ML14328A667: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ES-301 Administrative Topics Outline Form ES-301-1  Facility:  _Point Beach U1/U2__________________ Date of Examination:  _02/23/2015___ Examination Level:  RO         SRO  Operating Test Number:  _______    2015301   Administrative Topic (see Note) Type Code* Describe activity to be performed Conduct of Operations   R, P  Perform Shutdown Margin Calculation for an Operating Reactor  (2012 NRC) Conduct of Operations       Equipment Control   S, N  Calculate Setpoints for a CW Pump Shift Radiation Control   R, D  Determine a Stay Time for a High Radiation Area Emergency Procedures/Plan   S, D  Activate ERDS NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
{{#Wiki_filter:ES-301 Administrative Topics Outline Form ES-301-1  Facility:  _Point Beach U1/U2__________________
* Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from (N)ew or (M)odified from ES-301 Administrative Topics Outline Form ES-301-1  Facility:  _Point Beach U1/U2__________________ Date of Examination:  _02/23/2015___ Examination Level:  RO         SRO  Operating Test Number:   __2015301        Administrative Topic (see Note) Type Code* Describe activity to be performed Conduct of Operations   R, P  Verify Shutdown Margin Calculation for an Operating Reactor (2012 NRC) Conduct of Operations   R, N  Review Completed Surveillance Equipment Control   R, D  Complete a Technical Specification an Administrative Action Condition Logsheet Radiation Control   S, D  Review Release Permit Emergency Procedures/Plan   R, D  Perform Required Notifications NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
Date of Examination:  _
* Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from (N)ew or (M)odified from}}
02/23/2015___ Examination Level:  RO SRO  Operating Test Number:  _______    2015301 Administrative Topic (see Note) Type Code* Describe activity to be performed Conduct of Operations R, P  Perform Shutdown Margin Calculation for an Operating Reactor  (2012 NRC)
Conduct of Operations Equipment Control S, N  Calculate Setpoints for a CW Pump Shift
 
Radiation Control R, D  Determine a Stay Time for a High Radiation Area
 
Emergency Procedures/Plan S, D  Activate ERDS NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
* Type Codes & Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from (N)ew or (M)odified from
 
ES-301 Administrative Topics Outline Form ES-301-1  Facility:  _Point Beach U1/U2__________________
Date of Examination:  _
02/23/2015___ Examination Level:  RO SRO  Operating Test Number:
__2015301        Administrative Topic (see Note) Type Code* Describe activity to be performed Conduct of Operations R, P  Verify Shutdown Margin Calculation for an Operating Reactor (2012 NRC)
Conduct of Operations R, N  Review Completed Surveillance Equipment Control R, D  Complete a Technical Specification an Administrative Action Condition Logsheet Radiation Control S, D  Review Release Permit Emergency Procedures/Plan R, D  Perform Required Notifications NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
* Type Codes & Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from (N)ew or (M)odified from}}

Revision as of 07:27, 1 July 2018

2015 Point Beach Nuclear Power Plant Initial License Examination Form ES-301-1
ML14328A667
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/06/2015
From: McNeil D R
NRC/RGN-III/DRS/OLB
To:
Shared Package
ML14328A659 List:
References
Download: ML14328A667 (2)


Text

ES-301 Administrative Topics Outline Form ES-301-1 Facility: _Point Beach U1/U2__________________

Date of Examination: _

02/23/2015___ Examination Level: RO SRO Operating Test Number: _______ 2015301 Administrative Topic (see Note) Type Code* Describe activity to be performed Conduct of Operations R, P Perform Shutdown Margin Calculation for an Operating Reactor (2012 NRC)

Conduct of Operations Equipment Control S, N Calculate Setpoints for a CW Pump Shift

Radiation Control R, D Determine a Stay Time for a High Radiation Area

Emergency Procedures/Plan S, D Activate ERDS NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Type Codes & Criteria:

(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from (N)ew or (M)odified from

ES-301 Administrative Topics Outline Form ES-301-1 Facility: _Point Beach U1/U2__________________

Date of Examination: _

02/23/2015___ Examination Level: RO SRO Operating Test Number:

__2015301 Administrative Topic (see Note) Type Code* Describe activity to be performed Conduct of Operations R, P Verify Shutdown Margin Calculation for an Operating Reactor (2012 NRC)

Conduct of Operations R, N Review Completed Surveillance Equipment Control R, D Complete a Technical Specification an Administrative Action Condition Logsheet Radiation Control S, D Review Release Permit Emergency Procedures/Plan R, D Perform Required Notifications NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Type Codes & Criteria:

(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from (N)ew or (M)odified from