ML18115A432: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 20: Line 20:
Commission  
Commission  
Attention:  
Attention:  
Document  
Document Control Desk Washington, DC 20555-0001  
Control Desk Washington,  
NEXT era SEABROOK April 26, 2018 Docket No. 50-443 SBK-L-18082  
DC 20555-0001  
Seabrook Station Response to RlS 2018-02 Preparation  
NEXTera SEABROOK  
April 26, 2018 Docket No. 50-443 SBK-L-18082  
Seabrook  
Station Response  
to RlS 2018-02 Preparation  
and Scheduling  
and Scheduling  
of Operator  
of Operator Licensing  
Licensing  
Examinations  
Examinations  
NextEra Energy Seabrook,  
NextEra Energy Seabrook, LLC has enclosed a response to Regulatory  
LLC has enclosed  
Issue Summary 2018-02, Preparation  
a response  
to Regulatory  
Issue Summary 2018-02,  
Preparation  
and Scheduling  
and Scheduling  
of Operator  
of Operator Licensing  
Licensing  
Examinations.  
Examinations.  
If you have any questions  
If you have any questions  
regarding  
regarding  
this submittal,  
this submittal, please contact me at (603) 773-7932.  
please contact me at (603) 773-7932.  
cc: NRC Region I Administrator  
cc: NRC Region I Administrator  
D. Jackson,  
D. Jackson, NRC Region I J. Poole, NRC Project Manager P. Cataldo, NRC Resident Inspector  
NRC Region I J. Poole, NRC Project Manager P. Cataldo,  
Sincere ly, Licensing  
NRC Resident  
Manager NextEra Energy Seabrook , LLC , P.O. Box 300, Lafayette  
Inspector  
Road , Seabrook, NH 03874   
Sincerely, Licensing  
Manager NextEra Energy Seabrook, LLC, P.O. Box 300, Lafayette  
Road, Seabrook,  
NH 03874   
Enclosure  
Enclosure  
to SBK-L-18082   
to SBK-L-18082   
NRC FORM 536 U.S. NUCLEAR REGULATORY  
NRC FORM 536 U.S. NUCLEAR REGULATORY  
COMMISSION  
COMMISSION  
APPROVED  
APPROVED BY OMB: NO. 3150-0131  
BY OMB: NO. 3150-0131  
EXPIRES: 11/30/2020  
EXPIRES:  
11/30/2020  
(11-2017)  
(11-2017)  
RE"Qql..,->: 0,, OPERA TOR LICENSING  
RE"Qql..,->: 0,, OPERA TOR LICENSING  
Estimated  
Estimated  
burden per response  
burden per response to comply with this voluntary  
to comply with this voluntary  
information  
information  
collection  
collection  
Line 73: Line 54:
collection  
collection  
is used to plan budgets . and resources  
is used to plan budgets . and resources  
for operator  
for operator examinations.  
examinations.  
Send .. 0 comments regarding  
Send .. 0 comments  
burden estimate to the Information  
regarding  
Services Branch (T-2 F43), U.S. Nuclear t; EXAMINATION  
burden estimate  
to the Information  
Services  
Branch (T-2 F43), U.S. Nuclear t; EXAMINATION  
DATA Regulatory  
DATA Regulatory  
Commission,  
Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, """ and to the Desk Officer, Office of Information  
Washington,  
DC20555-0001,  
or by e-mail to lnfocollects.Resource@nrc.gov,  
""" and to the Desk Officer,  
Office of Information  
and Regulatory  
and Regulatory  
Affairs,  
Affairs, NEOB-10202, (3150-0131), Office ..........  
NEOB-10202,  
(3150-0131),  
Office ..........  
.., of Management  
.., of Management  
and Budget Washington,  
and Budget Washington, DC 20503. If a means used to impose an information  
DC 20503. If a means used to impose an information  
collection  
collection  
does not display a  
does not display a  
valid OMB control number, the NRC may not conduct or sponsor,  
valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information  
and a person is not required  
to respond to, the information  
collection.  
collection.  
FACILITY  
FACILITY NRC REGION I I A. PROPOSED EXAMINATION  
NRC REGION I I A. PROPOSED  
EXAMINATION  
PREPARATION  
PREPARATION  
SCHEDULE  
SCHEDULE PROPOSED NUMBER CY2019 CY 2020 CY 2021 CY2022 -------ESTIMATED  
PROPOSED  
NUMBER CY2019 CY 2020 CY 2021 CY2022 -------ESTIMATED  
NUMBER OF LICENSEE-PREPARED  
NUMBER OF LICENSEE-PREPARED  
0 1 0 1 EXAMINATIONS  
0 1 0 1 EXAMINATIONS  
Line 114: Line 76:
NUMBER OF NRG-PREPARED  
NUMBER OF NRG-PREPARED  
0 0 0 0 EXAMINATIONS  
0 0 0 0 EXAMINATIONS  
B. INITIAL OPERATOR  
B. INITIAL OPERATOR LICENSE EXAMINATIONS  
LICENSE EXAMINATIONS  
PROPOSED NUMBER CY2019 CY2020 CY2021 CY2022 ------------NUMBER OF REACTOR 0 8 0 6 OPERATORS  
PROPOSED  
NUMBER CY2019 CY2020 CY2021 CY2022 ------------NUMBER OF REACTOR 0 8 0 6 OPERATORS  
NUMBER OF SENIOR REACTOR 0 4 0 4 OPERATORS-
NUMBER OF SENIOR REACTOR 0 4 0 4 OPERATORS-
INSTANT NUMBER OF SENIOR REACTOR 0 4 0 2 OPERATORS-UPGRADE  
INSTANT NUMBER OF SENIOR REACTOR 0 4 0 2 OPERATORS-UPGRADE  
NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-
NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-
LIMITED PROPOSED  
LIMITED PROPOSED DATES 0 PRIMARY DATE 0 0912112020  
DATES 0 PRIMARY DATE 0 0912112020  
09/12/2022  
09/12/2022  
ALTERNATE  
ALTERNATE  
Line 131: Line 90:
Commission  
Commission  
Attention:  
Attention:  
Document  
Document Control Desk Washington, DC 20555-0001  
Control Desk Washington,  
NEXT era SEABROOK April 26, 2018 Docket No. 50-443 SBK-L-18082  
DC 20555-0001  
Seabrook Station Response to RlS 2018-02 Preparation  
NEXTera SEABROOK  
April 26, 2018 Docket No. 50-443 SBK-L-18082  
Seabrook  
Station Response  
to RlS 2018-02 Preparation  
and Scheduling  
and Scheduling  
of Operator  
of Operator Licensing  
Licensing  
Examinations  
Examinations  
NextEra Energy Seabrook,  
NextEra Energy Seabrook, LLC has enclosed a response to Regulatory  
LLC has enclosed  
Issue Summary 2018-02, Preparation  
a response  
to Regulatory  
Issue Summary 2018-02,  
Preparation  
and Scheduling  
and Scheduling  
of Operator  
of Operator Licensing  
Licensing  
Examinations.  
Examinations.  
If you have any questions  
If you have any questions  
regarding  
regarding  
this submittal,  
this submittal, please contact me at (603) 773-7932.  
please contact me at (603) 773-7932.  
cc: NRC Region I Administrator  
cc: NRC Region I Administrator  
D. Jackson,  
D. Jackson, NRC Region I J. Poole, NRC Project Manager P. Cataldo, NRC Resident Inspector  
NRC Region I J. Poole, NRC Project Manager P. Cataldo,  
Sincere ly, Licensing  
NRC Resident  
Manager NextEra Energy Seabrook , LLC , P.O. Box 300, Lafayette  
Inspector  
Road , Seabrook, NH 03874   
Sincerely, Licensing  
Manager NextEra Energy Seabrook, LLC, P.O. Box 300, Lafayette  
Road, Seabrook,  
NH 03874   
Enclosure  
Enclosure  
to SBK-L-18082   
to SBK-L-18082   
NRC FORM 536 U.S. NUCLEAR REGULATORY  
NRC FORM 536 U.S. NUCLEAR REGULATORY  
COMMISSION  
COMMISSION  
APPROVED  
APPROVED BY OMB: NO. 3150-0131  
BY OMB: NO. 3150-0131  
EXPIRES: 11/30/2020  
EXPIRES:  
11/30/2020  
(11-2017)  
(11-2017)  
RE"Qql..,->: 0,, OPERA TOR LICENSING  
RE"Qql..,->: 0,, OPERA TOR LICENSING  
Estimated  
Estimated  
burden per response  
burden per response to comply with this voluntary  
to comply with this voluntary  
information  
information  
collection  
collection  
Line 184: Line 124:
collection  
collection  
is used to plan budgets . and resources  
is used to plan budgets . and resources  
for operator  
for operator examinations.  
examinations.  
Send .. 0 comments regarding  
Send .. 0 comments  
burden estimate to the Information  
regarding  
Services Branch (T-2 F43), U.S. Nuclear t; EXAMINATION  
burden estimate  
to the Information  
Services  
Branch (T-2 F43), U.S. Nuclear t; EXAMINATION  
DATA Regulatory  
DATA Regulatory  
Commission,  
Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, """ and to the Desk Officer, Office of Information  
Washington,  
DC20555-0001,  
or by e-mail to lnfocollects.Resource@nrc.gov,  
""" and to the Desk Officer,  
Office of Information  
and Regulatory  
and Regulatory  
Affairs,  
Affairs, NEOB-10202, (3150-0131), Office ..........  
NEOB-10202,  
(3150-0131),  
Office ..........  
.., of Management  
.., of Management  
and Budget Washington,  
and Budget Washington, DC 20503. If a means used to impose an information  
DC 20503. If a means used to impose an information  
collection  
collection  
does not display a  
does not display a  
valid OMB control number, the NRC may not conduct or sponsor,  
valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information  
and a person is not required  
to respond to, the information  
collection.  
collection.  
FACILITY  
FACILITY NRC REGION I I A. PROPOSED EXAMINATION  
NRC REGION I I A. PROPOSED  
EXAMINATION  
PREPARATION  
PREPARATION  
SCHEDULE  
SCHEDULE PROPOSED NUMBER CY2019 CY 2020 CY 2021 CY2022 -------ESTIMATED  
PROPOSED  
NUMBER CY2019 CY 2020 CY 2021 CY2022 -------ESTIMATED  
NUMBER OF LICENSEE-PREPARED  
NUMBER OF LICENSEE-PREPARED  
0 1 0 1 EXAMINATIONS  
0 1 0 1 EXAMINATIONS  
Line 225: Line 146:
NUMBER OF NRG-PREPARED  
NUMBER OF NRG-PREPARED  
0 0 0 0 EXAMINATIONS  
0 0 0 0 EXAMINATIONS  
B. INITIAL OPERATOR  
B. INITIAL OPERATOR LICENSE EXAMINATIONS  
LICENSE EXAMINATIONS  
PROPOSED NUMBER CY2019 CY2020 CY2021 CY2022 ------------NUMBER OF REACTOR 0 8 0 6 OPERATORS  
PROPOSED  
NUMBER CY2019 CY2020 CY2021 CY2022 ------------NUMBER OF REACTOR 0 8 0 6 OPERATORS  
NUMBER OF SENIOR REACTOR 0 4 0 4 OPERATORS-
NUMBER OF SENIOR REACTOR 0 4 0 4 OPERATORS-
INSTANT NUMBER OF SENIOR REACTOR 0 4 0 2 OPERATORS-UPGRADE  
INSTANT NUMBER OF SENIOR REACTOR 0 4 0 2 OPERATORS-UPGRADE  
NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-
NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-
LIMITED PROPOSED  
LIMITED PROPOSED DATES 0 PRIMARY DATE 0 0912112020  
DATES 0 PRIMARY DATE 0 0912112020  
09/12/2022  
09/12/2022  
ALTERNATE  
ALTERNATE  

Revision as of 01:08, 6 July 2018

Seabrook Station - Response to RIS 2018-02: Preparation and Scheduling of Operator Licensing Examinations
ML18115A432
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 04/26/2018
From: Browne K J
NextEra Energy Seabrook
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS 2018-002, SBK-L-18082
Download: ML18115A432 (3)


See also: RIS 2018-02

Text

U. S. Nuclear Regulatory

Commission

Attention:

Document Control Desk Washington, DC 20555-0001

NEXT era SEABROOK April 26, 2018 Docket No. 50-443 SBK-L-18082

Seabrook Station Response to RlS 2018-02 Preparation

and Scheduling

of Operator Licensing

Examinations

NextEra Energy Seabrook, LLC has enclosed a response to Regulatory

Issue Summary 2018-02, Preparation

and Scheduling

of Operator Licensing

Examinations.

If you have any questions

regarding

this submittal, please contact me at (603) 773-7932.

cc: NRC Region I Administrator

D. Jackson, NRC Region I J. Poole, NRC Project Manager P. Cataldo, NRC Resident Inspector

Sincere ly, Licensing

Manager NextEra Energy Seabrook , LLC , P.O. Box 300, Lafayette

Road , Seabrook, NH 03874

Enclosure

to SBK-L-18082

NRC FORM 536 U.S. NUCLEAR REGULATORY

COMMISSION

APPROVED BY OMB: NO. 3150-0131

EXPIRES: 11/30/2020

(11-2017)

RE"Qql..,->: 0,, OPERA TOR LICENSING

Estimated

burden per response to comply with this voluntary

information

collection

request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This 41 "' information

collection

is used to plan budgets . and resources

for operator examinations.

Send .. 0 comments regarding

burden estimate to the Information

Services Branch (T-2 F43), U.S. Nuclear t; EXAMINATION

DATA Regulatory

Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, """ and to the Desk Officer, Office of Information

and Regulatory

Affairs, NEOB-10202, (3150-0131), Office ..........

.., of Management

and Budget Washington, DC 20503. If a means used to impose an information

collection

does not display a

valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information

collection.

FACILITY NRC REGION I I A. PROPOSED EXAMINATION

PREPARATION

SCHEDULE PROPOSED NUMBER CY2019 CY 2020 CY 2021 CY2022 -------ESTIMATED

NUMBER OF LICENSEE-PREPARED

0 1 0 1 EXAMINATIONS

ESTIMATED

NUMBER OF NRG-PREPARED

0 0 0 0 EXAMINATIONS

B. INITIAL OPERATOR LICENSE EXAMINATIONS

PROPOSED NUMBER CY2019 CY2020 CY2021 CY2022 ------------NUMBER OF REACTOR 0 8 0 6 OPERATORS

NUMBER OF SENIOR REACTOR 0 4 0 4 OPERATORS-

INSTANT NUMBER OF SENIOR REACTOR 0 4 0 2 OPERATORS-UPGRADE

NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-

LIMITED PROPOSED DATES 0 PRIMARY DATE 0 0912112020

09/12/2022

ALTERNATE

DATE 0 10/05/2020

09/26/2022

NRC FORM 536 (11-2017)

U. S. Nuclear Regulatory

Commission

Attention:

Document Control Desk Washington, DC 20555-0001

NEXT era SEABROOK April 26, 2018 Docket No. 50-443 SBK-L-18082

Seabrook Station Response to RlS 2018-02 Preparation

and Scheduling

of Operator Licensing

Examinations

NextEra Energy Seabrook, LLC has enclosed a response to Regulatory

Issue Summary 2018-02, Preparation

and Scheduling

of Operator Licensing

Examinations.

If you have any questions

regarding

this submittal, please contact me at (603) 773-7932.

cc: NRC Region I Administrator

D. Jackson, NRC Region I J. Poole, NRC Project Manager P. Cataldo, NRC Resident Inspector

Sincere ly, Licensing

Manager NextEra Energy Seabrook , LLC , P.O. Box 300, Lafayette

Road , Seabrook, NH 03874

Enclosure

to SBK-L-18082

NRC FORM 536 U.S. NUCLEAR REGULATORY

COMMISSION

APPROVED BY OMB: NO. 3150-0131

EXPIRES: 11/30/2020

(11-2017)

RE"Qql..,->: 0,, OPERA TOR LICENSING

Estimated

burden per response to comply with this voluntary

information

collection

request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This 41 "' information

collection

is used to plan budgets . and resources

for operator examinations.

Send .. 0 comments regarding

burden estimate to the Information

Services Branch (T-2 F43), U.S. Nuclear t; EXAMINATION

DATA Regulatory

Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, """ and to the Desk Officer, Office of Information

and Regulatory

Affairs, NEOB-10202, (3150-0131), Office ..........

.., of Management

and Budget Washington, DC 20503. If a means used to impose an information

collection

does not display a

valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information

collection.

FACILITY NRC REGION I I A. PROPOSED EXAMINATION

PREPARATION

SCHEDULE PROPOSED NUMBER CY2019 CY 2020 CY 2021 CY2022 -------ESTIMATED

NUMBER OF LICENSEE-PREPARED

0 1 0 1 EXAMINATIONS

ESTIMATED

NUMBER OF NRG-PREPARED

0 0 0 0 EXAMINATIONS

B. INITIAL OPERATOR LICENSE EXAMINATIONS

PROPOSED NUMBER CY2019 CY2020 CY2021 CY2022 ------------NUMBER OF REACTOR 0 8 0 6 OPERATORS

NUMBER OF SENIOR REACTOR 0 4 0 4 OPERATORS-

INSTANT NUMBER OF SENIOR REACTOR 0 4 0 2 OPERATORS-UPGRADE

NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-

LIMITED PROPOSED DATES 0 PRIMARY DATE 0 0912112020

09/12/2022

ALTERNATE

DATE 0 10/05/2020

09/26/2022

NRC FORM 536 (11-2017)