCO)
References
IR 2015007
Download: ML15107A022 (5)


See also: IR 05000338/2015007

Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257

April 16, 2015

Mr. David A. Heacock President and Chief Nuclear Officer

Virginia Electric and Power Company

Innsbrook Technical Center

5000 Dominion Boulevard

Glen Allen, VA 23060-6711

SUBJECT: NOTIFICATION OF NORTH ANNA POWER STATION - COMPONENT DESIGN BASES INSPECTION - U.S. NUCLEAR REGULATORY COMMISSION

INSPECTION REPORT 05000338/2015007 AND 05000339/2015007

Dear Mr. Heacock:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a component design bases inspection (CDBI) at your North Anna

Power Station during the weeks of July 20 - 24, August 3 - 7, and August 17 - 21, 2015.

Geoffrey Ottenberg, a Senior Reactor Inspector from the NRC's Region II Office, will lead the inspection team. This inspection will be conducted in accordance with Inspection Procedure 71111.21, "Component Design Bases Inspection," issued November 29, 2013.

The inspection will evaluate the capability of risk-significant /low-margin components to function

as designed and to support proper system operation. The inspection will also include a review of selected operator actions, operating experience, and modifications.

During a telephone conversation on April 7, 2015, the staff confirmed with Mr. J. Leberstien of

your staff, arrangements for an information-gathering site visit and the three-week onsite

inspection. The schedule is as follows:

  • Information-gathering visit: Week of June 29 - July 3, 2015
  • Onsite weeks: July 20 - 24, August 3 - 7, and August 17 - 21, 2015

The purpose of the information-gathering visit is to meet with members of your staff to identify risk-significant components and operator actions. Information and documentation needed to support the inspection will also be identified. Mr. Geoffrey Ottenberg, a Senior Reactor

Inspector, will be conducting all preparation activities associated with the inspection. In

addition, Mr. George MacDonald, a Region II Senior Reactor Analyst, will support Mr. Ottenberg

during the information-gathering visit to review probabilistic risk assessment data and identify risk-significant components, which will be examined during the inspection.

The Enclosure lists documents that will be needed prior to the information-gathering visit.

Please provide the referenced information to the Region II Office by June 15, 2015.

D. Heacock 2

Additional documents may be requested during the information-gathering visit. The inspectors will try to minimize your administrative burden by specifically identifying only those documents

required for inspection preparation. The additional information will need to be available to the team in the Region II office prior to the inspection team's preparation week of July 13, 2015. During the information-gathering trip, Mr. Ottenberg will also discuss the following inspection

support administrative details: (1) availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection, (2) method of tracking inspector

requests during the inspection, (3) licensee computer access, (4) working space,

(5) arrangements for site access, and (6) other applicable information.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

Enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide

Documents Access and Management

System (ADAMS). ADAMS

is accessible from the NRC

website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions, regarding the

information requested or the inspection, please contact Mr. Ottenberg at 404-997-4658 or

contact me at 404-997-4607.

Sincerely,

/RA/

Jonathan Bartley, Chief Engineering Branch 1

Division of Reactor Safety

Docket Nos: 50-338, 50-339 License Nos: NPF-4, NPF-7

Enclosure:

Information Request for North Anna Power

Station, Component Design Bases Inspection

cc: Distribution via Listserv

ML15107A022

x SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE GKO JHB1 NAME G. Ottenberg J. Bartley DATE 4/16/2015 4/16/2015 E-MAIL COPY? YES NO YES NO

Enclosure INFORMATION REQUEST FOR NORTH ANNA POWER STATION COMPONENT DESIGN BASES INSPECTION

Please provide the information electronically in ".pdf" files, Excel, or other searchable format on CDROM (or FTP site, Sharepoint, etc.). The CDROM (or website) should be indexed and

hyperlinked to facilitate ease of use.

1. From your most recent probabilistic safety analysis (PSA)

excluding external events and fires: a. Two risk rankings of components from your site-specific PSA: one sorted by Risk Achievement Worth (RAW), and the other sorted by Birnbaum Importance

b. A list of the top 500 cutsets

2. From your most recent PSA

including external events and fires:

a. Two risk rankings of components from your site-specific PSA: one sorted by RAW, and the other sorted by Birnbaum Importance

b. A list of the top 500 cutsets

3. Risk ranking of operator actions from your site-specific PSA sorted by RAW. Provide human reliability worksheets for these items.

4. List of time-critical operator actions with a brief description of each action.

5. List of Emergency and Abnormal Operating Procedures revised (significant) since July 1, 2012, with a brief description of each revision.

6. List of components with low-design margins (i.e., pumps closest to the design limit for flow or pressure, diesel generator close to design-required output, heat exchangers close to

rated design heat removal, and motor-operated valve risk-margin rankings, etc.).

7. List of station-operating experience evaluations/reviews performed, and documented in the station's corrective action program, for industry events and safety-related equipment

failures/vulnerabilities (as communicated by NRC Generic Communications, Industry

Communications, 10 CFR Part 21 Notifications, etc.) since July 1, 2012.

8. List and brief description of safety-related structures, systems, or components (SSCs)

design modifications implemented since July 1, 2012.

9. List and brief description of common-cause component failures that have occurred

since July 1, 2012.

10. List of equipment on the site's Station Equipment Reliability Issues List, including a description of the reason(s) why each component is on that list, and summaries (if

available) of your plans to address the issue(s).

2 11. List and brief description of equipment currently in degraded or nonconforming status as described in NRC Inspection Manual Chapter 0326, Operability Determinations and

Functionality Assessments for Conditions Adverse to Quality or Safety, issued

January 31, 2014.

12. List and reason for equipment classified in maintenance rule (a)(1) status from

July 1, 2012, to present.

13. Copy of Updated Final Safety Analysis Report.

14. Copy of Technical Specification(s).

15. Copy of Technical Specifications Bases.

16. Copy of Technical Requirements Manual(s).

17. List and brief description of Root Cause Evaluations performed since July 1, 2012.

18. Corrective Action Program Procedure(s).

19. Copy of Operability Determination procedure(s).

20. One-line diagram of electrical plant. (Electronic and full size - hard copy week

of June 29 - July 3, 2015)

21. Index and legend for electrical plant one-line diagrams.

22. Piping and instrumentation diagrams (P&IDs) for safety-related systems. (Electronic and 1/2 size - hard copy week of June 29 - July 3, 2015)

23. Index and Legend for P&IDs.

24. Copies of corrective action documents (i.e. CRs) associated with findings from previous CDBI. (If applicable)

25. Index (procedure number, title, and current revision) of station Emergency Operating Procedures, Abnormal Operating Procedures, and Annunciator Response Procedures.

26. Copy of any self-assessments performed in preparation for this inspection.

27. List of any condition reports generated in preparation for this inspection.

28. Copies of condition reports generated from previous CDBI (2012).

29. Contact information for a person to discuss PSA information prior to and during the information-gathering trip. (Name, title, phone number, and e-mail address)