ML15112B177: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UFUNIVERSITY ofCollege of EngineeringUF Training Reactor FacilityPO Box 118300Gainesville, FL 32611-8300352-294-2104bshea@ufl.eduApril 7, 2015U.S. Nuclear Regulatory CommissionATTN: Document Control DeskWashington, D.C. 20555-000110CFR50.54(p); License Amendment 27UFTR Operating License R-56, Docket 50-83
{{#Wiki_filter:UFUNIVERSITY ofCollege of Engineering UF Training Reactor FacilityPO Box 118300Gainesville, FL 32611-8300 352-294-2104 bshea@ufl.edu April 7, 2015U.S. Nuclear Regulatory Commission ATTN: Document Control DeskWashington, D.C. 20555-0001 10CFR50.54(p);
License Amendment 27UFTR Operating License R-56, Docket 50-83


==Subject:==
==Subject:==
Security Plan Changes Performed Under 10 CFR 50.54(p); Final SecurityProcedures with RAI Responses IncorporatedNOTICE: When separated from Safeguards Information designated as SafeguardsInformation -Modified Handling attachment, this document is decontrolledprovided the transmittal document does not otherwise warrant protection fromunauthorized disclosure.The UFTR has revised its Security Plan to incorporate RAI responses. A report of thechanges and a copy of the revised Security Plan and supporting procedures are attached.The revisions have been reviewed and approved by UFTR management and by the ExecutiveCommittee of the Reactor Safety Review Subcommittee.The changes have been evaluated for impact on security effectiveness and the determinationmade that no loss of security effectiveness results from these changes.I declare under penalty of perjury that the foregoing and attached are true and correct to myknowledge.Executed on April 7, 2015.ThFlýBrian SheaReactor ManagerThe Foundation for The Gator NationAn Equal Opportunity Institution}}
Security Plan Changes Performed Under 10 CFR 50.54(p);
Final SecurityProcedures with RAI Responses Incorporated NOTICE: When separated from Safeguards Information designated as Safeguards Information
-Modified Handling attachment, this document is decontrolled provided the transmittal document does not otherwise warrant protection fromunauthorized disclosure.
The UFTR has revised its Security Plan to incorporate RAI responses.
A report of thechanges and a copy of the revised Security Plan and supporting procedures are attached.
The revisions have been reviewed and approved by UFTR management and by the Executive Committee of the Reactor Safety Review Subcommittee.
The changes have been evaluated for impact on security effectiveness and the determination made that no loss of security effectiveness results from these changes.I declare under penalty of perjury that the foregoing and attached are true and correct to myknowledge.
Executed on April 7, 2015.ThFlýBrian SheaReactor ManagerThe Foundation for The Gator NationAn Equal Opportunity Institution}}

Revision as of 02:41, 1 July 2018

Security Plan Changes Performed Under 10 CFR 50.54(p; Final Security Procedures with RAI Responses Incorporated
ML15112B177
Person / Time
Site:
Issue date: 04/07/2015
From: Shea B
Univ of Florida
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML15112B177 (1)


Text

UFUNIVERSITY ofCollege of Engineering UF Training Reactor FacilityPO Box 118300Gainesville, FL 32611-8300 352-294-2104 bshea@ufl.edu April 7, 2015U.S. Nuclear Regulatory Commission ATTN: Document Control DeskWashington, D.C. 20555-0001 10CFR50.54(p);

License Amendment 27UFTR Operating License R-56, Docket 50-83

Subject:

Security Plan Changes Performed Under 10 CFR 50.54(p);

Final SecurityProcedures with RAI Responses Incorporated NOTICE: When separated from Safeguards Information designated as Safeguards Information

-Modified Handling attachment, this document is decontrolled provided the transmittal document does not otherwise warrant protection fromunauthorized disclosure.

The UFTR has revised its Security Plan to incorporate RAI responses.

A report of thechanges and a copy of the revised Security Plan and supporting procedures are attached.

The revisions have been reviewed and approved by UFTR management and by the Executive Committee of the Reactor Safety Review Subcommittee.

The changes have been evaluated for impact on security effectiveness and the determination made that no loss of security effectiveness results from these changes.I declare under penalty of perjury that the foregoing and attached are true and correct to myknowledge.

Executed on April 7, 2015.ThFlýBrian SheaReactor ManagerThe Foundation for The Gator NationAn Equal Opportunity Institution