ML17307A242: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:1NRR-PMDAPEm Resource From:Venkataraman, Booma Sent:Friday, November 03, 2017 11:27 AM To:Lashley, Phil H.
{{#Wiki_filter:1 NRR-PMDAPEm Resource From: Venkataraman, Booma Sent: Friday, November 03, 2017 11:27 AM To:Lashley, Phil H.
Cc:Danna, James
Cc: Danna, James


==Subject:==
==Subject:==
ACCEPTANCE REVIEW: Beaver Valley Power St ation Unit No. 1: Modified RTPTS Values and Reactor Vessel Surveillance Capsule Wi thdrawal Schedule (EPID: L-2017-LLL-0024)
ACCEPTANCE REVIEW: Beaver Valley Power St ation Unit No. 1: Modified RTPTS Values and Reactor Vessel Surveillance Capsule Wi thdrawal Schedule (EPID: L-2017-LLL-0024)
Expires:Tuesday, January 02, 2018 12:00 AMPhil,  By letter dated October 6, 2017 (Agencywide Documents Access and Management System Accession No. ML17284A195), FirstEnergy Nuclear Operating Company (FENOC, the licensee), in accordance with 10 CFR 50.61(b)(1) and 10 CFR 50.61(c)(3), submitted a request for approval of the modified pressurized thermal shock reference temperature values (RTPTS) for Beaver Valley Power Station (Beaver Valley), Unit No. 1, reactor vessel beltline and extended beltline region materials. In accordance with the surveillance criteria of 10 CFR 50, Appendix H, Section III.B.3, FENOC also requested approval of the proposed changes to Beaver Valley Unit No. 1 reactor vessel material irradiation surveill ance capsule withdrawal schedule in the letter.
Expires: Tuesday, January 02, 2018 12:00 AMPhil,  By letter dated October 6, 2017 (Agencywide Documents Access and Management System Accession No. ML17284A195), FirstEnergy Nuclear Operating Company (FENOC, the licensee), in accordance with 10 CFR 50.61(b)(1) and 10 CFR 50.61(c)(3), submitted a request for approval of the modified pressurized thermal shock reference temperature values (RTPTS) for Beaver Valley Power Station (Beaver Valley), Unit No. 1, reactor vessel beltline and extended beltline region materials. In accordance with the surveillance criteria of 10 CFR 50, Appendix H, Section III.B.3, FENOC also requested approval of the proposed changes to Beaver Valley Unit No. 1 reactor vessel material irradiation surveill ance capsule withdrawal schedule in the letter.
The purpose of this e-mail is to provide the results of the U.S.
The purpose of this e-mail is to provide the results of the U.S.
Nuclear Regulatory Commission (NRC) staff's acceptance review of the above request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Nuclear Regulatory Commission (NRC) staff's acceptance review of the above request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Revision as of 11:22, 6 July 2018

2017/11/03 NRR E-mail Capture - Acceptance Review: Beaver Valley Power Station Unit No. 1: Modified Rtpts Values and Reactor Vessel Surveillance Capsule Withdrawal Schedule (EPID: L-2017-LLL-0024)
ML17307A242
Person / Time
Site: Beaver Valley
Issue date: 11/03/2017
From: Booma Venkataraman
Plant Licensing Branch 1
To: Lashley P H
FirstEnergy Corp
References
L-2017-LLL-0024
Download: ML17307A242 (3)


Text

1 NRR-PMDAPEm Resource From: Venkataraman, Booma Sent: Friday, November 03, 2017 11:27 AM To:Lashley, Phil H.

Cc: Danna, James

Subject:

ACCEPTANCE REVIEW: Beaver Valley Power St ation Unit No. 1: Modified RTPTS Values and Reactor Vessel Surveillance Capsule Wi thdrawal Schedule (EPID: L-2017-LLL-0024)

Expires: Tuesday, January 02, 2018 12:00 AMPhil, By letter dated October 6, 2017 (Agencywide Documents Access and Management System Accession No. ML17284A195), FirstEnergy Nuclear Operating Company (FENOC, the licensee), in accordance with 10 CFR 50.61(b)(1) and 10 CFR 50.61(c)(3), submitted a request for approval of the modified pressurized thermal shock reference temperature values (RTPTS) for Beaver Valley Power Station (Beaver Valley), Unit No. 1, reactor vessel beltline and extended beltline region materials. In accordance with the surveillance criteria of 10 CFR 50, Appendix H, Section III.B.3, FENOC also requested approval of the proposed changes to Beaver Valley Unit No. 1 reactor vessel material irradiation surveill ance capsule withdrawal schedule in the letter.

The purpose of this e-mail is to provide the results of the U.S.

Nuclear Regulatory Commission (NRC) staff's acceptance review of the above request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your submittal and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed techni cal review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this request will take approximately 180 hours7.5 days <br />1.071 weeks <br />0.247 months <br /> to complete. The NRC staff expects to complete this review by October 10, 2018 as requested in your October 6, 2017, letter. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staff's initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

2If you have any questions, please contact me at (301) 415-2934.

Sincerely, Booma Booma Venkataraman, P.E. Project Manager, NRR/DORL/LPL1

Office of Nuclear Reactor Regulation Booma.Venkataraman@nrc.gov 301.415.2934

Hearing Identifier: NRR_PMDA Email Number: 3821 Mail Envelope Properties (Booma.Venkataraman@nrc.gov20171103112700)

Subject:

ACCEPTANCE REVIEW: Beaver Valley Power Station Unit No. 1: Modified RTPTS Values and Reactor Vessel Surveillance Capsule Withdrawal Schedule (EPID: L-2017-LLL-0024) Sent Date: 11/3/2017 11:27:11 AM Received Date: 11/3/2017 11:27:00 AM From: Venkataraman, Booma Created By: Booma.Venkataraman@nrc.gov Recipients: "Danna, James" <James.Danna@nrc.gov> Tracking Status: None "Lashley, Phil H." <phlashley@firstenergycorp.com> Tracking Status: None Post Office: Files Size Date & Time MESSAGE 3414 11/3/2017 11:27:00 AM

Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: 1/2/2018 Recipients Received: