ML17145A149: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 21: | Line 21: | ||
==SUBJECT:== | ==SUBJECT:== | ||
CATAWBA NUCLEAR STATION, UNITS 1 AND 2 -CORRECTION LEITER TO LICENSE AMENDMENT NOS. 288 AND 284 RE: ADOPTION OF TSTF-427, REVISION 2, "ALLOWANCE FOR NON TECHNICAL SPECIFICATION BARRIER DEGRADATION ON SUPPORTED SYSTEM OPERABILITY" (CAC NOS. MF8041 AND MF8042) | CATAWBA NUCLEAR STATION, UNITS 1 AND 2 -CORRECTION LEITER TO LICENSE AMENDMENT NOS. 288 AND 284 RE: ADOPTION OF TSTF-427, REVISION 2, "ALLOWANCE FOR NON TECHNICAL SPECIFICATION BARRIER DEGRADATION ON SUPPORTED SYSTEM OPERABILITY" (CAC NOS. MF8041 AND MF8042) | ||
==Dear Mr. Simril:== | ==Dear Mr. Simril:== | ||
By letter dated April 26, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 17066A374), | By letter dated April 26, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 17066A374), the U.S. Nuclear Regulatory Commission (NRG) issued Amendment Nos. 288 and 284 to Renewed Facility Operating License Nos. NPF-35 and NPF-53 for the Catawba Nuclear Station, Units 1 and 2 (CNS, Units 1 and 2), respectively. | ||
the U.S. Nuclear Regulatory Commission (NRG) issued Amendment Nos. 288 and 284 to Renewed Facility Operating License Nos. NPF-35 and NPF-53 for the Catawba Nuclear Station, Units 1 and 2 (CNS, Units 1 and 2), respectively. | The amendments changed the Technical Specifications in response to Duke Energy Carolinas application dated June 23, 2016. The amendments adopted NRG-approved Technical Specifications Task Force (TSTF) Standard Technical Specifications Change Traveler TSTF-427, Revision 2, "Allowance for Non Technical Specification Barrier Degradation on Supported System Operability." Subsequent to the issuance of the amendments, the NRC staff discovered typographical errors on page 4 of the facility operating license for CNS, Unit 2. These errors are administrative in nature and correcting them does not affect the safety evaluation for Amendment Nos. 288 and 284. Enclosed is the revised facility operating license page. Please replace the corresponding page issued by Amendment Nos 284 for CNS, Unit 2. | ||
The amendments changed the Technical Specifications in response to Duke Energy Carolinas application dated June 23, 2016. The amendments adopted NRG-approved Technical Specifications Task Force (TSTF) Standard Technical Specifications Change Traveler TSTF-427, Revision 2, "Allowance for Non Technical Specification Barrier Degradation on Supported System Operability." | |||
Subsequent to the issuance of the amendments, the NRC staff discovered typographical errors on page 4 of the facility operating license for CNS, Unit 2. These errors are administrative in nature and correcting them does not affect the safety evaluation for Amendment Nos. 288 and 284. Enclosed is the revised facility operating license page. Please replace the corresponding page issued by Amendment Nos 284 for CNS, Unit 2. | |||
T. Simril If you have any questions regarding this matter, I may be reached at (301) 415-3867 or via e-mail at michael.mahoney@nrc.gov. | T. Simril If you have any questions regarding this matter, I may be reached at (301) 415-3867 or via e-mail at michael.mahoney@nrc.gov. | ||
Docket Nos. 50-413 and 50-414 | Docket Nos. 50-413 and 50-414 | ||
Line 37: | Line 34: | ||
==SUBJECT:== | ==SUBJECT:== | ||
CATAWBA NUCLEAR STATION, UNITS 1 AND -CORRECTION LETTER TO LICENSE AMENDMENT NOS. 288 AND 284 RE: ADOPTION OF TSTF-427, REVISION 2, "ALLOWANCE FOR NON TECHNICAL SPECIFICATION BARRIER DEGRADATION ON SUPPORTED SYSTEM OPERABILITY" (CAC NOS. MF8041 AND MF8042) DATED JUNE 14, 2017 DISTRIBUTION: | CATAWBA NUCLEAR STATION, UNITS 1 AND -CORRECTION LETTER TO LICENSE AMENDMENT NOS. 288 AND 284 RE: ADOPTION OF TSTF-427, REVISION 2, "ALLOWANCE FOR NON TECHNICAL SPECIFICATION BARRIER DEGRADATION ON SUPPORTED SYSTEM OPERABILITY" (CAC NOS. MF8041 AND MF8042) DATED JUNE 14, 2017 DISTRIBUTION: | ||
PUBLIC LPL2-1 Reading RidsACRS_MailCTR Resource RidsNrrDorllpl2-1 Resource RidsNrrPMCatawba Resource RidsNrrLAKGoldstein Resource RidsRgn2MailCenter Resource ADAMS Accession No. ML 17145A149 OFFICE NRR/DORULPL2-1/PM NRR/DORULPL2-1/LA NRR/DORULPL2-2/BC NAME MMahoney KGoldstein UShoop DATE 06/09/17 06/12/17 06/14/17 OFFICIAL RECORD COPY NRR/DORULPL2-1/PM MMahoney 06/14/17 ENCLOSURE DUKE ENERGY CAROLINAS, LLC CATAWBA NUCLEAR STATION, UNITS 1AND2 REPLACEMENT LICENSE PAGE FOR AMENDMENT NOS. 288 AND 284 DOCKET NOS. 50-413 AND 50-414 (2) TECHNICAL SPECIFICATIONS The Technical Specifications contained in Appendix A, as revised through Amendment No. 284, which are attached hereto, are hereby incorporated into this renewed operating license. | PUBLIC LPL2-1 Reading RidsACRS_MailCTR Resource RidsNrrDorllpl2-1 Resource RidsNrrPMCatawba Resource RidsNrrLAKGoldstein Resource RidsRgn2MailCenter Resource ADAMS Accession No. ML 17145A149 OFFICE NRR/DORULPL2-1/PM NRR/DORULPL2-1/LA NRR/DORULPL2-2/BC NAME MMahoney KGoldstein UShoop DATE 06/09/17 06/12/17 06/14/17 OFFICIAL RECORD COPY NRR/DORULPL2-1/PM MMahoney 06/14/17 ENCLOSURE DUKE ENERGY CAROLINAS, LLC CATAWBA NUCLEAR STATION, UNITS 1AND2 REPLACEMENT LICENSE PAGE FOR AMENDMENT NOS. 288 AND 284 DOCKET NOS. 50-413 AND 50-414 (2) TECHNICAL SPECIFICATIONS The Technical Specifications contained in Appendix A, as revised through Amendment No. 284, which are attached hereto, are hereby incorporated into this renewed operating license. Duke Energy Carolinas, LLC shall operate the facility in accordance with the Technical Specifications. | ||
Duke Energy Carolinas, LLC shall operate the facility in accordance with the Technical Specifications. | (3) Updated Final Safety Analysis Report The Updated Final Safety Analysis Report supplement submitted pursuant to 10 CFR 54.21(d), as revised on December 16, 2002, describes certain future activities to be completed before the period of extended operation. | ||
(3) Updated Final Safety Analysis Report The Updated Final Safety Analysis Report supplement submitted pursuant to 10 CFR 54.21(d), | |||
as revised on December 16, 2002, describes certain future activities to be completed before the period of extended operation. | |||
Duke shall complete these activities no later than December 6, 2024, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection. | Duke shall complete these activities no later than December 6, 2024, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection. | ||
The Updated Final Safety Analysis Report supplement as revised on December 16, 2002, described above, shall be included in the next scheduled update to the Updated Final Safety Analysis Report required by 10 CFR 50.71 (e)(4), following issuance of this renewed operating license. | The Updated Final Safety Analysis Report supplement as revised on December 16, 2002, described above, shall be included in the next scheduled update to the Updated Final Safety Analysis Report required by 10 CFR 50.71 (e)(4), following issuance of this renewed operating license. Until that update is complete, Duke may make changes to the programs described in such supplement without prior Commission approval, provided that Duke evaluates each such change pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section (4) Antitrust Conditions Duke Energy Carolinas, LLC shall comply with the antitrust conditions delineated in Appendix C to this renewed operating license. (5) Fire Protection Program Duke Energy Carolinas, LLC shall implement and maintain in effect all provisions of the approved fire protection program that complies with 1 O CFR 50.48(a) and 1 O CFR 50.48(c), as specified in the licensee amendment request dated September 25, 2013, as supplemented by letters dated January 13, 2015; January 28, 2015; February 27, 2015; March 30, 2015; April 28, 2015; July 15, 2015; August 14, 2015; September 3, 2015; December 11, 2015; January 7, 2016; March 23, 2016; June 15, 2016; August 2, 2016; September 7, 2016; and January 26, 2017, as approved in the SE dated February 8, 2017. Except where NRC approval for changes or deviations is required by 10 CFR 50.48(c), and provided no other regulation, technical specification, license condition or requirement would require prior NRC approval, the licensee may make changes to the fire protection program without prior approval of the Commission if those changes satisfy the provisions set forth in 10 CFR 50.48(a) and 10 CFR 50.48(c), the change does not require a change to a technical specification or a license condition, and the criteria listed below are satisfied. | ||
Until that update is complete, Duke may make changes to the programs described in such supplement without prior Commission | |||
(5) Fire Protection Program Duke Energy Carolinas, LLC shall implement and maintain in effect all provisions of the approved fire protection program that complies with 1 O CFR 50.48(a) and 1 O CFR 50.48(c), | |||
as specified in the licensee amendment request dated September 25, 2013, as supplemented by letters dated January 13, 2015; January 28, 2015; February 27, 2015; March 30, 2015; April 28, 2015; July 15, 2015; August 14, 2015; September 3, 2015; December 11, 2015; January 7, 2016; March 23, 2016; June 15, 2016; August 2, 2016; September 7, 2016; and January 26, 2017, as approved in the SE dated February 8, 2017. Except where NRC approval for changes or deviations is required by 10 CFR 50.48(c), | |||
and provided no other regulation, technical specification, license condition or requirement would require prior NRC approval, the licensee may make changes to the fire protection program without prior approval of the Commission if those changes satisfy the provisions set forth in 10 CFR 50.48(a) and 10 CFR 50.48(c), | |||
the change does not require a change to a technical specification or a license condition, and the criteria listed below are satisfied. | |||
Renewed License No. NPF-52 Amendment No. 284}} | Renewed License No. NPF-52 Amendment No. 284}} |
Revision as of 20:29, 7 July 2018
ML17145A149 | |
Person / Time | |
---|---|
Site: | Catawba |
Issue date: | 06/14/2017 |
From: | Michael Mahoney Plant Licensing Branch II |
To: | Simril T Duke Energy Carolinas |
Mahoney | |
References | |
CAC MF8041, CAC MF8042 | |
Download: ML17145A149 (5) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Tom Simril Vice President Catawba Nuclear Station Duke Energy 4800 Concord Road I CN01 VP York, NC 29745 June 14, 2017
SUBJECT:
CATAWBA NUCLEAR STATION, UNITS 1 AND 2 -CORRECTION LEITER TO LICENSE AMENDMENT NOS. 288 AND 284 RE: ADOPTION OF TSTF-427, REVISION 2, "ALLOWANCE FOR NON TECHNICAL SPECIFICATION BARRIER DEGRADATION ON SUPPORTED SYSTEM OPERABILITY" (CAC NOS. MF8041 AND MF8042)
Dear Mr. Simril:
By letter dated April 26, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 17066A374), the U.S. Nuclear Regulatory Commission (NRG) issued Amendment Nos. 288 and 284 to Renewed Facility Operating License Nos. NPF-35 and NPF-53 for the Catawba Nuclear Station, Units 1 and 2 (CNS, Units 1 and 2), respectively.
The amendments changed the Technical Specifications in response to Duke Energy Carolinas application dated June 23, 2016. The amendments adopted NRG-approved Technical Specifications Task Force (TSTF) Standard Technical Specifications Change Traveler TSTF-427, Revision 2, "Allowance for Non Technical Specification Barrier Degradation on Supported System Operability." Subsequent to the issuance of the amendments, the NRC staff discovered typographical errors on page 4 of the facility operating license for CNS, Unit 2. These errors are administrative in nature and correcting them does not affect the safety evaluation for Amendment Nos. 288 and 284. Enclosed is the revised facility operating license page. Please replace the corresponding page issued by Amendment Nos 284 for CNS, Unit 2.
T. Simril If you have any questions regarding this matter, I may be reached at (301) 415-3867 or via e-mail at michael.mahoney@nrc.gov.
Docket Nos. 50-413 and 50-414
Enclosure:
Revised License Pages cc: Listserv Michael Mahoney, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation T. Simril
SUBJECT:
CATAWBA NUCLEAR STATION, UNITS 1 AND -CORRECTION LETTER TO LICENSE AMENDMENT NOS. 288 AND 284 RE: ADOPTION OF TSTF-427, REVISION 2, "ALLOWANCE FOR NON TECHNICAL SPECIFICATION BARRIER DEGRADATION ON SUPPORTED SYSTEM OPERABILITY" (CAC NOS. MF8041 AND MF8042) DATED JUNE 14, 2017 DISTRIBUTION:
PUBLIC LPL2-1 Reading RidsACRS_MailCTR Resource RidsNrrDorllpl2-1 Resource RidsNrrPMCatawba Resource RidsNrrLAKGoldstein Resource RidsRgn2MailCenter Resource ADAMS Accession No. ML 17145A149 OFFICE NRR/DORULPL2-1/PM NRR/DORULPL2-1/LA NRR/DORULPL2-2/BC NAME MMahoney KGoldstein UShoop DATE 06/09/17 06/12/17 06/14/17 OFFICIAL RECORD COPY NRR/DORULPL2-1/PM MMahoney 06/14/17 ENCLOSURE DUKE ENERGY CAROLINAS, LLC CATAWBA NUCLEAR STATION, UNITS 1AND2 REPLACEMENT LICENSE PAGE FOR AMENDMENT NOS. 288 AND 284 DOCKET NOS. 50-413 AND 50-414 (2) TECHNICAL SPECIFICATIONS The Technical Specifications contained in Appendix A, as revised through Amendment No. 284, which are attached hereto, are hereby incorporated into this renewed operating license. Duke Energy Carolinas, LLC shall operate the facility in accordance with the Technical Specifications.
(3) Updated Final Safety Analysis Report The Updated Final Safety Analysis Report supplement submitted pursuant to 10 CFR 54.21(d), as revised on December 16, 2002, describes certain future activities to be completed before the period of extended operation.
Duke shall complete these activities no later than December 6, 2024, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection.
The Updated Final Safety Analysis Report supplement as revised on December 16, 2002, described above, shall be included in the next scheduled update to the Updated Final Safety Analysis Report required by 10 CFR 50.71 (e)(4), following issuance of this renewed operating license. Until that update is complete, Duke may make changes to the programs described in such supplement without prior Commission approval, provided that Duke evaluates each such change pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section (4) Antitrust Conditions Duke Energy Carolinas, LLC shall comply with the antitrust conditions delineated in Appendix C to this renewed operating license. (5) Fire Protection Program Duke Energy Carolinas, LLC shall implement and maintain in effect all provisions of the approved fire protection program that complies with 1 O CFR 50.48(a) and 1 O CFR 50.48(c), as specified in the licensee amendment request dated September 25, 2013, as supplemented by letters dated January 13, 2015; January 28, 2015; February 27, 2015; March 30, 2015; April 28, 2015; July 15, 2015; August 14, 2015; September 3, 2015; December 11, 2015; January 7, 2016; March 23, 2016; June 15, 2016; August 2, 2016; September 7, 2016; and January 26, 2017, as approved in the SE dated February 8, 2017. Except where NRC approval for changes or deviations is required by 10 CFR 50.48(c), and provided no other regulation, technical specification, license condition or requirement would require prior NRC approval, the licensee may make changes to the fire protection program without prior approval of the Commission if those changes satisfy the provisions set forth in 10 CFR 50.48(a) and 10 CFR 50.48(c), the change does not require a change to a technical specification or a license condition, and the criteria listed below are satisfied.
Renewed License No. NPF-52 Amendment No. 284