{{#Wiki_filter:A~NNebraska Public Power DistrictAlways there when you need usNLS2015058April 30, 2015U.S. Nuclear Regulatory CommissionAttention: Document Control DeskWashington, D.C. 20555-0001
{{#Wiki_filter:A~NNebraska Public Power DistrictAlways there when you need usNLS2015058 April 30, 2015U.S. Nuclear Regulatory Commission Attention:
Document Control DeskWashington, D.C. 20555-0001


==Subject:==
==Subject:==
Annual Radioactive Effluent Release Report, Offsite Dose Assessment ManualSubmittal, and the Process Control Program SubmittalCooper Nuclear Station, Docket No. 50-298, DPR-46
 
Annual Radioactive Effluent Release Report, Offsite Dose Assessment ManualSubmittal, and the Process Control Program Submittal Cooper Nuclear Station, Docket No. 50-298, DPR-46


==Dear Sir or Madam:==
==Dear Sir or Madam:==
The purpose of this letter is to transmit to the Nuclear Regulatory Commission (NRC) theCooper Nuclear Station (CNS) Annual Radioactive Effluent Release Report for the periodJanuary 1, 2014, through December 31, 2014. This report is included as Enclosure 1. This letteralso transmits a copy of the current Offsite Dose Assessment Manual (ODAM) as Enclosure 2for the same time period, as well as a copy of the Process Control Program (PCP) as Enclosure 3.The Process Control Program was unchanged in 2014; therefore no summary of changes isbeing provided. These documents are being submitted for NRC use per the requirements ofTechnical Specification 5.6.3 and CNS ODAM Section D 5.3.This letter contains no regulatory commitments.Should you have any questions or require additional information, please contact me at(402) 825-2788.Sincerely,im ShawLicensing Manager/jfEnclosure I -Annual Radioactive Effluent Release Report January 1, 2014 through December31, 2014Enclosure 2 -Offsite Dose Assessment Manual January 1, 2014 through December 31, 2014Enclosure 3 -Process Control Program for Cooper Nuclear StationCOOPER NUCLEAR STATIONCIP.O. Box 98 / Brownville, NE 68321-0098Telephone: (402) 825-3811 / Fax: (402) 825-5211wvw.nppd.com NLS2015058Page 2 of 2cc: Regional Administrator w/ enclosuresUSNRC -Region IVSenior Resident Inspector w/ enclosuresUSNRC -CNSCooper Project Manager w/ enclosuresUSNRC -NRR Project Directorate IV-ICNS Records w/ enclosuresNPG Distribution w/o enclosures}}
The purpose of this letter is to transmit to the Nuclear Regulatory Commission (NRC) theCooper Nuclear Station (CNS) Annual Radioactive Effluent Release Report for the periodJanuary 1, 2014, through December 31, 2014. This report is included as Enclosure  
: 1. This letteralso transmits a copy of the current Offsite Dose Assessment Manual (ODAM) as Enclosure 2for the same time period, as well as a copy of the Process Control Program (PCP) as Enclosure 3.The Process Control Program was unchanged in 2014; therefore no summary of changes isbeing provided.
These documents are being submitted for NRC use per the requirements ofTechnical Specification 5.6.3 and CNS ODAM Section D 5.3.This letter contains no regulatory commitments.
Should you have any questions or require additional information, please contact me at(402) 825-2788.
Sincerely, im ShawLicensing Manager/jfEnclosure I -Annual Radioactive Effluent Release Report January 1, 2014 through December31, 2014Enclosure 2 -Offsite Dose Assessment Manual January 1, 2014 through December 31, 2014Enclosure 3 -Process Control Program for Cooper Nuclear StationCOOPER NUCLEAR STATIONCI P.O. Box 98 / Brownville, NE 68321-0098 Telephone:  
(402) 825-3811  
/ Fax: (402) 825-5211wvw.nppd.com NLS2015058 Page 2 of 2cc: Regional Administrator w/ enclosures USNRC -Region IVSenior Resident Inspector w/ enclosures USNRC -CNSCooper Project Manager w/ enclosures USNRC -NRR Project Directorate IV-ICNS Records w/ enclosures NPG Distribution w/o enclosures}}

Revision as of 01:43, 1 July 2018

Cooper - Submittal of Annual Radioactive Effluent Release Report, Offsite Dose Assessment Manual Submittal, and the Process Control Program
ML15126A429
Person / Time
Site: Cooper Entergy icon.png
Issue date: 04/30/2015
From: Shaw J
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML15126A433 List:
References
NLS2015058
Download: ML15126A429 (2)


Text

A~NNebraska Public Power DistrictAlways there when you need usNLS2015058 April 30, 2015U.S. Nuclear Regulatory Commission Attention:

Document Control DeskWashington, D.C. 20555-0001

Subject:

Annual Radioactive Effluent Release Report, Offsite Dose Assessment ManualSubmittal, and the Process Control Program Submittal Cooper Nuclear Station, Docket No. 50-298, DPR-46

Dear Sir or Madam:

The purpose of this letter is to transmit to the Nuclear Regulatory Commission (NRC) theCooper Nuclear Station (CNS) Annual Radioactive Effluent Release Report for the periodJanuary 1, 2014, through December 31, 2014. This report is included as Enclosure

1. This letteralso transmits a copy of the current Offsite Dose Assessment Manual (ODAM) as Enclosure 2for the same time period, as well as a copy of the Process Control Program (PCP) as Enclosure 3.The Process Control Program was unchanged in 2014; therefore no summary of changes isbeing provided.

These documents are being submitted for NRC use per the requirements ofTechnical Specification 5.6.3 and CNS ODAM Section D 5.3.This letter contains no regulatory commitments.

Should you have any questions or require additional information, please contact me at(402) 825-2788.

Sincerely, im ShawLicensing Manager/jfEnclosure I -Annual Radioactive Effluent Release Report January 1, 2014 through December31, 2014Enclosure 2 -Offsite Dose Assessment Manual January 1, 2014 through December 31, 2014Enclosure 3 -Process Control Program for Cooper Nuclear StationCOOPER NUCLEAR STATIONCI P.O. Box 98 / Brownville, NE 68321-0098 Telephone:

(402) 825-3811

/ Fax: (402) 825-5211wvw.nppd.com NLS2015058 Page 2 of 2cc: Regional Administrator w/ enclosures USNRC -Region IVSenior Resident Inspector w/ enclosures USNRC -CNSCooper Project Manager w/ enclosures USNRC -NRR Project Directorate IV-ICNS Records w/ enclosures NPG Distribution w/o enclosures